Amendment_3_-_KC46_BOT_-_Plans.pdf
PDF 13 MB Posted
- Attached to
- KC-46A Add/Alter Bldg. 2319 for Boom Operator Trainer Federal contract opportunity
- Solicitation number
- W912DS-18-B-0021
About this file
PLANS, W912DS-18-B-0021
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
e3enmrt3 Polygon e3enmrt3 Polygon e3enmrt3 Polygon
-10-9-8-7
-A
-B
-C
-D
-E
7'-5" 24'-3 1/4" 5'-5 3/8"
'-0
/2
'-1
1/ 2"
8' -3
/4
'-3
/4
E1
S-202
N
GRAPHIC
KEY
-1 -9
1 14
-A
-L
A
G C
D
B
A
-11
-AA
-BB
S M
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
TE
D B
Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N
TR
A C
T N
O
T A
S K
O R
D E
R N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N S
H E
E T
L A
K E
S
ID
E C
E N
T R
E
W A
Y S
U
IT
E
N E
W Y
O
K
D
IS
TR
IC
T
F E
D E
R A
L P
LA
Z
A
K C
A
B E
D D
O W
N M
C G
U
IR
E A
F B
B U
R
LI
N G
T O
N C
O U
N T
Y , N
S C
A
LE
1:
O
F
P T
F L-
2E R
-1 4-
D -0
SD101
K
LE
S
T E
R
J.
N
E
IL
G
R
IG
G
IN
S
L.
P
R E
S
LE
Y
JU
LY
FOR CONSTRUCTION
S T
R U
C T
U R
A L
D E
M O
LI
T
IO
N
P
LA
N E
X
IS
T
IN
G B
O T
A R
E A
IS
S
U E
F O
R C
O N
S
TR
U C
TI
O
N
-3
0-
R E
S
PO
N
SE
T O
C
LI
EN
T
C O
M M
E N
TS
-0
4-
GENERAL SHEET NOTES
KEYED NOTES
8 0 8
Scale: 1/8 INCH = 1 FOOT
1 REMOVE EXIST CONCRETE SLAB IN HATCHED AREA.
2 REMOVE EXIST TRENCH WITHIN THE HATCHED AREA.
3 EXISTING CMU TO BE REMOVED. SEE SHEET S-202 FOR DETAILS.
A FOR GENERAL STRUCTURAL NOTES, SEE SHEETS S-001 THROUGH
S-003.
1/8" = 1'-0"B2 DEMOLITION PLAN - EXIST BOT AREA
TA
SK
O R
D
ER
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
KC
-4
6A B
ED
D
O W
N M
C G
U
IR
E
AF
B
BU
R
LI
N G
TO
N
C O
U N
TY
, N
EW
J
ER
SE
Y
W
2E R
-1 4-
D -0
JU
LY
AN
SI
D 1:
L
AK
ES
ID
E C
EN
TR
E W
AY
SU
IT
E
KN
O
XV
IL
LE
, T
N
1. SOURCE OF TOPOGRAPHY SHOWN ON THE CIVIL PLANS ARE PROVIDED BY GEOD CORPORATION, SUPPLEMENTED BY GROUND SURVEY PERFORMED APRIL 2018 AND JULY 2018.
2. ACTUAL CONDITIONS MAY VARY FROM THOSE SHOWN ON THESE PLANS. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND ADJUST WORK PLAN ACCORDINGLY PRIOR TO BEGINNING CONSTRUCTION.
CONTRACTING OFFICER SHALL BE NOTIFIED OF SUCH DISCREPANCIES OF EXISTING CONDITIONS FOR
DESIGN CHANGE APPROVAL.
3. EXISTING TOPOGRAPHY, STRUCTURES, UTILITIES, AND SITE FEATURES ARE SHOWN SCREENED AND/OR LIGHT-LINED. NEW FINISH GRADE, STRUCTURES, AND SITE FEATURES ARE SHOWN HEAVY-LINED.
4. HORIZONTAL DATUM: NEW JERSEY STATE PLANE COORDINATE SYSTEM (NAD83). SEE DWG C-100 FOR SITE
BENCHMARK AND TRAVERSE POINT INFORMATION.
5. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88). SEE DWG C-100 FOR SITE
BENCHMARK AND TRAVERSE POINT INFORMATION.
6. MAINTAIN, RELOCATE, OR REPLACE EXISTING SURVEY MONUMENTS, CONTROL POINTS, AND STAKES
WHICH ARE DISTURBED OR DESTROYED. PERFORM THE WORK TO PRODUCE THE SAME LEVEL OF
ACCURACY AS THE ORIGINAL MONUMENT(S) IN A TIMELY MANNER, AND AT THE CONTRACTOR'S EXPENSE.
7. COORDINATES AND DIMENSIONS SHOWN FOR ROADWAY AND PARKING IMPROVEMENTS ARE MEASURED
AT THE FACE OF CURB OR EDGE OF PAVEMENT.
8. STAGING AREA SHALL BE FOR CONTRACTOR'S EMPLOYEE PARKING, CONTRACTOR'S TRAILERS AND
ON-SITE STORAGE OF MATERIALS.
9. PROVIDE TEMPORARY FENCING AS NECESSARY TO MAINTAIN SECURITY AT ALL TIMES.
10. ELEVATIONS GIVEN ARE TO FINISH GRADE UNLESS OTHERWISE SHOWN.
11. SLOPE UNIFORMLY BETWEEN CONTOURS AND SPOT ELEVATIONS SHOWN.
12. ALL DISTURBED AREAS NOT RECEIVING A HARD SURFACE SHALL RECEIVE 4" TOPSOIL AND SEEDING, AS
SPECIFIED.
13. CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING AND MAINTAINING EROSION CONTROL
DEVICES DURING CONSTRUCTION. SEE EROSION CONTROL DRAWINGS.
14. EXISTING UNDERGROUND UTILITIES OBTAINED FROM AS-BUILTS AND FROM FIELD SURVEY. CONTRACTOR
SHALL FIELD VERIFY DEPTH AND LOCATION PRIOR TO EXCAVATION.
15. PROTECT ALL EXISTING UTILITIES AND STRUCTURES TO REMAIN DURING CONSTRUCTION, UNLESS NOTED
OTHERWISE.
16. UNLESS OTHERWISE SHOWN ALL PIPING SHALL HAVE A MINIMUM OF 3' COVER.
17. ALL GRAVITY PIPES BETWEEN MANHOLES SHALL HAVE A CONSTANT SLOPE UNLESS A STRUCTURE OR
FITTING IS SHOWN.
18. FOR TRENCHING AND BACKFILL, SEE TYPICAL TRENCHING DETAIL ON SHEET C-501.
19. FOR SURFACE RESTORATION OF ASPHALT CONCRETE, SEE SITE DETAILS.
20. MINIMUM ALLOWABLE CLEARANCE BETWEEN PIPES AT CROSSINGS SHALL BE 3". WHERE CLEARANCE IS LESS THAN 12", CLSM SHALL BE USED AS INDICATED ON TRENCH PIPE CROSSING DETAIL, SHEET C-501.
21. UTILITIES SHOWN ARE PROVIDED BY THE SURVEYOR, NOT ALL EXISTING UTILITIES MAY BE SHOWN. THE
CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES MARKED OR UNMARKED BEFORE
COMMENCING CONSTRUCTION. THE CONTRACTOR SHALL USE EXTREME CARE IN ALL EXCAVATIONS TO AVOID CONFLICTS WITH ALL UTILITIES MARKED OR UNMARKED. CONTRACTOR SHALL REPAIR, AT HIS OWN
EXPENSE, ANY UTILITIES DAMAGED DURING CONSTRUCTION.
22. CONTRACTOR IS REQUIRED TO OBTAIN WRITTEN APPROVAL FROM THE CONTRACTING OFFICER FOR ANY
DEVIATIONS FROM PLANS AND SPECIFICATIONS.
23. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING PROPER SITE ACCESS AND USAGE OF THE ADJACENT AREAS. ALL TRAFFIC MAINTENANCE CONTROL SHALL BE COORDINATED WITH THE CONTRACTING OFFICER.
24. ALL DIMENSIONS, ELEVATIONS, AND STATIONS ARE IN FEET, UNLESS INDICATED OTHERWISE.
25. PROJECT TESTING: ALL CIVIL TESTING REQUIRED WILL BE CONDUCTED BY THE CONTRACTOR, AS
SPECIFIED.
26. CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE OWNER'S REPRESENTATIVE
PRIOR TO COMMENCEMENT OF DEMOLITION ACTIVITIES.
27. ALL WORK SHALL BE SUBJECT TO INSPECTION BY AUTHORIZED PERSONNEL OF LOCAL AND GOVERNMENT
REGULATORY AGENCIES AND THE CONTRACTING OFFICER.
28. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND LOCAL
AND GOVERNMENT CODES, ORDINANCES, AND REGULATIONS. IN CASE OF CONTRADICTION OR
DISCREPANCY BETWEEN REQUIREMENTS, CONTRACTOR SHALL INCORPORATE WHICHEVER IS MOST
STRINGENT, WHERE A QUESTION REMAINS ON WHICH REQUIREMENT IS MOST STRINGENT, CONTRACTOR SHALL SUBMIT ISSUE TO THE CONTRACTING OFFICER IN WRITING. THE DECISION OF THE CONTRACTING
OFFICER SHALL BE CONSIDERED FINAL.
29. SPECIAL HANDLING AND CONSIDERATION SHALL BE REQUIRED FOR EXCAVATED SOILS THOUGHT TO
CONTAIN PETROLEUM-BASED/ CONTAMINATED/ HAZARDOUS SUBSTANCES. CONTRACTOR SHALL
PERIODICALLY MONITOR EXCAVATED SOILS, SAMPLING EVERY 100 FT OF EXCAVATION. SOILS SHALL BE STORED ON SITE OR DISPOSED OF PROPERLY IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL REQUIREMENTS AND THE PROJECT SPECIFICATIONS. CONTRACTOR SHALL COORDINATE REMOVAL OF PETROLEUM-BASED/CONTAMINATED/ HAZARDOUS MATERIALS WITH OWNER. CONTRACTOR SHALL TAKE THREE COMPOSITE SAMPLES TO EXCAVATION DEPTH WITHIN THE LIMITS OF EXCAVATION. EACH SAMPLE
SHALL BE TESTED FOR TOTAL PETROLEUM HYDROCARBONS (TPH) AND BENZENE, TOLUENE,
ETHYLBENZENE AND XYLENES (BTEX). CONTRACTOR SHALL DELIVER ANALYTICAL REPORT TO
CONTRACTING OFFICER, FOR DETERMINATION OF SOIL DISPOSITION. CONTRACTOR SHALL DISPOSE OF
SOILS AS INSTRUCTED BY OWNER.
GENERAL SITE NOTES
$P
LO
TD
AT
E
$P
LO
TT
IM
E
PR
O
JE
C
TN
U M
BE
R
S
Clean Out
E
D
BM
T
W
G
W
DECIDUOUS TREE
PINE TREE
SPOT ELEVATION
SINGLE POST SIGN
DOUBLE POST SIGN
PROTECTIVE POST / BOLLARD
STREET LIGHT
SIDEWALK LIGHT
SEWER MANHOLE
DRAINAGE MANHOLE
DRAINAGE CATCH BASIN (RECTANGLE)
DRAIN
CLEAN OUT
TRAVERSE CONTROL POINT
WATER MANHOLE
ELECTRIC MANHOLE
TELEPHONE/COMMUNICATION MANHOLE
GAS MARKER
BENCHMARK
DRAINAGE CATCH BASIN (SQUARE)
FIRE HYDRANT
WATER VALVE
STAND PIPE (DOUBLE)
GAS METER
HEAD WALL
GM
MAJOR CONTOUR LINE
MINOR CONTOUR LINE
FLARED END SECTION
DEPRESSED CURB
EDGE OF PAVEMENT
F.E.S.
