Amendment_13-_KC46_BOT_Specs.pdf

PDF 793 KB Posted

Attached to
KC-46A Add/Alter Bldg. 2319 for Boom Operator Trainer Federal contract opportunity
Solicitation number
W912DS-18-B-0021
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

SPECIFICATIONS, AMENDMENT 0013

View the file

Other files for this federal contract opportunity

Other files attached to KC-46A Add/Alter Bldg. 2319 for Boom Operator Trainer, newest first.
File Type Posted
Bid_Abstract_W912DS-18-B-0021.pdf PDF
W912DS-18-B-0021_Amend_0013.pdf PDF
W912DS-18-B-0021_Amend_0012.pdf PDF
W912DS-18-B-0021_Amend_0011.pdf PDF
Amendment_11_-_KC46_BOT_-_Plans.pdf PDF
Amendment_10_-_KC46_BOT_-_Specs.pdf PDF
Amendment_10_-_KC46_BOT_-_Plans.pdf PDF
W912DS-18-B-0021_Amend_0010.pdf PDF
W912DS-18-B-0021_Amend_0009.pdf PDF
BOT_Amendment_8_Appendix_A.pdf PDF
Amendment_8_-_KC26_BOT_-_Plans.pdf PDF
W912DS-18-B-0021_Amend_0008.pdf PDF
Amendment_8_-_KC46_BOT_-_Specs.pdf PDF
W912DS-18-B-0021_Amend_0007.pdf PDF
Package_3_-_Bldg_2319_BOT_-_FF&E_-_Amendment_0006.pdf PDF
Appendix_C_-_Interior_Photos.pdf PDF
Amendment_6_-_KC46_BOT_-_Plans.pdf PDF
W912DS-18-B-0021_Amend_0006.pdf PDF
W912DS18B0021_-_Amendment_0005.pdf PDF
Amendment_4_-_KC46_BOT_-_Plans.pdf PDF
W912DS18B0021_-_Amendment_0004.pdf PDF
W912DS18B0021_-_Amendment_0003.pdf PDF
Amendment_3_-_KC46_BOT_-_Plans.pdf PDF
Amendment_3_-_KC46_BOT_-_Specifications.pdf PDF
W912DS18B0021_-_Amendment_0002.pdf PDF
POCs_for_BLD_2319_Boom_Operator.pdf PDF
Sign_In_Roster_29_AUG_Boom_Operator.pdf PDF
W912DS18B0021_-_Amendment_0001.pdf PDF
Package_3_-_Bldg_2319_BOT_-_FF&E.pdf PDF
Package_2_-_Bldg_2319_BOT_-_Specs.pdf PDF
Amendment_1_-_Bldg_2319_BOT_-_Plans.pdf PDF
W912DS18B0021_KC-46A_Bldg_2319_Boom_Operator.pdf PDF
Package_2_-_Bldg_2319_BOT_-_Specs.pdf PDF
Appendix_B_-_B2319_Geotechnical_Investigations.pdf PDF
Package_1_-_Bldg_2319_BOT_-_Plans.pdf PDF
Appendix_A_-_B2319_As-Build_Drawings.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KC-46A Beddown, Building 2319

(BOT/WST)

Specifications

Prepared for

U.S. Army Corps of Engineers

Revision 5

21 November 2018

CH2M HILL, Inc.

2095 Lakeside Centre Way

Suite 200 Knoxville, TN 37922

KC-46A Beddown, Building 2319

(BOT/WST)

Specifications Stamp Page

Prepared for

U.S. Army Corps of Engineers

Revision 5

21 November 2018

CH2M HILL, Inc.

2095 Lakeside Centre Way

Suite 200 Knoxville, TN 37922

USACE NYD JB MDL 695847

Revi s i on 5

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 00 01 COVER SHEET

00 00 02 CHECK LI ST FOR BI DDERS

00 10 00 SF 1442 AND BI DDI NG SCHEDULE

00 21 16 I NSTRUCTI ONS, CONDI TI ONS, AND NOTI CE TO BI DDERS

00 22 10 TECHNI CAL PROPOSAL DESI GN - BI D- BUI LD SELECTI ON PROCEDURES

00 24 00 EVALUATI ON FACTORS FOR AWARD

00 45 00 REPRESENTATI ONS AND CERTI FI CATI ONS

00 72 00 CONTRACT CLAUSES

00 73 00. 00 18 SPECI AL CONTRACT REQUI REMENTS

00 90 00 WAGE RATES

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRI CTI ONS

01 30 00 ADMI NI STRATI VE REQUI REMENTS

01 32 01. 00 10 PROJECT SCHEDULE

01 33 00 SUBMI TTAL PROCEDURES

01 33 29 SUSTAI NABI LI TY REPORTI NG

01 35 13 SPECI AL PROJECT PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00. 00 10 QUALI TY CONTROL

01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)

