Air Force Sustainability Requirements Scoresheet HPSB COMPLIANCE (Updated Jan 2017) * required entry

General Information INCOMPLETE PTFL 163010 Project ID (e.g. ABCD12345)

Real Property Unique ID (RPUID) * 1730, 1828, 1829, 1835, 1928 Facility Number

Building Name * Joint Base McGuire-Dix-Lakehurst Installation Trenton City NJ State Yes CONUS

AMC MAJCOM

USACE Construction Agent Stevens, Mai AFCEC DM/CM (Last Name, First Name)

PA *

26,114 Building Size (SF) 2019 Program Year (FY####) Design Complete Project Phase 12/01/17 Design Started (MM/DD/YY)

03/30/20 BOD (MM/DD/YY)

Not Certifying Guiding Principles Compliance Certification Method

100% HPSB Compliant 0% Energy Efficiency Achieved (% below ANSI/ASHRAE/IESNA

Standard 90.1-2013) 2017V1 Scoresheet version

SURVEY

INCOMPLETE

Date Project Registered (MM/DD/YY)

Date Project Certified (MM/DD/YY)

11/7/2018 1

Color Coding: See Instructions Tab for more detail Yes or N/A No Recommended not Required

90.1-2013 HPSB I: Employ Integrated Design Principles (UFC 1-200-02 para 2-2) Total Points 2 Possible Points 2

Yes HPSB I.1 Integrated Design 1 N/A HPSB I.2 Commissioning 1

HPSB II: Optimize Energy Performance (UFC 1-200-02 para 2-3) Total Points 5 Possible Points 5

N/A HPSB II.1 Energy Efficiency 1

N/A Reduce energy use 30% below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, or if not - achieve maximum energy efficiency that is lifecycle cost effective

0.0% Insert percentage below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, in terms of energy use (e.g. 32)

N/A Insert building energy intensity (kBtu/yr-sqft) calculated IAW 10 CFR Roof Attributes (Recommended) Select roof types (Check below)

Energy Efficient Products 1 Yes

N/A HPSB II.2 On-site Renewable Energy 1

N/A Installed renewable energy elements or projects were not lifecycle cost effective Renewable energy types (check below)

0.0 Insert generation capacity (kW)

0.0% Insert percentage of total building

N/A HPSB II.3 On-site Renewable Energy - Solar Hot Water Heater System 1

N/A Installed solar hot water heater system or found installation not lifecycle cost effective

0.0 Insert generation capacity (MMBtu/yr)

0.0% Insert percentage of demand

Yes HPSB II.4 Metering 1 Yes Electric Metering: Select N/A if no service Yes Natural Gas Metering: Select N/A if no service N/A Steam Metering: Select N/A if no service

HPSB III: Protect and Conserve Water (UFC 1-200-02 para 2-4) Total Points 6 Possible Points 6

Yes HPSB III.1 Indoor Water 1 N/A Indoor Water Metering 1 N/A HPSB III.2 Outdoor Water 1 N/A Outdoor Water Metering 1 N/A HPSB III.3 Alternative Water 1 N/A HPSB III.4 Stormwater Management (LID Documentation per UFC 3-210-10) 1

0.0 Change in Impervious Area (SF)

$0.00 Pre-Award Cost Estimate ($)

N/A Project addressed EISA 438 EISA Technical Constraints

0.0%

Percent Increase in Stormwater Runoff for 95 Percentile Storm (%) -or- Percent Increase in Stormwater Runoff from continuous simulation model, published data, studies, or other established tools (Reference UFC 3-210-10 Figure 2-1 Implementation of EISA Section 438)

On-Site LID Features Locations 0 Integrated Management Practices Employed

Drop-Down Box No Entry Required Custom Entry

Solar PV

Solar CP

Solar Thermal Electric

Geothermal

GSHP Wind

Hydro Waste to Energy

Renewables were not lifecycle cost effective

Cool roof

Green roof

Solar electric

Solar thermal

Solar Passive

Retaining stormwater impact receving water flow

Site too small to infiltrate significant volume

State or local restrict water harvesting

Shallow bedrock, contaminated soil, high ground water table, underground utilities

Non-potable water demand to small Structural, plumbing, and other mods not feasible

Soil infiltration capacity limited

State or local restrict use of green Other

11/7/2018 2

Final LID Construction Cost ($) Post Construction Analysis (Name of DOR)

HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02 para 2-5) Total Points 8 Possible Points 8

Yes HPSB IV.1 Thermal Comfort 1 Yes HPSB IV.2 Ventilation 1 N/A HPSB IV.3 Daylighting 1 Yes HPSB IV.4 1 Yes HPSB IV.5 Low Emitting Materials 1 Yes HPSB IV.6 Protect Indoor Air Quality during Construction 1 Yes HPSB IV.7 Environmental Tobacco Smoke Control 1 Yes HPSB IV.8 Occupant Health and Wellness 1

HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02 para 2-6) Total Points 5 Possible Points 5

Yes HPSB V.1 Recycled Content 1 Yes HPSB V.2 Biologically-based Products 1 Yes HPSB V.3 Ozone Depleting Substances 1 Yes HPSB V.4 Waste and Materials Management - Recycling 1 Yes HPSB V.5 Waste and Materials Management - Divert 60% from Disposal 1