E.O.P.
CIVIL LEGEND
EXISTING PROPOSED AC ASPHALT CONCRETE
AT/FP ANTI-TERRORISM FORCE PROTECTION
ASPH ASPHALT
BM BENCHMARK
C COMMUNICATION
CLSM CONTROLLED LOW STRENGTH MATERIAL
CTD CENTERED
DIP DUCTILE IRON PIPE
CONC CONCRETE
CPP CORRUGATED PLASTIC PIPE
DC DEPRESSED CURB
D STORM DRAIN OR DRAINAGE
DIA DIAMETER
DEMO DEMOLISH
E ELECTRICAL
ELEV ELEVATION
EOP EDGE OF PAVEMENT
EXST EXISTING
FES FLARED END SECTION
G GAS
GB GRADE BREAK
GM GAS METER
INV INVERT
MH MANHOLE
MUTCD MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
OC ON CENTER
PCC PORTLAND CEMENT CONCRETE
PVMT PAVEMENT
PVC POLYVINYL CHLORIDE
R RADIUS
RCP REINFORCED CONCRETE PIPE
S SEWER
SD SUB DRAIN
SIM SIMILAR
STRUCT STRUCTURE
TR TRAVERSE
TYP TYPICAL
U UNIDENTIFIED
U.N.O. UNLESS NOTED OTHERWISE
W WATER
CIVIL ABBREVIATIONS
S
Clean Out
E
D
BM
T
W
G
W
Pine Tree
Drain
GM
F.E.S.
E.O.P.
SANITARY SEWER
STORM DRAIN
SUB DRAIN
COMMUNICATION CABLES
PETROLEUM, OIL, LUBRICANT
NATURAL GAS
HIGH TEMPERATURE WATER SUPPLY
AND RETURN
HTWSHTWS
COMMCOMMCOMMCOMM
GG
SD
D
SD
D
POL POL
$P
LO
TD
AT
E $P
LO
TT
IM
E
C
IV
IL
G
EN
ER
AL
N
O
TE
S, L
EG
EN
D A
N D
AB
BR
EV
IA
TI
O
N S
C-001
FOR CONSTRUCTION
E.
N
EP
ER
U D
J.
P
AL
M
ER
J.
C
O R
U M
G . R
IG
G
IN
S
PT
FL
-1
-2
9-
C -0
.d w g
IS
SU
E
FO
R
C O
N
ST
R U
C
TI
O N
-3
0-
R
ES
PO
N
SE
T O
C
LI
EN
T
C O
M M
EN
TS
-0
4-
EXST SUB DRAIN
EXST 6" CURB
EXST EDGE
OF PVMT
EXST 6' SIDEWALK
EXST 15"
STORM DRAIN
EXST 12" STORM DRAIN
EXST 6.5' ASPH
SIDEWALK
EXST HOT WATER
SUPPLY AND RETURN
EXST SUB DRAIN
E E
E E E E E E
E
E
E E
E E
E
E
E E E E E E E E E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E E
E
E E E E
E
POL
POL
POL
POL
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
POL
POL
G G
G G
G G G G G G G G G
G G
G G
G G
G G
G
C C
C C
C C
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C
C
C
C
C
C
C
C
Rip Rap
D
GM
GM
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
G G G G
HTWS HTWS HTWS HTWS
H
TW
S H
TW
S
HTWS
D D
D D
D
U U
U U
U U
H
TW
S
E E E E E E E E E E E
HTWS
HTWS HTWS HTWS
H
TW
S H
TW
S
HTWS HTWS HTWS
SD SD SD SD SD
SD
SD
D D D D D
D
D
W W W W W W W W W W W W W W W W W W
Clean Out
E Clean Out
S S
S S
S
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD SD
SD
Clean Out
SD
Clean Out
Clean Out
Clean Out Clean
Out
Clean Out
Clean Out
Clean Out
Clean Out
Clean Out
Clean Out
Clean Out
BM
BM
W W
W W
C
C C C
E
E
E E
E E E E E E
E
E
E E
E E E E E E E
E E E E E E E E E E E E E
E E
E E
POL
POL
POL
POL
E E
E
E E
E E
E E E E E
E
E E E E
E E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
U U
U
E E
E E E
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
D D D D D D D D D D
HTWS
W
W W
W
EXST DUMPSTER
N 436549.78 E 466199.31
6.5' EXST SIDEWALK
EXST GRASS
N 436530.06 E 466375.27
CONTROL POINT TABLE
TRAVERSE POINT / BENCHMARK
TR-1 / BM-1
TR-2
TR-101 / BM-3
TR-102
TR-201 / BM-2
TR-202
TR-203
Northing
436608.59
436680.82
436357.70
436306.01
436493.17
436442.12
436434.62
Easting
466187.57
466569.20
466610.76
466248.81
466456.89
466351.95
466306.16
Elevation
114.965
111.816
112.754
115.132
115.053
115.431
115.273
TA
SK
O R
D
ER
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
KC
-4
6A B
ED
D
O W
N M
C G
U
IR
E
AF
B
BU
R
LI
N G
TO
N
C O
U N
TY
, N
EW
J
ER
SE
Y
W
2E R
-1 4-
D -0
GRAPHIC SCALE
JU
LY
AN
SI
D 1:
L
AK
ES
ID
E C
EN
TR
E W
AY
SU
IT
E
KN
O
XV
IL
LE
, T
N
A. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DWG
C-001.
B. THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES
AS INDICATED HAVE BEEN OBTAINED FROM EXISTING RECORDS
AND FIELD SURVEYS. UNDERGROUND STRUCTURES AND
UTILITIES MAY BE PRESENT WHICH ARE NOT DOCUMENTED OR
LOCATED.
C. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
FIELD-VERIFY EXISTING STRUCTURES, UTILITIES, AND SURVEY
INFORMATION, AND TO TAKE NECESSARY PRECAUTIONS DURING
DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL
FIELD-CHECK ALL EXISTING CONDITIONS AND BE THOROUGHLY
FAMILIAR WITH THE SITE BEFORE ANY WORK COMMENCES. ANY
DISCREPANCIES IN THE DRAWINGS SHALL BE IMMEDIATELY
REPORTED TO THE OWNER BEFORE ANY FURTHER WORK
COMMENCES. IN THE EVENT AN UNEXPECTED UTILITY OR
STRUCTURE INTERFERENCE IS ENCOUNTERED, THE
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER.
D. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS
NOT TO BE DAMAGED DURING DEMOLITION AND CONSTRUCTION.
THE CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED OR
DISTURBED ITEMS TO THE SATISFACTION OF THE OWNER.
GENERAL SHEET NOTES
20' 40'0
N
47 C-100
FOR CONSTRUCTION
C
IV
IL
EX
IS
TI
N G
S
IT
E
PL
AN
O
VE
R
AL
L
E.
N
EP
ER
U D
J.
P
AL
M
ER
J.
C
O R
U M
G . R
IG
G
IN
S
-2
9-
C -1
.d w g
IS
SU
E
FO
R
C O
N
ST
R U
C
TI
O N
-3
0-
R
ES
PO
N
SE
T O
C
LI
EN
T
C O
M M
EN
TS
-0
4-
GGGGG
1.
2.
3.
4.
5.
6.
FINISH GRADE,
SLOPE AS SHOWN
ON GRADING PLANS
1:1, TYP
COMPACTED BASE COURSE
PREPARED SUBGRADE,
AS SPECIFIED
WIDTH AS NOTED
ON PLANS
6X6 6/6 WIRE MESH, SEE NOTE A
SLOPE 1/4"/FT
OR AS SHOWN
4" MINIMUM CONCRETE DEPTH
1/2" PJF (WHERE AGAINST
BUILDING OR RIGID STRUCTURE)
TOOLED
COLD JOINT
7.
8.
9.
10.
TYPICAL SECTION
6" TYP
1'-0" MIN
4" M
IN
4"
M
IN
NOTES:
PLACE WIRE MESH AT CENTER OF CONCRETE
SECTION MAINTAINING A COVER OF 2" ON TOP
AND SIDES.
BROOM FINISHED CONCRETE SURFACE. SMOOTH
FINISH (3" WIDE) AT EDGES AND CONTRACTION
JOINTS W/ STEEL TROWELS.
A.
B.
10 78
F8 TYPICAL CONCRETE SIDEWALK
NONE
INSTALL CONTROL JOINTS EVERY 6 FEET (MAX)
USING A TOOL SCORE 1" DEEP, 1/4" WIDE, AND
INSTALL EXPANSION JOINTS EVERY 32 FEET O.C. (MAX).
C.
CONTROLLED LOW-STRENGTH
MATERIAL (CLSM). MINIMUM
28-DAY COMPRESSIVE STRENGTH
1.
PLAN
SECTION
12"
TYP
TY
P
12"
TYP
M
IN
3"
B8 TRENCH PIPE CROSSING
NONE
NOTES:
CLSF SUPPORT IS REQUIRED:
A. WHEN BOTH PIPELINES ARE
NEW AND CLEARANCE
BETWEEN THEM IS LESS THAN
12".
B. WHEN A NEW PIPELINE IS
CROSSING OVER AN EXISTING
PIPELINE AND THE CLEARANCE
BETWEEN THEM IS LESS THAN
12".
C. AT ALL PIPE CROSSINGS
WHERE A NEW PIPELINE IS
CROSSING UNDER AN EXISTING
PIPELINE.
D. REFER TO SPECIFICATION 03 30
00 FOR ADDITIONAL CONCRETE
REQUIREMENTS.
OF 100 PSI CONCRETE.
NEW SURFACING, SEE PLANS, REFER TO
REFERENCED PAVEMENT SECTIONS
TRENCH BACKFILL ABOVE
PIPE ZONE, AS SPECIFIED
PIPE OUTSIDE DIAMETER
PIPE BEDDING MATERIAL, FOR MINIMUM
TRENCH STABILIZATION MATERIAL
WHERE REQUIRED
DEPTH OF COVER
PIPE ZONE
1.
2.
3.
4.
5.
6.
7.
8.
9. MINIMUM WIDTH = PIPE OD + 1'-6"
MARKING TAPE AS
B4 TYPICAL TRENCH
NONE
THICKNESS, SEE TABLE.
PIPE ZONE UPPER LIMIT, FOR MINIMUM
THICKNESS, SEE TABLE
10.
PIPES 15" AND LESS
PIPES 18" TO 36"
CONDUIT
DIRECT BURIED CABLE
DUCT BANKS
PIPE BEDDING
(MINIMUM)
THICKNESS
(INCHES)
4" 6" 3" 3" 3"
PIPES 15" AND LESS
PIPES 18" TO 36"
CONDUIT
DIRECT BURIED CABLE
DUCT BANKS
PIPE ZONE UPPER
LIMIT (MINIMUM)
THICKNESS
(INCHES)
12" 12" 3" 3" 3"
A.
B.
C.
D.
E.
NOTES:
1.
2.
3.
4.
5.