01 45 20. 00 18 TESTI NG FOR MECHANI CAL AND ELECTRI CAL SYSTEMS

01 45 35 SPECI AL I NSPECTI ONS

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS

01 58 00 PROJECT I DENTI FI CATI ON

01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMI TTALS

01 78 23 OPERATI ON AND MAI NTENANCE DATA

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

02 42 51 CARPET REMOVAL AND RECLAMATI ON

DI VI SI ON 03 - CONCRETE

03 30 00 CAST- I N- PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 UNI T MASONRY

DI VI SI ON 05 - METALS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD- FORMED METAL FRAMI NG

05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

PROJECT TABLE OF CONTENTS Page 1 21 November 2018

06 10 00 ROUGH CARPENTRY

06 41 16. 00 10 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL CABI NETS

06 61 16 SOLI D SURFACI NG FABRI CATI ONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTI NG AN AI R BARRI ER SYSTEM FOR AI R TI GHTNESS

07 21 13 BOARD AND BLOCK I NSULATI ON

07 21 16 MI NERAL FI BER BLANKET I NSULATI ON

07 22 00 ROOF AND DECK I NSULATI ON

07 27 10. 00 10 BUI LDI NG AI R BARRI ER SYSTEM

07 27 26 FLUI D- APPLI ED MEMBRANE AI R BARRI ERS

07 42 63 FABRI CATED WALL PANEL ASSEMBLI ES

07 60 00 FLASHI NG AND SHEET METAL

07 61 14. 00 20 STEEL STANDI NG SEAM ROOFI NG

07 84 00 FIRESTOPPING

07 92 00 JOI NT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 33 23 OVERHEAD COI LI NG DOORS

08 71 00 DOOR HARDWARE

08 91 00 METAL WALL AND DOOR LOUVERS

DI VI SI ON 09 - FI NI SHES

09 06 00 SCHEDULES FOR FI NI SHES

09 29 00 GYPSUM BOARD

09 30 10 CERAMI C, QUARRY, AND GLASS TI LI NG

09 51 00 ACOUSTI CAL CEI LI NGS

09 65 00 RESI LI ENT FLOORI NG

09 67 23. 13 STANDARD RESI NOUS FLOORI NG

09 68 00 CARPETING

09 69 13 RI GI D GRI D ACCESS FLOORI NG

09 90 00 PAI NTS AND COATI NGS

DI VI SI ON 10 - SPECI ALTI ES

10 11 00 VI SUAL DI SPLAY UNI TS

10 14 00. 20 I NTERI OR SI GNAGE

10 14 53 TRAFFI C SI GNAGE

10 21 13 TOI LET COMPARTMENTS

10 28 13 TOI LET ACCESSORI ES

10 44 16 FI RE EXTI NGUI SHERS

10 51 13 METAL LOCKERS

DI VI SI ON 12 - FURNI SHI NGS

12 36 00 COUNTERTOPS

12 50 00. 13 10 FURNI TURE AND FURNI TURE I NSTALLATI ON

12 59 00 SYSTEMS FURNI TURE

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 18. 00 10 PREACTI ON AND DELUGE SPRI NKLER SYSTEMS, FI RE PROTECTI ON

DI VI SI ON 22 - PLUMBI NG

PROJECT TABLE OF CONTENTS Page 2

22 00 00 PLUMBI NG, GENERAL PURPOSE

22 13 29 SANI TARY SEWERAGE PUMPS

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS

23 05 15 COMMON PI PI NG FOR HVAC

23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC

23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS

23 09 00 I NSTRUMENTATI ON AND CONTROL FOR HVAC

23 09 13 I NSTRUMENTATI ON AND CONTROL DEVI CES FOR HVAC

23 09 23. 02 BACNET DI RECT DI GI TAL CONTROL FOR HVAC AND OTHER BUI LDI NG

CONTROL SYSTEMS

23 23 00 REFRI GERANT PI PI NG

23 64 10 WATER CHI LLERS, VAPOR COMPRESSI ON TYPE

DI VI SI ON 26 - ELECTRI CAL

26 08 00 APPARATUS I NSPECTI ON AND TESTI NG

26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM

26 28 01. 00 10 COORDI NATED POWER SYSTEM PROTECTI ON

26 41 00 LI GHTNI NG PROTECTI ON SYSTEM

26 51 00 I NTERI OR LI GHTI NG

DI VI SI ON 27 - COMMUNI CATI ONS

27 05 14. 00 10 CABLE TELEVI SI ON PREMI SES DI STRI BUTI ON SYSTEM

27 05 28. 36 40 CABLE TRAYS FOR COMMUNI CATI ONS SYSTEMS

27 05 29. 00 10 PROTECTI VE DI STRI BUTI ON SYSTEM ( PDS) FOR SI PRNET

COMMUNI CATI ON SYSTEMS

27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM

27 54 00. 00 20 COMMUNI TY ANTENNA TELEVI SI ON ( CATV) SYSTEMS

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 64. 00 10 FI RE DETECTI ON AND ALARM SYSTEM, ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 05 22 GEOTEXTI LES USED AS FI LTERS

