Amendment_1_-_Bldg_2319_BOT_-_Plans.pdf
PDF 1 MB Posted
- Attached to
- KC-46A Add/Alter Bldg. 2319 for Boom Operator Trainer Federal contract opportunity
- Solicitation number
- W912DS-18-B-0021
About this file
PLANS - W912DS18B0021
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E E E E
E E
E
E
E
E
E E
E E
E
E E
E
E E
E
E E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
P
O
L
P
O
L
P
O
L
P
O
L
P
O
L
P
O
L
P
O
L
P
O
L
P
O
L
P O
L
P O
L
P O
L P
O L
P
O
L
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
R ip
R a p
E.O.P.
E.O.P.
A s p h a l t
S i d e w a l k
Asphalt Sidewalk
S
S
R ip
R a p
Gate
A/C Unit
On Conc. Pad
With Canopy
D
G
D
E
T
Rim=113.70'
D
G
M
E
Rim=115.08'
A/C Unit
On Conc. Pad
S w a l e
S w a l e
T R
T
R
T
R
T
R
GM
Cross Walk
S
Rim=115.53'
(6" CIP) a. Inv.=113.03'
(6" PVC) b. Inv.=112.83'
Electrical
Equipment
On Conc. Pad
Conc. Riser
5' Dia.
Conc.
Pad
D
A/C Unit
On Conc. Pad
Roof Peak
Elev.=136.47'
Finished Floor
Elev.=115.81'
Roof Peak
Elev.=147.75'
Roof Peak
Elev.=137.41'
Finished Floor
Elev.=116.48'
Roof Peak
Elev.=162.55'
Finished Floor
Elev.=115.75'
Building #
KC-10 Flight
Simulator
Addition
D C
D C
D.C.
D C
S i d e w a l k
E
E E
E
E E
E E
E
E
E
E
E E
E
E
E
E
E
E
E E
S w a l e
G
G
G
G
HTWS
HTWS
HTWS
HTWS
H T
W S
H T
W S
H
T
W
S
D
D
D
D
D
U U
U
U
U
U
H T
W S
E
E
E E
E E
E
E
E
E
E
H T
W S
H
T
W
S
HTWS
HTW
S
H T
W S
H T
W S
H T
W S
HTWS
HTWS
SD
SD
SD
SD
SD
S
D
S
D
D
D D
D
D
D
D
Clean
Out
Conc. Sidewalk
Asphalt Parking Lot
Grass
E
Finished Floor
Elev.=115.86'
A/C Unit
On Conc. Pad
Clean
Out
Conc. S idewalk
Transformer
On Conc. Pad
W
Swale
Conc. Curb
S
S
S
S
S a b
SD
a b
S
D a
C
P
P
W a t e r
W a t e r
A s p h a lt S id e w a lk
S D
S D
S D
S D a
C
P P
S
D
S
D
S
D
S
D
P
SD
SD
D
D
D
D
S
D
S
D
M a r k
O u t a i n t a b c a b c
P
8" CPP
C
P P
SD
S D
S D a b c
C P
P
Clean
Out
SD
a b
Clean
Out
Clean
Out
Clean
Out
Clean
Out
Clean
Out
Clean
Out
Clean
Out
Clean
Out
Clean
Out
Clean
Out
Clean
Out
V a n d e n b e r g
A v e
BM
Conc. Curb
C o n c
C u r b
C o n c
C u r b
BM 1
Elev.=114.97'
BM
BM 2
Elev.=115.05'
A/C Units
On Conc. Pad
S te p s
G
M
G
G
G
W
W
W
W
W
R ip
R a p
Rip
Rap
Rip
Rap
C
C
C
C
C
C
C
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E E
E
E
E
E
E
E
E E
E
E
E
E
E
1' Diameter Conc.
Old Sign Base
(Typ.)
P
O
L
P
O
L
P
O
L
P
O
L
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
D
E E
E
E E
E E
E
E
E
E
E
E
E E
E
E
E E
E
E
E E
U
U
U
E
E
E
Electric Cabinet
On Conc. Pad
Conc. Gutter
Asphalt Parking Lot
Conc. Curb
G ra ss
G ra ss
Conc. Riser
5' Dia.
