T A
S K O
R D
E R N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W Y
O R
K D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K
N Y
S C
A L E
S H
E E
T
D R
A W
IN
G C
O D
E
O F
K C -4
A A
L T
E R B
L D
G S F
O R O
P S A
N D T
F I
A M
U -A
M X
S
J O
IN
T B
A S
E M c G
U
IR
E -D
IX
-L
A K
E H
U R
S T
N E
W J
E R
S E
Y
B U
IL
D
IN
G S
A
N D
W
E
R -1
-D -0
F E
B R
U A
R Y
A N
S I
D :1
L
A K
E S
ID
E C
E N
T R
E W
A Y
S U
IT
E
K N
O X
V
IL
L E T
N
-A
P R -2
:5
G E
N E
R A
L
IN
D
E X O
F D
R A
W
IN
G S
G-002
FOR CONSTRUCTION
V
G A
R S
K E
V
G A
R S
K E
D S
H A
N K
L
IN
G
R
IG
G
IN
S
P T F
L -1
-0
-G
-0 .d w g
IS
S U
E D F
O R C
O N
S T
R U
C T
IO
N -1
-1
P R
O J E
C T -N
O
INDEX OF DRAWINGS
e3enmrt3 Text Box
I
2 I 3
I
BUILDING 1829 I
PLUMBING
257 PD110 OVERALL DEMOLITION FIRST FLOOR PLUMBING PLAN 322
258 PL110 OVERALL FIRST FLOOR PLUMBING PLAN 323
259 PL401 ENLARGED PLANS 324
260 PL601 FIXTURE SCHEDULE S 325
261 PL901 SOMETRIC RI SERS
MECHANICAL 326
262 MD110 OVERALL DEMOLITION FIRST FLOOR HVAC PLAN 327
263 MD120 OVERALL DEMOLITION SECOND FLOOR HVAC PLAN 328
264 MD401 DEMOLITION ENLARGED MECHANICAL ROOM PLANS 329
265 MH110 OVERALL FIRST FLOOR HVAC PLA/',I
266 MH120 OVERALL SECOND FLOOR HVAC PLAN
F 267 MH401 ENLARGED MECHANICAL ROOM PLAN S 330
268 MH402 FIRST FLOOR ENLARGED PLAN 331
269 MH403 SECOND FLOOR ENLARGED PLAN 332
270 MH601 HVAC EQUIPMENT SCHEDULES 333
271 MH602 HVAC EQUIPMENT SCHEDULES
272 MH610 HVAC CONTROLS SYSTEM SCHEMATIC
273 MH611 HOT WATER CONTROLS SYSTEM SCHEMATIC 334
274 MH612 CHILLED WATER CONTROLS SYSTEM SCHEMATIC 335
275 MP110 OVERALL FIRST FLOOR PIPING PLAN 336
276 MP120 OVERALL SECOND FLOOR P IPNG PLAN 337
ELECTRICAL 339
277 ED110 FIRST FLOOR DEMOLITION PLAN -OVERALL 340
E
278 ED120 SECOND FLOOR DEMOLITON PLAN - OVERALL 341
279 EL110 FIRST FLOOR LIGHTING PLAN -OVERALL 342
280 EL111 FIRST FLOOR LIGHTING PLAN - ENLARGED 343
281 EL120 SECOND FLOOR LIGHTING PLAN - OVERALL 344
282 EL121 SECOND FLOOR LIGHTING PLAN - ENLARGED 345
283 EP110 FIRST FLOOR POWER PLAN - OVERALL 346
284 EP120 SECOND FLOOR POWER PLAN - OVERALL 347 - 285 EP121 SECOND FLOOR POWER PLAN - ENLARGED
286 E-601 ONE-LINE Dl<\GRAM
287 E-602 PANEL SCHEDULES 348
TELECOM MUNI CATIONS 350
288 TD110 FIRST FLOOR PLAN - OVERALL 351
289 TD120 SECOND FLOOR PLAN - OVERALL 352
D
290 T-110 FIRST FLOOR PLAN - OVERALL 353
291 T-120 SECOND FLOOR PLAN - OVERALL 354
292 T-121 SECOND FLOOR PLAN - AREA A 355
f 356
293 BUILDING 1928
CIVIL
- 294 C-001 GENERAL NOTES, LEGEND AND AEBREVl<\TIONS 357
295 CS100 SITE LAYOUT PLAN - OVERALL
296 C-501 SITE DETA ILS 359
297 CG100 SO IL EROS ION AND SEDIMENTATION CONTROL PLAN - OVERALL
298 CG501 EROSON CONTROL DETA ILS
STRUCTURAL
i 299 S-101 EXIST NG CMU WALL MODIF ICATION PLAN, SECTION AND DETA ILS
;): 363
IL ARCHITECTURAL
364 � 300 A-003 BU ILDNG SUMMARY INFORMATION
302 AD110 FIRST FLOOR DEMOLITION PLAN -OVERALL
303 AD111 FIRST FLOOR DEMOLITION PLAN - AREA A
304 AD112 FIRST FLOOR DEMOLITION PLAN - AREA B
368 -
301 A-100 LIFE SAFETY PLAN
305 A-110 FIRST FLOOR PLAN - OVERALL
306 A-111 FIRST FLOOR PLAN -AREA A
307 A-112 FIRST FLOOR PLAN -AREA B
308 A-150 REFLECTED CE ILING PLAN - OVERALL
309 A-151 REFLECTED CE ILING PLAN - AREA A
B 310 A-152 REFLECTED CE ILING PLAN - AREA B
311 A-401 FIRST FLOOR PLAN - ENLARGED
312 A-601 DOOR SCHEDULE
INTERIORS
313 IF110 NTERIOR FURN I SHINGS PLAN - OVERALL
314 IF111 ENLARGED INTEROR FURN ISHING PLAN - 379
315 IF112 ENLARGED INTEROR FURNISHING PLAN
316 IN601 FINI SH SCHEDULE
317 IN602 FINI SH SCHEDULE
318 IG110 INTERIOR GRAPHICS PLAN· OVERALL
319 IG111 NTERIOR GRAPHICS PLAN - AREA A
A 320 IG112 NTERIOR GRAPHICS PLAN - AREA B
321 IG601 SIGNAGE SCHEDULE
w
I
I
I
