Appendix_C_-_Revised_SOW.pdf

PDF 27 KB Posted

Attached to
KC-46A Alter Facilities for Maintenance Federal contract opportunity
Solicitation number
W912DS18B0023
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

SOW

View the file

Other files for this federal contract opportunity

Other files attached to KC-46A Alter Facilities for Maintenance, newest first.
File Type Posted
Bid_Abstract_W912DS-18-B-0023.pdf.pdf PDF
Amendment_8-_KC46_Alter_Facilities_for_MX.pdf PDF
A.07.27_Amendment_8_W912DS18B0023.pdf PDF
Amendment_0007_Alter_Faciltities_for_MX_-_Plans.pdf PDF
Amendment_0007_Alter_Faciltities_for_MX_-_Specs.pdf PDF
A.07.27_Amendment_7_W912DS18B0023.pdf PDF
A.07.27_Amendment_6_W912DS18B0023.pdf PDF
A.07.27_Amendment_5_W912DS18B0023.pdf PDF
Appendix_B_-_Photo_RFI_15.pdf PDF
Amendment_4_-_KC46_Alter_Facilities_for_MX_-_Plans.pdf PDF
Appendix_G-_Revised_Section_08_71_00.pdf PDF
Appendix_E_-_Revised_Section_01_50_00.pdf PDF
Appendix_F_-_Revised_Submittal_Register.pdf PDF
Appendix_D_-_Revised_Section_01_45_00.pdf PDF
A.07.27_Amendment_4_W912DS18B0023.pdf PDF
Amendment_3_-_Appendix_A_-_As-Build_Drawings.pdf PDF
Am2_Revised_Drawings.pdf PDF
A.07.27_Amendment_3_W912DS18B002303.pdf PDF
Fixtures_Schedule.pdf PDF
W912DS18B002302.pdf PDF
W912DS18B0023-Amendment_0001.pdf PDF
A.07.23_W912DS18B0023.pdf PDF
H.01.01_Drawings_2_W912DS18B0023.pdf PDF
H.01.01_Drawings_1_W912DS18B0023.pdf PDF
H.01.04_Specs_Furnishings_W912DS18B0023.pdf PDF
H.01.04_Specs_W91DS18B0023.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE NYD JB MDL 695847

Issue for Construction

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals Salvage Plan; G, RO

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes the following and incidental related work.

1. Building 1817:

a. Removal of the existing hanger doors and install new insulated wall panels.

b. Provide new roll-up doors.

2. Building 2201:

a. The existing tire and wheel shop will be converted into the Hydro-WARP maintenance area.

b. Construct a new X-Ray vault.

c. Modifications to the existing Dye Penetrant Line (DPL) area including modifications to the HVAC, fire protection, and lighting.

d. Construct Hazardous Material (HAZMAT) storage room.

3. Building 2251:

a. Provide Hydro-WARP lift truck and trailer parking.

4. Building 3101:

a. Demolish existing and construct new restrooms.

b. Demolish existing and construct office space.

SECTION 01 11 00 Page 1

1.2.2 Location

The work is located within Joint Base McGuire-Dix-Lakehurst, McGuire AFB, Buildings 1817, 2201, 2251 and 3101. These buildings are located along Tuskegee Airman, West Arnold and East Arnold Avenues. The exact location will be shown by the Contracting Officer.

1.3 OCCUPANCY OF PREMISES

Building(s) 1817, 2201, 2251 and 3101 will be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area.

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.4 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.5 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.5.1 Notification Prior to Excavation

Notify the Contracting Officer at least 15 days prior to starting excavation work.

SECTION 01 11 00 Page 2

1.6 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within five miles of the construction site.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --