Amendment_13-_KC46_BOT_Specs.pdf
PDF 793 KB Posted
- Attached to
- KC-46A Add/Alter Bldg. 2319 for Boom Operator Trainer Federal contract opportunity
- Solicitation number
- W912DS-18-B-0021
About this file
SPECIFICATIONS, AMENDMENT 0013
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KC-46A Beddown, Building 2319
(BOT/WST)
Specifications
Prepared for
U.S. Army Corps of Engineers
Revision 5
21 November 2018
CH2M HILL, Inc.
2095 Lakeside Centre Way
Suite 200 Knoxville, TN 37922
KC-46A Beddown, Building 2319
(BOT/WST)
Specifications Stamp Page
Prepared for
U.S. Army Corps of Engineers
Revision 5
21 November 2018
CH2M HILL, Inc.
2095 Lakeside Centre Way
Suite 200 Knoxville, TN 37922
USACE NYD JB MDL 695847
Revi s i on 5
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 00 01 COVER SHEET
00 00 02 CHECK LI ST FOR BI DDERS
00 10 00 SF 1442 AND BI DDI NG SCHEDULE
00 21 16 I NSTRUCTI ONS, CONDI TI ONS, AND NOTI CE TO BI DDERS
00 22 10 TECHNI CAL PROPOSAL DESI GN - BI D- BUI LD SELECTI ON PROCEDURES
00 24 00 EVALUATI ON FACTORS FOR AWARD
00 45 00 REPRESENTATI ONS AND CERTI FI CATI ONS
00 72 00 CONTRACT CLAUSES
00 73 00. 00 18 SPECI AL CONTRACT REQUI REMENTS
00 90 00 WAGE RATES
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRI CTI ONS
01 30 00 ADMI NI STRATI VE REQUI REMENTS
01 32 01. 00 10 PROJECT SCHEDULE
01 33 00 SUBMI TTAL PROCEDURES
01 33 29 SUSTAI NABI LI TY REPORTI NG
01 35 13 SPECI AL PROJECT PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 00 10 QUALI TY CONTROL
01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)
01 45 20. 00 18 TESTI NG FOR MECHANI CAL AND ELECTRI CAL SYSTEMS
01 45 35 SPECI AL I NSPECTI ONS
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 58 00 PROJECT I DENTI FI CATI ON
01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ON AND MAI NTENANCE DATA
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
02 42 51 CARPET REMOVAL AND RECLAMATI ON
DI VI SI ON 03 - CONCRETE
03 30 00 CAST- I N- PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNI T MASONRY
DI VI SI ON 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD- FORMED METAL FRAMI NG
05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
PROJECT TABLE OF CONTENTS Page 1 21 November 2018
06 10 00 ROUGH CARPENTRY
06 41 16. 00 10 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL CABI NETS
06 61 16 SOLI D SURFACI NG FABRI CATI ONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 PRESSURE TESTI NG AN AI R BARRI ER SYSTEM FOR AI R TI GHTNESS
07 21 13 BOARD AND BLOCK I NSULATI ON
07 21 16 MI NERAL FI BER BLANKET I NSULATI ON
07 22 00 ROOF AND DECK I NSULATI ON
07 27 10. 00 10 BUI LDI NG AI R BARRI ER SYSTEM
07 27 26 FLUI D- APPLI ED MEMBRANE AI R BARRI ERS
07 42 63 FABRI CATED WALL PANEL ASSEMBLI ES
07 60 00 FLASHI NG AND SHEET METAL
07 61 14. 00 20 STEEL STANDI NG SEAM ROOFI NG
07 84 00 FIRESTOPPING
07 92 00 JOI NT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 33 23 OVERHEAD COI LI NG DOORS
08 71 00 DOOR HARDWARE
08 91 00 METAL WALL AND DOOR LOUVERS
DI VI SI ON 09 - FI NI SHES
09 06 00 SCHEDULES FOR FI NI SHES
09 29 00 GYPSUM BOARD
09 30 10 CERAMI C, QUARRY, AND GLASS TI LI NG
09 51 00 ACOUSTI CAL CEI LI NGS
09 65 00 RESI LI ENT FLOORI NG
09 67 23. 13 STANDARD RESI NOUS FLOORI NG
09 68 00 CARPETING
09 69 13 RI GI D GRI D ACCESS FLOORI NG
09 90 00 PAI NTS AND COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 VI SUAL DI SPLAY UNI TS
10 14 00. 20 I NTERI OR SI GNAGE
10 14 53 TRAFFI C SI GNAGE
10 21 13 TOI LET COMPARTMENTS
10 28 13 TOI LET ACCESSORI ES
10 44 16 FI RE EXTI NGUI SHERS
10 51 13 METAL LOCKERS
DI VI SI ON 12 - FURNI SHI NGS
12 36 00 COUNTERTOPS
12 50 00. 13 10 FURNI TURE AND FURNI TURE I NSTALLATI ON
12 59 00 SYSTEMS FURNI TURE
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 18. 00 10 PREACTI ON AND DELUGE SPRI NKLER SYSTEMS, FI RE PROTECTI ON
