W912DS19B0007
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Answ er questions to prospective bidders for informational purposes only.
2. Revise draw ings and specifications as outlined on the continuaiton page.
NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the proposal (or as amended) by one of the follow ing methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 23
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Jul-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS19B0007
X 9B. DATED (SEE ITEM 11)
12-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Jul-2019
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
CONTINUATION PAGE
KC46 – ALTER Bldg for OPS & TFI AMU-AMXS Joint Base McGuire-Dix-Lakehurst, NJ
W912DS-19-B-0007
Amendment 0004
AMENDMENT 0004 to DRAWINGS and SPECIFICATIONS for Alterations to Bldg OPS & TFI AMU-AMXS, Joint Base McGuire-Dix-Lakehurst, New Jersey.
TO OFFERORS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- Bldg 1829 – Drawing A-111 – add the word “Existing” to beginning of note #17
- Bldg 1829 – Drawing FA-120 – add the following General Note: “B. THE CONTRACTOR SHALL
ASSUME 7 SPEAKER/STROBE DEVICES TO BE REMOVED/REPLACED”
2. The following DRAWINGS have been REVISED and REISSUED:
- Drawing A-502
- Bldg 1730 – Drawing CP100
- Bldg 1730 – Drawing AD112
- Bldg 1730 – Drawing A111
- Bldg 1730 – Drawing A112
- Bldg 1730 – Drawing A150
- Bldg 1730 – Drawing A151
- Bldg 1730 – Drawing A152
- Bldg 1730 –Drawing A160
- Bldg 1730 – Drawing IN602
- Bldg 1730 – Drawing IF111
- Bldg 1829 – Drawing IN602
- Bldg 1835 – Drawing A-401
- Bldg 1835 – Drawings IN-602
3. The following DRAWINGS have been ADDED:
- None
4. The following DRAWINGS have been DELETED:
- None
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
- Section 32 13 43 – Pervious Concrete Paving
- Attachment H – HPSB Checklist
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
- None
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
- Main Table of Content – has been updated and reissued
- Section 00 01 00 – Bid Schedule CLINs 0023 through 0028 have been revised and reissued
- Attachment B – FFE Order Forms – is hereby reissued in its entirety
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
BIDDER’ QUESTIONS AND GOVERNMENT REPLY
1. Will GSA pricing be extended to the contractor for the FF&E items. RESPONSE: It is the contractors responsibility to contact the GSA venders to see if they will provide the GSA pricing
2. Note #16 West of Bldg 1758 indicates asphalt pavement, but during site visit it was obvious that there was pervious concrete. Please clarify. If this is found to be previous concrete, please advise as to how to protect from contamination of soil, during construction. RESPONSE: The pavement is pervious, Bldg 1730 drawing CP100 has been updated as well as spec section 32 13 43 Pervious Concrete Paving has been added.
3. In building 1829, on the 1st and 2nd floors unable to locate or identify "Heritage Rooms" which are requesting furnishings for. Please advise. RESPONSE: Please refer to reissued Bid Schedule in this amendment for clarification.
4. The spec refers to Attachment 1, HPSB Checklist, which defines the sustainability goals to be pursued in this project for each of the buildings being renovated. there is no Attachment 1 at the end of section. Please advise. RESPONSE: Please see added attachment H – HPSB Checklist, issued with this amendment.
5. On Bldg 1835 Note #13 on A-5/A-110 shows lockers to remain. Where as Note #7 on detail B1-A401 shows lockers which are adjacent to wall to be removed and reinstalled. Please clarify. RESPONSE:
Its assumed reference is to Note #13 on 1835 A5/AD110. The contractor is responsible to protect these and is given the option to remove and re-install if protecting in-place does not provide enough protection during renovations. See revised drawing 1835 A-401 attached.
6. Can you please provide the Canopy Details for Building 1730. RESPONSE: Details are to be developed by Construction Sub-Contractor. Refer to Civil and Architectural drawings and section 10 73 26 "Walkway Covers".