INDEX OF DRAWINGS
BUILDING 1928
FIRE PROTECTION
F-100 SITE PLAN
F-110 F IRST FLOOR PLAN - OVERALL
F-301 SECTIONS
F-401 ENLARGED PLAN
FIRE ALARM
F0110 F IRST FLOOR DEMO PLAN
FA110 F IRST FLOOR PLAN - OVERALL
FM01 F IRST FLOOR ENLARGED PLANS
FA601 DIAGRAMS
PLUMBING
PL110 F IRST FLOOR PLUMBING PLAN - OVERALL
PL401 ENLARGED PLAN
PL601 F IXTURE SCHEDULE S
PL901 SOMETRIC RI SERS
MECHANICAL
MD110 OVERALL DEMOLITION F IRST FLOOR HVAC PLAN
MD401 OVERALL ENLARGED DEMOLITION F IRST FLOOR HVAC PLAN
MD611 DEMOLITK)N HOT WATER BO ILER SYSTEM CONTROL DIAGRAM
MH110 OVERALL F IRST FLOOR HVAC PLAN
MH301 SECTION S
MH401 ENLARGED MECHANICAL ROOM PLAN
MH402 FIRST FLOOR ENLARGED PLAN
MH403 FIRST FLOOR ENLARGED PLAN
MH601 HVAC EQUIPMENT SCHEDUL E S
MH602 HVAC EQUIPMENT SCHEDULE S
MH610 HVAC CONTROLS SYSTEM SCHEMATIC
MH611 HOT WATER CONTROLS SYSTEM SCHEMATIC
MH612 CHILLED WATER CONTROLS SYSTEM SCHEMATIC
MP110 OVERALL F IRST FLOOR P IP ING PLAN
ELECTRICAL
ED110 F IRST FLOOR DEMOLITION PLAN - OVERALL
EL110 F IRST FLOOR LIGHTING PLAN - OVERALL
EL111 FIRST FLOOR LIGHTING PLAN - AREA B, C
EL112 F IRST FLOOR LIGHTING PLAN - AREA A
EP110 FIRST FLOOR POWER PLAN - OVERALL
EP111 F IRST FLOOR POWER PLAN - AREA B, C
EP112 F IRST FLOOR POWER PLAN - AREA A
E-601 ONE-LIN E Dl<\GRAM
E-602 PANEL SCHEDULES
TELECOMMUNICATIONS
TD110 FIRST FLOOR DEMOLITION PLAN - OVERALL
T-110 F IRST FLOOR PLAN - OVERALL
T-111 F IRST FLOOR PLAN - AREA A
T-112 F IRST FLOOR PLAN - AREA B
BUILIOING 1730 EAST HVAC I
MECHANICAL
M-002E MECHANICAL LEGEND
MD111E F IRST FLOOR HVAC PLAN - DEMOLITION
MD404E ENLARGED HVAC PLAN - DEMOLITION
MH111E F IRST FLOOR HVAC PLAN - OVERALL
MH403E ENLARGED HVAC PLANS
MH404E ENLARGED HVAC PLANS
MH603E HVAC EQUIPMENT SCHEDULES
MH604E HVAC EQUIPMENT SCHEDULE S
MH613E HVAC CONTROLS SYSTEM SCHEMATIC
MH614E HOT WATER CONTROLS SYSTEM SCHEMATIC
MH615E CHILLED WATER CONTROLS SYSTEM SCHEMATIC
MP111E F IRST FLOOR PIP ING PLAN - OVERALL
MP403E ENLARGED PIPING PL.ANS
MP404E ENLARGED P IP ING PLANS
ELECTRICAL
ED111E ENLARGED PLAN - DEMOLITION
ED404E F IRST FLOOR PLAN - DEMOLITION
EP403E ENLARGED PLAN
EP404E ENLARGED PLAN
I
7 I 8 I
9 I 10
I m US Army Corps of Engineers ® m ci -z w� ffi w=> 0
►w ow w>< "'" z� z� S2.,:
� c3 (/)C, w . □> □>
0: w w z>- "'
LL(l.)C..>-05...JZ &o::wet:
0oco c.,>-w>-
;��� ,:Z Z
XW
�g?co ::a�-.,:wo Q(/)e, zO:a, �m� o"-
��re u.15� g�� 0: oc, w::Sz
��9 .,:a,=>
�!z al
�Q m
� �;,i; 0 z
0:
(/) z
'-'z0: 0 f2 j:::
0 !e w 0:
(/) (/) (/) w
- 0
0 � uj 8 ci 0 �� z 0 ij'-' "' � I
>-o >- w-z wo 0 �� '-' 0
0":"':
��� 0 U I ,a �� W(f)<!J I . =, '-' 0 (/) (/)<{ i w w uf
-5Q�:j ff](/)�
(!) z _J :i:
WO
Z LL
wo w 0 �
SHEET ID
G-003
FOR CONSTRUCTION
e3enmrt3 Text Box e3enmrt3 Text Box
S K O
R D
E R N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W Y
O R
K D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K
N Y
S C
A L E
S H
E E
T
D R
A W
IN
G C
O D
E
O F
K C -4
A A
L T
E R B
L D
G S F
O R O
P S A
N D T
F I
A M
U -A
M X
S
J O
IN
T B
A S
E M c G
U
IR
E -D
IX
-L
A K
E H
U R
S T
N E
W J
E R
S E
Y
B U
IL
D
IN
G S
A
N D
E
R -1
-D -0
F E
B R
U A
R Y
A N
S I
D :1
L
A K
E S
ID
E C
E N
T R
E W
A Y
S U
IT
E
K N
O X
V
IL
L E T
N
PSV
PI
TI
TT
PI
PI
6" INTAKE
PSV
PI
TI
TT
PI
PI
B-02
WATER BOILER
NO.2 HOT
6" INTAKE
1-1/2" NG
2" HWS
2" HWR
3" HWS
1-1/2" NG
H W
S
H W
R
H W
S
-1 /2
N G
H W
S
45 GPM @ 25 FT. HEAD
BP-02
CIRCULATING PUMP
NO.2 BOILER
45 GPM @ 25 FT. HEAD
BP-01
CIRCULATING PUMP
NO.1 BOILER
HWP-01
WATER SUPPLY PUMP
TO BUILDING HOT
3" HWR
B-01
WATER BOILER
NO.1 HOT
3" BELOW TEE
6 - SEDIMENT TRAP; NIPPLE & CAP MIN.
5 - CHECK VALVE, TYP.
BALL VALVE
4 - PRESSURE GAUGE WITH PIG TAIL &
3 - BOILER CIRCUALTING PUMP, TYP
2 - ANGLE VALVE, DRAIN TYP.