C o n c . C u rb
G
C o n c . S id e w a lk
G ra ss
C o n c
S i d e w a l k
S
D
S
D
S D
S D a b
S
D
S
D
S
D
S
D
S
D
S
D a b c
" C
P P
P
P
P a
D D D D D D
D D D D
Asphalt Parking Lot
H
T
W
S
Building #
T R
W
W
W
W
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXXXXXXXXXXXXXXX
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X l l l l l l l l l l
77.7'± l l l l l l l l l l l l l l l l l l l l l l l l l l l l l llllllllllllllll l l l lll l l l l
70.4±
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
T A
K
O
R D
N
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
T
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U S
A
R M
Y
C
O R
F
E
N G
I N
E E
R S
N E
W
Y
O R
K
D
I S
T R
I C
T
D
E R
A L
A
Z A
N E
W
Y
O R
K
N
Y
S C
A L
E
S H
E E
T
D R
A W
I N
G
C
O D
E
O F
K C
B
D
D O
W N
M C
G U
I R
E
A
F B
B U
R L
I N
G T
U
N T
Y
N
W
J
R S
E Y
W
E R
D
GRAPHIC SCALE
J U
Y
A N
S I
D
L A
K E
S I D
E
C
E N
T R
E
W
A Y
S U
I T
E
K N
O X
V I L L E
T
N
A. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DRAWING C-001.
B. ALL DEMOLITION ACTIVITIES ARE TO BE COORDINATED WITH WORK
PERFORMED INSIDE BUILDINGS AND CONSTRUCTION OF NEW BUILDING
ADDITION TO ALLOW ADEQUATE AND SAFE ACCESS FOR WORKERS,
EQUIPMENT, AND MATERIALS TO AND FROM THESE BUILDINGS.
C. ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY MATERIALS
SHALL BE DISPOSED OF OFF BASE OR SITE AS DIRECTED BY CONTRACTING
OFFICER.
D. CONTRACTOR SHALL COORDINATE LIMITS OF PAVEMENT, CURB, GUTTER,
AND SIDEWALK REMOVAL WITH PROPOSED PAVEMENT ON SITE LAYOUT
PLAN.
E. SIDEWALK DESIGNATED FOR DEMOLITION SHALL BE REMOVED AT EXISTING
CONTROL JOINTS AND/OR EXPANSION JOINTS. SAW CUT FULL DEPTH OF
CONCRETE. THICKNESS OF SIDEWALK TO BE VERIFIED BY CONTRACTOR.
F. PAVEMENT REMOVAL SHALL INCLUDE REMOVAL OF PAVEMENT AND ANY
SUBBASE MATERIAL PRESENT. EXISTING PAVEMENT CONSISTS OF HOT MIX
ASPHALT. PAVING SECTION THICKNESSES VARY. CONTRACTOR TO VERIFY
EXISTING SECTION.
G. ANY DAMAGE TO PAVEMENT AREAS DESIGNATED TO REMAIN SHALL BE
REPAIRED OR REMOVED AND REPLACED AT NO ADDITIONAL COST TO THE
GOVERNMENT.
H. THE CONTRACTOR SHALL NOT DISTURB THE JP-4 FUEL LINE DURING
CONSTRUCTION. EXCAVATION SHALL BE DONE BY HAND IN THE VICINITY OF
THIS PIPELINE.
I. SPECIAL HANDLING AND CONSIDERATION SHALL BE REQUIRED FOR
EXCAVATED SOILS THOUGHT TO CONTAIN PETROLEUM-BASED /
CONTAMINATED / HAZARDOUS SUBSTANCES. SEE GENERAL NOTES ON
DRAWING C-001.
GENERAL SHEET NOTES
20' 40'0
N
P
L O
T D
A T
E P
L O
T T
I M
E
D E
M O
L I T
I O
N
C I V
I L
S I T
E
D
E M
O L I T
I O
N
P
L A
N
CD100
FOR CONSTRUCTION
E
N
E P
E R
U D
J
P
A L
M E
R
J
C
O R
U M
G
R
I G
G I N
S
P T
F L
C
D d w g
PA
R
KI
N G
L O
T
AN
D D
R
IV
E
LA
N E
LA
YO
U T
C H
AN
G
E
1. EXISTING BUILDING, PROTECT IN PLACE, U.N.O.. SEE ARCHITECTURAL AND
STRUCTURAL DRAWINGS FOR DEMOLITION AND CHANGES.
2. SAW CUT AND REMOVE CONCRETE CURB, FULL DEPTH.
3. SAW CUT AND REMOVE ASPHALT PAVEMENT, FULL DEPTH.
4. SAW CUT AND REMOVE CONCRETE SIDEWALK, FULL DEPTH.
5. EXISTING CONCRETE CURB, PROTECT IN PLACE.
6. REMOVE AND RELOCATE SIDEWALK LIGHT AND CONCRETE BASE, SEE
DRAWINGS ED101 AND ES101.
7. EXISTING STORM DRAIN MANHOLE AND/OR INLET, PROTECT IN PLACE.
8. EXST TREE, PROTECT IN PLACE, TYP FOR ALL TREES.
9. EXISTING HIGH TEMPERATURE HOT WATER, PROTECT IN PLACE, U.N.O.
10. EXISTING SUBDRAIN PIPE AND SUBDRAIN CLEAN OUT, PROTECT IN PLACE.
REMOVE AND REPLACE WHERE INDICATED TO ALLOW INSTALLATION OF NEW
STORM DRAIN PIPE.