7. The note number 22 in the finish Schedule for Building 1730 states base & paint on new walls only.
But the finish schedule notes in the table above does not show note number 22. Kindly clarify.
RESPONSE: Finish Schedule notes on IN602 are standard and not all may be used in the finish schedule notes. Use notes referenced in the "Finish Schedule Notes" column.
8. What is the floor to deck height? RESPONSE: Please refer to the as-build attachments for this information, and as always the contractor shall verify in the field.
9. What does FCTY mean in the finish schedule? RESOPONSE: See abbreviations legend at the top of each finish schedule. FCTY = Factory.
10. Building 1829 In sheet A-111, Item# 17 in the keynote states "used ball transfer conveyor. Is this an existing conveyor that needs to be pad mounted or this a new conveyor that the GC has to furnish?
Also, what is the minimum thickness for the pad. Please clarify. RESPONSE: This is an existing ball type conveyor that the contractor shall install on the existing floor slab. Note #17 is hereby clarified in this amendment.
11. For Building 1829, in sheet IN-602, the Finish Schedule for the second floor is not provided. Kindly clarify. RESPONSE: On drawing 1829 IN602 the finishes in Room #221 (Women's Locker Expansion), Room #228 (Men's Restroom) and Room #232 (Women's Restroom) shall match the finishes shown in drawing 1835 IN602 for Room # 128 (Women's Lockers). See revised drawing Bldg 1829 – IN602 attached.
12. The bid documents has drg# IF-120 for Bldg 1829-2nd Floor that has furniture/appliances. But, In the FF& E Data Sheets , there is no mention of Bldg1829, 2nd floor. Please advise. RESPONSE: Use tagging and item counts shown on enlarged drawings 1829 IF121 and IF122 to create the bid. Existing FFE detail order forms can be used for purchase at the time of bid execution.
13. Accordion partition ref. S002 #7 which references architectural drawings for steel support this cannot be found in the architectural drawings for 1730. Please verify location. RESPONSE: See Architectural General Drawing A-501 Detail F4. The intent of Structural General Drawing S-002 Note #7 is to provide requirements for the operable panel (folding partition) vendor is to design the structure to support the operable panels and submit during submittal process.
14. Second floor of 1828 FF&E does not match the drawing details. example there is no WS7 we only see WS. Please verify. RESPONSE: Workstations (WS) in private offices with 2 visitor chairs are WS12 as shown in the 1828 2nd Floor FF&E Order Sheet. For other non-tagged items in private offices, price per tagging shown in Drawing 1928 IF112 Chief (Room #113C). Price WS in Commander's Office (Room #217) as WS7 as shown in the 1828 2nd Floor FF&E Order Sheet. For other non-tagged items in Commander's office (Room #217), price per tagging shown in Drawing 1829 IF122 tagging in Commander's Office (Room # 246).
15. Bldg 1828 - Does the Pilot lounge HVAC get added to the overall HVAC for the second floor or does the HVAC for pilot lounge get added to CLIN item 26? RESPONSE: The Pilot Lounge HVAC should be included in the overall HVAC for the second floor, not CLIN 026.
16. Bid Item #0025 calls for 2nd floor restroom renovation, Drawing A-120 does not show any restroom renovation. If restrooms are to be renovated please specify if both mens and womens? RESPONSE:
Please refer to revised bid schedule. Reference is revised to read as 1st floor.
17. Unable to adjust the print size for Appendix D & G. Please provide files that allows to print larger then 8" & 11". RESPONSE: The Government has no issues with printing 22 x 34 plots of the appendices. As a suggestion it may be beneficial to "CROP" the pages to view more of the page content.
18. A160 states coordinate canopy drains to rainwater drainage collection CP100 calls for splash blocks please confirm which is required. RESPONSE: Per CP100 the canopy should drain to the splash blocks and then overland flow to the nearby inlets / drainage system.
19. Building 1730 FF&E package does not match quantity for entire building. FF&E order sheets to do match the drawings. RESPONSE: Drawing quantities take precedent over FF&E Order Data Sheets.