31 11 00 CLEARI NG AND GRUBBI NG

31 23 00. 00 20 EXCAVATI ON AND FI LL

31 32 11 SOI L SURFACE EROSI ON CONTROL

31 63 26 DRI LLED CAI SSONS

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 11 23 AGGREGATE BASE COURSES

32 11 23. 23 BASE COURSE DRAI NAGE LAYERS

32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS

32 16 13 CONCRETE SI DEWALKS AND CURBS AND GUTTERS

32 17 23 PAVEMENT MARKI NGS

32 92 19 SEEDING

DI VI SI ON 33 - UTI LI TI ES

33 40 00 STORM DRAI NAGE UTI LI TI ES

33 51 15 NATURAL- GAS DI STRI BUTI ON

PROJECT TABLE OF CONTENTS Page 3

DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT

41 22 13. 14 BRI DGE CRANES, OVERHEAD ELECTRI C, TOP RUNNI NG

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 64 PAGES

163001

01 11 00 SD-01 Preconstruction Submittals

1.6 G ROSalvage Plan

01 14 00 SD-01 Preconstruction Submittals

1.2.1.1 G ROList of Contact Personnel

01 30 00 SD-01 Preconstruction Submittals

1.4 G ROView Location Map

1.5 G ROProgress and Completion

Pictures SD-04 Samples

1.3 G ROColor Boards

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

3.5.2 G RONarrative Report

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 G ROPreliminary High Performance

and Sustainable Building Checklist

1.4.1 G ROSustainability Action Plan

1.5.3.1 G ROPreliminary Sustainability

eNotebook SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 64 PAGES

01 33 29 1.5.3.1 G ROFinal High Performance and Sustainable Building Checklist

1.5.3.1 G ROFinal Sustainability eNotebook

1.5.3.1 G ROAmended Final Sustainability

eNotebook

1.5.3.1 GAmended Final High

Performance and Sustainable Building Checklist

01 35 26 SD-01 Preconstruction Submittals

1.7 G ROAccident Prevention Plan (APP)

SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates 1.6.1.5Crane Operators/Riggers

1.7.2.2 G ROStandard Lift Plan

1.7.2.3 G ROCritical Lift Plan

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates

1.14.1 G RORadiography Operation Planning

Work Sheet

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 64 PAGES

01 35 26 1.14.1 G ROPortable Gauge Operations Planning Worksheet

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan SD-06 Test Reports

3.9.2Verification Statement 01 45 35 SD-01 Preconstruction Submittals

3.1.2Written Practices 3.1.2NDT Procedures and Equipment

Calibration Records SD-06 Test Reports

3.1.2Daily Reports 3.1.1Biweekly Reports

SD-07 Certificates 2.1Fabrication Plant 2.1Steel Truss Plant 2.1Certificate of Compliance

1.5 GSpecial Inspector

3.1.2Qualification Records

SD-11 Closeout Submittals

3.1.2 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 G ROConstruction Site Plan

3.4.1 G ROTraffic Control Plan

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 64 PAGES

01 50 00 1.4.3Backflow Preventer Tests SD-07 Certificates

1.4.1Backflow Tester 1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals 1.5.1Preconstruction Survey

1.10 G ROSolid Waste Management Permit

1.5.2 G RORegulatory Notifications

1.6 G ROEnvironmental Protection Plan

1.6.9.1 G RODirt and Dust Control Plan

1.5.5 G ROEmployee Training Records

1.5.4 G ROEnvironmental Manager

Qualifications SD-06 Test Reports

3.7.1.1.2Laboratory Analysis

3.7.2.1 G ROSolid Waste Management Report

SD-07 Certificates

1.5.5 G ROEmployee Training Records

1.5.5.1Certificate of Competency

SD-11 Closeout Submittals

3.7.1 G ROWaste Determination

Documentation

3.7.3.6 G RODisposal Documentation for

Hazardous and Regulated Waste

1.5.5 G ROAssembled Employee Training

Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 64 PAGES

01 57 19 1.10 G ROSolid Waste Management Permit

3.7.2.1 G ROSolid Waste Management Report

3.7.3.1 G ROHazardous Waste/Debris

Management

1.5.2 G RORegulatory Notifications

3.7.2.1 G ROSales Documentation

3.7.2.1Contractor Certification

01 58 00 SD-02 Shop Drawings

1.3.1 G ROSign Legend Orders

01 74 19 SD-01 Preconstruction Submittals

1.5 GWaste Management Plan

SD-11 Closeout Submittals 1.6Records

01 78 00 SD-03 Product Data 1.7.1Warranty Management Plan 1.7.5Warranty Tags 1.5Spare Parts Data