CONTRACTION JOINT,
SEE NOTE A AND B
CONCRETE SLAB
ON GRADE
REINFORCING, #5 @ 12"
CTD 2 1/2" COVER
BASE COURSE
PREPARED SUBGRADE
CONTRACTION JOINT SHALL BE MADE, CLEANED WITH COMPRESSED AIR, AND FILLED WITH SEALANT AS
SPECIFIED. SEE DETAIL F4 ON DRAWING C-502.
CONCRETE JOINT SPACING: AS SHOWN.
INSTALL 1/2" PREMOLDED JOINT FILLER FULL DEPTH WHERE CONCRETE PAVEMENT ABUTS CONCRETE CURB, BUILDING OR ANY RIGID STRUCTURE.
PROVIDE A 12" THICK BY 18" WIDE THICKENED EDGE AROUND PERIMETER OF SLAB. TRANSITION THICKENED
EDGE TO NORMAL THICKNESS IN 18".
PROVIDE PORTLAND CEMENT CONCRETE PAVEMENT AS SHOWN ON PLANS.
8"
NOTE:
A.
1" 6"
2" 7"
1. FINISH GRADE AS
SHOWN
2. TACK COAT
3. PRIME COAT (AS
SPECIFIED)
4. GEOTEXTILE (AS
SPECIFIED)
5. TOP OF PREPARED
SUBGRADE
6. PREPARED SUBGRADE
(AS SPECIFIED)
7. ASPHALT CONCRETE
SURFACE COURSE
8. ASPHALT CONCRETE
INTERMEDIATE COURSE
9. BASE COURSE (RAPID
DRAINING MATERIAL)
10. AGGREGATE BASE
COURSE
PROVIDE ASPHALT CONCRETE PAVEMENT
SECTION AS SHOWN OR MATCH EXISTING,
WHICH EVER IS GREATER.
NOTE:
A. PAINT EDGE OF EXISTING ASPHALT WITH TACK COAT PRIOR TO PAVING.
CRACK SEAL JOINT AFTER PAVING OPERATION HAS BEEN COMPLETED.
1. CRACK SEAL, TYP, SEE
NOTE
2. EXISTING PAVEMENT
3. EXISTING BASE COURSE
4. PREPARED SUBGRADE
5. SAW CUT 2' MIN JUST
PRIOR TO PAVING
6. EDGE OF EXISTING
PAVEMENT
7. NEW PAVEMENT
8. NEW BASE COURSE(S) PER
ASPHALT CONCRETE
PAVEMENT SECTION.
1/
2"
2"
10'-0" 3"
1. PREFORMED JOINT SEAL
2. EDGE OF CONCRETE AS SHOWN
ON PLAN
3. GREASE AND CAP SLAB-SIDE OF
DOWEL
4. CONCRETE PAVEMENT
5. 18"×1 1/4" STEEL DOWELS @ 12"
OC, CENTERED IN IMPACT SLAB
6. CONCRETE EXPANSION JOINT
7. PREPARED SUBGRADE
8. BURIED SLAB
9. BASE COURSE, PER PAVEMENT
SECTIONS.
10. ASPHALT CONCRETE
PAVEMENT
11. TACK COAT SURFACES
12. 1" DEEP × 3/4" WIDE SAW CUT
GROOVE. FILL WITH CRAFCO
TYPE SEALANT
13. BACKER ROD
14. JOINT SEALANT, AS SPECIFIED
6 7 8 9
1. PROVIDE PIPE BEDDING MATERIAL
FOR A MINIMUM OF 8" AROUND
CLEANOUT WYE
2. PIPE BEDDING MATERIAL AS
SPECIFIED
3. FINISHED SURFACE/GRADE.
4. CAST IRON FRAME AND COVER
5. CONCRETE COLLAR
6. 45° BEND
7. PIPE DIAMETER AS
INDICATED.
2' SQ
TA
SK
O R
D
ER
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
KC
-4
6A B
ED
D
O W
N M
C G
U
IR
E
AF
B
BU
R
LI
N G
TO
N
C O
U N
TY
, N
EW
J
ER
SE
Y
W
2E R
-1 4-
D -0
JU
LY
AN
SI
D 1:
L
AK
ES
ID
E C
EN
TR
E W
AY
SU
IT
E
KN
O
XV
IL
LE
, T
N
$P
LO
TD
AT
E $P
LO
TT
IM
E
C
IV
IL
SI
TE
D
ET
AI
LS
SH
EE
T
C-501
FOR CONSTRUCTION
E.
N
EP
ER
U D
J.
P
AL
M
ER
J.
C
O R
U M
G . R
IG
G
IN
S
PT
FL
-1
-2
9-
C -5
.d w g
IS
SU
E
FO
R
C O
N
ST
R U
C
TI
O N
-3
0-
R
ES
PO
N
SE
T O
C
LI
EN
T
C O
M M
EN
TS
-0
4-
F4 ASPHALT CONCRETE PAVEMENT
NONEF1 CONCRETE PAVEMENT
NONE
D1 PAVEMENT CONNECTION
NONE D4 CONCRETE TO ASPHALT TRANSITION
NONE
B1 ROOF DRAIN AND SUBDRAIN CLEANOUT
NONE
1 1
SNAP CAP
1/2" PJF
(U.N.O.)
WALL, COLUMN, OR
FOUNDATION
SLAB SLAB
SNAP CAP
3/4" PJF
(U.N.O.)
1"
POLYURETHANE OR POLY
SULPHIDE BASE SEALANT
1/4" RADIUS (TYP)
SLAB1/
2"
POLYURETHANE OR POLY
SULPHIDE BASE SEALANT
3' -6
1" 3"
C
LR
3' -6
1. GROUT PLUG
2. 8" DIA. SCHED 40 STEEL PIPE,
GRIND SMOOTH, FILL WITH CONC
AND PAINT WITH ANTI-RUST
PAINT. COLOR TO MATCH BRICK.
3. 1/2" EXPANSION JOINT W/
SEALANT
4. CONCRETE PAVEMENT
5. CONCRETE ENCASEMENT
6. 1'-6" MIN DIA.
NOTES:
A. INSTALL CENTER OF BOLLARD 'IN-LINE' WITH EDGE
OF EQUIPMENT DOOR FRAME AND AT AN OFFSET
DISTANCE OF 1'-6" FROM THE EDGE OF BUILDING.
2'-3"
1. MANHOLE FRAME AND
COVER
2. GROUT
3. REINFORCED STANDARD
TOP SLAB DESIGNED FOR
HS20 LOADING
4. PRECAST MANHOLE
SECTION
5. MANHOLE BASE
6. INSIDE DIAMETER SHALL BE 4' MIN.
7. PRECAST 2", 4" OR 6" GRADE
RINGS TO SUIT GRADE
8. FINISH GRADE
9. VARIES AS REQUIRED 2"
MINIMUM 12" MAXIMUM
SUBBASE COURSE
BASE COURSE (RDM)
COMPACTED SUBGRADE
SEE PAVING DETAIL
1. WHITE CONCRETE CURB
MATCH COLOR
OF EXISTING CURBING.
2. EXPANSION JOINT W/
SEALANT
3. CONCRETE SIDEWALK
6"
6"
1'
6"
R1"
6" 6" 6"
SEE SIDEWALK DETAIL
2 3
NOTES:
A. 10 FEET MAXIMUM SPACING BETWEEN
CONTRACTION JOINTS.
SUBBASE
BASE COURSE (RDM)
SEE PAVING DETAIL
1. WHITE CONCRETE CURB
MATCH COLOR
OF EXISTING CURBING
2. FINISHED GRADE
3. FILTER FABRIC
4. 6" SUBDRAIN
5. 6" MIN. OVERLAP
6"
6"
1'
6"
R1"
6" 6" 6"
NOTES:
A. 10 FEET MAXIMUM SPACING
BETWEEN CONTRACTION JOINTS.
" M
IN
COURSECOURSE
COMPACTED
SUBGRADE
3"
1' -6
TYP
3" MIN
3" M
IN
1. MOUNTING HARDWARE
2. SIGN WORDING LAYOUT AND MATERIAL
TO BE PER BASE INSTALLATION SIGN
STANDARDS.
3. 2" SQUARE STEEL TUBING, OR
APPROVED EQUAL
4. CONCRETE SIDEWALK OR BACK OF
CURB
5. CONCRETE BACKFILL
NOTES:
A. ALL HOLES TO BE 9/16" DIAMETER FOR 1/2" BOLTS.
B. ALL MATERIAL TO BE PAINTED PER BASE
INSTALLATION STANDARDS.
C. FOR SIGNS MOUNTED ON BUILDING EXTERIOR,
PLACE AT 7 FEET ABOVE PAVEMENT SURFACE
AND ATTACH USING MASONRY TYPE FASTENERS.
5' -0
3'
-0
1'
6" M
IN
6" M
IN
M
AX
6" M
IN
4" MIN
1. FLEXIBLE MANHOLE CONNECTOR
2. PROVIDE JOINT ON PIPE WITHIN
1'-6" OF OUTSIDE FACE OF
MANHOLE IF APPLICABLE.
3. LESS THAN 2'-0"
4. COMPACTED IMPORTED PIPE
BEDDING TO UNDISTURBED
EARTH, 6" MIN
5. INSIDE DIAMETER SHALL BE 4' MIN.
6. PRECAST BASE
7. CAST-IN-PLACE BASE
8. MANHOLE TOP
9. MANHOLE STEPS, IF SPECIFIED
10. PRECAST MANHOLE SECTIONS
11. GROUT IN EVEN SLOPE FROM
FLOW LINE TO FLOW LINE
12. POURED OR PRECAST CONC BASE
AT CONTRACTORS OPTION
13. SLOPE 2" PER 1'-0"
6 7
2"
SE
E
PL
AN
1/4"x4 1/2" SQUARE DOWEL
PLATE AND SLEEVE @ 18" OC
STOP REINF
AT JOINT
2"
TYP
EA SIDE
C
LR
SLAB REINF
SAW CUT 1/8" WIDE x T/4 DEEP
JOINT W/EARLY ENTRY SAW. FILL
JOINT WITH POLYURETHANE OR
POLY SULPHIDE BASE SEALANT
T
2"
SE
E
PL
AN
SLAB REINF
C
LR
T
SAW CUT 1/8" WIDE x 1 T/4 DEEP JOINT
W/EARLY ENTRY SAW. FILL JOINT WITH
POLYURETHANE OR POLY SULPHIDE
BASE SEALANT
TA
SK
O R
D
ER
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
KC
-4
6A B
ED
D
O W
N M
C G
U
IR
E
AF
B
BU
R
LI
N G
TO
N
C O
U N
TY
, N
EW
J
ER
SE
Y
W
2E R
-1 4-
D -0
JU
LY
AN
SI
D 1:
L
AK
ES
ID
E C
EN
TR
E W
AY
SU
IT
E
KN
O
XV
IL
LE
, T
N
$P
LO
TD
AT
E $P
LO
TT
IM
E
C
IV
IL
SI
TE
D
ET
AI
LS
SH
EE
T
C-502
FOR CONSTRUCTION
E.
N
EP
ER
U D
J.
PA
LM
ER
J.