See updated Attachment B - FF&E Order Sheets reissued.
20. FFE: Hamilton products #3 model number references legal sz but description states letter sz which is it? RESPONSE: Assuming reference is made to Building 1730 Furniture Order Sheet "S3". If so, model number is correct, and it is Legal size. Order Sheets are hereby reissued to reflect the correction.
21. F1, WD12, BC1 call for laminate Herman miller does not over laminate for this can you please specify metal? RESPONSE: The selection is based on Conducted meetings with users and designed based on preferences. Users prefer laminate as shown in FF&E Order Data Sheets. Metal will not be specified.
22. Safco Flat File need quantity clarified/confirmed. Spec qty of 4 but photo reflects 2 units on top one another do you want (4 units) consisting of (2) 5 drawer files with top and base = (8) 5 drawer units or (4) 5 drawer units with 2 tops and 2 bases. RESPONSE: FF&E Photo does not govern. Note below the image states "Image not exact. Refer to salient features". Clarification – Four Safeco model number 4998 flat files sitting on four Safeco closed bases model number 4999.
23. IF120 bldg 1829 2nd floor of furnishings but there is not specs for 1829 in the FF& E package.
RESPONSE: Use tagging and item counts shown on enlarged drawings 1829 IF121 and IF122 to create the bid. Existing FFE detail order forms can be used for purchase at the time of bid execution.
24. Drawing IF120 (Bldg 1829) shows furniture on the 2nd floor. However there are no specs for 1829 on the second floor in the FF&E package. Do you want the 2nd floor FF&E package to be included?
RESPONSE: Use tagging and item counts shown on enlarged drawings 1829 IF121 and IF122 to create the bid. Existing FFE detail order forms can be used for purchase at the time of bid execution.
25. Please identify "Heritage Rooms" throughout the FF&E specs. RESPONSE: Please refer to reissued Bid Schedule in this amendment for clarification.
26. Bid Item 0027 indicates to renovate the Heritage Room in Building 1829. I cannot find the Heritage Room on the plans for that building. Please advise. RESPONSE: Please refer to reissued Bid Schedule in this amendment for clarification.
27. Is the electrical contractor responsible for the corridor tray? RESPONSE: Assignment of the work in the project to the subcontractors and trades selected by the general contractor constructing the project is the responsibility of the general contractor.
28. Is there any OSP backbone cabling (fiber/optic/copper) on this project? RESPONSE: Extent of cabling provisions and cabling requirements are indicated on the project detail drawings and the equipment schedules, drawings T-501 - T-603 inclusive.
29. The drawings do not state what type of cable is to be used at the TV locations? cat 6 or RG-6 coax.
RESPONSE: Outlet types are indicated on the plan drawings (…T601,T602, T603), and the "TV" designation identifies those outlets designated for television monitors which have additional requirements for mounting location and coordination. The telecommunications outlet schedules define cabling requirements for the outlet types indicated on the plans.
30. T112 1&2 - states see telecommunications detail drawing. On drawing T-501 there is not part number or spec on the cabinet. what cabinet should be used? RESPONSE: The cabinets indicated on the telecommunications detail drawings have a designation located in the lower left-hand corner of the cabinet/rack that correlates with the designations indicated on the TELECOMMUNICATIONS SYSTEM EQUIPMENT SCHEDULE on drawing T-601, which identifies the cabinet/rack requirements.
31. Bid Item 0025 indicates to renovate the 2nd floor restroom in Building 1828. I cannot find any plans showing any renovations of a 2nd floor bathroom. Please advise. RESPONSE: Bid schedule is hereby revised as part of this amendment to show 1st floor bathroom renovation.
32. Can the AISC requirements for structural steel be waived? RESPONSE: No, requirement will remain.
33. Bldg 1730 room 106 A111 shows a raised floor if no raised access floor how is door 106A to be handled for a 7" step up. RESPONSE: Per Drawings door 106A transitions between Room 104 and Room 106, both of which are shown with raised access flooring. Door opening starts at top of raised floor.