1 - BALL VALVE, TYP
GATE VALVE
11 - GAS PRESSURE GAUGE WITH
10 - BOILER DRAIN VALVE
CONTRACTOR)
(FURNISHED BY CONTROLS
9 - TEMPERATURE TRANSMITTER
8 - TEMPERATURE GAUGE
SET AT 80 PSIG
7 - PRESSURE RELIEF VALVE (FWE)
RECOMMENDATIONS.
PVC TEE PER MANUFACTURER'S
16 - CONDENSATE DRAIN - INSTALL 1"
(EACH BOILER)
15 - GROUND JOINT UNION
14 - 6" EXHAUST VENT CONNECTION
13 - 6" COMBUSTION AIR INTAKE
12 - HOT WATER BOILER, TYP.
VENT TO OUTSIDE
ROOF
6" EXHAUST AIR 6" EXHAUST AIR
(TYPICAL)
BUTTERFLY VALVE
CONNECTOR
FLEXIBLE
Y-STRAINER W/ DRAIN VALVE
CONNECTOR
FLEXIBLE
(TYPICAL)
BUTTERFLY VALVE
CONNECTOR
FLEXIBLE
(TYPICAL)
Y-STRAINER W/ DRAIN VALVE
CONNECTOR
FLEXIBLE
CONNECTOR
FLEXIBLE
OR APPROVED EQUAL.
POSITION. DST MODEL WLC
IN VERTICAL DOWNFLOW
SUITABLE FOR INSTALLATION
WAFER CHECK VALVE,
NON-SLAM, SPRING-ASSISTED
CONNECTOR
FLEXIBLE
M
IN
IM
U M D
IA
M E
T E
R A
IG
H T P
IP
E
OR APPROVED EQUAL.
POSITION. DST MODEL WLC
IN VERTICAL DOWNFLOW
SUITABLE FOR INSTALLATION
WAFER CHECK VALVE,
NON-SLAM, SPRING-ASSISTED
CHW P-3
WATER PUMP
INLINE CHILLED
CHW P-2
WATER PUMP
INLINE CHILLED
CHW P-2 & CHW P-3
WATER PUMPS
INLINE CHILLED
SIDE VIEW - LOOKING WEST FRONT VIEW - LOOKING NORTH
M
IN
IM
U M D
IA
M E
T E
R A
IG
H T P
IP
E
-M
A Y -2
:5
M E
C H
A N
IC
A L
P
IP
IN
G D
E T
A
IL
MP502
J S
M
IT
H
J S
M
IT
H
J
G A
R N
E R
G
R
IG
G
IN
S
P T F
L -1
-0
-M
P .d w g
IS
S U
E D F
O R C
O N
S T
R U
C T
IO
N -1
E1
HOT WATER BOILER PIPING SCHEMATIC - 1730 WEST
SCALE: NONE
C7
INLINE CENTRIFUGAL CHILLED WATER PUMP - 1730 WEST
SCALE: NONE
TA
SK
O R
D
ER
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
KC
-4
6A A
LT
ER
B
LD
G S
FO
R
O
PS
A N
D T
FI
A
M U
-A M
XS
JO
IN
T
BA
SE
M cG
U
IR
E- D
IX
-L
AK
EH
U R
ST
, N
EW
J
ER
SE
Y B
U
IL
D
IN
G S
, 1
8, A N
D
W
2E R
-1 4-
D -0
GRAPHIC SCALE
FE
BR
U
AR
Y
AN
SI
D 1:
L
AK
ES
ID
E C
EN
TR
E W
AY
SU
IT
E
KN
O
XV
IL
LE
, T
N
$P
LO
TD
AT
E $P
LO
TT
IM
E
C
IV
IL
C
AN
O
PY
P
LA
N
CP100
FOR CONSTRUCTION
E.
N
EP
ER
U D
J.
P
AL
M
ER
J.
B
AU
D
R Y
G . R
IG
G
IN
S
PT
FL
-1
-1
0-
C P1
.d w g
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
-1 2-
10' 20'0
A. LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES AS
INDICATED HAVE BEEN OBTAINED FROM FIELD SURVEYS.
UNDERGROUND STRUCTURES AND UTILITIES MAY BE PRESENT
WHICH ARE NOT DOCUMENTED OR LOCATED.
B. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD-VERIFY
EXISTING STRUCTURES, UTILITIES, AND SURVEY INFORMATION,
AND TO TAKE NECESSARY PRECAUTIONS DURING DEMOLITION AND
CONSTRUCTION. THE CONTRACTOR SHALL FIELD CHECK ALL
EXISTING CONDITIONS AND BE THOROUGHLY FAMILIAR WITH THE
SITE BEFORE ANY WORK COMMENCES. ANY DISCREPANCIES IN THE
DRAWINGS SHALL BE IMMEDIATELY REPORTED TO THE
CONTRACTING OFFICER BEFORE ANY FURTHER WORK
COMMENCES. IN THE EVENT AN UNEXPECTED UTILITY OR
STRUCTURE IS ENCOUNTERED, THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.
C. PROTECT IN PLACE ALL EXISTING UNDERGROUND UTILITIES,
UNLESS NOTED OTHERWISE.
D. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS NOT
TO BE DAMAGED DURING DEMOLITION AND CONSTRUCTION. THE
CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED OR
DISTURBED ITEMS TO THE SATISFACTION OF THE CONTRACTING
OFFICER AT NO EXPENSE TO THE GOVERNMENT.
E. PROVIDE WATER TIGHT SEAL BETWEEN CANOPY AND EXISTING
VESTIBULE AT BUILDING 1730.
F. HIGH SIDE OF CANOPY SHALL BE LIMITED TO 10 FEET 6 INCHES.
THIS IS TO AVOID CONFLICTS WITH THE EXISTING BUILDING ROOF
OVERHANG.
G. OVERALL CANOPY AREA IS APPROXIMATELY 2730 SQUARE FEET.
H. TOTAL AREA OF IMPERVIOUS SURFACE ADDED TO THE SITE IS
APPROXIMATELY 845 SQUARE FEET.
I. EXISTING ROOF GUTTERS, DOWNSPOUTS, AND DRAINS SHALL
REMAIN IN PLACE. NEW CANOPY SHALL NOT INTERFERE WITH THE
EXISTING ROOF DRAINAGE.