C
O R
U M
G .R
IG
G
IN
S
PT
FL
-1
-2
9-
C -5
.d w g
IS
SU
E
FO
R
C O
N
ST
R U
C
TI
O N
-3
0-
R
ES
PO
N
SE
T O
C
LI
EN
T
C O
M M
EN
TS
-0
4-
SLAB CONTROL JOINT SLAB CONSTRUCTION JOINT ISOLATION JOINT EXPANSION JOINT
FRAME PLAN
GRATE PLAN
SECTION A
SECTION B
1' -1
0"
2' -1
1"
2' -0
2'-0"
A
BB
2'-11"
1'-10"
6"
2'-0"
2"
TOTAL WEIGHT 400 LBS MIN.
PLAN SECTION A-A
A
8" 8"4'-0"
8" 4'
-0
8"
MORTAR
8" 8"
2"
8" 4'-0" 8"
1. HEAVY DUTY CAST IRON
FRAME AND COVER
2. FRAME SHALL BE SET IN
A 1" BED OF MORTAR
AND LOCKED IN PLACE
WITH MORTAR CAP
3. 2-#4 BARS, 4 SIDES OF
OPENING
4. #4 BARS 12" O.C. BOTH
WAYS.
SOLID COVER
FRAME SECTION
1.
2.
LETTERING "D" (STORM)
SHALL BE STAMPED OR
CAST INTO COVER.
MACHINE TO A TRUE 26"
D
2'-0"
2'-3"
3'-3"
7"
3/ 4"
4- 1/
4"
2'-1 3/4"
2"
1"
8"
3/4"
1/
2"
COVER SECTION
TOTAL WEIGHT 400 LBS MIN.
1. EXISTING CONCRETE
2. CORE DRILL HOLE PIPE OD+2-1/2" + CLEAN
PRIOR TO INSTALLING GROUT AND PIPE
3. INVERT ELEVATION SHOWN ON PLAN
4. WET PIPE AND CONCRETE WALL. THEN
SEAL WITH NON-SHRINK GROUT
5. PIPE JOINT, WHERE REQUIRED
6. 1-1/2" PIPE DIA, 18" MAX
7. NEOPRENE GASKET
8. NEW PIPE
FF=115.86
FF=115.86
5.
115.00
4.9
114.91115.41
115.06
5.
115.23
115.72
6'
6'
32.13'
.0
3' 6'
6.50'
115.49115.76
115.82
115.16
115.12
115.82
115.76
115.26
-2 .0
3%
-2.18%
-2.23%
-4.16%
-3 .0
8%
6'
1. SEE DETAIL D4 DWG C-501 FOR CONCRETE TO
ASPHALT TRANSITION.
2. ASHPALT PAVEMENT SEE DETAIL F4 DWG C-501.
3. CONCRETE PAVEMENT, TYPE C3, 10". SEE
DETAIL F1 DWG C-501.
4. BOLLARD, SEE DETAIL D8 DWG C-502.
5. EXPANSION JOINT, SEE DETAIL F8 DWG C-502.
6. CONTROL JOINT LOCATIONS, SEE DETAIL F4
DWG C-502.
7. APPROXIMATE LIMITS OF BURIED SLAB FOR
CONCRETE TO ASPHALT TRANSITION.
R5.5
R3'
4.65'
BUILDING
2319 ADDITION
BUILDING
2319 (EXISTING)
5 4 TYP OF 4
-1 .9
7%
6'
115.82
115.82115.82
TA
SK
O R
D
ER
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
KC
-4
6A B
ED
D
O W
N M
C G
U
IR
E
AF
B
BU
R
LI
N G
TO
N
C O
U N
TY
, N
EW
J
ER
SE
Y
W
2E R
-1 4-
D -0
JU
LY
AN
SI
D 1:
L
AK
ES
ID
E C
EN
TR
E W
AY
SU
IT
E
KN
O
XV
IL
LE
, T
N
$P
LO
TD
AT
E $P
LO
TT
IM
E
C
IV
IL
SI
TE
D
ET
AI
LS
SH
EE
T
C-503
FOR CONSTRUCTION
E.
N
EP
ER
U D
J.
PA
LM
ER
J.
C
O R
U M
G .R
IG
G
IN
S
PT
FL
-1
-2
9-
C -5
.d w g
IS
SU
E
FO
R
C O
N
ST
R U
C
TI
O N
-3
0-
R
ES
PO
N
SE
T O
C
LI
EN
T
C O
M M
EN
TS
-0
4-
F4 PIPE CONNECTIONS
NONEF1 MANHOLE FRAME AND COVER
NONE
B1 CONCRETE PAVEMENT GRADING
NONE
F8 TYPICAL INLET FRAME AND GRATE
NONE
B8 TYPICAL INLET
NONE
SD
SD
SD SD
SD
SD
SD
D D
E E
E E E E E E
E
E
E E
E E
E
E
E E E E E E E E E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E
E E E
E
E E E E
E
POL
POL
POL
POL
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
POL
G G
G G
G G G G G G G G G
G G
G G
G G
G G
G
C C
C C
C C
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C
C
C
C
C
C
C
Rip Rap
D
GM
GM
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
G G G G
HTWS HTWS HTWS HTWS
H
TW
S H
TW
S
HTWS
D D
D
U U
U U
U U
H
TW
S
E E E E E E E E E E E
HTWS
HTWS HTWS HTWS
H
TW
S H
TW
S
HTWS HTWS HTWS
SD SD SD SD SD
SD
SD
D D D D D
D
D
Clean Out
E Clean Out
S S
S S
S
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD SD
SD
Clean Out
SD
Clean Out
Clean Out
Clean Out Clean
Out
Clean Out
Clean Out
Clean Out
Clean Out
Clean Out
Clean Out
Clean Out
BM
BM
W W
W W
C
C C C
E
E
E E
E E E E E E
E
E
E E
E E E E E E E
E E E E E E E E E E E E E
E E
E E
POL
POL
POL
POL
E E
E
E E
E E
E E E E E
E
E E E E
E E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
U U
U
E E
E E E
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
D D D D D D D D D D
HTWS
W
W W
W
SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
5TYP.
X
X
X
$P
LO
TD
AT
E $P
LO
TT
IM
E
C
IV
IL
SO
IL
E
R O
SI
O
N A
N D
S
ED
IM
EN
TA
TI
O N
C O
N
TR
O L
PL
AN
O
VE
R
AL
L
CG100
FOR CONSTRUCTION
E.
N
EP
ER
U D
J.
P
AL
M
ER
J.
C
O R
U M
G . R
IG
G
IN
S
PT
FL
-1
-2
9-
C G
0.
dw g
IS
SU
E
FO
R
C O
N
ST
R U
C
TI
O N
-3
0-
R
ES
PO
N
SE
T O
C
LI
EN
T
C O
M M
EN
TS
-0
4-
TA
SK
O R
D
ER
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
KC
-4
6A B
ED
D
O W
N M
C G
U
IR
E
AF
B
BU
R
LI
N G
TO
N
C O
U N
TY
, N
EW
J
ER
SE
Y
W
2E R
-1 4-
D -0
GRAPHIC SCALE
JU
LY
AN
SI
D 1:
L
AK
ES
ID
E C
EN
TR
E W
AY
SU
IT
E
KN
O
XV
IL
LE
, T
N
20' 40'0
N
SHEET KEYNOTES
1. STORM SEWER INLET PROTECTION, SEE DETAIL E1 ON DWG
CG501.
2. STABILIZED CONSTRUCTION ACCESS, SEE DETAIL E8 ON DWG
CG501.
3. SEDIMENT FENCE, SEE DETAIL E4 ON DWG CG501.
4. CONCRETE PAD, SEE DWG MH402.
5. TREE PROTECTION, SEE DWG CG501.
6. RESTORE SURFACE, (TOPSOIL AND AND SEEDING).
A. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE SHEET C-001.
B. REFER TO SPECIFICATION 31 32 11 FOR ADDITIONAL EROSION AND SEDIMENT
CONTROL REQUIREMENTS.
C. REFER TO SPECIFICATION 32 92 19 FOR SITE SEEDING REQUIREMENTS.
D. ALL APPLICABLE EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE IN
PLACE PRIOR TO ANY GRADING OPERATION AND/OR INSTALLATION OF
PROPOSED STRUCTURES OR UTILITIES.
E. SOIL AND EROSION CONTROL PRACTICES IN THE PLAN SHALL BE CONSTRUCTED
IN ACCORDANCE WITH THE STANDARDS FOR SOIL EROSION AND SEDIMENT
CONTROL IN NEW JERSEY.
F. ALL APPLICABLE EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE LEFT
IN PLACE UNTIL CONSTRUCTION IS COMPLETED AND/OR THE AREA IS
STABILIZED.
G. ANY DISTURBED AREA THAT WILL BE LEFT EXPOSED FOR MORE THAN SIXTY (60)
DAYS AND NOT SUBJECT TO CONSTRUCTION TRAFFIC SHALL IMMEDIATELY
RECEIVE A TEMPORARY SEEDING AND FERTILIZATION IN ACCORDANCE WITH
THE NEW JERSEY STANDARDS AND THEIR RATES SHOULD BE INCLUDED IN THE
NARRATIVE. IF THE SEASON PROHIBITS TEMPORARY SEEDING, THE DISTURBED
AREAS WILL BE MULCHED WITH SALT HAY OR EQUIVALENT END ANCHORED IN
ACCORDANCE WITH THE NEW JERSEY STANDARDS (I.E. PEG AND TWINE, MULCH
NETTING, OR LIQUID MULCH BINDER).
H. ALL CRITICAL AREAS SUBJECT TO EROSION WILL RECEIVE A TEMPORARY
SEEDING IN COMBINATION WITH STRAW MULCH AT A RATE OF 2 TONS PER
ACRE, ACCORDING TO THE NEW JERSEY STANDARDS IMMEDIATELY FOLLOWING
ROUGH GRADING.
I. THE SITE SHALL AT ALL TIMES BE GRADED AND MAINTAINED SUCH THAT ALL
STORMWATER RUNOFF IS DIVERTED TO SOIL EROSION AND SEDIMENT
CONTROL FACILITIES.
J. ALL SEDIMENTATION STRUCTURES WILL BE INSPECTED AND MAINTAINED ON A
REGULAR BASIS AND AFTER EVERY STORM EVENT.
K. SOIL STOCKPILES ARE NOT TO BE LOCATED WITHIN FIFTY (50) FEET OF THE
FLOODPLAIN, SLOPE, ROADWAY, OR DRAINAGE FACILITY. THE BASE OF THE
STOCKPILES SHOULD BE PROTECTED BY A HAY BALE BARRIER OR SEDIMENT
FENCE.
L. PAVED ROADWAYS MUST BE KEPT CLEAN AT ALL TIMES.
M. ALL CATCH BASIN INLETS WILL BE PROTECTED DURING CONSTRUCTION.
N. ALL DEWATERING OPERATIONS MUST DISCHARGE DIRECTLY INTO A SEDIMENT
FILTRATION DEVICE. PLACE DISCHARGE SO AS NOT TO CAUSE EROSION OF THE
DOWNSTREAM AREA.
O. THE BURLINGTON COUNTY SOIL CONSERVATION DISTRICT SHALL BE NOTIFIED,
IN WRITING, 12 HOURS PRIOR TO ANY LAND DISTURBANCE.
P. MULCHING IS REQUIRED ON ALL SEEDED AREAS TO INSURE AGAINST EROSION
BEFORE GRASS IS ESTABLISHED TO PROMOTE EARLIER VEGETATION COVER.
Q. A COPY OF THE CERTIFIED SOIL EROSION AND SEDIMENT CONTROL PLAN MUST
BE MAINTAINED ON THE PROJECT SITE DURING CONSTRUCTION.