34. A502 E1. What is height of "short wall" does steel tube need to be at both ends of the partition when abutting adjacent wall? thickness required of steel tube. RESPONSE: Short wall height is 42" AFF.
Tube location is stated on the drawing as 6" from end of the partition, which is intended as applicable to the unsupported end of the partition. Tube wall thickness is shown on A4/A-502. See revised drawing A502 included.
35. Bldg 1730 A111wall mounted phone storage cabinet which interior drawing is to be referenced?
RESPONSE: Note 6 is correct as shown. See interior drawing 1730 IF111 and Furniture Order Data Sheet item "PTB".
36. Bldg 1730. Wall types not shown A111 & A112 along corridor 103C, 104/ 105/101D, 104/106, nor all of area B for room 110,107,103 areas. RESPONSE: Wall type information is provided in General Note B on each of these drawings.
37. Bldg 170. Door 110I not shown for demo please confirm door replacement. RESPONSE: Please refer to A-601, comment under Remarks in Door Schedule, which says, "RE-INSTALL EXISTING
DOOR, PROVIDE NEW HARDWAR.
38. FF&E, the solicitation asks for furnishings from the FF&E package for bldg 1829 but its only for MOB storage room, not the furniture on the second floor. RESPONSE: That is an incorrect statement. CLIN 0016 (Option 3) requests FF&E for the entire building. 1st and 2nd floors. CLIN 0028 (Option 15) requests separate pricing for 1829 second floor heritage rooms. Please refer to revised bid schedule in this amendment.
39. A-150 room 110A not on A110. RESPONSE: Not sure what is meant by this comments, however, Room number 110A (Room Name Tactics) is shown on Drawing 1730 A110 at coordinate E-2.
40. Bld 1828. In the womens locker room is Rm #139A included in line item #0023? RESPONSE: CLIN 0023 (Bid Option 10) is for Room Number 138 (Locker Expansion) only. Refer to revised bid schedule as included in this amendment.
41. Please provided proper scale. RESPONSE: See revised drawing Bldg1730 AD112 attached with added graphic scale.
42. Building 1829 drawing FA 120, please provide quantities and fire alarm device types to be removed and replaced on ceiling. RESPONSE: Bidders should assume seven (7) speaker/strobe devices, see added note on drawings FA-120.
43. Bldg 1730 - A111 keynote 16 confirm 6" or 6" above ceiling. RESPONSE: Please see revised note 16 on drawing Bldg 1730 – A-111.
44. Door schedule A601 door 109F shown twice on A112 please confirm if one is meant to be 109E.
RESPONSE: Door number to the Janitor's closet (Room number 109C) is to be 109E. See revised drawing attached.
45. A150 shows symbols not in legend please clarify all symbols. RESPONSE: Please see clarified drawings A150, A152, A152.
46. IN602 calls for server room 105A to receive VCT this room cannot be found on the plans please provide location. RESPONSE: Building 1730 Room Number 105A has been removed from the Finish Schedule. See revised drawing IN602 attached.
47. 1) Drawing IN602 finish schedule note 10 states to pain frame and doors throughout the facility.
Please concur if it is correct. Door schedule of the entire facility.
2) Drawing IN 602 finish schedule call for new paint and carper in Commanders staff room 209 .
However Drawings AD 120 has not demo notes for that room. Please advise if the painting and flooring to be performed at this room.
3) According to drawing A 122, contractor will be constructing room 216, 217,218, and 219 .
However, finish schedule for room number 217,218 and 219 are not shown on finish schedule in drawing IN602. Please provide the same. RESPONSE: 1) Drawing 1835 IN 602 finish schedule note 10 is correct. 2) New paint and flooring are required in Flight Commander's Staff (Room Number 209).
3) Finishes for room numbers 217, 218 & 219 shall be the same as room number 216. See revised drawing attached, IN 602.