J. FOR SPECIFICATION INFORMATION ON CANOPY, REFER TO
SPECIFICATION 10 73 26, WALKWAY COVERS.
K. FOR ARCHITECTURAL FLOOR PLAN, ENLARGED PLAN, AND SECTION
OF THIS CANOPY, SEE DRAWING 1730-A-160.
L. FOR ARCHITECTURAL ELEVATIONS OF THIS CANOPY, SEE DRAWING
1730-A-260.
GENERAL SHEET NOTES
SHEET KEYNOTES
1. CANOPY BETWEEN BUILDING 1730 AND BUILDING 1758, CENTERED
ON SIDEWALKS. ROOF SLOPES AS SHOWN (1/4" PER FOOT).
2. CONCRETE FOOTING FOR CANOPY SUPPORT COLUMNS.
3. STEEL SUPPORT COLUMNS, 30 TOTAL LOCATIONS.
4. BUILT-IN ROOF GUTTER, ALONG LOW SIDE OF CANOPY.
5. DOWNSPOUT, TYPICAL 6 LOCATIONS.
6. SPLASHBLOCK, TYPICAL AT ALL DOWNSPOUTS.
7. EXISTING CONCRETE SIDEWALK (PROTECT IN PLACE), TYP.
8. EXISTING CANOPY OR VESTIBULE (PROTECT IN PLACE), TYP.
9. EXISTING BRICK WALL ON EXISTING VESTIBULE (BLDG 1730)
(PROTECT IN PLACE). SEE NOTE E.
10. EXISTING COLUMNS ON EXISTING CANOPY (BLDG 1758) (PROTECT
IN PLACE).
11. EXISTING UNDERGROUND WATER LINE (PROTECT IN PLACE), TYP.
12. EXISTING UNDERGROUND STORM DRAIN AND INLETS (PROTECT IN
PLACE), TYP.
13. EXISTING LIGHT BOLLARDS, REMOVE, SALVAGE, AND REINSTALL.
LOCATE LIGHT BOLLARDS TO COMPLIMENT THE CANOPY COLUMN
SPACING.
14. EXISTING UNDERGROUND ELECTRICAL CABLES, REMOVE AND
REINSTALL TO ACCOMMODATE NEW CANOPY COLUMN AND LIGHT
BOLLARD LOCATIONS.
15. LOCATION WHERE EXISTING ROOF EAVE AND/OR EXISTING CANOPY
EAVE OVERHANGS LIMITS OF NEW CANOPY.
16. EXISTING ASPHALT PAVEMENT, PROTECT IN PLACE. REPAIR AREAS
DISTURBED DURING CONSTRUCTION.
17. EXTERIOR FACE OF EXISTING BUILDING AS SURVEYED.
18. EXISTING SANITARY SEWER LINE (PROTECT IN PLACE).
19. EXISTING GRASS. PROTECT IN PLACE AND/OR RESOD AREAS
DISTURBED DURING CONSTRUCTION.
20. ROOF OVERHANG FOR BUILDING 1758.
AP
R
IL
N
DD FORM 1391 LIMITATION SQ. METERS SQ. FEET
BUILDING 1730 CANOPY 291 3,132
AS DESIGNED - CANOPY SQ. METERS SQ. FEET
BUILDING 1730 CANOPY 254 2,730
1 7
H
T A
S K O
R D
E R N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W Y
O R
K D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K
N Y
S C
A L E
S H
E E
T
D R
A W
IN
G C
O D
E
O F
K C -4
A A
L T
E R B
L D
G S F
O R O
P S A
N D T
F I
A M
U -A
M X
S
J O
IN
T B
A S
E M c G
U
IR
E -D
IX
-L
A K
E H
U R
S T
N E
W J
E R
S E
Y
B U
IL
D
IN
G S
A
N D
E
R -1
-D -0
KEY PLAN
F E
B R
U A
R Y
A N
S I
D :1
L
A K
E S
ID
E C
E N
T R
E W
A Y
S U
IT
E
K N
O X
V
IL
L E T
N
N
1 2 3 4 5 6 7
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7
A
B
C
D
E
F
G
H
PRIOR TO BEGINNING DEMOLITION ACTIVITIES.
CONFIGURATION OF EXISTING SYSTEMS AND ELEMENTS IN FIELD
RECORD DOCUMENTS NOT PRODUCED BY JACOBS. CONFIRM ACTUAL
ILLUSTRATION OF EXISTING CONDITIONS TAKEN FROM GOVERNMENT B.
GENERAL NOTES.
SEE SHEET M-001 FOR SYMBOLS, ABBREVIATIONS AND A.
GENERAL SHEET NOTES
SHEET KEYNOTES
WITH NEW DDC CONTROL SYSTEM.
DEMOLISH EXISTING PNEUMATIC CONTROL PANEL, TO BE REPLACED 14.
PROVIDE DOUBLE BLOCK AND BLEED VALVE.
DEMOLISH NATURAL GAS LINE BACK TO LOCATION INDICATED AND
BOILER VENT LINES. DEMOLISH BOILER HOUSEKEEPING PAD.
(BP-1) COMPLETELY, INCLUDING ALL PRIMARY HOT WATER LINES AND
DEMOLISH EXISTING BOILER (B-1) AND BOILER CIRCULATION PUMP 13.
TO REMAIN.
SEPARATOR (AS-1), EXPANSION TANK (ET-1) AND CHEM FEEDER (CF-1)
AND TEMPORARILY CAP. EXISTING HOT WATER PUMP (HWP-1), AIR
HANDLING UNIT AHU-1 BACK TO THE LOCATIONS INDICATED. VALVE
DEMOLISH HOT WATER SUPPLY & RETURN PIPING SERVING AIR 12.
CONSTRUCTION PROJECT.
EXISTING GAS METER TO REMAIN OPERATIONAL THROUGHOUT 11.
UNDER BID ITEM #0030 SCOPE.
REFER TO DWG MD-111 & MD-404 FOR DEMO WORK TO BE PERFORMED
EXISTING CONDENSING UNITS TO REMAIN UNDER BID ITEM #0002. 10.
REQUIRED TO SUPPORT NEW AIR COOLED CHILLER.
HOUSEKEEPING PAD TO REMAIN AND BE RE-USED AND MODIFIED AS
DIRECTED OTHERWISE BY THE BASE. EXISTING CONCRETE
REFRIGERANT. REMOVE REFRIGERANT FROM THE SITE, UNLESS
SHALL BE DEMOLISHED COMPLETELY, AFTER RECOVERING
PIPING AND SPECIALTIES, SERVING EXISTING AIR HANDLING UNIT AHU-1
EXISTING AIR COOLED CONDENSING UNIT, CU-1, AND ALL REFRIGERANT 9.