11. EXISTING STORM DRAIN PIPE, PROTECT IN PLACE.
12. EXISTING ELECTRICAL / TELECOMMUNICATIONS, PROTECT IN PLACE, U.N.O.
13. REMOVE EXISTING NATURAL GAS AS SHOWN. CAP ABANDONED PIPES
WHERE INDICATED. REROUTE NATURAL GAS AROUND NEW BUILDING AS
SHOWN ON DRAWING CU100.
14. REMOVE EXISTING HIGH TEMPERATURE HOT WATER SUPPLY AND RETURN
LINES UNDER NEW BUILDING TO A MINIMUM OF 5 FEET FROM EDGE OF
FOUNDATION. CAP REMAINING ENDS AND ABANDON PIPES IN PLACE.
15. REMOVE EXISTING STORM DRAIN AND DOWNSPOUT CONNECTIONS.
16. EXISTING P.O.L., PROTECT IN PLACE, SEE NOTE H.
17. EXISTING TELECOMMUNICATION MANHOLE, PROTECT IN PLACE.
18. EXISTING HOT WATER MANHOLE AND VENT STACK, PROTECT IN PLACE.
19. EXISTING NATURAL GAS UTILITY, PROTECT IN PLACE, U.N.O
20. EXISTING CATHODIC PROTECTION TEST STATION, PROTECT IN PLACE.
21. EXISTING PARKING LIGHT WITH CONCRETE BASE, PROTECT IN PLACE.
22. EXISTING ASPHALT PAVEMENT, PROTECT IN PLACE, U.N.O.
SHEET KEYNOTES
REMOVE ASPHALT
REMOVE CONCRETE CURB
REMOVE CONCRETE SIDEWALK
REMOVE UTILITY, SEE NOTES
REMOVE AND RESET BOLLARD
SHEET LEGEND
XXXX
LIMIT OF DEMOLITION
ABANDON UTILITY, SEE NOTES
lll
A U
G U e3enmrt3 Polygon e3enmrt3 Polygon
#2319 ADDITION
SEE DWG S-101
R ip
R a p
E.O.P.
E.O.P.
A s p h a l t
S i d e w a l k
Asphalt Sidewalk
S
S
R ip
R a p
Gate
D
E
G
M
E
T
R
T
R
T
R
S
Electrical
Equipment
On Conc. Pad
Conc.
Pad
Roof Peak
Elev.=136.47'
Finished Floor
Elev.=115.81'
Roof Peak
Elev.=147.75'
Roof Peak
Elev.=137.41'
Finished Floor
Elev.=116.48'
Roof Peak
Elev.=162.55'
Finished Floor
Elev.=115.75'
Building #
KC-10 Flight
Simulator
Addition
S i d e w a l k
Conc. Sidewalk
Asphalt Parking Lot
E
Finished Floor
Elev.=115.86'
Conc. S idewalk
S
S
S
S
S a b
A s p h a lt S id e w a lk
V a n d e n b e r g
A v e
G
M
C o n c . S id e w a lk
G ra ss
Asphalt Parking Lot
Building #
T R
FF=115.86'
N 436492.13
E 466445.49
N 436474.59
E 466449.53
N 436457.15
E 466373.81
N 436572.30
E 466345.80
R3' TYP.
N 436596.00
E 466340.09
N 436611.94
E 466408.66
20'
6.5'
R
9' 9'
39'-3
1 2
4'
28.25'
L1
L2
C
L
*REPRESENTS FACE OF CURB
CURB LINE AND CURVE TABLE
C1
L1
L2
L3
LENGTH
15.71'
3.52'
9.46'
64.03'
RADIUS
10.00'
DIRECTION / DELTA
090°00'00"
S13°19'14"E
N76°40'46"E
S13°19'14"E
START NORTHING EASTING
N 436581.46
E 466385.12
N 436582.70
E 466375.10
N 436579.28
E 466375.91
N 436574.03
E 466397.16
END NORTHING EASTING
N 436574.03
E 466397.16
N 436579.28
E 466375.91
N 436581.46
E 466385.12
N 436511.72
E 466411.91
T A
K
D
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
N E
W
Y
O R
K
D
I S
T R
I C
T
D
E R
A
Z A
N E
W
Y
O R
K
N
Y
S C
A L
E
S H
E E
T
D R
A W
I N
G
C
O D
E
O F
K C
B
D
D O
W N
M C
G U
I R
E
A
F B
B U
R L
I N
G T
U
N T
Y
N
W
J
R S
E Y
W
E R
D
GRAPHIC SCALE
J U
Y
A N
S I
D
L A
K E
S I D
E
C
E N
T R
E
W
A Y
S U
I T
E
K N
O X
V I L L E
T
N
P
L O
T D
A T
E P
L O
T T
I M
E
C I V
I L
S I T
E
L A
Y O
U
A
N
O V
E R
A L L
CS100
FOR CONSTRUCTION
E
N
E P
E R
U D
J
P
A L
M E
R
J
C
O R
U M
G
R
I G
G I N
S
P T
F L
C
S d w g
PA
R
KI
N G
L O
T A
N D
D R
IV
E
LA
N
E
LA
YO
U
T C
H
AN
G E
20' 40'0
N
A. FOR GENERAL NOTES, LEGEND, AND ABBREVIATIONS SEE DWG
C-001.