R. MAXIMUM SIDE SLOPES OF ALL EXPOSED SURFACES SHALL NOT BE
CONSTRUCTED STEEPER THAN 3:1 UNLESS OTHERWISE APPROVED BY THE
DISTRICT.
S. THE SOIL EROSION INSPECTOR MAY REQUIRE ADDITIONAL SOIL EROSION
MEASURES TO BE INSTALLED, AS DIRECTED BY THE DISTRICT INSPECTOR.
GENERAL SHEET NOTES
SHEET LEGEND
VEHICLE TRACKING / CONSTRUCTION DRIVEWAY
INLET CONTROL FILTER
SILT FENCE
PROJECT LIMITS
SF
MATCH EXST ASPH
I1
EXST INLET
GRATE=113.4
FF=115.86
E E
E E E E E E
E
E
E E
E E
E
E
E E E E E E E E E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E
E E E
E
E E E E
E
POL
POL
POL
POL
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
POL
G G
G G
G G G G G G G G G
G G
G G
G G
G G
G
C C
C C
C C
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C
C
C
C
C
C
C
Rip Rap
D
GM
GM
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
G G G G
HTWS HTWS HTWS HTWS
H
TW
S H
TW
S
HTWS
D D
D
U U
U U
U U
H
TW
S
E E E E E E E E E E E
HTWS
HTWS HTWS HTWS
H
TW
S H
TW
S
HTWS HTWS HTWS
SD SD SD SD SD
SD
SD
D D D D D
D
D
Clean Out
E Clean Out
S S
S S
S
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD SD
SD
Clean Out
SD
Clean Out
Clean Out
Clean Out Clean
Out
Clean Out
Clean Out
Clean Out
Clean Out
Clean Out
Clean Out
Clean Out
BM
BM
W W
W W
C
C C C
E
E
E E
E E E E E E
E
E
E E
E E E E E E E
E E E E E E E E E E E E E
E E
E E
POL
POL
POL
POL
E E
E
E E
E E
E E E E E
E
E E E E
E E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
U U
U
E E
E E E
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
D D D D D D D D D D
HTWS
W
W W
W
SD
SD
SD SD
SD
SD
SD
D D
-1.
-1.
I2
EXST INLET
GRATE=113.79
A
C
DE
I3
TYP
MATCH EXST ASPH
4 5
B
MH3
NEW MANHOLE
RIM=115.21
MH2
EXST MANHOLE
RIM=115.59
I3
EXST INLET
GRATE=114.88
MH1
EXST MANHOLE
RIM=114.76
$P
LO
TD
AT
E $P
LO
TT
IM
E
C
IV
IL
SI
TE
G
R
AD
IN
G
A N
D D
R
AI
N
AG
E
PL
AN
O
VE
R
AL
L
CG120
FOR CONSTRUCTION
E.
N
EP
ER
U D
J.
P
AL
M
ER
J.
C
O R
U M
G . R
IG
G
IN
S
PT
FL
-1
-2
9-
C G
0.
dw g
IS
SU
E
FO
R
C O
N
ST
R U
C
TI
O N
-3
0-
R
ES
PO
N
SE
T O
C
LI
EN
T
C O
M M
EN
TS
-0
4-
TA
SK
O R
D
ER
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
KC
-4
6A B
ED
D
O W
N M
C G
U
IR
E
AF
B
BU
R
LI
N G
TO
N
C O
U N
TY
, N
EW
J
ER
SE
Y
W
2E R
-1 4-
D -0
GRAPHIC SCALE
JU
LY
AN
SI
D 1:
L
AK
ES
ID
E C
EN
TR
E W
AY
SU
IT
E
KN
O
XV
IL
LE
, T
N
20' 40'0
N
SHEET KEYNOTES
1. CONNECT TO EXISTING STORM SEWER MANHOLE.
2. CONNECT TO EXISTING STORM SEWER INLET.
3. CONCRETE SIDEWALK, 2% FROM BUILDING, SEE DETAIL F8 ON
DWG C-501.
4. REPLACE SUBDRAIN AND CLEAN OUT TO MATCH EXISTING.
ADJUST CLEAN OUT RIM TO MATCH PROPOSED GRADING. SEE
DETAILS B1 ON DWG C-501 AND D1 ON DWG C-502.
5. CONSTRUCT NEW STORM DRAINS PER PLAN AND PROFILES ON
DWG CG-201.
6. ROOF DRAINAGE, SEE SCHEDULE.
7. ROOF DRAIN CLEAN OUT, SEE DETAIL B1 ON DWG C-501.
8. CONCRETE PAD, SEE DWG MH402.
9. CONCRETE PAVEMENT, SEE DETAIL B1 ON DWG C-503.
A. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DWG
C-001.
B. FINISHED SURFACE ELEVATIONS SHALL MATCH EXISTING GRADE
ELEVATIONS. MATCH TOP OF CONCRETE PAVEMENT TO TOP OF
EXISTING CONCRETE PAVEMENT.
C. TOPSOIL AND SEED ALL AREAS DISTURBED BY CONSTRUCTION
WHICH ARE NOT PAVED.
D. ROOF DRAINS BETWEEN BUILDING AND INTERCEPTING DRAINS
SHALL BE 4”. THEIR INVERT AT THE BUILDING SHALL BE A
MINIMUM OF 6” ABOVE THE TOP OF FOOTING AND SHALL SLOPE
AT A MINIMUM OF 2%. ROOF DRAINS SHALL JOIN UPPER
QUADRANT OF INTERCEPTING DRAIN SO THAT THERE IS A 45°
ANGLE BETWEEN THE CENTERLINE OF THE ROOF DRAIN AND THE
HORIZONTAL LINE THROUGH THE CENTER OF THE INTERCEPTING
DRAIN.
E. THE CONTRACTOR SHALL NOT DISTURB THE JP-4 / P.O.L. FUEL
LINE DURING CONSTRUCTION. EXCAVATION IN THE VICINITY OF
THIS PIPELINE SHALL BE DONE BY HAND. WHEN EXCAVATING
NEAR THE FUEL LINE, CONTACT ALEXANDER DYSON,
A.DYSON@COMCAST.NET, (609) 267-9100.
GENERAL SHEET NOTES
0+50 1+00 2+00 2+50
57.13 LF 12" CPP @ 0.67%
STORM B
64.29 LF 12" CPP @ 0.65%
STORM C
EX
ST
I2
ST
A.
+2 8.
R
IM
=1
.7
IN
V
IN
=1
.5
IN
V
O U
T=
8.
EX
ST
M H
ST
A.
+0 0.
R
IM
=1
.5
IN
V
IN
=1
.5
IN
V
O U
T=
9.
M H
ST
A.
+6 1.
R
IM
=1
.4
IN
V
IN
=1
.0
IN
V
O U
T=
9.
PROPOSED
GRADE
EXISTING
GRADE
IN
V
IN
=1
.0
SD
SD
SD SD
SD
SD
SD
D D
E E E E E E E E
E E
E E
E E
E E
E E
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
G G
G G
G
C
C
C
C
C
C
C C
C
GM
G G G G
HTWS HTWS HTWS
D D
H
TW
S
E E E E E E E E E E E
TWS
HTWS HTWS HTWS
H
TW
S H
TW
S
HTWS HTWS HTWS
SD SD SD SD SD
SD
SD
D D D D D
D
E Clean Out
SD
SD
SD
SD
SD SD
SD SD SD
Clean Out
Clean Out
BM
HTWS
1+
2+00
2+30
MH2 (EXST)
STA. 1+00.00
I2 (EXST)
STA. 2+28.42
MH1 (EXST)
$P
LO
TD
AT
E $P
LO
TT
IM
E
C
IV
IL
ST
O R
M D
R
AI
N L
IN
ES
A ,C
A N
D D
PL
AN
A N
D P
R O
FI
LE
CG201
FOR CONSTRUCTION
E.
N
EP
ER
U D
J.
P
AL
M
ER
J.
C
O R
U M
G . R
IG
G
IN
S
PT
FL
-1
-2
9-
C G
1.
dw g
IS
SU
E
FO
R
C O
N
ST
R U
C
TI
O N
-3
0-
R
ES
PO
N
SE
T O
C
LI
EN
T
C O
M M
EN
TS
-0
4-
TA
SK
O R
D
ER
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
KC
-4
6A B
ED
D
O W
N M
C G
U
IR
E
AF
B
BU
R
LI
N G
TO
N
C O
U N
TY
, N
EW
J
ER
SE
Y
W
2E R
-1 4-
D -0
JU
LY
AN
SI
D 1:
L
AK
ES
ID
E C
EN
TR
E W
AY
SU
IT
E
KN
O
XV
IL
LE
, T
N
20' 40'0
N SHEET KEYNOTES
1. CONSTRUCT NEW 4' MANHOLE, SEE DETAIL B1 AND B4 DWG C-502
AND DETAIL F1 DWG C-503.
2. CONNECT TO EXISTING STORM SEWER MANHOLE.
3. CONNECT TO EXISTING STORM SEWER INLET.
4. CONSTRUCT NEW STORM INLET. SEE DETAIL F1 DWG C-503.
5. ROOF DRAIN, SEE DWG CG120.
A. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DWG C-001.
B. FINISHED SURFACE ELEVATIONS SHALL MATCH EXISTING GRADE ELEVATIONS.
MATCH TOP OF CONCRETE PAVEMENT TO TOP OF EXISTING CONCRETE
PAVEMENT.
C. TOPSOIL AND SEED ALL AREAS DISTURBED BY CONSTRUCTION WHICH ARE
NOT PAVED.
D. ROOF DRAINS BETWEEN BUILDING AND INTERCEPTING DRAINS SHALL
BE 4”. THEIR INVERT AT THE BUILDING SHALL BE A MINIMUM OF 6” ABOVE
THE TOP OF FOOTING AND SHALL SLOPE AT A MINIMUM OF 2%. ROOF
DRAINS SHALL JOIN UPPER QUADRANT OF INTERCEPTING DRAIN SO THAT
THERE IS A 45° ANGLE BETWEEN THE CENTERLINE OF THE ROOF DRAIN AND
THE HORIZONTAL LINE THROUGH THE CENTER OF THE INTERCEPTING DRAIN.
E. THE CONTRACTOR SHALL NOT DISTURB THE JP-4 / P.O.L. FUEL LINE DURING
CONSTRUCTION. EXCAVATION IN THE VICINITY OF THIS PIPELINE SHALL BE
DONE BY HAND. WHEN EXCAVATING NEAR THE FUEL LINE, CONTACT
ALEXANDER DYSON, A.DYSON@COMCAST.NET, (609) 267-9100.
F. COORDINATES FOR STORM DRAIN STRUCTURES INDICATE THE CENTER OF
THE STRUCTURE.
GENERAL SHEET NOTES
E6 STORM B AND STORM C PLAN
SCALE: 1" = 20'
B6 STORM B AND STORM C PROFILE
SCALE: 1" = 20'
$P
LO
TD
AT
E $P
LO
TT
IM
E
C
IV
IL
PA
R
KI
N G
R O
AD
PL
AN
A
N D
P R
O
FI
LE
CG202
FOR CONSTRUCTION
E.
N
EP
ER
U D
J.
PA
LM
ER
J.