DI VI SI ON 22 - PLUMBI NG
PROJECT TABLE OF CONTENTS Page 2
22 00 00 PLUMBI NG, GENERAL PURPOSE
22 13 29 SANI TARY SEWERAGE PUMPS
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS
23 05 15 COMMON PI PI NG FOR HVAC
23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC
23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS
23 09 00 I NSTRUMENTATI ON AND CONTROL FOR HVAC
23 09 13 I NSTRUMENTATI ON AND CONTROL DEVI CES FOR HVAC
23 09 23. 02 BACNET DI RECT DI GI TAL CONTROL FOR HVAC AND OTHER BUI LDI NG
CONTROL SYSTEMS
23 23 00 REFRI GERANT PI PI NG
23 64 10 WATER CHI LLERS, VAPOR COMPRESSI ON TYPE
DI VI SI ON 26 - ELECTRI CAL
26 08 00 APPARATUS I NSPECTI ON AND TESTI NG
26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM
26 28 01. 00 10 COORDI NATED POWER SYSTEM PROTECTI ON
26 41 00 LI GHTNI NG PROTECTI ON SYSTEM
26 51 00 I NTERI OR LI GHTI NG
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 14. 00 10 CABLE TELEVI SI ON PREMI SES DI STRI BUTI ON SYSTEM
27 05 28. 36 40 CABLE TRAYS FOR COMMUNI CATI ONS SYSTEMS
27 05 29. 00 10 PROTECTI VE DI STRI BUTI ON SYSTEM ( PDS) FOR SI PRNET
COMMUNI CATI ON SYSTEMS
27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM
27 54 00. 00 20 COMMUNI TY ANTENNA TELEVI SI ON ( CATV) SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 64. 00 10 FI RE DETECTI ON AND ALARM SYSTEM, ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 05 22 GEOTEXTI LES USED AS FI LTERS
31 11 00 CLEARI NG AND GRUBBI NG
31 23 00. 00 20 EXCAVATI ON AND FI LL
31 32 11 SOI L SURFACE EROSI ON CONTROL
31 63 26 DRI LLED CAI SSONS
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 11 23 AGGREGATE BASE COURSES
32 11 23. 23 BASE COURSE DRAI NAGE LAYERS
32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS
32 16 13 CONCRETE SI DEWALKS AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKI NGS
32 92 19 SEEDING
DI VI SI ON 33 - UTI LI TI ES
33 40 00 STORM DRAI NAGE UTI LI TI ES
33 51 15 NATURAL- GAS DI STRI BUTI ON
PROJECT TABLE OF CONTENTS Page 3
DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT
41 22 13. 14 BRI DGE CRANES, OVERHEAD ELECTRI C, TOP RUNNI NG
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 64 PAGES
163001
01 11 00 SD-01 Preconstruction Submittals
1.6 G ROSalvage Plan
01 14 00 SD-01 Preconstruction Submittals
1.2.1.1 G ROList of Contact Personnel
01 30 00 SD-01 Preconstruction Submittals
1.4 G ROView Location Map
1.5 G ROProgress and Completion
Pictures SD-04 Samples
1.3 G ROColor Boards
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
3.5.2 G RONarrative Report
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 G ROPreliminary High Performance
and Sustainable Building Checklist
1.4.1 G ROSustainability Action Plan
1.5.3.1 G ROPreliminary Sustainability
eNotebook SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 64 PAGES
01 33 29 1.5.3.1 G ROFinal High Performance and Sustainable Building Checklist
1.5.3.1 G ROFinal Sustainability eNotebook
1.5.3.1 G ROAmended Final Sustainability
eNotebook
1.5.3.1 GAmended Final High
Performance and Sustainable Building Checklist
01 35 26 SD-01 Preconstruction Submittals
1.7 G ROAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 G ROAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 1.6.1.5Crane Operators/Riggers
1.7.2.2 G ROStandard Lift Plan
1.7.2.3 G ROCritical Lift Plan
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates
1.14.1 G RORadiography Operation Planning
Work Sheet
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 64 PAGES
01 35 26 1.14.1 G ROPortable Gauge Operations Planning Worksheet
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan SD-06 Test Reports
3.9.2Verification Statement 01 45 35 SD-01 Preconstruction Submittals
3.1.2Written Practices 3.1.2NDT Procedures and Equipment
Calibration Records SD-06 Test Reports
3.1.2Daily Reports 3.1.1Biweekly Reports