SCREEN IS PRESENT.
INSECT SCREEN TO BACKSIDE OF EXISTING LOUVER IF NO INSECT
LOUVERS IN SOFFIT TO REMAIN AND SHALL BE RE-USED. PROVIDE
UNDERSIDE OF BUILDING EXTERIOR SOFFIT. EXHAUST DISCHARGE
DEMOLISHED BACK TO EXHAUST DISCHARGE LOUVER MOUNTED IN
EXISTING TOILET ROOM EXHAUST FANS AND DUCTWORK ARE TO BE 8.
TO REMAIN.
DEMOLISHED DUCTWORK PENETRATES EXISTING WALLS SCHEDULED
TO BACK SIDE OF LOUVER. PATCH ALL WALL PENETRATIONS WHERE
SOFFIT. LOUVER IN SOFFIT TO REMAIN. APPLY SHEET METAL BLANK OFF
COMPLETELY TO OUTDOOR AIR DISCHARGE LOUVER INSTALLED IN
WOMEN'S RESTROOMS. DUCTWORK SHALL BE DEMOLISHED
DEMOLISH EXHAUST FANS AND DUCTWORK SERVING MEN'S AND 7.
TAKE-OFF.
BACK TO MAIN. CAP, SEAL, AND INSULATE BRANCH DUCT AT MAIN
DEMOLISH EXISTING SUPPLY AIR DIFFUSERS AND BRANCH DUCTWORK 6.
DOWNSTREAM EXISTING TO REMAIN.
DUCTWORK UPSTREAM TO BE DEMOLISHED, ALL DUCTWORK
CAP, SEAL, AND INSULATE EXISTING 10" RND. R.A. DUCTWORK. ALL 5.
UPSTREAM EXISTING TO REMAIN.
DUCTWORK DOWNSTREAM TO BE DEMOLISHED, ALL DUCTWORK
CAP, SEAL, AND INSULATE EXISTING 15" RND. S.A. DUCTWORK. ALL 4.
WORK TO BE PERFORMED UNDER BID ITEM #0030 SCOPE.
UNDER BID ITEM #0002. REFER TO DWG MD-111 & MD-404 FOR DEMO
PORTION OF THE BUILDING, INCLUDING OUTSIDE AIR DUCT, TO REMAIN
EXISTING MULTI-ZONE AIR HANDLING UNIT AHU-2 SERVING THE EAST 3.
SHALL REMAIN IN PLACE.
AHU-2 OUTSIDE AIR DUCTWORK WHICH CONNECTS TO SAME LOUVER
DEMOLISH AHU-1 OUTSIDE AIR DUCTWORK BACK TO EXISTING LOUVER.
AND MODIFIED AS REQUIRED TO SUPPORT NEW AIR HANDLING UNIT.
EXISTING CONCRETE HOUSEKEEPING PAD TO REMAIN AND BE RE-USED
PORTION OF THE BUILDING TO BE DEMOLISHED COMPLETELY.
EXISTING MULTI-ZONE AIR HANDLING UNIT AHU-1 SERVING THE WEST 2.
COMPLETELY IN THIS AREA.
DIFFUSERS, GRILLES, HANGERS, SUPPORTS, AND ACCESSORIES
DEMOLISH ALL AHU-1 SUPPLY AND RETURN HVAC DUCTWORK, 1.
B4
FIRST FLOOR HVAC PLAN - DEMOLITION - 1730 WEST
SCALE: 3/32"=1'-0"
0 8' 32'16'
F
IL
E N
A M
E
P L
O T D
A T
E
P L
O T T
IM
E
-M
A Y -2
:5
M E
C H
A N
IC
A L
F
IR
S T F
L O
O R H
V A
C P
L A
N D
E M
O L
IT
IO
N
MD110
FOR CONSTRUCTION
J S
M
IT
H
J S
M
IT
H
J
G A
R N
E R
G
R
IG
G
IN
S
P T F
L -1
-1
-M
D .d w g
IS
S U
E D F
O R C
O N
S T
R U
C T
IO
N -1
11 10
AHU-1
AHU-2
CU-1
CU-2
CU-3
HW P-1
B-1
HWR
HWS
EXISTING
LEGEND
(E)AS-1
(E)HWP-1
(E)AHU-2
(E)60"x24" SA
(E )3
H
W S
(E )3
H
W R
(E) 2" HWR FRM AHU-2
(E) 2" HWS TO AHU-2
(E)3" HWS
TO AHU-2
(E)30"x30" OA
T A
S K O
R D
E R N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W Y
O R
K D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K
N Y
S C
A L E
S H
E E
T
D R
A W
IN
G C
O D
E
O F
K C -4
A A
L T
E R B
L D
G S F
O R O
P S A
N D T
F I
A M
U -A
M X
S
J O
IN
T B
A S
E M c G
U
IR
E -D
IX
-L
A K
E H
U R
S T
N E
W J
E R
S E
Y
B U
IL
D
IN
G S
A
N D
E
R -1
-D -0
F E
B R
U A
R Y
A N
S I
D :1
L
A K
E S
ID
E C
E N
T R
E W
A Y
S U
IT
E
K N
O X
V
IL
L E T
N
C B
DISC
A
DEMOLITION ACTIVITIES.
SYSTEMS AND ELEMENTS IN FIELD PRIOR TO BEGINNING
JACOBS. CONFIRM ACTUAL CONFIGURATION OF EXISTING
GOVERNMENT RECORD DOCUMENTS NOT PRODUCED BY
ILLUSTRATION OF EXISTING CONDITIONS TAKEN FROM B.
NOTES.
SEE SHEET M-001 FOR SYMBOLS, ABBREVIATIONS AND GENERAL A.
