AMENDMENT 0004, W912DS-18-B-0021
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
-- Make changes to the Draw ings -- Make changes to the Specifications, particularly revising and reissuing the Bid Schedule
The Bid Opening date is extended to 11 October 2018 at 2:00pm EST.
NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing Block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS18B0021
X 9B. DATED (SEE ITEM 11)
17-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Sep-2018
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS18B0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY
REVISED BID SCHEDULE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
FFP
FY18 KC46 ADAL BOT, JBMDL: All work (includes all plant, labor, and material) for the alterations within Bldg 2319 both BOT and WST areas as described in the plans and specifications except for work included in items below.
FOB: Destination
NET AMT
0002 1 Job
FY18 KC46 ADAL BOT, JBMDL: All work (includes all plant, labor, and material) for the addition to Bldg 2319 for BOT as described in the plans and specifications except for work included in items below.
0003 1 Job
FY18 KC46 ADAL BOT, JBMDL: All Work (includes all plant, labor, and material) for the site work, all work outside the five-foot line of Bldg 2319 perimeter, excluding items below, as described in plans and specifications.
0004 1 Job
FY18 KC46 ADAL BOT, JBMDL: All work for the Final Record Drawing Submission (See Section 00 73 00).
THIS CLIN IS PRICED $50,000.00.
$50,000.00
0005 1 Job OPTION Option 1
FFP
FY18 KC46 ADAL BOT, JBMDL: Purchase, deliver, and install Furnishings, Equipment and Appliances, per CID/SID & FF&E packages for Bldg 2319.
0006 1 Job OPTION Option 2
FFP
FY18 KC46 ADAL BOT, JBMDL: All Work (includes all plant, labor, and material) for the removal and installation of East side foundation footings for the WST if found not suitable for reuse, refer to plans S102, S402… and specifications for details
0007 1 Job OPTION Option 3
FFP
FY18 KC46 ADAL BOT, JBMDL: All Work (includes all plant, labor, and material) for the removal and installation of West Side foundation footings for the WST if found not suitable for reuse, refer to plans S102, S402… and specifications for details.
0008 1 Job OPTION Option 4
FFP
FY18 KC46 ADAL BOT, JBMDL: All Work (includes all plant, labor, and material) for the renovation of restrooms 119 & 120, as described in plans and specifications.
0009 1 Job OPTION Option 5
FFP
FY18 KC46 ADAL BOT, JBMDL: All Work (includes all plant, labor, and material) for the renovation of restrooms 129 & 130, as described in plans and specifications.
0010 1 Job OPTION Option 6
FFP
FY18 KC46 ADAL BOT, JBMDL: All Work (includes all plant, labor, and material) for the installation of 2 partial opening infill panel and rollup doors on both WST existing large openings as shown on Detail A4 on A-202 and A5 on A- 310, include disposal of the existing access panels.
0011 1 Job OPTION Option 7
FFP
FY18 KC46 ADAL BOT, JBMDL: All Work (includes all plant, labor, and material) for the procurement and installation of 2 ton crane
0012 1 Job OPTION Option 8
FFP
FY18 KC46 ADAL BOT, JBMDL: All Work (includes all plant, labor, and material) for Installation of lightning protection on the existing Building 2319.
(does not include new addition built in this contract)
TOTALS & NOTES
BASE CLINs (0001 to 0004) $_______________
OPTION CLINs (0005 to 0012) $_______________
TOTAL CLINs (0001 to 0012) $_______________
NOTES:
1. Bidders are required to bid on all the Base Bid and all the Optional Bid Items or their bids will be rejected.
2. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself, thereto, may render the bid non-responsive and be cause for its rejection.
3. Line item 0004 is pre-priced at $50,000.00 and this price shown may not be changed. See Section 00 73 00 for Final Record Drawing definition and requirement.
4. The Basis of Evaluation will be the lowest responsive, responsible bid based on the Total Amount for the Base Bid Items plus the Optional Bid Items (Line Items 0001 thru 0010).
5. Option #1: At any time prior to 540 calendar days after award of the contract, the Government at its option, may direct the Contractor, by written order, to perform the work and/or services provided under this Option. Execution of this option will not alter the project completion date of the contract.
6. Option #2: At any time prior to 420 calendar days after award of the contract, the Government at its option, may direct the Contractor, by written order, to perform the work and/or services provided under this Option. Execution of this option will not alter the project completion date of the contract.
7. Option #3: At any time prior to 700 calendar days after award of the contract, the Government at its option, may direct the Contractor, by written order, to perform the work and/or services provided under this Option. Execution of this option will not alter the project completion date of the contract.
8. Option #4-8: At any time prior to 600 calendar days after award of the contract, the Government at its option, may direct the Contractor, by written order, to perform the work and/or services provided under this Option. Execution of this option will not alter the project completion date of the contract.
9. The Bid Acceptance Period is as stated on Standard Form 1442.
10. Submit technical inquiries and questions relating to this solicitation via Bidder Inquiry in ProjNet at
(https://www.projnet.org) at least 10 calendar days prior to the date established in the IFB for receipt of bids. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to receipt of bids. If a bidder believes that the requirements in this Invitation for Bid contain an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale.
To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access.
A prospective vendor who submits a comment or question will receive answers in an amendment. All timely questions and approved answers will be made available in amendments and posted to FBO.Gov
Bidder Inquiry Key: IY9M8A-FCV4CA
Specific Instructions for Initial ProjNet Bid Inquiry Access:
1. From the ProjNet home page, click on Quick Add on the upper right side of the screen.
2. Identify the Agency as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. E‐mail. Enter the e‐mail address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 25-Sep-2018 02:00 PM to 11-Oct-2018 02:00 PM.
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
KC46 – ADAL B2319 for Boom Operator Trainer Joint Base McGuire-Dix-Lakehurst, NJ
W912DS-18-B-0021
Amendment 0004
AMENDMENT 0004 to DRAWINGS and SPECIFICATIONS for Bldg. 2319 Boom Operator Trainer, Joint Base McGuire-Dix-Lakehurst, New Jersey
TO OFFERORS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- None
2. The following DRAWINGS have been REVISED and REISSUED:
- Drawing ES-101
3. The following DRAWINGS have been ADDED:
- None
4. The following DRAWINGS have been DELETED:
- None
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
- None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
- None
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
- 00 10 00 – Solicitation Bid Schedule
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
- Section 01 50 00 Temporary Construction Facilities and Controls – replace paragraph 3.6.1 in its entirety with “NOT USED”
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
1. None
(End of Summary of Changes)