SD-07 Certificates 2.1Fabrication Plant 2.1Steel Truss Plant 2.1Certificate of Compliance
1.5 GSpecial Inspector
3.1.2Qualification Records
SD-11 Closeout Submittals
3.1.2 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 G ROConstruction Site Plan
3.4.1 G ROTraffic Control Plan
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 64 PAGES
01 50 00 1.4.3Backflow Preventer Tests SD-07 Certificates
1.4.1Backflow Tester 1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals 1.5.1Preconstruction Survey
1.10 G ROSolid Waste Management Permit
1.5.2 G RORegulatory Notifications
1.6 G ROEnvironmental Protection Plan
1.6.9.1 G RODirt and Dust Control Plan
1.5.5 G ROEmployee Training Records
1.5.4 G ROEnvironmental Manager
Qualifications SD-06 Test Reports
3.7.1.1.2Laboratory Analysis
3.7.2.1 G ROSolid Waste Management Report
SD-07 Certificates
1.5.5 G ROEmployee Training Records
1.5.5.1Certificate of Competency
SD-11 Closeout Submittals
3.7.1 G ROWaste Determination
Documentation
3.7.3.6 G RODisposal Documentation for
Hazardous and Regulated Waste
1.5.5 G ROAssembled Employee Training
Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 64 PAGES
01 57 19 1.10 G ROSolid Waste Management Permit
3.7.2.1 G ROSolid Waste Management Report
3.7.3.1 G ROHazardous Waste/Debris
Management
1.5.2 G RORegulatory Notifications
3.7.2.1 G ROSales Documentation
3.7.2.1Contractor Certification
01 58 00 SD-02 Shop Drawings
1.3.1 G ROSign Legend Orders
01 74 19 SD-01 Preconstruction Submittals
1.5 GWaste Management Plan
SD-11 Closeout Submittals 1.6Records
01 78 00 SD-03 Product Data 1.7.1Warranty Management Plan 1.7.5Warranty Tags 1.5Spare Parts Data
SD-08 Manufacturer’s Instructions 1.7.1Instructions
SD-10 Operation and Maintenance Data
3.7 G ROOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 G ROAs-Built Drawings
3.3 G RORecord Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 64 PAGES
01 78 00 3.6As-Built Record of Equipment and Materials
3.4Final Approved Shop Drawings 3.5Construction Contract
Specifications
2.3 G ROCertification of EPA Designated
Items
3.9 G ROInterim DD FORM 1354
3.9 G ROChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance Data
1.3 G ROO&M Database
3.1.1 G ROTraining Plan
3.1.3 G ROTraining Outline
3.1.2 G ROTraining Content
SD-11 Closeout Submittals
3.1.5 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition/Deconstruction Plan
1.11Existing Conditions
SD-07 Certificates
1.7 GNotification
SD-11 Closeout Submittals 3.3.4Receipts
02 42 51 SD-01 Preconstruction Submittals
1.4.2 GProposed Dust-Control Measures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 64 PAGES
02 42 51 1.4.2 GProposed Packing and Transportation Measures
1.4.4 GSchedule of Carpet Reclamation
Activities
1.4.3 GCarpet Reclamation Agency
Records
03 30 00 SD-01 Preconstruction Submittals 1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Plan
1.6.6 GQuality Control Personnel
Certifications 1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
2.3.1.7 GThermal Control Plan
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data 2.4.8Joint Sealants 2.4.7Joint Filler 2.1Materials for Forms 2.4.1Cementitious Materials 2.4.6Vapor Barrier 2.3.3Concrete Curing Materials 2.5Reinforcement 2.6.1Liquid Chemical Floor Hardener
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 64 PAGES
03 30 00 2.4.5Admixtures 2.5.2Mechanical Reinforcing Bar
Connectors 2.2.1Waterstops 1.8.1Local/Regional Materials 2.4.9Biodegradable Form Release
Agent SD-05 Design Data
2.3.1 GMix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash 1.6.4.1Pozzolan 1.6.4.2Ground Granulated Blast-Furnace
Slag 2.4.3Aggregates
3.13.2.3 GCompressive Strength Tests
3.13.2.5Unit Weight of Structural
Concrete 3.13.2.4Air Content 3.13.2.1Slump Tests 2.4.2Water