SD-08 Manufacturer’s Instructions 1.7.1Instructions

SD-10 Operation and Maintenance Data

3.7 G ROOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 G ROAs-Built Drawings

3.3 G RORecord Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 64 PAGES

01 78 00 3.6As-Built Record of Equipment and Materials

3.4Final Approved Shop Drawings 3.5Construction Contract

Specifications

2.3 G ROCertification of EPA Designated

Items

3.9 G ROInterim DD FORM 1354

3.9 G ROChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance Data

1.3 G ROO&M Database

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

3.1.5 GValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition/Deconstruction Plan

1.11Existing Conditions

SD-07 Certificates

1.7 GNotification

SD-11 Closeout Submittals 3.3.4Receipts

02 42 51 SD-01 Preconstruction Submittals

1.4.2 GProposed Dust-Control Measures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 64 PAGES

02 42 51 1.4.2 GProposed Packing and Transportation Measures

1.4.4 GSchedule of Carpet Reclamation

Activities

1.4.3 GCarpet Reclamation Agency

Records

03 30 00 SD-01 Preconstruction Submittals 1.6.3.1Concrete Curing Plan

1.6.5 GQuality Control Plan

1.6.6 GQuality Control Personnel

Certifications 1.6.6Quality Control Organizational

Chart

1.6.8 GLaboratory Accreditation

2.3.1.7 GThermal Control Plan

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data 2.4.8Joint Sealants 2.4.7Joint Filler 2.1Materials for Forms 2.4.1Cementitious Materials 2.4.6Vapor Barrier 2.3.3Concrete Curing Materials 2.5Reinforcement 2.6.1Liquid Chemical Floor Hardener

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 64 PAGES

03 30 00 2.4.5Admixtures 2.5.2Mechanical Reinforcing Bar

Connectors 2.2.1Waterstops 1.8.1Local/Regional Materials 2.4.9Biodegradable Form Release

Agent SD-05 Design Data

2.3.1 GMix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.4.1Fly Ash 1.6.4.1Pozzolan 1.6.4.2Ground Granulated Blast-Furnace

Slag 2.4.3Aggregates

3.13.2.3 GCompressive Strength Tests

3.13.2.5Unit Weight of Structural

Concrete 3.13.2.4Air Content 3.13.2.1Slump Tests 2.4.2Water

SD-07 Certificates 2.5.1Reinforcing Bars 1.9Welder Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 64 PAGES

03 30 00 1.6.3.2VOC Content for Form Release Agents, Curing Compounds, and Concrete Penetrating Sealers

1.6.3.3Safety Data Sheets 1.8.2Forest Stewardship Council

(FSC) Certification 1.6.6.2Field Testing Technician and

Testing Agency SD-08 Manufacturer’s Instructions

2.3.3Curing Compound 04 20 00 SD-02 Shop Drawings

3.3.4.1 GCut CMU

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2 GClay or Shale Brick

2.2.3.2.1 GCement

2.4.1.1 GCementitious Materials

2.6.8 GInsulation

SD-04 Samples

1.3.1.1 GMock-Up Panel

2.2.2 GClay or Shale Brick

2.2.3.2 GConcrete Masonry Units (CMU)

2.4.1.3 GAdmixtures for Masonry Mortar

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 64 PAGES

04 20 00 2.6.2 GAnchors, Ties, and Bar Positioners

2.6.3 GJoint Reinforcement

2.6.6 GClay Masonry Expansion-Joint

Materials

2.6.8 GInsulation

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

2.2.3.3Fire-Rated Concrete Masonry

Units

3.2.5 GBracing Calculations

SD-06 Test Reports 2.2.2.1.4Efflorescence Test 2.2.3.3Fire-Rated Concrete Masonry

Units 3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout 2.1.2Prism Test

SD-07 Certificates 1.3.2Special Masonry Inspector

Qualifications 2.2.2Clay or Shale Brick 2.2.3.2Concrete Masonry Units (CMU) 2.2.4Precast Concrete Units 2.4.1.1Cementitious Materials 2.4.1.3Admixtures for Masonry Mortar

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 64 PAGES

04 20 00 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar

Positioners 2.6.3Joint Reinforcement 2.6.8Insulation 2.6.8Insulation

SD-08 Manufacturer’s Instructions 2.4.1.3Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance Data

3.8Take-Back Program SD-11 Closeout Submittals

2.2.2.1.3 SClay Units

2.2.3.2.2 SRecycled Content

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection Drawings

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data 2.6.2Shop Primer 2.4.1Welding Electrodes and Rods 2.3.2.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout 2.3.3Tension Control Bolts

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 64 PAGES

05 12 00 2.3Bolts, Nuts, and Washers 3.7.1.2Weld Inspection Reports 3.7.2.1Direct Tension Indicator Washer

Inspection Reports 3.7.3.1Bolt Testing Reports

SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing 1.3AISC Fabrication Plant Quality

Certification 1.3AISC Erector Quality Certification 1.4.3.1Welding Procedures and

Qualifications 2.4.1Welding Electrodes and Rods

05 30 00 SD-02 Shop Drawings

1.3.3 GFabrication Drawings

SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.3Galvanizing Repair Paint 2.2.11Mechanical Fasteners 2.1.3Touch-Up Paint

SD-04 Samples 2.1.1Metal Roof Deck Units 2.2.3Flexible Closure Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 64 PAGES

05 30 00 SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates 1.3.2.1Fire Safety 1.3.2.2Wind Storm Resistance 1.3.1Manufacturer's Certificate