48. Bldg 1828. Womens Locker Room Expansion. On drawing ED-110 it shows removing all lighting fixtures however Drawing EL-110 does not show any new fixtures. Please Advise. RESPONSE:
Drawing 1828 ED110 shows fixtures for coordination purposes only. There is no lighting demolition scope in Locker Expansion (Room Number 138).
49. What is the duration period for each phase listed in the phasing schedule which has a total of 3 phases. RESPONSE: The durations of the phases are left to the contractors to develop as part of the schedule submittal. it will then be evaluated by COR and End Users.
50. Can a 2nd site visit be arranged? RESPONSE: Sorry, we are unable to comply with your request. We've already made reasonable arrangements to provide site visit to all interested at the start of the solicitation.
51. Dwg MH-111 shows new duct work. In order to install new duct work as shown please clarify if existing ceiling is to be replaced or will a new ceiling be required. Also, is building 1730 East completely occupied and if so, is any temporary protection needed? Please advise.
RESPONSE: Current scope does not consider a new ceiling, but removal of ceiling as required to install mechanical equipment, ductwork, diffusers, etc. Building 1730 East is occupied. Contractor is responsible for providing temporary protection. For Work Restrictions, See specification section 01 14 00 "Work Restrictions".
52. Sub Paragrah A,B & C does not include Rm130(men's locker) and Rm128(Womens locker) in phasing schedule. Please advise. RESPONSE: Since the item refers to an optional work, and the optional work is not guaranteed, its not included in the phasing. should this work be affordable, phasing will be discussed at the pre-construction meeting.
53. Dwg PL-401 shows a new 4" sanitary line connecting to the exisiting sewer main. The site utility drawing CS100 does not show any new sanitary sewer piping or any details on how this is to be done.
Please provide a drawing with details. RESPONSE: A sewer manhole is located across the west parking lot and identified on the base utility map (attached). The intent is to exit the building north and turn west until the new sewer line intercepts the sewer from Building 1908 at the existing manhole.
Assume 325' in length for bidding. Add a clean-out at the sewer line bend similar to the attached detail, Attachment I.
54. Drawing IN-602 finish schedule note 10 states to paint frame and doors throughout facility . Does this apply to buildings 1828 & 1829 also? RESPONSE: The note is applicable to each building for the areas that work is identified on the plans and specifications.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
FFP
All work (includes all plant, labor, and material) for the alterations within the west side of Bldg 1730 as described in the plans and specifications except for work included in items below.
FOB: Destination
NET AMT
0002 1 Job
All work (includes all plant, labor, and material) for the HVAC alterations within the west side of Bldg 1730 as described in the plans and specifications except for work included in items below.
0003 1 Job
All work (includes all plant, labor, and material) for the HVAC controls within the west side Bldg 1730 as described in the plans and specifications except for work included in items below.
0004 1 Job
All work (includes all plant, labor, and material) for the alterations within Bldg 1828 as described in the plans and specifications except for work included in items below.
0005 1 Job
Bldg 1828 as described in the plans and specifications except for work included in items below.
0006 1 Job
All work (includes all plant, labor, and material) for the HVAC controls within Bldg 1828 as described in the plans and specifications except for work included in
0007 1 Job
1829 as described in the plans and specifications except for work included in items
0008 1 Job
Bldg 1829 as described in the plans and specifications except for work included in
0009 1 Job
Bldg 1829 as described in the plans and specifications except for work included in
0010 1 Job
1835 as described in the plans and specifications except for work included in items
0011 1 Job
Bldg 1835 as described in the plans and specifications except for work included in
0012 1 Job
Bldg 1835 as described in the plans and specifications except for work included in
0013 1 Job
All work for the Final Record Drawing Submission (See Section 00 73 00). PRE-
PRICED LINE ITEM
$50,000.00
0014 1 Job
OPTION
FFP
Purchase, deliver, and install Furnishings and Appliances, per CID/SID & FF&E packages for the west side of Bldg 1730.
0015 1 Job
OPTION
FFP
Purchase, deliver, and install Furnishings and Appliances, per CID/SID & FF&E packages for Bldg 1828.