C
O R
U M
G .R
IG
G
IN
S
PT
FL
-1
-2
9-
C G
2.
dw g
IS
SU
E
FO
R
C O
N
ST
R U
C
TI
O N
-3
0-
D
EL
ET
ED
-0 4-
TA
SK
O R
D
ER
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
KC
-4
6A B
ED
D
O W
N M
C G
U
IR
E
AF
B
BU
R
LI
N G
TO
N
C O
U N
TY
, N
EW
J
ER
SE
Y
W
2E R
-1 4-
D -0
GRAPHIC SCALE
JU
LY
AN
SI
D 1:
L
AK
ES
ID
E C
EN
TR
E W
AY
SU
IT
E
KN
O
XV
IL
LE
, T
N
N
GENERAL SHEET NOTES
0 10' 20'
E1
1. SEDIMENT BARRIER. USE
ANY OF THE FOLLOWING:
1.1. STRAW BALES
1.2. ROCK SOCKS
1.3. BIOFILTER BAGS
2. FILTER FABRIC
STORM SEWER INLET PROTECTION
NTS
SECTION
5' -0
2'
-6
2' -6
6"
6"
6"
2' -6
6"
5' -0
PLAN
ELEVATION
6' MAXIMUM
SPACING
NOTES:
A. BURY BOTTOM OF FILTER FABRIC 6" VERTICALLY BELOW
FINISHED GRADE.
B. 2"x4" DOUGLAS FIR OR STEEL FENCE POSTS.
C. SECURE FENCE TO POST WITH METAL FASTENERS AND
REINFORCEMENT BETWEEN FASTENER AND FABRIC.
D. COMPACT ALL AREAS OF FILTER FABRIC TRENCH.
1. ANGLE BOTH ENDS OF FILTER
FABRIC FENCE TO ASSURE
SOIL IS TRAPPED
2. INTERLOCKED 2"x4" POSTS
AND ATTACH
3. FILTER FABRIC MATERIAL,
36" WIDE ROLLS
4. NEWLY GRADED OR
DISTURBED SLOPE
5. DRAW STRING RUNNING
THROUGH FABRIC ALONG
TOP OF FENCE
6. PROVIDE BASE COURSE
BACKFILL IN TRENCH
E4 SEDIMENT FENCE
NTS
3.
4.
ADDITIONAL GRAVEL SHALL
BE ADDED PERIODICALLY
TO MAINTAIN PROPER
FUNCTION OF THE PAD.
REMOVE GRAVEL
ENTRANCE AND REPLACE
WITH NEW BASE COURSE
PRIOR TO COMPLETION
OF ACCESS ROAD.
INSTALLATION SHALL BE
COORDINATED WITH
CONSTRUCTION PHASING.
4" M
IN
SEE PLAN
50' MIN
1.
2.
5.
A.
B.
6" M
IN
EXISTING PAVEMENT
OR APPROVED
ACCESS POINT.
25' R, MIN.
CLEAN PIT RUN OR
2 1/2" MINUS GRAVEL
(OR LARGER IF
REQUIRED).
FREE DRAINING
EXCAVATED MATERIAL.
GEOTEXTILE, IF
SPECIFIED.
NOTES:
E8 STABILIZED CONSTRUCTION ACCESS
NTS
C.
NOTES:
WHEN FENCES AROUND MULTIPLE
TREES WOULD OVERLAP, FENCE
TO BE SET AT PERIMETER OF
TREE STAND, ACCORDING TO
LAYOUT DIRECTIONS ABOVE.
EXSITING TREE, TO
BE PROTECTED
PLASTIC CONSTRUCTION
FENCING W/ STEEL T-POSTS
W/ PLASTIC CAPS, OR
APPROVED SUBSTITUTE.
FENCING W/ STEEL T-POSTS
W/ PLASTIC CAPS, OR
APPROVED SUBSTITUTE.
CRRCRR
C R
R C
R R
CRR (CRITICAL ROOT RADIUS)
= 12" PER 1" OF TREE CAL. OR
10' FROM TRUNK WHICHEVER
IS GREATER.
ELEVATION
PLAN
B1 TREE PROTECTION DURING CONSTRUCTION
NTS
CR
R
TREE DRIP LINE
FENCING OPTION (AROUND
TREE WITH A RADIUS EQUAL
OR GREATER THAN CRR).
TA
SK
O R
D
ER
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
KC
-4
6A B
ED
D
O W
N M
C G
U
IR
E
AF
B
BU
R
LI
N G
TO
N
C O
U N
TY
, N
EW
J
ER
SE
Y
W
2E R
-1 4-
D -0
JU
LY
AN
SI
D 1:
L
AK
ES
ID
E C
EN
TR
E W
AY
SU
IT
E
KN
O
XV
IL
LE
, T
N
$P
LO
TD
AT
E $P
LO
TT
IM
E
C
IV
IL
SO
IL
E
R O
SI
O
N A
N D
S
ED
IM
EN
TA
TI
O N
C O
N
TR
O L
D
ET
AI
LS
CG501
FOR CONSTRUCTION
E.
N
EP
ER
U D
J.
P
AL
M
ER
J.
C
O R
U M
G . R
IG
G
IN
S
PT
FL
-1
-2
9-
C G
1.
dw g
IS
SU
E
FO
R
C O
N
ST
R U
C
TI
O N
-3
0-
R
ES
PO
N
SE
T O
C
LI
EN
T
C O
M M
EN
TS
-0
4-
E E E E E E
E
E
E E
E E
E
E
E E E E E E E E E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E E
E
E E E E
E
POL
POL
POL
POL
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
POL
POL
G G
G G
G G G G G G G G G
G G
G G
G G
G G
G
C C
C C
C C
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C
C
C
C
C
C
C
C
Rip Rap
D
GM
GM
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
G G G G
HTWS HTWS HTWS HTWS
H
TW
S H
TW
S
HTWS
D D
D
U U
U U
U U
H
TW
S
E E E E E E E E E E E
HTWS
HTWS HTWS HTWS
H
TW
S H
TW
S
HTWS HTWS HTWS
SD SD SD SD SD
SD
SD
D D D D D
D
D
W W W W W W W W W W W W W W W W W W
Clean Out
E Clean Out
S S
S S
S
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD SD
SD
Clean Out
SD
Clean Out
Clean Out
Clean Out Clean
Out
Clean Out
Clean Out
Clean Out
Clean Out
Clean Out
Clean Out
Clean Out
BM
BM
W W
W W
C
C C C
E
E
E E
E E E E E E
E
E
E E
E E E E E E E
E E E E E E E E E E E E E
E E
E E
POL
POL
POL
POL
E E
E
E E
E E
E E E E E
E
E E E E
E E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
U U
U
E E
E E E
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
D D D D D D D D D D
HTWS
W
W W
W
SD
SD
SD SD
SD
SD
G G
GG
SD
G G
G G
G
D D
5.00'
G G
G G
G G G G G G G G G
G G
G G
G G
G G
N 436594.35 E 466347.53
N 436605.29 E 466394.89
N 436487.07 E 466422.88
N 436469.08 E 466373.60
N 436475.55 E 466372.97
TA
SK
O R
D
ER
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
KC
-4
6A B
ED
D
O W
N M
C G
U
IR
E
AF
B
BU
R
LI
N G
TO
N
C O
U N
TY
, N
EW
J
ER
SE
Y
W
2E R
-1 4-
D -0
GRAPHIC SCALE
JU
LY
AN
SI
D 1:
L
AK
ES
ID
E C
EN
TR
E W
AY
SU
IT
E
KN
O
XV
IL
LE
, T
N
A. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DWG
C-001.
B. THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES
AS INDICATED HAVE BEEN OBTAINED FROM EXISTING RECORDS
AND FIELD SURVEYS. UNDERGROUND STRUCTURES AND
UTILITIES MAY BE PRESENT WHICH ARE NOT DOCUMENTED OR
LOCATED.
C. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
FIELD-VERIFY EXISTING STRUCTURES, UTILITIES, AND SURVEY
INFORMATION, AND TO TAKE NECESSARY PRECAUTIONS DURING
DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL
FIELD-CHECK ALL EXISTING CONDITIONS AND BE THOROUGHLY
FAMILIAR WITH THE SITE BEFORE ANY WORK COMMENCES. ANY
DISCREPANCIES IN THE DRAWINGS SHALL BE IMMEDIATELY
REPORTED TO THE OWNER BEFORE ANY FURTHER WORK
COMMENCES. IN THE EVENT AN UNEXPECTED UTILITY OR
STRUCTURE INTERFERENCE IS ENCOUNTERED, THE
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER.
D. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS
NOT TO BE DAMAGED DURING DEMOLITION AND CONSTRUCTION.
THE CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED OR
DISTURBED ITEMS TO THE SATISFACTION OF THE OWNER.
E. THE CONTRACTOR SHALL NOT DISTURB THE JP-4 / P.O.L. FUEL
LINE DURING CONSTRUCTION. EXCAVATION IN THE VICINITY OF
THIS PIPELINE SHALL BE DONE BY HAND. WHEN EXCAVATING
NEAR THE FUEL LINE, CONTACT ALEXANDER DYSON,
A.DYSON@COMCAST.NET, (609) 267-9100.
GENERAL SHEET NOTES
20' 40'0
N
1. REROUTE 1" NATURAL GAS LINE. CONTRACTOR TO VERIFY
EXISTING PIPE DIAMETER, MATERIAL, AND DEPTH (MATCH
EXISTING).
2. TIE IN TO EXISTING NATURAL GAS LINE.
3. REPLACE SUB DRAIN AND CLEAN OUT TO MATCH EXISTING.
CLEAN OUT RIM TO MATCH PROPOSED GRADING.
4. PROPOSED STORM DRAIN, TYP, SEE DWG CG120.
5. PROPOSED ROOF DRAIN, TYP, SEE DWG CG120.
6. EXISTING STORM DRAIN, PROTECT IN PLACE.
7. EXISTING ELECTRICAL DUCT BANK, PROTECT IN PLACE.
8. EXISTING HIGH TEMPERATURE HOT WATER (SUPPLY AND
RETURN) LINES, PROTECT IN PLACE.
9. EXISTING HIGH TEMPERATURE HOT WATER (SUPPLY AND
RETURN) LINES, DEMOLISH IF REQUIRED WHERE SHOWN ON DWG
CD100.
10. EXISTING SUBDRAIN AND CLEAN OUT, PROTECT IN PLACE, U.N.O.
11. EXISTING P.O.L., JP-4 FUEL LINE, PROTECT IN PLACE, SEE NOTE E.
12. EXISTING COMMUNICATIONS LINES, PROTECT IN PLACE.
13. CONCRETE PAD, SEE DWG MH402.
SHEET KEYNOTES
$P
LO
TD
AT
E $P
LO
TT
IM
E
C
IV
IL
SI
TE
U
TI
LI
TY
P
LA
N
O
VE
R
AL
L
CU100
FOR CONSTRUCTION
E.
N
EP
ER
U D
J.
P
AL
M
ER
J.