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products 05 40 00 SD-02 Shop Drawings

1.6.1 GFraming Components

SD-03 Product Data

2.1Studs, Joists SD-05 Design Data

1.6.2 GMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal Framing

3.2.1Welds SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products

05 50 13 SD-02 Shop Drawings

2.3 GCover Plates and Frames

2.4 GExpansion Joint Covers

2.5 GBollards/Pipe Guards

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 64 PAGES

05 50 13 2.7 GAngles and Plates SD-03 Product Data

2.3 GCover Plates and Frames

2.4 GExpansion Joint Covers

2.6 GDownspout Terminations

SD-04 Samples 2.4Expansion Joint Covers

2.1 GCertified Mill

06 10 00 SD-03 Product Data 1.8Fire-retardant Treatment 2.3.4Adhesives 2.2Oriented Strand Board

SD-06 Test Reports 1.4.3Preservative-treated

SD-07 Certificates

1.9.1 GCertified Sustainably Harvested

Wood 1.7Preservative Treatment 1.9.2Indoor Air Quality

SD-11 Closeout Submittals

2.2.1.1 SCertified Sustainably Harvested

Plywood for Other Uses

2.3.4 SIndoor Air Quality for Aerosol

Adhesives

2.3.4 SIndoor Air Quality for Non-aerosol

Adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 64 PAGES

06 41 16.00 10 SD-02 Shop Drawings 2.6Shop Drawings 3.1Installation

SD-03 Product Data 2.1Wood Materials

SD-04 Samples 2.3Plastic Laminates

SD-07 Certificates 1.5Quality Assurance 3.1Laminate Clad Casework

SD-11 Closeout Submittals 1.3LEED Documentation

06 61 16 SD-02 Shop Drawings

1.5.2 GDetail Drawings

3.1 GInstallation

SD-03 Product Data 2.1Solid Polymer Material 1.5.1Qualifications 2.3Fabrications

SD-04 Samples

2.1 GMaterial

2.3.5 GCounter and Vanity Tops

SD-06 Test Reports 2.1Solid Polymer Material

SD-07 Certificates 2.3Fabrications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 64 PAGES

06 61 16 1.5.1Qualifications SD-10 Operation and Maintenance Data

3.2Clean-up SD-11 Closeout Submittals

1.3LEED Documentation 07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-07 Certificates

1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 GPressure Test Procedures

3.5.8 GAir Leakage Test Report

3.6.5 GDiagnostic Test Report

07 21 13 SD-03 Product Data

1.3 GManufacturer's Standard Details

2.2 GBlock or Board Insulation

2.3 GVapor Retarder

2.4 GPressure Sensitive Tape

1.4 GProtection Board or Coatings

2.6 GAccessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 64 PAGES

07 21 13 SD-07 Certificates

2.2 GBlock or Board Insulation

2.3 GVapor Retarder

2.5 GProtection Board or Coating

3.4.5 GProtection Board or Coating

1.7 GSpecial Warranties

1.7 GSpecial Warranties

SD-08 Manufacturer’s Instructions 2.2Block or Board Insulation 2.6.1Adhesive

SD-11 Closeout Submittals

2.1.1 SVolatile Organic Compound

(VOC) Content

2.1.2 SRecycled Content

07 21 16 SD-03 Product Data 2.2Blanket Insulation 2.3Vapor Retarder 2.4Pressure Sensitive Tape 2.5Accessories