GENERAL SHEET NOTES
SHEET KEYNOTES
-M
A Y -2
:5
M E
C H
A N
IC
A L
H V
A C S
E C
T
IO
MH301
J S
M
IT
H
J S
M
IT
H
J
G A
R N
E R
G
R
IG
G
IN
S
P T F
L -1
-1
-M
H .d w g
IS
S U
E D F
O R C
O N
S T
R U
C T
IO
N -1
D4
SECTION - 1730 WEST
SCALE: 1/4" = 1'-0"
EXISTING CONCRETE
HOUSEKEEPING PAD
0 4' 8'2'
24"x48" SA
8"x8" EXH
A4
SECTION - 1730 WEST
SCALE: 1/4" = 1'-0"
EF-1
AHU-1
6"x6" EXHAUST
48"x24" SA
20"x24" SA12"x12" SA
10"x10" SA
VAV-103
24"x42" RA26"x32" RA
24"x42" RA
22"x22" RA 22"x22" RA
AHU-1
CHWR
4" CHWS/
TO AHU-1
1-1/2" HWS/HWR
BF-1
4" CHWR
4" CHWS/CHWR
2" HWS
EXISTING CONSTRUCTION
NEW WORK
LEGEND
DSDCEILING
ATTIC
B8
MH501
B8
MH501
E8
MH502
E8
MH502
E1
MH502
CEILING
ATTIC
DSD
C5
MH501
C H
W S
C H
W R
-1 /2
H W
S
-1 /2
H W
R
4" CHWR
4" CHWS
CH-1
AS-2
C1
MP501
3" HWR
TO WEST SIDE VAV'S
2" HWS/R
B-1 B-2
BP-1
TYP. 2
6" BOILER INTAKE
E1
MP502
3" HWS/R DN TO BOILERS
TYP. 2
1-1/2" NG
2" HWR
2" HWS
B-2
B-1
TYP. 2
2" HWR
1-1/2" NG
2" HWS
HWR
3" HWS/
18"x24" OA
TO AHU-1
2" CHWS/CHWR
BP-1
BP-2
HWR
3" HWS/ TYP. 2
INTAKE
6" BOILER
MANUFACTURER'S RECOMMENDATIONS.
PIPE. ENSURE ADEQUATE CLEARANCE AND SUPPORT PER
CHILLED WATER PUMP CHW P-3 IN PARALLEL IN VERTICAL CHWR
INSTALL INLINE CHILLED WATER PUMP CHW P-2 AND STANDBY 10.
MECHANICAL ROOM.
PROVIDE SHUTOFF VALVES ON PIPES ENTERING AND LEAVING 9.
INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
VENDOR-PROVIDED TERMINATION COUPLING AND BIRD SCREEN.
6" EXHAUST AIR FROM BOILER B-01 & B-02. INSTALL 8.
PER MANUFACTURER'S RECOMMENDATIONS.
VENDOR-PROVIDED INTAKE ELBOW AND BIRD SCREEN. INSTALL
6" COMBUSTION AIR INTAKE TO BOILERS B-01 & B-02. INSTALL 7.
CLAMPS.
BASE. FASTEN PIPE TO CROSSBEAM WITH MULTI-STRUT PIPE
CROSSBEAM AND UPRIGHTS. BOLT UPRIGHTS TO CONCRETE
GRADE WITH 1 5/8" X 1 5/8", 12 GAUGE GALVANIZED STEEL STRUT
SUPPORT EXTERIOR CHILLED WATER PIPING CL 1'-2" ABOVE 6.
#0030 SCOPE.
DRAWING MP-404 FOR WORK TO BE COMPLETED UNDER BID ITEM
AND RETURN BRANCHES UNDER BID ITEM #0002. REFER TO
PROVIDE SHUTOFF VALVE AND CAP 3" CHILLED WATER SUPPLY 5.
AND TIE INTO EXISTING AHU-2 HWR LINE.
2" HOT WATER RETURN FROM AHU-2. PROVIDE SHUTOFF VALVE 4.
VALVE AND TIE INTO EXISTING NATURAL GAS MAIN.
1-1/2" NATURAL GAS LINE. PROVIDE DOUBLE BLOCK & BLEED 3.
PROVIDE SHUTOFF VALVE AND TIE INTO EXISTING 3" HWS LINE..
2" HOT WATER SUPPLY FROM EXISTING HOT WATER PUMP HWP-1. 2.
TIE INTO EXISTING 3" HWR LINE AT AIR SEPARATOR INLET.
3" HOT WATER RETURN TO EXISTING HOT WATER PUMP HWP-1. 1.
8"x8" EXH
M
IN
M
IN
6" BOILER EXHAUST
AHU-1TO
42"x24" RA
E5
MP501
EXISTING 30"x30"
OA TO AHU-2
CHW P-2
CHW P-3
C7
MP502
EXHAUST
6" BOILER
H
BREAK ROOM
SAPF
BRIEFING ROOM
102F
COMBAT CREW ROOM
SSR
VTC
102D
SSR
102C
SSO
102E
ENTRY ALCOVE
MANTRAP / LOUNGE
101E
CORRIDOR 1
103A
122 135
127 142
101B 101C
146 147 148
149E
149F
149A
101A
149B 149C
102B
BRIEFING 1
107C
BRIEFING 2
107B
BRIEFING 3
107A
INTEL AND TACTICS
INTEL 1
110C
INTEL 2
110B
BRIEFING 6
107D
BRIEFING 5
107E
MPC
TACTICS
110A
CORRIDOR 3
103C
102A
CORRIDOR 2
103B
MEN'S RESTROOM
109A
WOMEN'S RESTROOM
109BBRIEFING 4
107F
MANTRAP 2
101D
CORRIDOR 4
103D
J.C.
109C
ENTRY ALCOVE 1
STAIR
RESTROOM
RESTROOM
ENTRY ALCOVE 2
101D
T A
S K O
R D
E R N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W Y
O R
K D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K
N Y
S C
A L E
S H
E E
T
D R
A W
IN
G C
O D
E
O F
K C -4
A A
L T
E R B
L D
G S F
O R O
P S A
N D T
F I
A M
U -A
M X
S
J O
IN
T B
A S
E M c G
U
IR
E -D
IX
-L
A K
E H
U R
S T
N E
W J
E R
S E
Y
B U
IL
D
IN
G S
A
N D
E
R -1
-D -0
F E
B R
U A
R Y
A N
S I
D :1
L
A K
E S
ID
E C
E N
T R
E W
A Y
S U
IT
E
K N
O X
V
IL
L E T
N
N
1 2 3 4 5 6 7
A
B
C
D
E
F
G
H
ELEMENTS IN FIELD PRIOR TO BEGINNING DEMOLITION ACTIVITIES.
CONFIRM ACTUAL CONFIGURATION OF EXISTING SYSTEMS AND
GOVERNMENT RECORD DOCUMENTS NOT PRODUCED BY JACOBS.