C
O R
U M
G . R
IG
G
IN
S
PT
FL
-1
-2
9-
C U
0.
dw g
IS
SU
E
FO
R
C O
N
ST
R U
C
TI
O N
-3
0-
R
ES
PO
N
SE
T O
C
LI
EN
T
C O
M M
EN
TS
-0
4-
-11-10-9
AA
BB
-8-7
-A
-B
-C
-D
-E
7'-5" 24'-3 1/4" 5'-5 3/8" 32'-3"
'-7
/2
TYP
A1
S-511
A5
S-511
A5
S-511
E1
S-512
E4
S-512
(TYP
AT COL)
F1
S-511
12" CMU WALL,
TYP 3 SIDES
T/SLAB EL 99'-0"
'-0
/2
'-1
1/ 2"
8' -3
/4
'-3
/4
A7
S-511
A7
S-511
2'-3" 9" EOS
9" E
O S
2' -3
2' -3
2'-3"
1' -6
/4
2' -3
2' -3
9"
E O
S
2'-3" 9" EOS
TYP
4'-0"
TYP
2'-3"
TYP
2'-3"
TYP
TYP
TYP
1'-0" 12'-0"
EOS
29'-11 1/4" 1'-4" EOS
18'-0" 6'-1"
EOS
9 1/8"
EOS
8 1/4"
4'-9 1/8"2'-6" 3'-4"9'-5"
CL
BOT
FDN
1'-10 3/8" TYP
10"
E O
S
T/EXIST SLAB EL 98'-6"
1' -1
3/
8"
'-5
/8
'-5
/8
2'
-0
'-4
/8
EOS
3/
8" 1'
-2
EOS
EOS
T Y
P 6"
T Y
P 6"
1'-6 3/8"
EOS
30'-7 1/4"
6" TYP
E O
S
TYP
TYP
TYP
TYP
TYP
TYP
2' -7
/2
C L
B O
T F
D N
CL
BOT
FDN
16'-9 3/4"
'-7
/4
C L
B O
T F
D N
B1 S-201
E4
S-202
E7
S-512
(TYP)
88 TYP AT
EXIST PIERS
(TYP)
N
GRAPHIC
KEY
-1 -9
1 14
-A
-L
A
G C
D
B
A
-11
-AA
-BB
S M
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
TE
D B
Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N
TR
A C
T N
O
T A
S K
O R
D E
R N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N S
H E
E T
L A
K E
S
ID
E C
E N
T
Y S
U
IT
E
N E
W Y
O
TR
IC
T
F E
D E
R A
L P
LA
Z
A
K C
A
B E
D D
O W
N M
C G
U
IR
E A
F B
B U
R
LI
N G
T O
N C
O U
N T
Y , N
A
LE
1:
O
F
P T
F L-
2E R
-1 4-
D -0
S-101
K
LE
S
T E
R
J.
N
E
IL
G
R
IG
G
IN
S
L.
P
R E
S
LE
Y
JU
LY
FOR CONSTRUCTION
S T
R U
C T
U R
A L
F O
U N
D A
T
IO
N A
N D
S
LA
B P
LA
N
B O
T A
R E
A S
IS
S
U E
F O
R C
O N
S
TR
U C
TI
O
N
-3
0-
R E
S
PO
N
SE
T O
C
LI
EN
T
C O
M M
E N
TS
-0
4-
1/8" = 1'-0"B2
FOUNDATION AND SLAB PLAN - BOT
BUILDING ADDITION AND EXISTING BOT
AREA
GENERAL SHEET NOTES
KEYED NOTES
8 0 8
Scale: 1/8 INCH = 1 FOOT
A FOR GENERAL STRUCTURAL NOTES, SEE SHEETS S-001 THROUGH
S-003.
B FOR CMU WALL REINFORCING DETAILS SEE SHEETS S-520 AND
S-521.
C SEE ARCH'L DRAWINGS FOR CMU WALL AND DOOR LOCATIONS AND
SIZES.
1 8" CONCRETE SLAB REINFORCED WITH #5 AT 12" EACH WAY. FOR
DETAILS, SEE SHEET S-510.
2 BOT EQUIPMENT FOUNDATION, SEE SHEET S-401 FOR ENLARGED
PLAN.
3 1/2" ISOLATION JOINT AT SLAB PERIMETER. FOR DETAILS, SEE
SHEET S-510.
4 SLAB CONTRACTION OR CONSTRUCTION JOINTS. FOR DETAILS,
SEE SHEET S-510.
5 EXTEND SLAB EDGE TO OUTSIDE FACE OF BRICK AND STEM WALL
AT DOOR. PROVIDE DETAIL SIMILAR TO F1/S-511, EMBEDED ANGLE
NOT REQUIRED.
6 EXISTING BLDG FOUNDATION.
7 6" CONCRETE SLAB REINFORCED WITH #4 AT 12" EACH WAY.
8 2 - #5 X 5'-0' LONG RE-ENTRANT CORNER BARS.
9 EXISTING CMU PILASTERS.
10 FILL-IN 1'-0" WIDE X 1'-0 3/8" HIGH OPENING AT TOP OF EXISTING 10"
THICK STEM WALL WITH CONCRETE.
11 FACE OF EXISTING BRICK AND STEM WALL.
12 FILL IN BRICK LEDGE WITH CONCRETE. SEE SHEET S-202, DETAIL
A3.
T/SLAB EL = 100'-0" (U.N.)
T/STEM WALL EL = 100'-0"
T/PIER EL = 98'-10 5/8"
T/FTG EL = 96'-6"
-9-8
-A
-B
'-3
/4
24'-3 1/4"
W x5
(E
5A5
S-111
A1
S-111
BLDG ADDITION
8 7/8"
G.L. FOR BOT
5 SPACES AT 3'-10 1/2"
19'-4 1/2" 3'-7"
BOT BLDG
ADDITION
F A
C E
/B R
IC
K
3/
8"
T/TRUSS EL 120'-1 5/8"
E D
G E
/R O
O F
LI
N
E
1/
4" F
A C
E /B
R
IC
K A
N D
S
LO
P E
3/
S
LO
P E
3/
-9-8
-A
-B
6 EQUAL SPACES
24'-3 1/4"
E
Q U
A L
S P
A C
E S
'-3
/4
W x1
W x1
W x1 2 W x1
2 W x1
W x2
W10x12
W10x12
W10x12
W10x12
W10x19
W14x22
W x5
W14x22 (T/STL EL 112'-7 1/2")
W x2
(T /S
T L
E L
2'
-7
/2
H.P. T/STL EL 119'-7 1/2"
SLOPE
3/12
S
LO
P E
3/
T/STL EL 113'-6 5/8"
(TYP ALONG COLUMN
LINES -A AND -9, U.N.O.)
EDGE/ROOFLINE
8 1/4"
FACE/BRICK AND
E D
G E
/R O
O F
LI
N
E
1/
4" F
A C
E /B
R
IC
K A
N D
-9-8
24'-3 1/4"
ON COLUMN LINE -B
AT COLUMN LINE -9
W14x22 (E)
T/EXIST STL EL 119'-7 1/2"
AT COLUMN LINE -8
A1 S-1115
T/STL EL 120'-1 5/8"
T/STL EL 113'-6 5/8"
5 SPACES AT 3'-10 1/2"
19'-4 1/2" 3'-7"
-B
W14 (E) W10 (E) W10 (E) W10 (E) W14 (E)
T/TRUSS EL 119'-7 5/8"
E X
IS
T
IN
G
W
1/
8" A
T C
E N
T E
R
LI
N E
2 6
TRUSS AT COLUMN LINE -B
50 PSF
LEEWARD SNOW DRIFT
8' -0
8'-0"
-8 -9
-A
-B
P
S F
15 PSF
36 PSF
WINDWARD SNOW DRIFT
5' -0
11'-0"
-A
-B
P
S F
15 PSF
N
GRAPHIC
KEY
-1 -9
1 14
-A
-L
A
G C
D
B
A
-11
-AA
-BB
S M
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
TE
D B
Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N
TR
A C
T N
O
T A
S K
O R
D E
R N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N S
H E
E T
L A
K E
S
ID
E C
E N
T
Y S
U
IT
E
N E
W Y
O
TR
IC
T
F E
D E
R A
L P
LA
Z
A
K C
A
B E
D D
O W
N M
C G
U
IR
E A
F B
B U
R
LI
N G
T O
N C
O U
N T
Y , N
A
LE
1:
O
F
P T
F L-
2E R
-1 4-
D -0
S-111
K
LE
S
T E
R
J.
N
E
IL
G
R
IG
G
IN
S
L.
P
R E
S
LE
Y
JU
LY
FOR CONSTRUCTION
S T
R U
C T
U R
A L
LO
W
R O
O F
F R
A M
IN
G
P
LA
N S
IS
S
U E
F O
R C
O N
S
TR
U C
TI
O
N
-3
0-
R E
S
PO
N
SE
T O
C
LI
EN
T
C O
M M
E N
TS
-0
4-
GENERAL SHEET NOTES
KEYED NOTES
4 0 4 8
Scale: 1/4 INCH = 1 FOOT
1 H.P. T/1 1/2" ROOF DECK EL 119'-9 1/4" (AT F/EXISTING BRICK).
2 NEW COLD-FORMED ROOF TRUSS. T/TRUSS TO MATCH T/EXISTING
Z-PURLIN EL ON SW SECTION OF ROOF SHOWN. TRUSSES TO SPAN
FROM NEW TRUSS ON COLUMN LINE -B TO EXISTING W14x53.
3 EXISTING T/STL ELEVATIONS NOTED ARE THE T/STL FOR THE W10
AND W14 ROOF BEAMS. ROOF LINE AND T/Z-PURLINS IS 6 1/8"
ABOVE T/STL ELEVATIONS NOTED.
4 CUT EXISTING Z-PURLINS AS REQUIRED TO INSTALL NEW TRUSS.
5 TRUSS ALONG COLUMN LINE -B TO BE DESIGNED TO SPAN FULL 24'
3 1/4" FROM COLUMN LINES -8 TO -9.
6 6" DEEP COLD-FORMED MEMBERS TO MATCH DEPTH OF EXISTING
Z-PURLINS. SUPPORT AT NEW ROOF TRUSSES AND EXISTING
W14X53. FOR COLD-FORMED TRUSS DETAIL, SEE A6/S-531.
7 EXISTING COLD-FORMED 6" Z-PURLINS.
8 FOR COLD-FORMED TRUSS DETAILS, SEE DETAIL A6/S-531.
1/4" = 1'-0"D5
EXISTING LOW ROOF COLD-FORMED
TRUSS FRAMING PLAN
1/4" = 1'-0"D1
EXISTING LOW ROOF FRAMING PLAN
(FOR REFERENCE ONLY)
- 1/4" = 1'-0"
A5 TRUSS ALONG COLUMN LINE -B
- 1/4" = 1'-0"
A1 TYPICAL ROOF TRUSS
A FOR GENERAL STRUCTURAL NOTES, SEE SHEETS S-001 THROUGH
S-003.
B LOWER ROOF SNOW DRIFT LOADING DIAGRAM:
1 1
-11-10-9
AA
BB
-A
W27x94
W x7
W21x73
W x7
HSS6x6x1/4
HSS6x 6x
1/
W x9
W x9
W27x94
W x9
W12x26
W21x48
W12x26
W21x48
W12x26
W21x48
5'-5 3/8" 32'-3"
9"
'-7
/2
W12x65
TYP 4 PLCS
D8
S-531
D8
S-531
D8
S-531
D1
S-531
D5
S-531
'-3
/4
'-3
/4
S
P A
'-0
2' -0
2'
-0 " 4
S P
A
'-0
3'-7" 16'-1 1/2" 16'-1 1/2"
4 SPA @ 4'-0"
2'-0" 2'-0"
3 SPA @ 4'-0"
12" CMU WALL
(TYP)
W8x31
TYP 3
PLCS
'-1
/2
'-6
1' -6
/4
7' -6
7'
-6
7' -6
8'
-0
/4
8' -0
/4
G.L.