SD-08 Manufacturer’s Instructions 3.2.1Insulation

SD-11 Closeout Submittals

2.1.1 SRecycled Content for Insulation

Materials

2.1.2 SReduce Volatile Organic

Compounds (VOC)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 64 PAGES

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

1.3 GVerification of Existing Conditions

SD-03 Product Data

2.2 GInsulation

1.4 GCover Board

2.4 GFasteners

SD-06 Test Reports

1.8.1 GFlame Spread Rating

SD-07 Certificates

1.9 GVolatile Organic Compounds

(VOC) Content

1.6 GInstaller Qualifications

SD-08 Manufacturer’s Instructions

2.4 GFasteners

2.2 GInsulation

SD-11 Closeout Submittals

1.9 SVolatile Organic Compounds

(VOC) Content 07 27 10.00 10 SD-06 Test Reports

1.7 GDesign Review Report

3.1.2 GTesting and Inspection

SD-07 Certificates

1.6 GAir Barrier Inspector

07 27 26 SD-01 Preconstruction Submittals

1.9.1 GQualifications of Manufacturer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 64 PAGES

07 27 26 1.9.2 GQualifications of Installer SD-02 Shop Drawings

1.4 GFluid-Applied Membrane Air

Barrier

SD-03 Product Data

1.4 GFluid-Applied Membrane Air

Barrier

2.4 GTransition Membrane

2.3 GPrimers, Adhesives, and Mastics

2.7 GReinforcement

1.4.2 GSafety Data Sheets

SD-04 Samples

1.4.3 GMockup

SD-06 Test Reports

1.6 GCapillary Moisture Test

1.4.4 GField Peel Adhesion Test

1.4.4 GFlame Propagation of Wall

Assemblies

1.4.4 GFlame Spread and Smoke

Developed Index Ratings

3.4.1 GSite Inspections

SD-07 Certificates

1.4 GFluid-Applied Membrane Air

Barrier

2.4 GTransition Membrane

1.9.1 GQualifications of Manufacturer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 64 PAGES

07 27 26 1.9.2 GQualifications of Installer SD-08 Manufacturer’s Instructions

1.4 GFluid-Applied Membrane Air

Barrier

2.4 GTransition Membrane

2.3 GPrimers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1 SVolatile Organic Compound

(VOC) Content 07 42 63 SD-01 Preconstruction Submittals

1.5.3Qualification of Manufacturer 1.5.4Qualification of Installer 1.5.4.1Qualifications for Welding Work

SD-02 Shop Drawings 1.5.1Fabrication and Installation drawings 1.5.1Wall Panel Assemblies 1.5.1Flashing and Accessories 1.5.1Anchorage Systems

SD-03 Product Data Certification

1.5.1sustainable acquisition 1.5.1Manufacturer's catalog data 1.5.1Factory Color Finish 1.5.1Sub-girts and Formed Shapes 1.5.1Closure Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 64 PAGES

07 42 63 1.5.1Insulation 1.5.1Pressure Sensitive Tape 2.4.4.1Sealants and Caulking 1.5.1Accessories

SD-04 Samples 1.5.1Wall Panel Assemblies 1.5.1Fasteners 1.5.1Metal Closure Strips 1.5.1Insulation 1.5.1manufacturer's color charts and chips SD-05 Design Data

1.5.1Wind Design Analysis SD-06 Test Reports

3.7.2Leakage Tests 1.3.2Wind Load Tests 1.3.2Seismic Tests 1.5.1Factory Color Finish

SD-07 Certificates 1.5.1Fasteners 1.5.3Qualification of Manufacturer 1.5.4Qualification of Installer 1.5.1wall system assembly wind load and fire rating classification listings SD-08 Manufacturer’s Instructions

1.5.1Installation of Wall Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 64 PAGES

07 42 63 SD-11 Closeout Submittals 1.5.1Warranty 1.5.1Instructions 1.5.1Safety Data Sheets

20 year 'No-Dollar-Limit' Warranty 07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

3.1.15 GGutters

3.1.16 GDownspouts

3.1.11 GCounterflashing

3.1.20 GFlashing at Roof Penetrations

and Equipment Supports

3.1.14 GDrip Edges

3.1.17 GOpen Valley Flashing

SD-03 Product Data

2.2.5 GCool Roof

2.2.7 GReglets

3.1.19 GExpansion Joints

SD-04 Samples

1.4.2 GFinish Samples

SD-07 Certificates

2.1 GCertificates of Compliance

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 GQuality Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 64 PAGES

07 60 00 SD-10 Operation and Maintenance Data

1.4.3 GCleaning and Maintenance

SD-11 Closeout Submittals

2.1 SRecycled Content

07 61 14.00 20 SD-02 Shop Drawings

1.2.5 GRoofing

SD-03 Product Data

2.2 GRoofing Panels

2.4Attachment Clips 2.5.1Closures 2.5Accessories 2.5.2Fasteners 2.5.3Sealants

1.7 GWarranty

SD-04 Samples 2.2Panel 2.5Accessories 2.5.3Sealants 2.3Intermediate Support

SD-05 Design Data 1.5Design Calculations

SD-06 Test Reports 3.6Field Inspection 1.3.3Structural Performance 1.6.6Finish

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 64 PAGES

07 61 14.00 20 SD-07 Certificates 1.6.3Manufacturer's Technical

Representative 1.6.4Installer's Qualifications

2.2 GCoil Stock

SD-08 Manufacturer’s Instructions

3.3 GInstallation

SD-11 Closeout Submittals 3.8Information Card

2.2.1 SRecycled Content for Steel

Roofing Product

2.2 SHeat Island Reduction

1.7Warranty

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates 1.5.2Inspector Qualifications 2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.2 GSealants

2.3 GPrimers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 64 PAGES

07 92 00 2.4 GBond Breakers

2.5 GBackstops

3.1 GField Adhesion

SD-11 Closeout Submittals

2.2.1 SIndoor Air Quality For Interior

Sealants

2.2.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.2.4 SIndoor Air Quality For Interior

Acoustical Sealants 08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.7 GFrames