0016 1 Job
OPTION
FFP
Purchase, deliver, and install Furnishings and Appliances, per CID/SID & FF&E packages for Bldg 1829.
0017 1 Job
OPTION
FFP
Purchase, deliver, and install Furnishings and Appliances, per CID/SID & FF&E packages for Bldg 1835.
0018 1 Job
OPTION
FFP
Purchase, deliver, and install Furnishings and Appliances, per CID/SID & FF&E packages for Bldg 1928.
0019 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the alterations within Bldg 1928 as described in the plans and specifications.
0020 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the HVAC alterations within Bldg 1928 as described in the plans and specifications.
0021 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the HVAC controls within Bldg 1928 as described in the plans and specifications.
0022 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the canopy within Bldg 1730 as described in the plans and specifications.
0023 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the 1st floor women's locker expansion in Bldg 1828 (labeled as Locker Expansion Rm 138) as described in the plans and specifications.
0024 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the 1st floor heritage room renovation in Bldg 1828 (labeled as Heritage Room No. 143 and Sched. Room No.
144) as described in the plans and specifications.
0025 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the 1st floor restroom renovation in Bldg 1828 as described in the plans and specifications.
0026 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the 2nd floor boom/pilot lounge room renovation in Bldg 1828 (Labeled as Boom Lounge (Room No. 228), Pilot Lounge (Room NO. 227), Flight Commander (Room No. 227A) and Chief Boom (Room 228A).) as described in the plans and specifications.
0027 1 Job
OPTION
FFP
Purchase, deliver, and install furniture for 1st floor heritage room in Bldg 1829 (labeled as Lounge (Room No. 158) drawing 1829 IF111) as described in the plans (IF-111) and specifications.
0028 1 Job
OPTION
FFP
Purchase, deliver, and install furniture for 2nd floor heritage room in Bldg 1829 as described in the plans and specifications.Purchase, deliver, and install furniture for 2nd floor heritage room in Bldg 1829 (The included rooms are: Boom Arts/Operators (Room No. 219), Engineer Arts/Engineers (Room No. 222), Engineer Arts/Engineers (Room No. 236) and Boom Arts/Operators (Room No.
238) and shown on drawings 1829 IF121 and 1829 IF122.) as described in the plans and specifications.
0029 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for renovating the restrooms and lockers for the 1st floor in Bldg 1835 described in the plans and specifications.
0030 1 Job
OPTION
FFP
All work (includes all plant, labor, and material) for the HVAC alterations and controls within the east side of Bldg 1730 as described in the plans and specifications except for work included in items below.
0031 5,000 Square
Foot
OPTION
All work (includes all plant, labor, and material) for purchase and installation of new carpeting in areas identified by the COR and users. ESTIMATED
QUANTITIES
0032 10,000 Square
Foot
OPTION
FY18 KC46 ALTER OPS & TFI, JBMDL: All work (includes all plant, labor, and material) for painting of additional areas as defined by the COR and users.
ESTIMATED QUANTITIES
TOTAL BASE BID PRICE FOR LINE ITEMS 0001- 0013 _________________
TOTAL BASE BID + OPTIONAL ITEMS PRICE FOR LINE ITEMS 0013- 0032
NOTES:
1. Bidders are required to bid on all the Base Bid and all the Optional Bid Items or their bids will be rejected.
2. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself, thereto, may render the bid non-responsive and be cause for its rejection.
3. Line item 0013 is pre-priced at 50,000.00 and this price shown may not be changed. See Section 00 73 00 for Final Record Drawing definition and requirement.
4. The Basis of Evaluation will be the lowest responsive, responsible bid based on the Total Amount for the Base Bid Items plus the Optional Bid Items (Line Items 0001 thru 0032).
5. Option #1 thru #19: At any time prior to 420 calendar days after award of the contract, the Government at its option, may direct the Contractor, by written order, to perform the work and/or services provided under this Option. Execution of this option will not alter the project completion date of the contract.
6. The Bid Acceptance Period is as stated on Standard Form 1442.