SD-07 Certificates 2.5.1Reinforcing Bars 1.9Welder Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 64 PAGES
03 30 00 1.6.3.2VOC Content for Form Release Agents, Curing Compounds, and Concrete Penetrating Sealers
1.6.3.3Safety Data Sheets 1.8.2Forest Stewardship Council
(FSC) Certification 1.6.6.2Field Testing Technician and
Testing Agency SD-08 Manufacturer’s Instructions
2.3.3Curing Compound 04 20 00 SD-02 Shop Drawings
3.3.4.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2 GClay or Shale Brick
2.2.3.2.1 GCement
2.4.1.1 GCementitious Materials
2.6.8 GInsulation
SD-04 Samples
1.3.1.1 GMock-Up Panel
2.2.2 GClay or Shale Brick
2.2.3.2 GConcrete Masonry Units (CMU)
2.4.1.3 GAdmixtures for Masonry Mortar
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 64 PAGES
04 20 00 2.6.2 GAnchors, Ties, and Bar Positioners
2.6.3 GJoint Reinforcement
2.6.6 GClay Masonry Expansion-Joint
Materials
2.6.8 GInsulation
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
2.2.3.3Fire-Rated Concrete Masonry
Units
3.2.5 GBracing Calculations
SD-06 Test Reports 2.2.2.1.4Efflorescence Test 2.2.3.3Fire-Rated Concrete Masonry
Units 3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout 2.1.2Prism Test
SD-07 Certificates 1.3.2Special Masonry Inspector
Qualifications 2.2.2Clay or Shale Brick 2.2.3.2Concrete Masonry Units (CMU) 2.2.4Precast Concrete Units 2.4.1.1Cementitious Materials 2.4.1.3Admixtures for Masonry Mortar
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 64 PAGES
04 20 00 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar
Positioners 2.6.3Joint Reinforcement 2.6.8Insulation 2.6.8Insulation
SD-08 Manufacturer’s Instructions 2.4.1.3Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance Data
3.8Take-Back Program SD-11 Closeout Submittals
2.2.2.1.3 SClay Units
2.2.3.2.2 SRecycled Content
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data 2.6.2Shop Primer 2.4.1Welding Electrodes and Rods 2.3.2.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout 2.3.3Tension Control Bolts
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 64 PAGES
05 12 00 2.3Bolts, Nuts, and Washers 3.7.1.2Weld Inspection Reports 3.7.2.1Direct Tension Indicator Washer
Inspection Reports 3.7.3.1Bolt Testing Reports
SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing 1.3AISC Fabrication Plant Quality
Certification 1.3AISC Erector Quality Certification 1.4.3.1Welding Procedures and
Qualifications 2.4.1Welding Electrodes and Rods
05 30 00 SD-02 Shop Drawings
1.3.3 GFabrication Drawings
SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.3Galvanizing Repair Paint 2.2.11Mechanical Fasteners 2.1.3Touch-Up Paint
SD-04 Samples 2.1.1Metal Roof Deck Units 2.2.3Flexible Closure Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 64 PAGES
05 30 00 SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates 1.3.2.1Fire Safety 1.3.2.2Wind Storm Resistance 1.3.1Manufacturer's Certificate
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products 05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists SD-05 Design Data
1.6.2 GMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal Framing
3.2.1Welds SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products
05 50 13 SD-02 Shop Drawings
2.3 GCover Plates and Frames
2.4 GExpansion Joint Covers
2.5 GBollards/Pipe Guards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 64 PAGES
05 50 13 2.7 GAngles and Plates SD-03 Product Data
2.3 GCover Plates and Frames
2.4 GExpansion Joint Covers
2.6 GDownspout Terminations
SD-04 Samples 2.4Expansion Joint Covers
2.1 GCertified Mill
06 10 00 SD-03 Product Data 1.8Fire-retardant Treatment 2.3.4Adhesives 2.2Oriented Strand Board
SD-06 Test Reports 1.4.3Preservative-treated
SD-07 Certificates
1.9.1 GCertified Sustainably Harvested
Wood 1.7Preservative Treatment 1.9.2Indoor Air Quality
SD-11 Closeout Submittals
2.2.1.1 SCertified Sustainably Harvested