4'-8 1/2"
TYP
G .L
2'
-3
W21x48
W12x26
B1 S-201
HSS6x6x1/4HSS6x 6x
1/
TYP
9"
-9.5
9 1/2"
W 8x
W
8x
W 8x
W
8x
W 8x
9"
-11-10-9
AA
BB
-A
1' -7
'-7
/2
1' -7
32'-3" 1'-7"
C O
M M
O N
T R
U S
S
S T
E P
D O
W N
T R
U S
S
#1 H
IP
T
R U
S S
PERIMETER
OF TRUSS
EDGES
JACK TRUSS
HIP JACK
TRUSS
D8
S-531
D8
S-531
D8
S-531
D1
S-531
1' -6
/4
'-9
/2
38'-1"
4'-3"
D5
S-531
JACK TRUSSES
A1 S-121
SLOPE
3/12 (TYP)
SLOPE
S
LO
P E
S
LO
P E
A6 S-121
5'-5 3/8"
L.
P
. T /T
R U
S S
L.
P
. T /T
R U
S S
L.P. T/TRUSS
L.P. T/TRUSS
H.P. T/TRUSS
AABB
19'-0 1/2" 3'-8 1/2" 19'-0 1/2"
41'-9 1/2"
1'-7" 19'-3 3/4" 19'-3 3/4" 1'-7"
TYP
H.P. EL 138'-9 1/8"
L.P. EL 134'-0"
TRUSS BRG EL 133'-6" 6"
4'
-9
/8
-11-10
19'-0 1/2"19'-0 1/2"
38'-1"
1'-7"16'-1 1/2"16'-1 1/2"3'-7"8"
TYP
EL 138'-9 1/8"
EL 134'-0"
TRUSS BRG EL 133'-6"
4' -9
/8
6"
-9.5
N
GRAPHIC
KEY
-1 -9
1 14
-A
-L
A
G C
D
B
A
-11
-AA
-BB
S M
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
TE
D B
Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N
TR
A C
T N
O
T A
S K
O R
D E
R N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N S
H E
E T
L A
K E
S
ID
E C
E N
T
Y S
U
IT
E
N E
W Y
O
TR
IC
T
F E
D E
R A
L P
LA
Z
A
K C
A
B E
D D
O W
N M
C G
U
IR
E A
F B
B U
R
LI
N G
T O
N C
O U
N T
Y , N
A
LE
1:
O
F
P T
F L-
2E R
-1 4-
D -0
S-121
K
LE
S
T E
R
J.
N
E
IL
G
R
IG
G
IN
S
L.
P
R E
S
LE
Y
JU
LY
FOR CONSTRUCTION
S T
R U
C T
U R
A L
R O
O F
F R
A M
IN
G
P
LA
N B
O T
B U
IL
D
IN
G
A D
D
IT
IO
N
IS
S
U E
F O
R C
O N
S
TR
U C
TI
O
N
-3
0-
R E
S
PO
N
SE
T O
C
LI
EN
T
C O
M M
E N
TS
-0
4-
GENERAL SHEET NOTES
KEYED NOTES
8 0 8
Scale: 1/8 INCH = 1 FOOT
1 1 1/2" 20 GAGE STEEL ROOF DECK, 5'-0' MAXIMUM SPAN.
2 WALL CONNECTION PLATE.
3 COLD-FORMED STEEL ROOF TRUSSES, TYPICAL. FOR TYPICAL
DETAILS SEE SHEET S-530.
4 L4X4X1/4 BRACING, TOED DOWN WITH T/STL EL 131'-9".
5 HSS6X6 B/STL EL SAME AS B/STL EL OF W27.
6 ADDITIONAL ROOF DECK SUPPORT MEMBERS AS REQUIRED.
7 ROOF TRUSS SUPPORT POINTS AT ROOF FRAMING T/STL EL 133'-6".
8 INSIDE FACE OF CMU WALL.
9 CENTERLINE OF W8'S WITH C8 CAP.
1/8" = 1'-0"C1 ROOF FRAMING PLAN - BOT BUILDING
1/8" = 1'-0"C6 ROOF TRUSS FRAMING PLAN
T/STL EL 133'-6" (U.N.)
ADDITIO
A FOR GENERAL STRUCTURAL NOTES, SEE SHEETS S-001 THROUGH
S-003.
B FOR BASE PLATE DETAIL SEE SHEET S-530.
C FOR HORIZONTAL BRACING DETAILS SEE SHEET S-530.
TRUSS BRG EL 133'-6" (U.N.)
H.P. T/TRUSS EL 138'-9 1/8"
L.P. T/TRUSS EL 134'-0"
1/8" = 1'-0"A1 SECTION - ROOF TRUSS OUTLINE
1/8" = 1'-0"A6 SECTION - ROOF TRUSS OUTLINE
3'-6" 10'-6" 10'-6" 3'-6"
TYP
21'-0"
'-1
/4
'-1
/4
3'-6" 3'-6"TYP
7'-0"
'-2
/4
6'
-0
/4
'-3
8'-4 " R
60°60°
_______D6
S-402
TYP
9'-5 7/8" R
A
A
B
B
1/
2"
X
SECTIONX
1'-3" 1'-3"
NOTE: DO NOT DAMAGE EXISTING REINFORCING.
ADJUST LOCATION OF EPOXY DOWELS
AS REQUIRED TO MISS REINFORCING.
COORDINATE LOCATION OF DOWELS
WITH EQUIPMENT POST-INSTALLED
ANCHOR BOLT LOCATIONS.
1' -1
1'
-1
T Y
P
9" T
Y P
E M
B E
D
TYP
EMBED 6"
TYP
9"
EXISTING REINFORCING
T/CONC EL
100'-0"
GRAPHIC
S M
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
TE
D B
Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N
TR
A C
T N
O
T A
S K
O R
D E
R N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N S
H E
E T
L A
K E
S
ID
E C
E N
T
Y S
U
IT
E
N E
W Y
O
TR
IC
T
F E
D E
R A
L P
LA
Z
A
K C
A
B E
D D
O W
N M
C G
U
IR
E A
F B
B U
R
LI
N G
T O
N C
O U
N T
Y , N
A
LE
1:
O
F
P T
F L-
2E R
-1 4-
D -0
S-402
K
LE
S
T E
R
J.
N
E
IL
G
R
IG
G
IN
S
L.
P
R E
S
LE
Y
JU
LY
FOR CONSTRUCTION
S T
R U
C T
U R
A L
W S
T E
N
LA
R G
E D
F O
U N
D A
T
IO
N P
LA
N
IS
S
U E
F O
R C
O N
S
TR
U C
TI
O
N
-3
0-
R E
S
PO
N
SE
T O
C
LI
EN
T
C O
M M
E N
TS
-0
4-
GENERAL SHEET NOTES
KEYED NOTES
4 0 4 8
Scale: 1/4 INCH = 1 FOOT
1 WST AXIS - TYPICAL.
2 CENTERLINE EXISTING 4'-0' DIA x 6" DEEP CONCRETE FILLED
POCKET - TYPICAL.
3 MOTION FLOOR PAD. WST BASE PLATES AND POST-INSTALLED
ANCHORS BY EQUIPMENT MANUFACTURER (SEE GENERAL SHEET
NOTE B).
4 CENTERLINE POCKET AND WST AXIS.
5 #5 ADHESIVE DOWEL.
6 EXISTING 4'-0" (+/-) DIA x 6" (+/-) DEEP CIRCULAR POCKET IN WST
FOUNDATION.
7 REMOVE EXISTING CONCRETE IN CIRCULAR POCKET DOWN TO
ORIGINAL CONCRETE (+/- 6"). DO NOT DAMAGE EXISTING
REINFORCING. ROUGHEN SIDES AND BOTTOM OF POCKET TO 1/4"
AMPLITUDE. FILL POCKET WITH NON-SHRINK EPOXY GROUT (SEE
GENERAL SHEET NOTE B).
8 EXISTING AIR DUCT (TYPICAL 2 PLACES).
9 CENTERLINE OF WST BASE PLATES.
10 LOADS FROM TABLE 2.3-1 OF KC-46 AIRCRAFT TRAINING SYSTEM
FA8621-13-C-6247, TRAINER FACILITY REPORT (CDRL
A017/DI-FACR-80966/T) DOCUMENT NUMBER KC45-ENG-15-053,
REVISION C, DATED 26 JANUARY 2018. DOCUMENT PREPARED BY
FLIGHT SAFETY SERVICES CORP OF CENTENNIAL, COLORADO
80112.
11 WST MOTION CENTROID.
12 PROVIDE ADDITIONAL #5 REINFORCEMENT AS SHOWN CENTERED
BETWEEN #5 ADHESIVE DOWELS.
1/4" = 1'-0"D1
EXISTING ENLARGED FOUNDATION PLAN
- WST
A FOR GENERAL STRUCTURAL NOTES, SEE SHEETS S-001 THROUGH
S-003.
1 0 1 2
Scale: 3/4 INCH = 1 FOOT
3/4" = 1'-0"D6 CONCRETE INFILL
MAXIMUM UN-FACTORED LOADING APPLIED TO THE FLOOR AT EACH MOTION FLOOR PAD
LOAD CONDITION UNITS VALUE
TENSILE STATIC LBf 10,200
DYNAMIC LBf 58,850
COMPRESSIVE STATIC LBf 22,680
DYNAMIC LBf 120,200
SHEAR STATIC LBf 30,000
DYNAMIC LBf 117,870
MOMENT ABOUT AXIS A-A LBf -ft +/- 105,400
MOMENT ABOUT AXIS B-B LBf -ft +/- 67,950
YAW MOMENT ABOUT FLOOR PAD LBf -ft +/- 20,350
TOTAL UN-FACTORED LOADING APPLIED BY THE MOTION SYSTEM TO THE FLOOR AT THE MOTION CENTROID
LOAD CONDITION UNITS VALUE
TENSILE STATIC LBf 0
DYNAMIC LBf 31,000
COMPRESSIVE STATIC LBf 34,000
DYNAMIC LBf 120,000
SHEAR STATIC LBf 0
DYNAMIC LBf 52,950
MOMENT ABOUT ANY FLOOR PAD AXIS (NOTE) LBf -ft +/- 1,265,600
MOMENT PERPENDICULAR TO ANY FLOOR PAD AXIS LBf -ft +/- 1,500,100
YAW MOMENT ABOUT MOTION CENTROID LBf -ft +/- 568,650
NOTE: FLOOR PAD AXES (3) BEGIN AT THE MOTION CENTROID AND EXTEND OUT THROUGH EACH MOTION
FLOOR PAD CENTERLINE (COLLINEAR WITH AXIS B-B)
EPOXY GROUT SHALL BE EUCLID CHEMICAL COMPANY E3-XTREME.
NO SUBSTITUTIONS ALLOWED. DO NOT PLACE GREATER THAN 6"
DEEP WITHOUT VENDOR APPROVAL. FOR DEPTHS GREATER THAN
6", 2 EQUAL DEPTH POURS MAY BE USED WITH VENDOR
APPROVAL. FOLLOW GROUT MANUFACTURER'S INSTRUCTIONS
FOR HANDLING, MIXING, AND PLACING GROUT. WST BASE PLATE
SHALL BE GROUTED WITH SAME EPOXY GROUT USED IN POCKET,
IF REQUIRED.
B
A --------------------
A ASSEMBLY OCCUPANCY
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
ADPE AUTOMATED DATA PROCESSING EQUIPMENT
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFMAN AIR FORCE MANUAL
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR AS REQUIRED
ARCH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.