AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to correct the CLIN totals in the bid schedule.
Bid opening Date Remains the same
NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jul-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS19B0007
X 9B. DATED (SEE ITEM 11)
12-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jul-2019
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS19B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
CONTINUATION PAGE AMENDMENT 5
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
FFP
All work (includes all plant, labor, and material) for the alterations within the west side of Bldg 1730 as described in the plans and specifications except for work included in items below.
FOB: Destination
NET AMT
0002 1 Job
All work (includes all plant, labor, and material) for the HVAC alterations within the west side of Bldg 1730 as described in the plans and specifications except for work included in items below.
0003 1 Job
All work (includes all plant, labor, and material) for the HVAC controls within the west side Bldg 1730 as described in the plans and specifications except for work included in items below.
0004 1 Job
All work (includes all plant, labor, and material) for the alterations within Bldg 1828 as described in the plans and specifications except for work included in items below.
0005 1 Job
Bldg 1828 as described in the plans and specifications except for work included in items below.
0006 1 Job
All work (includes all plant, labor, and material) for the HVAC controls within Bldg 1828 as described in the plans and specifications except for work included in
0007 1 Job
1829 as described in the plans and specifications except for work included in items
0008 1 Job
Bldg 1829 as described in the plans and specifications except for work included in
0009 1 Job
Bldg 1829 as described in the plans and specifications except for work included in
0010 1 Job
1835 as described in the plans and specifications except for work included in items
0011 1 Job
Bldg 1835 as described in the plans and specifications except for work included in
0012 1 Job
Bldg 1835 as described in the plans and specifications except for work included in
0013 1 Job
All work for the Final Record Drawing Submission (See Section 00 73 00). PRE-
PRICED LINE ITEM
0014 1 Job
OPTION
FFP
Purchase, deliver, and install Furnishings and Appliances, per CID/SID & FF&E packages for the west side of Bldg 1730.
0015 1 Job
OPTION
FFP
Purchase, deliver, and install Furnishings and Appliances, per CID/SID & FF&E packages for Bldg 1828.
0016 1 Job
OPTION
FFP
Purchase, deliver, and install Furnishings and Appliances, per CID/SID & FF&E packages for Bldg 1829.
0017 1 Job
OPTION
FFP
Purchase, deliver, and install Furnishings and Appliances, per CID/SID & FF&E packages for Bldg 1835.
0018 1 Job
OPTION
FFP
Purchase, deliver, and install Furnishings and Appliances, per CID/SID & FF&E packages for Bldg 1928.
0019 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the alterations within Bldg 1928 as described in the plans and specifications.
0020 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the HVAC alterations within Bldg 1928 as described in the plans and specifications.
0021 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the HVAC controls within Bldg 1928 as described in the plans and specifications.
0022 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the canopy within Bldg 1730 as described in the plans and specifications.
0023 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the 1st floor women's locker expansion in Bldg 1828 (labeled as Locker Expansion Rm 138) as described in the plans and specifications.
0024 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the 1st floor heritage room renovation in Bldg 1828 (labeled as Heritage Room No. 143 and Sched. Room No.
144) as described in the plans and specifications.
0025 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the 1st floor restroom renovation in Bldg 1828 as described in the plans and specifications.
0026 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the 2nd floor boom/pilot lounge room renovation in Bldg 1828 (Labeled as Boom Lounge (Room No. 228), Pilot Lounge (Room NO. 227), Flight Commander (Room No. 227A) and Chief Boom (Room 228A).) as described in the plans and specifications.
0027 1 Job
OPTION
FFP
Purchase, deliver, and install furniture for 1st floor heritage room in Bldg 1829 (labeled as Lounge (Room No. 158) drawing 1829 IF111) as described in the plans (IF-111) and specifications.
0028 1 Job
OPTION
FFP
Purchase, deliver, and install furniture for 2nd floor heritage room in Bldg 1829 as described in the plans and specifications.Purchase, deliver, and install furniture for 2nd floor heritage room in Bldg 1829 (The included rooms are: Boom Arts/Operators (Room No. 219), Engineer Arts/Engineers (Room No. 222), Engineer Arts/Engineers (Room No. 236) and Boom Arts/Operators (Room No.
238) and shown on drawings 1829 IF121 and 1829 IF122.) as described in the plans and specifications.
0029 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for renovating the restrooms and lockers for the 1st floor in Bldg 1835 described in the plans and specifications.
0030 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the HVAC alterations and controls within the east side of Bldg 1730 as described in the plans and specifications except for work included in items below.
0031 5,000 Square
Foot
OPTION
All work (includes all plant, labor, and material) for purchase and installation of new carpeting in areas identified by the COR and users. ESTIMATED
QUANTITIES
0032 10,000 Square
Foot
OPTION
FY18 KC46 ALTER OPS & TFI, JBMDL: All work (includes all plant, labor, and material) for painting of additional areas as defined by the COR and users.
ESTIMATED QUANTITIES
TOTAL BASE BID PRICE FOR LINE ITEMS 0001- 0013 _________________
TOTAL OPTIONAL ITEMS PRICE FOR LINE ITEMS 0014- 0032
TOTAL BASE BID + OPTIONAL ITEMS PRICE FOR LINE ITEMS 0001- 0032