ILLUSTRATION OF EXISTING CONDITIONS TAKEN FROM B.
NOTES.
SEE SHEET M-001 FOR SYMBOLS, ABBREVIATIONS AND GENERAL A.
GENERAL SHEET NOTES
SHEET KEYNOTES
1.
-M
A Y -2
:4
M E
C H
A N
IC
A L
F
IR
S T F
L O
O R P
IP
IN
G P
L A
N O
V E
R A
L L
MP110
FOR CONSTRUCTION
J S
M
IT
H
J S
M
IT
H
J
G A
R N
E R
G
R
IG
G
IN
S
P T F
L -1
-1
-M
P .d w g
IS
S U
E D F
O R C
O N
S T
R U
C T
IO
N -1
A3
MP401
0 8' 32'16'
B4
FIRST FLOOR PIPING PLAN - OVERALL - 1730 WEST
SCALE: 3/32"=1'-0"
EXISTING CONSTRUCTION
NEW WORK
LEGEND
A3
MP402
(E)AHU-2
HW EXPANSION TANK
(E)ET-1
HW AIR SEPARATOR
(E)AS-1
(E)WATER HEATER
(E) HWR
(E) HWS
HOT WATER PUMP
(E)HW P-1
MECHANICAL
1 7
A
H
(E) CU-2
(E) CU
(E) CU
HW CHEM FEEDER
(E)CF-1
(E) NG
(E) HWS
(E) HWR
T A
S K O
R D
E R N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W Y
O R
K D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K
N Y
S C
A L E
S H
E E
T
D R
A W
IN
G C
O D
E
O F
K C -4
A A
L T
E R B
L D
G S F
O R O
P S A
N D T
F I
A M
U -A
M X
S
J O
IN
T B
A S
E M c G
U
IR
E -D
IX
-L
A K
E H
U R
S T
N E
W J
E R
S E
Y
B U
IL
D
IN
G S
A
N D
E
R -1
-D -0
F E
B R
U A
R Y
A N
S I
D :1
L
A K
E S
ID
E C
E N
T R
E W
A Y
S U
IT
E
K N
O X
V
IL
L E T
N
N
ELEMENTS IN FIELD PRIOR TO BEGINNING DEMOLITION ACTIVITIES
CONFIRM ACTUAL CONFIGURATION OF EXISTING SYSTEMS AND
GOVERNMENT RECORD DOCUMENTS NOT PRODUCED BY JACOBS.
ILLUSTRATION OF EXISTING CONDITIONS TAKEN FROM B.
NOTES.
SEE SHEET M-001 FOR SYMBOLS, ABBREVIATIONS AND GENERAL A.
GENERAL SHEET NOTES
SHEET KEYNOTES
-M
A Y -2
:5
M E
C H
A N
IC
A L
E N
L A
R G
E D P
IP
IN
G P
L A
MP401
FOR CONSTRUCTION
J S
M
IT
H
J S
M
IT
H
J
G A
R N
E R
G
R
IG
G
IN
S
P T F
L -1
-1
-M
P .d w g
IS
S U
E D F
O R C
O N
S T
R U
C T
IO
N -1
0 4' 8'2'
A3
ENLARGED MECH ROOM PIPING PLAN - 1730 WEST
SCALE: 1/4"=1'-0"
H W
S
AHU-1
H W
S
CH-1
A
B
C
H W
R
RECOMMENDATIONS.
CLEARANCE AND SUPPORT PER MANUFACTURER'S
PARALLEL IN VERTICAL CHWR PIPE. ENSURE ADEQUATE
INSTALL INLINE CHILLED WATER PUMPS CHW P-2 & CHW P-3 IN 16.
SCHEDULE MH-602.
WATER CONTROL DIAGRAM MH-611 AND CONTROL VALVE
3" HWS BYPASS AND CONTROL VALVE PCV-102. REFER TO HOT 15.
B-2. REFER TO DETAIL E1-MP502 FOR HOOKUP.
3" PRIMARY HWS/R LINES DOWN TO HOT WATER BOILERS B-1 & 14.
UNDER BID ITEM #0030 SCOPE.
REFER TO DRAWING MP-404 FOR WORK TO BE COMPLETED
VALVE AND CAP 3" CHWS/R BRANCHES UNDER BID ITEM #0002. 13.
CLAMPS.
BASE. FASTEN PIPE TO CROSSBEAM WITH MULTI-STRUT PIPE
CROSSBEAM AND UPRIGHTS. BOLT UPRIGHTS TO CONCRETE
GRADE WITH 1 5/8" X 1 5/8", 12 GAUGE GALVANIZED STEEL STRUT
SUPPORT EXTERIOR CHILLED WATER PIPING CL 1'-2" ABOVE 12.
MECHANICAL ROOM.
PROVIDE SHUTOFF VALVES ON PIPES ENTERING AND LEAVING 11.
BOILER DIMENSIONS. REFER TO DETAIL E1-MP502 FOR HOOKUP.
HOUSEKEEPING PAD EXTENDING 4" GREATER THAN OVERALL
MANUFACTURER'S RECOMMENDATIONS. PROVIDE NEW 4" HIGH
INSTALL NEW HOT WATER BOILERS (B-1 & B-2) PER 10.
#0030 SCOPE.
TO DWG MP-404 FOR WORK TO BE COMPLETED UNDER BID ITEM
REFRIGERANT PIPING TO REMAIN UNDER BID ITEM #0002. REFER
EXISTING OUTSIDE CONDENSING UNITS AND ASSOCIATED 9.
#0030 SCOPE.
TO DWG MP-404 FOR WORK TO BE COMPLETED UNDER BID ITEM
REFRIGERANT PIPING TO REMAIN UNDER BID ITEM #0002. REFER
EXISTING AHU-2, ASSOCIATED DUCTWORK AND HOT WATER AND 8.
TESTED, ADJUSTED, BALANCED AND COMMISSIONED.
NEW AIR AND WATER SYSTEMS AND CONTROLS SHALL BE FULLY 7.
YEAR-ROUND.
THE EXISTING HOT WATER SYSTEM CONTINUOUSLY
PROGRAMMED TO OPERATE NEW CHILLED WATER SYSTEM AND
WATER AND HOT WATER SYSTEMS. THE DDC SYSTEM SHALL BE
CONTROLLER IN MECH ROOM FOR BUILDING HVAC, CHILLED
INSTALL NEW DDC CONTROL SYSTEM WITH JACE NETWORK 6.