B. NEW ASPHALT PAVEMENT SECTION SHALL MEET MINIMUM DESIGN
THICKNESS AS INDICATED OR MATCH EXISTING ASPHALT
PAVEMENT THICKNESS, WHICH EVER IS THICKER.
C. ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES DURING
CONSTRUCTION. ANY DRAINAGE FEATURE OR STRUCTURE
DISTURBED DURING CONSTRUCTION, NOT IDENTIFIED TO BE
DEMOLISHED, SHALL BE RESTORED TO EXISTING CONDITIONS OR
BETTER SUBJECT TO THE APPROVAL OF THE OWNER.
D. POSITIVE DRAINAGE AWAY FROM BUILDINGS SHALL BE MAINTAINED.
E. INSTALL PARKING LOT STRIPING WHERE INDICATED, AS SPECIFIED.
RESTRIPE ALL EXISTING PARKING LOT STRIPING DISTURBED OR
DAMAGED BY CONSTRUCTION ACTIVITIES.
F. FOR PARKING LOT LIGHTING AND WALKWAY LIGHTING SEE DWG
ES101.
G. CONCRETE SIDEWALKS SHALL HAVE CROSS SLOPE OF 2%, AWAY
FROM THE BUILDING. CONTROL JOINTS SHALL BE INSTALLED PER
DETAIL.
H. PARKING STALL COUNTS:
BUILDING 2319:
EXISTING = 57 STALLS
PROPOSED = 35 STALLS
TOTAL REMOVED = 22 STALLS
I. TOPSOIL AND SEED ALL AREAS DISTURBED BY CONSTRUCTION
WHICH ARE NOT PAVED, AS SPECIFIED.
GENERAL SHEET NOTES
SHEET KEYNOTES
1. CONSTRUCT 6" CONCRETE CURB, SEE DETAIL F1 DWG C-502.
2. CONSTRUCT CONCRETE SIDEWALK, SEE DETAIL F8 DWG C-501.
SEE EXPANSION / CONTRACTION JOINT DETAIL F4 DWG C-502.
3. TRANSITION 6" CURB TO 0" OVER 6'.
4. TIE INTO EXISTING CURB.
5. TIE INTO EXISTING WALK.
6. PAINTED STRIPING, 4" WHITE 2' O.C., AS SHOWN.
7. PAINTED 4" WHITE PARKING STRIPE.
8. PROVIDE NO PARKING LOADING ZONE (DOUBLE ARROW) SIGN,
R7-6D. STYLE TO MATCH BASE INSTALLATION STANDARDS IF
APPLICABLE. FOR MOUNTING SEE DETAIL D4 ON DWG C-502.
9. BOLLARD TYP. OF 4 AT EQUIPMENT DOORS. SEE DETAIL D8 DWG
C-502.
10. BOLLARD LUMINAIRE, SEE ELECTRICAL DWG ES101.
11. TIE INTO EXISTING ASPHALT, SEE DETAIL D1 DWG C-501.
12. NEW ASPHALT PAVEMENT SEE DETAIL F4 DWG C-501.
13. CONCRETE PAVEMENT SEE LAYOUT AND GRADING DETAIL B1 DWG
C-503.
14. CONCRETE PAD, SEE DWG MH402.
15. PROVIDE NO PARKING FIRE LANE (DOUBLE ARROW) SIGN, R8-31D.
STYLE TO MATCH BASE INSTALLATION STANDARDS IF APPLICABLE.
FOR MOUNTING, SEE DETAIL D4 ON DWG C-502.
SHEET LEGEND
ASPHALT PAVEMENT
CONCRETE SIDEWALK
TOPSOIL AND SEED
CURB, SEE DETAILS.
A U
G U e3enmrt3 Polygon e3enmrt3 Polygon e3enmrt3 Typewritten Text
File details come from the government source that posted it.