Plywood for Other Uses
2.3.4 SIndoor Air Quality for Aerosol
Adhesives
2.3.4 SIndoor Air Quality for Non-aerosol
Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 64 PAGES
06 41 16.00 10 SD-02 Shop Drawings 2.6Shop Drawings 3.1Installation
SD-03 Product Data 2.1Wood Materials
SD-04 Samples 2.3Plastic Laminates
SD-07 Certificates 1.5Quality Assurance 3.1Laminate Clad Casework
SD-11 Closeout Submittals 1.3LEED Documentation
06 61 16 SD-02 Shop Drawings
1.5.2 GDetail Drawings
3.1 GInstallation
SD-03 Product Data 2.1Solid Polymer Material 1.5.1Qualifications 2.3Fabrications
SD-04 Samples
2.1 GMaterial
2.3.5 GCounter and Vanity Tops
SD-06 Test Reports 2.1Solid Polymer Material
SD-07 Certificates 2.3Fabrications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 64 PAGES
06 61 16 1.5.1Qualifications SD-10 Operation and Maintenance Data
3.2Clean-up SD-11 Closeout Submittals
1.3LEED Documentation 07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-03 Product Data
2.2 GThermal Imaging Camera
SD-07 Certificates
1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 GPressure Test Procedures
3.5.8 GAir Leakage Test Report
3.6.5 GDiagnostic Test Report
07 21 13 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.2 GBlock or Board Insulation
2.3 GVapor Retarder
2.4 GPressure Sensitive Tape
1.4 GProtection Board or Coatings
2.6 GAccessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 64 PAGES
07 21 13 SD-07 Certificates
2.2 GBlock or Board Insulation
2.3 GVapor Retarder
2.5 GProtection Board or Coating
3.4.5 GProtection Board or Coating
1.7 GSpecial Warranties
1.7 GSpecial Warranties
SD-08 Manufacturer’s Instructions 2.2Block or Board Insulation 2.6.1Adhesive
SD-11 Closeout Submittals
2.1.1 SVolatile Organic Compound
(VOC) Content
2.1.2 SRecycled Content
07 21 16 SD-03 Product Data 2.2Blanket Insulation 2.3Vapor Retarder 2.4Pressure Sensitive Tape 2.5Accessories
SD-08 Manufacturer’s Instructions 3.2.1Insulation
SD-11 Closeout Submittals
2.1.1 SRecycled Content for Insulation
Materials
2.1.2 SReduce Volatile Organic
Compounds (VOC)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 64 PAGES
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
1.3 GVerification of Existing Conditions
SD-03 Product Data
2.2 GInsulation
1.4 GCover Board
2.4 GFasteners
SD-06 Test Reports
1.8.1 GFlame Spread Rating
SD-07 Certificates
1.9 GVolatile Organic Compounds
(VOC) Content
1.6 GInstaller Qualifications
SD-08 Manufacturer’s Instructions
2.4 GFasteners
2.2 GInsulation
SD-11 Closeout Submittals
1.9 SVolatile Organic Compounds
(VOC) Content 07 27 10.00 10 SD-06 Test Reports
1.7 GDesign Review Report
3.1.2 GTesting and Inspection
SD-07 Certificates
1.6 GAir Barrier Inspector
07 27 26 SD-01 Preconstruction Submittals
1.9.1 GQualifications of Manufacturer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 64 PAGES
07 27 26 1.9.2 GQualifications of Installer SD-02 Shop Drawings
1.4 GFluid-Applied Membrane Air
Barrier
SD-03 Product Data
1.4 GFluid-Applied Membrane Air
Barrier
2.4 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
2.7 GReinforcement
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4.3 GMockup
SD-06 Test Reports
1.6 GCapillary Moisture Test
1.4.4 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
1.4.4 GFlame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections
SD-07 Certificates
1.4 GFluid-Applied Membrane Air
Barrier
2.4 GTransition Membrane
1.9.1 GQualifications of Manufacturer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 64 PAGES
07 27 26 1.9.2 GQualifications of Installer SD-08 Manufacturer’s Instructions
1.4 GFluid-Applied Membrane Air
Barrier
2.4 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
SD-11 Closeout Submittals
2.1 SVolatile Organic Compound
(VOC) Content 07 42 63 SD-01 Preconstruction Submittals
