A.07.27_Amendment_3_W912DS18B002303.pdf

PDF 158 KB Posted

Attached to
KC-46A Alter Facilities for Maintenance Federal contract opportunity
Solicitation number
W912DS18B0023
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

Amendment

View the file

Other files for this federal contract opportunity

Other files attached to KC-46A Alter Facilities for Maintenance, newest first.
File Type Posted
Bid_Abstract_W912DS-18-B-0023.pdf.pdf PDF
Amendment_8-_KC46_Alter_Facilities_for_MX.pdf PDF
A.07.27_Amendment_8_W912DS18B0023.pdf PDF
Amendment_0007_Alter_Faciltities_for_MX_-_Plans.pdf PDF
Amendment_0007_Alter_Faciltities_for_MX_-_Specs.pdf PDF
A.07.27_Amendment_7_W912DS18B0023.pdf PDF
A.07.27_Amendment_6_W912DS18B0023.pdf PDF
A.07.27_Amendment_5_W912DS18B0023.pdf PDF
Appendix_B_-_Photo_RFI_15.pdf PDF
Amendment_4_-_KC46_Alter_Facilities_for_MX_-_Plans.pdf PDF
Appendix_D_-_Revised_Section_01_45_00.pdf PDF
Appendix_C_-_Revised_SOW.pdf PDF
Appendix_G-_Revised_Section_08_71_00.pdf PDF
Appendix_E_-_Revised_Section_01_50_00.pdf PDF
Appendix_F_-_Revised_Submittal_Register.pdf PDF
A.07.27_Amendment_4_W912DS18B0023.pdf PDF
Amendment_3_-_Appendix_A_-_As-Build_Drawings.pdf PDF
Am2_Revised_Drawings.pdf PDF
Fixtures_Schedule.pdf PDF
W912DS18B002302.pdf PDF
W912DS18B0023-Amendment_0001.pdf PDF
A.07.23_W912DS18B0023.pdf PDF
H.01.01_Drawings_2_W912DS18B0023.pdf PDF
H.01.01_Drawings_1_W912DS18B0023.pdf PDF
H.01.04_Specs_Furnishings_W912DS18B0023.pdf PDF
H.01.04_Specs_W91DS18B0023.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DS18B0023

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment to address Contractor requests for information and provide updates to plans and specifications. Bid opening date is not further extended and remains October 24 at 2:00 PM EST. Outstanding RFIs w ill be addressed in a future amendment.

1. CONTRACT ID CODE PAGE OF PAGES

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Oct-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS18B0023

X 9B. DATED (SEE ITEM 11)

23-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Oct-2018

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

RFIS

AMENDMENT 0003 to DRAWINGS and SPECIFICATIONS for Alter Facilities For Maintenance, Joint Base McGuire-Dix-Lakehurst, New Jersey.

TO OFFORERS

The following changes shall be made to the drawings and specifications.

- The FF&E Package has been revised and reissued for building 2201 and 3101.

- Appendix A – As-build Drawings has been added.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

General Drawings

- G-001

- G-002

- S-002

- F-001

- F-002

- FA-001

- P-001

- M-001

- E-601

- T-001

- T-502

- T-506

- T-507

Building 1817 Drawings

- G-000

- AD-101

- S-201

- S-510

- A-110

- A-201

- A-601

- EP-110

Building 2201 Drawings

- G-000

- FD-110

- MD-110

- MD-401

- ED-110

- S-101

- S-510

- A-010

- A-100

- A-110

- A-111

- A-112

- A-151

- A-301

- A-310

- A-601

- IF401

- IN-601

- F-110

- F-301

- F-401

- F-402

- FA-110

- FA-401

- FA-501

- MH-110

- MH-111

- MH-401

- MH-402

- MH-601

- MH-610

- MH-611

- EL-111

- EL-112

- EP-110

- EP-111

- EP-112

- T-112

Building 2251 Drawings

- G-000

- A-110

- A-401

- A-601

- EP-110

Building 3101 Drawings

- G-000

- AD-101

- AD-102

- FD-101

- A-010

- A-100

- A-111

- A-112

- A-150

- IF-401

- F-110

- FA-110

- FA-601

- PL-110

- PL-401

- PL-402

- PL-501

- PL-601

- MH-110

- MH-301

- MH-401

- MH-402

- MH-501

- MH-601

- MH-602

- EL-111

- EP-111

- EP-112

- E-602

- E-701

- T-111

3. The following DRAWINGS have been ADDED:

- None

4. The following DRAWINGS have been DELETED:

- None

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- None

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

- None

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

- None

BIDDER’S QUESTIONS AND GOVERNMENT REPLY

1. Reference Building 3101 – Drawing PL-401 note 4 states to relocate hot water heater. Drawing PL-

402 note 19 states existing 20-gallon hot water heater unit on site, looks more like 40 or 50 gallon electric water heater. Drawing PL-501 detail 7 states hot water heater is 120 gallon. Which drawing is correct?

Response: See related notes on Revision 1 to attached drawings PL-401, 402, and 501. The existing water heater is an A.O. Smith Model ECT 52 210, 50 Gallon electric.

2. Reference Building 3101 – Is a backflow Preventer required on the domestic cold water service feeding the toilet rooms?

Response: No, building main is provided with backflow preventer.

3. Reference Building 3101 – Is a pressure reducing valve required on this same cold-water service feeding the toilet rooms?

Response: No, building main is provided with reducing valve.

4. Reference Building 3101 – Drawing MH-501 has a floor drain detail, should this be on the Plumbing Drawings?

Response: Revised drawing MH-501 is attached.