2.7 GFrames

2.5Accessories 2.9Weatherstripping

SD-03 Product Data

2.1 GDoors

2.7 GFrames

2.5Accessories 2.9Weatherstripping

SD-04 Samples

2.11.1 GFactory-applied enamel finish

08 33 23 SD-02 Shop Drawings

2.2.1 GOverhead Coiling Doors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 64 PAGES

08 33 23 2.2.3 GCounterbalancing Mechanism

2.2.5 GElectric Door Operators

2.2.1.3 GBottom Bars

2.1.1.1 GGuides

2.2.3.1 GMounting Brackets

2.2.1.8 GOverhead Drum

3.3.2 GHood

2.1.1.1 GInstallation Drawings

SD-03 Product Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

2.2.5 GElectric Door Operators

SD-05 Design Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

2.2.5 GElectric Door Operators

SD-10 Operation and Maintenance Data

3.3.2 GOperation and Maintenance

Manuals

3.3.2 GMaterials

3.3.2 GDevices

3.3.2 GProcedures

3.3.2 GManufacture's Brochures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 64 PAGES

08 33 23 3.3.2 GParts Lists SD-11 Closeout Submittals

3.3.1 GWarranty

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.3.4 GKeying System

SD-03 Product Data

2.3 GHardware Items

SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting 08 91 00 SD-02 Shop Drawings

1.4Wall louvers 1.5Wall louvers

SD-03 Product Data 2.2Metal Wall Louvers

SD-04 Samples

1.4 GWall louvers

1.5 GWall louvers

1.5 GDoor louvers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 64 PAGES

09 29 00 SD-03 Product Data 2.2.4Cementitious Backer Units 3.2.2Glass Mat Water-Resistant

Gypsum Tile Backing Board 3.2.2Water-Resistant Gypsum Backing

Board 2.2.3Abuse Resistant Gypsum Board 2.2.8Accessories 1.3Certifications 2.2.1Gypsum Board

SD-07 Certificates

2.2 GAsbestos Free Materials

1.3.1 GIndoor Air Quality

SD-08 Manufacturer’s Instructions 2.2.5Safety Data Sheets

SD-11 Closeout Submittals

2.2.1 SRecycled Content for Gypsum

Board

2.2.1 SRecycled Content for Paper

Facing and Gypsum Cores

2.2.1 SIndoor Air Quality for Gypsum

Board

2.2.5 SVOC Content of Joint Compound

09 30 10 SD-02 Shop Drawings

3.2 GDetail Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 64 PAGES

09 30 10 2.1.1 GPorcelain Tile

2.2 GSetting-Bed

2.4 GMortar, Grout, and Adhesive

SD-04 Samples

2.1 GTile

2.1 GAccessories

2.1 GTransition Strips

2.6 GTransition Strips

2.4.2 GGrout

SD-07 Certificates 1.3.1Indoor Air Quality

SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions

SD-10 Operation and Maintenance Data

3.2 GInstallation

SD-11 Closeout Submittals

2.4Indoor Air Quality for Adhesives 09 51 00 SD-02 Shop Drawings

2.1 GApproved Detail Drawings

SD-03 Product Data

2.2.1.1 GAcoustical Ceiling Systems

SD-04 Samples

2.2 GAcoustical Units

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 64 PAGES

09 51 00 2.1.1 GCeiling Attenuation Class and Test

09 65 00 SD-03 Product Data 2.5Adhesives

SD-06 Test Reports

3.3 GMoisture, Alkalinity and Bond

Tests SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

09 67 23.13 SD-04 Samples

1.5.2 GManufacturer's hardboard

mounted epoxy flooring standard samples

SD-11 Closeout Submittals

1.6 GWarranty

09 68 00 SD-02 Shop Drawings

3.4 GInstallation Drawings

SD-03 Product Data

2.1 GCarpet

2.3 GCarpet Cushion

SD-04 Samples

2.1 GCarpet

2.3 GCarpet Cushion

SD-06 Test Reports

3.2 GMoisture and Alkalinity Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 64 PAGES

09 68 00 SD-07 Certificates 1.3.1Indoor Air Quality 1.6Warranty

SD-08 Manufacturer’s Instructions 3.1Surface Preparation

SD-10 Operation and Maintenance Data

3.5Cleaning and Protection SD-11 Closeout Submittals

1.6Warranty 09 69 13 SD-02 Shop Drawings

2.3.2 GDetailed Installation Drawings

2.3.1 GFabrication Drawings

SD-03 Product Data

2.2 GAccess Flooring System

SD-04 Samples 2.3Floor Panels

2.3.4 GFloor Covering

2.4Panel Support System

2.3.5 GAccessories

2.5 GFascia

2.5 GExposed Steps and Ramps

2.3.2 GRailings

2.7 GPerforated Air Supply Panels

SD-05 Design Data 2.2.7Seismic Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 64 PAGES

09 69 13 SD-06 Test Reports 2.6Factory Tests 2.2.1Concentrated Load 2.2.1Uniform Live Load 2.2.1Rolling Load 2.2.1Impact Load 2.2.1Ultimate Load 2.2.3Stringer Load 2.2.4Pedestal Axial Load 2.2.5Bonding Strength of Pedestal

Adhesive 3.2.4Electrical Resistance 3.2Field Tests

SD-07 Certificates 2.2Compliance with ICC-ES AC300 2.2Compliance with ICC IBC 2.2Certificate of Compliance 1.4.1Qualification of Manufacturer