1.5.3Qualification of Manufacturer 1.5.4Qualification of Installer 1.5.4.1Qualifications for Welding Work
SD-02 Shop Drawings 1.5.1Fabrication and Installation drawings 1.5.1Wall Panel Assemblies 1.5.1Flashing and Accessories 1.5.1Anchorage Systems
SD-03 Product Data Certification
1.5.1sustainable acquisition 1.5.1Manufacturer's catalog data 1.5.1Factory Color Finish 1.5.1Sub-girts and Formed Shapes 1.5.1Closure Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 64 PAGES
07 42 63 1.5.1Insulation 1.5.1Pressure Sensitive Tape 2.4.4.1Sealants and Caulking 1.5.1Accessories
SD-04 Samples 1.5.1Wall Panel Assemblies 1.5.1Fasteners 1.5.1Metal Closure Strips 1.5.1Insulation 1.5.1manufacturer's color charts and chips SD-05 Design Data
1.5.1Wind Design Analysis SD-06 Test Reports
3.7.2Leakage Tests 1.3.2Wind Load Tests 1.3.2Seismic Tests 1.5.1Factory Color Finish
SD-07 Certificates 1.5.1Fasteners 1.5.3Qualification of Manufacturer 1.5.4Qualification of Installer 1.5.1wall system assembly wind load and fire rating classification listings SD-08 Manufacturer’s Instructions
1.5.1Installation of Wall Panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 64 PAGES
07 42 63 SD-11 Closeout Submittals 1.5.1Warranty 1.5.1Instructions 1.5.1Safety Data Sheets
20 year 'No-Dollar-Limit' Warranty 07 60 00 SD-02 Shop Drawings
2.2.1 GExposed Sheet Metal
3.1.15 GGutters
3.1.16 GDownspouts
3.1.11 GCounterflashing
3.1.20 GFlashing at Roof Penetrations
and Equipment Supports
3.1.14 GDrip Edges
3.1.17 GOpen Valley Flashing
SD-03 Product Data
2.2.5 GCool Roof
2.2.7 GReglets
3.1.19 GExpansion Joints
SD-04 Samples
1.4.2 GFinish Samples
SD-07 Certificates
2.1 GCertificates of Compliance
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
3.5 GQuality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 64 PAGES
07 60 00 SD-10 Operation and Maintenance Data
1.4.3 GCleaning and Maintenance
SD-11 Closeout Submittals
2.1 SRecycled Content
07 61 14.00 20 SD-02 Shop Drawings
1.2.5 GRoofing
SD-03 Product Data
2.2 GRoofing Panels
2.4Attachment Clips 2.5.1Closures 2.5Accessories 2.5.2Fasteners 2.5.3Sealants
1.7 GWarranty
SD-04 Samples 2.2Panel 2.5Accessories 2.5.3Sealants 2.3Intermediate Support
SD-05 Design Data 1.5Design Calculations
SD-06 Test Reports 3.6Field Inspection 1.3.3Structural Performance 1.6.6Finish
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 64 PAGES
07 61 14.00 20 SD-07 Certificates 1.6.3Manufacturer's Technical
Representative 1.6.4Installer's Qualifications
2.2 GCoil Stock
SD-08 Manufacturer’s Instructions
3.3 GInstallation
SD-11 Closeout Submittals 3.8Information Card
2.2.1 SRecycled Content for Steel
Roofing Product
2.2 SHeat Island Reduction
1.7Warranty
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates 1.5.2Inspector Qualifications 2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.2 GSealants
2.3 GPrimers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 64 PAGES
07 92 00 2.4 GBond Breakers
2.5 GBackstops
3.1 GField Adhesion
SD-11 Closeout Submittals
2.2.1 SIndoor Air Quality For Interior
Sealants
2.2.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.2.4 SIndoor Air Quality For Interior
Acoustical Sealants 08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.7 GFrames
2.7 GFrames
2.5Accessories 2.9Weatherstripping
SD-03 Product Data
2.1 GDoors
2.7 GFrames
2.5Accessories 2.9Weatherstripping
SD-04 Samples
2.11.1 GFactory-applied enamel finish
08 33 23 SD-02 Shop Drawings
2.2.1 GOverhead Coiling Doors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 64 PAGES
08 33 23 2.2.3 GCounterbalancing Mechanism
2.2.5 GElectric Door Operators
2.2.1.3 GBottom Bars
2.1.1.1 GGuides
2.2.3.1 GMounting Brackets
2.2.1.8 GOverhead Drum
3.3.2 GHood
2.1.1.1 GInstallation Drawings
SD-03 Product Data
2.2.1 GOverhead Coiling Doors
2.2.2 GHardware
2.2.3 GCounterbalancing Mechanism
2.2.5 GElectric Door Operators
SD-05 Design Data