5. Reference Building 3101 – Floor drain on MH-501 indicates a 1/2” trap primer, however fixture schedule on drawing PL-601 indicates no water is required to the floor drain. Please advise if trap primer is required and if so no water is shown anywhere feeding the trap primers. Please advise.

Response: No trap primer required. MH-501 has been revised to remove this indicator.

6. Reference Building 3101 – Reference drawing MH-602 schedule for the outdoor condensing unites.

There are 5 notes at the bottom of the schedule indicating remarks/ accessories but in the remarks.

Accessories column there are no numbers listed, are there 5 accessories for each unit? Please advise.

Response: Yes, all 5 accessories in Remarks are required for each unit.

7. Reference Building 3101 – There are no pipe sizes on the water mains shown on Contract Drawing PL-402. Please advise.

Response: PL-402 has been revised to include water main sizes and branch sizes, defined in the sheet keynotes. Revision attached

8. Reference Building 3101 – Should there be an expansion tank installed on the relocated Hot Water Heater?

Response: Yes, see revised drawing PL-402 to include expansion tank, attached.

9. Reference Building 2201 – Contract Drawing MH-601 states DDC controls are an extension of the existing control system as does specification section 23-09-00. Whose control system is currently being used in the building?

Response: The Ameresco-controlled equipment in 2201 includes the radiant heat in the bay, three hot water boilers, and one steam boiler. They are controlled through Ameresco's control panel, which a uses a Continuum system. The chillers are not controlled by Ameresco.

10. Reference Building 2201 – Drawing A-151 “Reflected Ceiling Plan” shows acoustical ceiling in rooms 175 and 118 at 8’ and 14’. However, the finish schedule on drawing IN-601 indicates Rooms 119 and 120 are to receive acoustical ceiling at 10’. Which drawing are we to follow?

Response: The drawings are correct, Room 118, and 119 & 120 will have independent ceiling heights, and each is an individual space. Rooms 119 and 120 already have a hard ceiling.

11. Reference Building 2201 – Drawing A-301 “Building Section” shows the Hazmat ceiling at 12’.

However, the schedule drawing IN-601 shows 8’. Which is correct?

Response: Provide new ceiling at 12’-0” AFF, see revised drawing IN601.

12. Reference Building 1817 – Structural drawing S-101 and Architectural drawing A-110 indicate overhead ceiling doors to be 16’ wide. The door schedule drawing A601 indicated the doors to be 14’ wide. Which is correct?

Response: Provide Door 100A: 16’-0” x 18’-0”; Door 100B: 16’-0” x 18’-0”; Door 100D: 12’-0” x 18’-0”, see revised drawing A601.

13. Reference Building 1817 – Drawing A-201 indicated in note #5 that the steel bollards are to be painted safety yellow. Detail D5 on the same drawing indicates bollards to have a yellow HDPE cover. Which is correct?

Response: Safety Bollards shall be ‘Painted Safety Yellow’, should not include HDPE cover.

Refer to revised drawing A-201.

14. Building 2201 - Per detail A1 on Sheet A-201 -Drawings A-508, A-508A, A-508B are referenced but not included in the bid documents. Can you please provide the drawings referenced & information on the manufacturer of the existing Vault Door?

Response: Appendix A of this amendment includes referenced drawings and information.

15. Is there a GSA purchasing contract for this project? This affects the costs of the furniture specified in the bid documents. If applicable, the furniture available is at a significantly lower cost.

Response: Where available, GSA schedule numbers have been provided on the revised furnishings schedule.

16. The only buildings showing fire suppression systems are in Buildings 2201 & 3101, there does not seem to be any fire suppression work in Building 2251 & 1817. Please confirm as I want to make sure there are no missing drawings.

Response: Correct. Both buildings 2201 and 3101 each require work to the Fire Suppression System; Buildings 2251 and 1817 have existing Fire Suppression Systems that require no additional work.

17. Building 2251 drawing A-110 notes work to be performed on the exterior of this facility but there are no elevation drawings for building 2251 in the bid documents. Please provide them to enable an accurate assessment of the work required.

Response: There are no exterior building elevations provided because the scope of work is too small to illustrate without an enlarged partial elevation. The scope of work is limited to removing a portion of damaged brick veneer and replacing it ‘in-kind’ to match existing. The size of the areas being patched are approximately 3 ft. wide by 3 ft. high at each of two locations. 18 SF total.

18. Building 3101 drawing A-111 note 5 makes reference to details D7 and F7 on drawing A601 for information on the casework. However, A601 detail D7 denotes a door type and there is no detail F7 on drawing A601. Please advise as to the correct details for the casework.

Response: Note 5 on revised Sheet A-111, attached, has been updated to reference details A4 and A6 respectively, in lieu of details D7 and F7.

19. Reference Building 2201 – Sheet EP-112 refers to panel “DPA- 81”, please provide a location for this panel.

Response: The panel name is DPH-MZ located on the mezzanine at column J and 7.8. EP-112 has been revised and attached, References to DPA-B1 have been changed to DPH-MZ.

20. Reference Building 2201 – Sheet FA-401, please clarify which fire alarm devices are new and which are existing.

Response: Sheet FA401 has been revised and is attached. The plotting of devices was corrupted. The existing devices are shaded and the new devices are bold.

21. Reference Building 2201 – Will MC cable be an acceptable wiring method for concealed branch circuits?

Response: MC cable is allowed according to the UFC in dry exposed locations and concealed in undisturbed walls.

22. Reference Building 3101 - Will MC cable be an acceptable wiring method for concealed branch circuits?

Response: MC cable is allowed according to the UFC in dry exposed locations and concealed in undisturbed walls.

(End of Summary of Changes)