WATER HEATING SYSTEM.
FLUSH, FILL, BALANCE, AND RE-COMMISSION BUILDING HOT 5.
EXPANSION TANK (ET-1) CHEMICAL FEEDER (CF-1) TO REMAIN.
EXISTING HOT WATER PUMP (P-1), AIR SEPARATOR (AS-1), 4.
DIVERTING LINE.
CONTROL VALVE. INSTALL BALANCE VALVE IN THE 3-WAY
1-1/2" HWS/R DOWN TO AHU-1 HEATING COIL. INSTALL 3-WAY 3.
DIVERTING LINE.
CONTROL VALVE. INSTALL BALANCE VALVE IN THE 3-WAY
3" CHWS/R DOWN TO AHU-1 COOLING COIL. INSTALL 3-WAY 2.
EXTERNAL CHILLED WATER PIPING.
EXISTING HOUSEKEEPING PAD AS NECESSARY. HEAT TRACE ALL
HOUSEKEEPING PAD AS DEMOLISHED CHILLER. MODIFY
INSTALL NEW AIR-COOLED CHILLER CH-1 ON THE SAME 1.
HOT WATER BOILERS
B-1 & B-2
GLYCOL MAKEUP UNIT
GMU-1
6 7
TYP. FOR BLDG
4"-CHWS
4"-CHWR
A4
MH301
EXISTING CONSTRUCTION
NEW WORK
LEGEND
CHW AIR SEPARATOR
AS-2
CHW CHEM FEEDER
CF-2
CHW BUFFER TANK
BF-1
C1
MP501
JACE NETWORK
HVAC CONTROLLER 6
E5
MP501
CHW EXPANSION TANK
CEILING HUNG
ET-2
H W
R
C H
W S
C7
MP502
1 1/2"-NG
3/4" VENT TO OUTSIDE
E4
MH301
C H
W R
CHW P-2
E1
MP502
CHW P-3
TYP.
CHILLED WATER PUMP
TYP.
4"-CHWR
4"-CHWS
H
TACTICS
INTEL AND
110B
INTEL 2
110C
INTEL 1
110A
TACTICS
107D
BRIEFING 6
107E
BRIEFING 5
103C
CORRIDOR 3
107C
BRIEFING 1
107B
BRIEFING 2
107A
BRIEFING 3
101E
LOUNGE
MAN TRAP/
ALCOVE 1
ENTRY
SSR
103A
CORRIDOR 1
102C
SSR
102F
ROOM
BRIEFING
102E
SSO
102D
VTC
STAIR
MPC
101D
MAN TRAP 2
CREW ROOM
COMBAT
107F
BRIEFING 4
BREAK ROOM
103D
CORRIDOR 4
109B
RESTROOM
WOMEN'S
109A
RESTROOM
MEN'S
109C
J.C.
SAPF
102A
102B
MECH ROOM
(E) AHU-2
T A
S K O
R D
E R N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N E
W Y
O R
K D
IS
T R
IC
T
F
E D
E R
A L P
L A
Z A
N E
W Y
O R
K
N Y
S C
A L E
S H
E E
T
D R
A W
IN
G C
O D
E
O F
K C -4
A A
L T
E R B
L D
G S F
O R O
P S A
N D T
F I
A M
U -A
M X
S
J O
IN
T B
A S
E M c G
U
IR
E -D
IX
-L
A K
E H
U R
S T
N E
W J
E R
S E
Y
B U
IL
D
IN
G S
A
N D
E
R -1
-D -0
F E
B R
U A
R Y
A N
S I
D :1
L
A K
E S
ID
E C
E N
T R
E W
A Y
S U
IT
E
K N
O X
V
IL
L E T
N
N
1 2 3 4
A
B
C
D
E
F
G
H
ELEMENTS IN FIELD PRIOR TO BEGINNING DEMOLITION ACTIVITIES.
CONFIRM ACTUAL CONFIGURATION OF EXISTING SYSTEMS AND
GOVERNMENT RECORD DOCUMENTS NOT PRODUCED BY JACOBS.
ILLUSTRATION OF EXISTING CONDITIONS TAKEN FROM B.
NOTES.
SEE SHEET M-001 FOR SYMBOLS, ABBREVIATIONS AND GENERAL A.
GENERAL SHEET NOTES
SHEET KEYNOTES
TESTED, ADJUSTED, BALANCED AND COMMISSIONED.
BUILDING AIR AND WATER SYSTEMS AND CONTROLS SHALL BE
FLUSH AND CLEAN ALL CHILLED WATER AND HOT WATER PIPING. 3.
DETAIL E5-MP501.
INSTALL 3-WAY CONTROL VALVE FOR NEW VAV BOXES. REFER TO 2.
PERFORMED UNDER BID ITEM #0030 SCOPE.
UNDER BID ITEM #0002. REFER TO DWG MP-403 FOR WORK TO BE
PROVIDE VALVE AND CAP FOR 3/4" HWS/R BRANCH TAKE-OFF 1.
-M
A Y -2
:4
M E
C H
A N
IC
A L
E N
L A
R G
E D P
IP
IN
G P
L A
MP402
FOR CONSTRUCTION
J S
M
IT
H
J S
M
IT
H
J
G A
R N
E R
G
R
IG
G
IN
S
P T F
L -1
-1
-M
P .d w g
IS
S U
E D F
O R C
O N
S T
R U
C T
IO
N -1
A3
MP401
A3
FIRST FLOOR PIPING PLAN - ENLARGED -1730 WEST
SCALE: 1/8"=1'-0"
VAV-102
VAV-101
VAV-103
VAV-104
VAV-106
VAV-105
VAV-107
VAV-109
VAV-108
VAV-102
TO
2" HWR
H W
S
1-1/2" HWS
1-1/4" HWR
-1 /4
H W
S
-1 -2
H
W R
3/4" HWR/S
VAV-103
TO
3/4" HWR/S
1" HWR/S
1" HWR/S
3/4" HWR/S
3/4" HWR/S
3/4" HWR/S
1" HWR/S
VAV-109
TO
VAV-108
TO
VAV-105
TO
VAV-106
TO
VAV-104
TO
VAV-107
TO
3/4" HWR/S
VAV-101
TO
BUILDING
TYP. FOR
TYP.
EXISTING CONSTRUCTION
NEW WORK
LEGEND
T
T
T
T
T
T
T
T
T
TO AHU-1
RH-101
H
0 8'4' 16'
CH-1
AHU-1