N/A 60% or greater diverted 60.0% Insert percentage diverted from landfill

HPSB VI: Address Climate Change Risk (UFC 1-200-02 para 2-7) Total Points 1 Possible Points 1

N/A HPSB VI.1 Address Climate Change Risk 1 Possible Points 27

27 Federal Requirements - Yes or N/A 0 Federal Requirements - No

100% Percentage of Federal Requirements Met

Moisture Control

Bio-Retention

Infiltration Trench

Soil Amendments

Dry Wells Inlet Pollution Removal Device

Permeable Pavement/Pavers

Filter Strips Grassed Swells

Rain Barrels/Cisterns

Tree Box Filters Vegetated Buffers Vegetated Roof

Other

11/7/2018 3

Federal Requirements for High Performance and Sustainable Buildings (HPSB) & UFC 1-200-02 Instructions: Provide a common or project specific justification for an element to be non-applicable, when completed, the Scoresheet tab will allow an N/A response.

Justification for Non-Applicable Answers Common Justification Project Specific Justification Complete?

HPSB I: Employ Integrated Design Principles (UFC 1-200-02, 2-2) HPSB I.1 Integrated Design Applicable

HPSB I.2

Commissioning

Yes

Electrical - Construction commissioning is being performed. UFGS specs do have some commissioning that the designers believe is appropraite for this renovation scope.

Yes

HPSB II: Optimize Energy Performance (UFC 1-200-02, 2-3)

HPSB II.1

Energy Efficiency

N/A

All new equipment meets the minimum requirements of ASHRAE 90.1 2013 Electrical - Lighting controls swith off automatically as well as receptacles.

Lighting uses LED lighting for replacement of any lighting. This is only for the offices and open offices.

Yes

HPSB II.1 Energy Efficient Products Yes Electrical - Lighting uses LED lighting for replacement of any lighting.

Applicable

HPSB II.2 On-site Renewable Energy N/A Not included in project scope - Base Level Initiative

Yes

HPSB II.3 On-site Renewable Energy - Solar Hot Water Heater System N/A Not included in project scope - Base Level Initiative

Yes

HPSB II.4 Metering

HPSB II.4 Electric Metering: Select N/A if no service N/A

Installation provides advanced metering protocols separate from project.

Electrical - Buildings had no electrcial service entrance modifications.

Applicable

HPSB II.4 Natural Gas Metering: Select N/A if no service N/A

Installation provides advanced metering protocols separate from project.

Electrical - Buildings had no electrcial service entrance modifications.

Applicable

HPSB II.4 Steam Metering: Select N/A if no service N/A No Service Yes HPSB III: Protect and Conserve Water (UFC 1-200-02, 2-4) HPSB III.1 Indoor Water Applicable

HPSB III.1 Indoor Water Metering: Select N/A if no service N/A

Installation provides advanced metering protocols separate from project.

Electrical - Buildings had no electrcial service entrance modifications.

Yes

HPSB III.2 Outdoor Water N/A No Service Yes HPSB III.2 Outdoor Water Metering: Select N/A if no service N/A No Service Yes HPSB III.3 Alternative Water N/A Renovation of less than 50% of building Yes HPSB III.4 Stormwater Management

HPSB III.4 Project addressed EISA 438 N/A Renovation of less than 50% of building;

No exterior renovations

Yes

HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02, 2-5)

HPSB IV.1

Thermal Comfort

Yes Mechanical systems where renovated, have been restored to proper working order to provide better thermal comfort.

Applicable

HPSB IV.2

Ventilation

Yes Mechanical systems where renovated, have been restored to proper working order to provide better ventilation.

Applicable

HPSB IV.3 Daylighting N/A Renovation of windows not within project scope

Yes

HPSB IV.4 Moisture Control N/A Partial - Ventilation Provided Applicable

HPSB IV.5

Low Emitting Materials

Yes Spec section 01 33 29 requires the construction contractor to provide low emitting materials.

Applicable

HPSB IV.6 Protect Indoor Air Quality during Construction Yes Ventilation Provided Applicable HPSB IV.8 Occupant Health and Wellness Applicable HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02, 2-6)

HPSB V.1

Recycled Content

Yes

Spec section 01 33 29 requires the construction contractor to provide products containing recycled content and to document the percentage recycled content of the products.

Applicable

HPSB V.2

Biologically based products

Yes

Renovation of less than 50% of building but spec section 01 33 29 requires the construction contractor to provide bio-based products.

Applicable

HPSB V.3

Ozone Depleting Substances

Yes

Spec section 01 33 29 requires the construction contractor to meet the requirements of ASHRAE 189.1 to reduce ozone deleting substances. Spec section 23 64 10 requires refirgerants to be in accrodance with the "Montreal Protocol on Substances the Delplete the Ozone Layer".

Applicable

HPSB V.4

Waste and Materials Management - Recycling

Yes Renovation of less than 50% of building but Spec Section 01 74 19 requires 60% construction waste diverted from landfill

Applicable

HPSB V.5

Waste and Materials Management - Divert 60% from Disposal

Yes Renovation of less than 50% of building but Spec Section 01 74 19 requires 60% construction waste diverted from landfill

Applicable

HPSB VI: Adress Climate Change Riskd (UFC 1-200-02, 2-7)

HPSB VI.1 Address Climate Change Risk N/A Renovation of less than 50% of building Yes