2.2.1 GOverhead Coiling Doors
2.2.2 GHardware
2.2.3 GCounterbalancing Mechanism
2.2.5 GElectric Door Operators
SD-10 Operation and Maintenance Data
3.3.2 GOperation and Maintenance
Manuals
3.3.2 GMaterials
3.3.2 GDevices
3.3.2 GProcedures
3.3.2 GManufacture's Brochures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 64 PAGES
08 33 23 3.3.2 GParts Lists SD-11 Closeout Submittals
3.3.1 GWarranty
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.4 GKeying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting 08 91 00 SD-02 Shop Drawings
1.4Wall louvers 1.5Wall louvers
SD-03 Product Data 2.2Metal Wall Louvers
SD-04 Samples
1.4 GWall louvers
1.5 GWall louvers
1.5 GDoor louvers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 64 PAGES
09 29 00 SD-03 Product Data 2.2.4Cementitious Backer Units 3.2.2Glass Mat Water-Resistant
Gypsum Tile Backing Board 3.2.2Water-Resistant Gypsum Backing
Board 2.2.3Abuse Resistant Gypsum Board 2.2.8Accessories 1.3Certifications 2.2.1Gypsum Board
SD-07 Certificates
2.2 GAsbestos Free Materials
1.3.1 GIndoor Air Quality
SD-08 Manufacturer’s Instructions 2.2.5Safety Data Sheets
SD-11 Closeout Submittals
2.2.1 SRecycled Content for Gypsum
Board
2.2.1 SRecycled Content for Paper
Facing and Gypsum Cores
2.2.1 SIndoor Air Quality for Gypsum
Board
2.2.5 SVOC Content of Joint Compound
09 30 10 SD-02 Shop Drawings
3.2 GDetail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 64 PAGES
09 30 10 2.1.1 GPorcelain Tile
2.2 GSetting-Bed
2.4 GMortar, Grout, and Adhesive
SD-04 Samples
2.1 GTile
2.1 GAccessories
2.1 GTransition Strips
2.6 GTransition Strips
2.4.2 GGrout
SD-07 Certificates 1.3.1Indoor Air Quality
SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions
SD-10 Operation and Maintenance Data
3.2 GInstallation
SD-11 Closeout Submittals
2.4Indoor Air Quality for Adhesives 09 51 00 SD-02 Shop Drawings
2.1 GApproved Detail Drawings
SD-03 Product Data
2.2.1.1 GAcoustical Ceiling Systems
SD-04 Samples
2.2 GAcoustical Units
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 64 PAGES
09 51 00 2.1.1 GCeiling Attenuation Class and Test
09 65 00 SD-03 Product Data 2.5Adhesives
SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
09 67 23.13 SD-04 Samples
1.5.2 GManufacturer's hardboard
mounted epoxy flooring standard samples
SD-11 Closeout Submittals
1.6 GWarranty
09 68 00 SD-02 Shop Drawings
3.4 GInstallation Drawings
SD-03 Product Data
2.1 GCarpet
2.3 GCarpet Cushion
SD-04 Samples
2.1 GCarpet
2.3 GCarpet Cushion
SD-06 Test Reports
3.2 GMoisture and Alkalinity Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 64 PAGES
09 68 00 SD-07 Certificates 1.3.1Indoor Air Quality 1.6Warranty
SD-08 Manufacturer’s Instructions 3.1Surface Preparation
SD-10 Operation and Maintenance Data
3.5Cleaning and Protection SD-11 Closeout Submittals
1.6Warranty 09 69 13 SD-02 Shop Drawings
2.3.2 GDetailed Installation Drawings
2.3.1 GFabrication Drawings
SD-03 Product Data
2.2 GAccess Flooring System
SD-04 Samples 2.3Floor Panels
2.3.4 GFloor Covering
2.4Panel Support System
2.3.5 GAccessories
2.5 GFascia
2.5 GExposed Steps and Ramps
2.3.2 GRailings
2.7 GPerforated Air Supply Panels
SD-05 Design Data 2.2.7Seismic Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 64 PAGES
09 69 13 SD-06 Test Reports 2.6Factory Tests 2.2.1Concentrated Load 2.2.1Uniform Live Load 2.2.1Rolling Load 2.2.1Impact Load 2.2.1Ultimate Load 2.2.3Stringer Load 2.2.4Pedestal Axial Load 2.2.5Bonding Strength of Pedestal
Adhesive 3.2.4Electrical Resistance 3.2Field Tests
SD-07 Certificates 2.2Compliance with ICC-ES AC300 2.2Compliance with ICC IBC 2.2Certificate of Compliance 1.4.1Qualification of Manufacturer
SD-10 Operation and Maintenance Data
3.4 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
2.2 SAccess Flooring System
Recycled Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 64 PAGES