SD-10 Operation and Maintenance Data

3.4 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

2.2 SAccess Flooring System

Recycled Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 64 PAGES

09 69 13 2.1.2 SRecycled Content of Floor Covering and Resilient Base

2.1.1 SReduced VOC's for Pedestal

Adhesive

2.1.3 SReduced VOC's for Floor

Covering (Excluding Carpet Tile)

2.3.8Lifting Device

1.6 GWarranty

09 90 00 SD-03 Product Data

2.1 GCoating

2.1Manufacturer's Technical Data

Sheets SD-04 Samples

1.9 GColor

SD-07 Certificates

1.3Applicator's qualifications

1.4.1.2 GQualification Testing

SD-08 Manufacturer’s Instructions 3.4.2Mixing 1.7.2Manufacturer's Safety Data

Sheets SD-10 Operation and Maintenance Data

2.1 GCoatings:

10 11 00 SD-03 Product Data

1.2 GVisual Display Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 64 PAGES

10 11 00 SD-04 Samples

2.1.1 GAluminum

2.1 GMaterials

SD-11 Closeout Submittals 1.5Manufacturer's standard performance guarantees or warranties

10 14 00.20 SD-11 Closeout Submittals 1.5Warranty

10 14 53 SD-03 Product Data 2.1Traffic Sign Posts 2.3Traffic Sign Retroreflective

Sheeting 10 21 13 SD-02 Shop Drawings

2.1Fabrication Drawings

3.2 GInstallation Drawings

SD-03 Product Data 2.1Cleaning and Maintenance

Instructions 2.8Colors And Finishes 2.2.1Anchoring Devices and Fasteners 2.2.3Hardware and Fittings 2.2.2Brackets 2.2.4Door Hardware 2.6Pilaster Shoes

2.2.3.2 GFinishes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 64 PAGES

10 21 13 SD-04 Samples

2.8 GColors and Finishes

2.2.3Hardware and Fittings 2.2.1Anchoring Devices and Fasteners

SD-07 Certificates 1.6Warranty 1.3.1Indoor Air Quality

10 28 13 SD-03 Product Data

2.1.2 GFinishes

2.2 GAccessory Items

SD-04 Samples

2.1.2 GFinishes

2.2Accessory Items

SD-07 Certificates 2.2Accessory Items

10 44 16 SD-01 Preconstruction Submittals Part 2 GManufacturer's Product Data

SD-02 Shop Drawings Part 2 GFire Extinguisher

1.2.1 GAccessories

Part 2 GCabinets

1.2.1 GWall Brackets

SD-03 Product Data

1.2.1 GAccessories

Part 2 GCabinets

1.2.1 GWall Brackets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 64 PAGES

10 44 16 3.2.1 GReplacement Parts List SD-04 Samples

1.2.1 GCabinet

1.2.1 GWall Brackets

1.2.1 GAccessories

SD-07 Certificates Part 2 GFire Extinguisher Part 2 GManufacturer's Warranty with

Inspection Tag 10 51 13 SD-02 Shop Drawings

2.1 GTypes

1.4 GLocation

3.1Installation 3.2Numbering system

SD-03 Product Data 2.2Material 2.3.1Locking Devices 2.3.4Handles 2.2.2Finish 2.3components 3.1Assembly

SD-04 Samples

1.5.1 GColor chips

12 36 00 SD-02 Shop Drawings

2.2 GFabrication

3.1 GInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 64 PAGES

12 36 00 SD-03 Product Data

2.2.1 GSynthetic Resin

2.3 GAdhesives

2.3 GFiller Material

2.3 GTurpentine

2.3 GFasteners

2.4.2 GJoint Sealants

SD-04 Samples

2.2.1 GCountertop

2.2.1 GBacksplash

2.1 GManufacturer's Standard Color

Charts SD-08 Manufacturer’s Instructions

2.1Manufacturer's Instructions SD-11 Closeout Submittals

2.1Warranty 12 50 00.13 10 SD-01 Preconstruction Submittals

1.7.3 GStorage Location

SD-02 Shop Drawings

3.3.1 GInstallation Drawings

3.3.1 GGrommet, Power and

Communication Units, and Wire Management Locations

SD-03 Product Data

2.3 GProduct Data

2.3 GProduct Style Options

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 64 PAGES

12 50 00.13 10 SD-04 Samples

2.3.5 GFabric and Finishes

SD-07 Certificates

1.6 GAuthorized Dealer

1.6 GCertified Furniture Installers

1.6 GLicensed Electrician

1.6 GCertified Telecommunications

Installer

2.3 GManufacturer's Certification

1.8 GWarranty

SD-10 Operation and Maintenance Data

3.5 GFurniture, Data Package 1

SD-11 Closeout Submittals

2.1.1 SEnergy Efficient Equipment

2.1.2 SReduced VOC's for Furniture

2.1.3 SRecycled Content of Furniture

2.1.4 SBio-Based Content of Furniture

12 59 00 SD-02 Shop Drawings

1.3.4 GDetail Drawings

SD-03 Product Data

1.5 GWarranty

2.1.1Workstations 2.10Power and Communications 2.10.8Communications

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBM…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.