09 69 13 2.1.2 SRecycled Content of Floor Covering and Resilient Base
2.1.1 SReduced VOC's for Pedestal
Adhesive
2.1.3 SReduced VOC's for Floor
Covering (Excluding Carpet Tile)
2.3.8Lifting Device
1.6 GWarranty
09 90 00 SD-03 Product Data
2.1 GCoating
2.1Manufacturer's Technical Data
Sheets SD-04 Samples
1.9 GColor
SD-07 Certificates
1.3Applicator's qualifications
1.4.1.2 GQualification Testing
SD-08 Manufacturer’s Instructions 3.4.2Mixing 1.7.2Manufacturer's Safety Data
Sheets SD-10 Operation and Maintenance Data
2.1 GCoatings:
10 11 00 SD-03 Product Data
1.2 GVisual Display Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 64 PAGES
10 11 00 SD-04 Samples
2.1.1 GAluminum
2.1 GMaterials
SD-11 Closeout Submittals 1.5Manufacturer's standard performance guarantees or warranties
10 14 00.20 SD-11 Closeout Submittals 1.5Warranty
10 14 53 SD-03 Product Data 2.1Traffic Sign Posts 2.3Traffic Sign Retroreflective
Sheeting 10 21 13 SD-02 Shop Drawings
2.1Fabrication Drawings
3.2 GInstallation Drawings
SD-03 Product Data 2.1Cleaning and Maintenance
Instructions 2.8Colors And Finishes 2.2.1Anchoring Devices and Fasteners 2.2.3Hardware and Fittings 2.2.2Brackets 2.2.4Door Hardware 2.6Pilaster Shoes
2.2.3.2 GFinishes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 64 PAGES
10 21 13 SD-04 Samples
2.8 GColors and Finishes
2.2.3Hardware and Fittings 2.2.1Anchoring Devices and Fasteners
SD-07 Certificates 1.6Warranty 1.3.1Indoor Air Quality
10 28 13 SD-03 Product Data
2.1.2 GFinishes
2.2 GAccessory Items
SD-04 Samples
2.1.2 GFinishes
2.2Accessory Items
SD-07 Certificates 2.2Accessory Items
10 44 16 SD-01 Preconstruction Submittals Part 2 GManufacturer's Product Data
SD-02 Shop Drawings Part 2 GFire Extinguisher
1.2.1 GAccessories
Part 2 GCabinets
1.2.1 GWall Brackets
SD-03 Product Data
1.2.1 GAccessories
Part 2 GCabinets
1.2.1 GWall Brackets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 64 PAGES
10 44 16 3.2.1 GReplacement Parts List SD-04 Samples
1.2.1 GCabinet
1.2.1 GWall Brackets
1.2.1 GAccessories
SD-07 Certificates Part 2 GFire Extinguisher Part 2 GManufacturer's Warranty with
Inspection Tag 10 51 13 SD-02 Shop Drawings
2.1 GTypes
1.4 GLocation
3.1Installation 3.2Numbering system
SD-03 Product Data 2.2Material 2.3.1Locking Devices 2.3.4Handles 2.2.2Finish 2.3components 3.1Assembly
SD-04 Samples
1.5.1 GColor chips
12 36 00 SD-02 Shop Drawings
2.2 GFabrication
3.1 GInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 64 PAGES
12 36 00 SD-03 Product Data
2.2.1 GSynthetic Resin
2.3 GAdhesives
2.3 GFiller Material
2.3 GTurpentine
2.3 GFasteners
2.4.2 GJoint Sealants
SD-04 Samples
2.2.1 GCountertop
2.2.1 GBacksplash
2.1 GManufacturer's Standard Color
Charts SD-08 Manufacturer’s Instructions
2.1Manufacturer's Instructions SD-11 Closeout Submittals
2.1Warranty 12 50 00.13 10 SD-01 Preconstruction Submittals
1.7.3 GStorage Location
SD-02 Shop Drawings
3.3.1 GInstallation Drawings
3.3.1 GGrommet, Power and
Communication Units, and Wire Management Locations
SD-03 Product Data
2.3 GProduct Data
2.3 GProduct Style Options
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 64 PAGES
12 50 00.13 10 SD-04 Samples
2.3.5 GFabric and Finishes
SD-07 Certificates
1.6 GAuthorized Dealer
1.6 GCertified Furniture Installers
1.6 GLicensed Electrician
1.6 GCertified Telecommunications
Installer
2.3 GManufacturer's Certification
1.8 GWarranty
SD-10 Operation and Maintenance Data
3.5 GFurniture, Data Package 1
SD-11 Closeout Submittals
2.1.1 SEnergy Efficient Equipment
2.1.2 SReduced VOC's for Furniture
2.1.3 SRecycled Content of Furniture
2.1.4 SBio-Based Content of Furniture
12 59 00 SD-02 Shop Drawings
1.3.4 GDetail Drawings
SD-03 Product Data
1.5 GWarranty
2.1.1Workstations 2.10Power and Communications 2.10.8Communications
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBM…