Amendment_0005.pdf

PDF 354 KB Posted

Attached to
Pershing Barracks Renovation/Modernization, West Point New York Federal contract opportunity
Solicitation number
W912DS-16-B-0010
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

Amendment 0005

View the file

Other files for this federal contract opportunity

Other files attached to Pershing Barracks Renovation/Modernization, West Point New York, newest first.
File Type Posted
Bid_Abstract.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005_Project_Table_of_Contents_IFB_final.pdf PDF
Amendment_0005_PERSHING_DRAWINGS2.pdf PDF
Amendment_0005_Sections_Specsrr.pdf PDF
Amendment_0005_CD101_-_Exhibit_-_Temporary_Fence.pdf PDF
W912DS-16-B-0010-Amendment_0004.pdf PDF
Amendment_0003_Historical_Pictures.pdf PDF
Amendment_0003_03_30_00_Cast_In_Place_Concrete.pdf PDF
Amendment_0003.pdf PDF
Amendment_0003_West_Point_J As.pdf PDF
Amendment_0003_Pershing_AppendicesRV.pdf PDF
Amendment_0003_Drawings.pdf PDF
Amendment_0003_Pershing_Field_Investigation_Report.pdf PDF
B-1_Pershing_751_Framing_plbg_roof.pdf PDF
Pershing_738_740_751_Repair Shower Rooms.pdf PDF
6833.tif TIF image
Amendment_0002_Site_Visit_Sign_In_Sheet.pdf PDF
Amendment_0002.pdf PDF
7687-5942.tif TIF image
B-7_Pershing_751_painting.pdf PDF
36993_00751_01.dwg DWG drawing
7687-5945.tif TIF image
7687-5940.tif TIF image
B-6_Pershing_751_Floor_roof plans.pdf PDF
36993_00751_L1.dwg DWG drawing
Amendment_0002_Asbestos_Report.pdf PDF
9189.tif TIF image
A-7_Pershing_751_acoustics_elec.pdf PDF
Amendment_0002_Geotechnical_Evaluation.pdf PDF
36993_00751_04.dwg DWG drawing
Pages from C-6_Pershing_751_fixtures_roof plan_windows.pdf PDF
1261.tif TIF image
7687-5941.tif TIF image
A-1_Pershing_751_Maint and Repairs.pdf PDF
LIFE SAFETY Pages from A-1_Pershing_751_Maint and Repairs 1.pdf PDF
36993_00751_02.dwg DWG drawing
C-7_Pershing_751_flooring_painting.pdf PDF
36993_00751_03.dwg DWG drawing
Amendment_0001_Section_28_08_10.pdf PDF
PLANS_Pages__151-200.pdf PDF
PLANS_Pages_101-150.pdf PDF
PLANS_Pages_201-250.pdf PDF
PLANS_Pages_51-100rd.pdf PDF
PLANS_Pages_251-320.pdf PDF
PLANS_Pages_1-50.pdf PDF
W912DS-16-B-0010.pdf PDF
2016_0608_Pershing_IFB_Specs_Volume_1R.pdf PDF
2016_0608_Pershing_IFB_Specs_Volume_2.pdf PDF
Show all 50

Pershing Barracks Renovation/Modernization, West Point New York has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is:

1. The Bid opening due date has been extended from 23 August 2016 to 30 August 2016 at 2:00 P.M. Eastern Standard Time (EST) at 26 Federal Plaza, Room 1843, New York N.Y. 10278

2. Changes to the bid schedule. Please see continuation page.

3. Draw ings have been Revised and Not Reissued & Reissued. Please see continuation page.

4. Specification Sections have been added and deleted. Please see continuation page.

5. Respond to bidder request for information and Wage Rate Update. Please see continuation Page.

NOTE: Bidder must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by the follow ing method:

in the space provided on the SF 1442, by separate letter by signing block 15 below .

FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 85

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-16-B-0010

X 9B. DATED (SEE ITEM 11)

01-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Aug-2016

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-16-B-0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 0005

Pershing Barracks Renovation/Modernization, West Point New York

Amendment 0005 Section 00 10 00

Bid Schedule

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

PERSHING - CONSTRUCTION

The contractor shall provide all labor, materials, and equipment necessary to renovate and modernize Pershing Barracks per the specifications outlined in the statement of work and drawings. NOTE: Pricing for this CLIN shall not include work covered under the remaining CLINS.

FOB: Destination

NET AMT

0002 3 Each

NEGATIVE AIR MACHINES

Contractor shall provide negative air machine(s) for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for machines actually furnished and accepted in the completion of this task.

0003 2 Each

30 YARD DUMPTSTERS

Contractor shall provide 30 yard capacity dumpsters for Asbestos Debris for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for dumpsters actually furnished and accepted in the completion of this task.

0004 1,200 Square

Foot

PERSONNEL DECONTAMINATION CHAMBERS

Contractor shall provide personnel decontamination chamber(s) with Poly or with Plywood sides, and shower(s) for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for chambers actually furnished and accepted in the completion of this task. "Estimated Quantities"

0005 3 Each

WASTE DECONTAMINATION CHAMBERS

Contractor shall provide 200 square foot waste decontamination chamber(s) with Poly or with Plywood sides for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for chambers actually furnished and accepted in the

0006 3 Each

REMOVAL OF DECONTAMINATION CHAMBERS

Contractor shall provide removal of 400 square foot personnel decontamination chamber(s) with Poly or with Plywood sides (custom built or portable) for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for chambers actually furnished and accepted in the completion of this task. "Estimated Quantities"

0007 3 Each

REMOVAL OF WASTE DECONTAMINATION CHAMBER

Contractor shall provide removal of 200 square foot waste decontamination chamber(s) with Poly or with Plywood sides (custom built or portable) for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for chambers actually furnished and accepted in the completion of this task. "Estimated Quantities"

0008 20,486 Square

PROVIDE PRE-CLEAN, HEPA VACUUM

Contractor shall provide pre-clean, HEPA Vacuum, and wet wipe surfaces for 20,486 square feet of surface for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for square footage actually serviced and accepted in the

0009 20,486 Square

PROVIDE FINAL-CLEAN HEPA VACUUM

Contractor shall provide final-clean, HEPA Vacuum, and wet wipe surfaces for 20,486 square feet of surface for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for square footage actually serviced and accepted in the

0010 20,486 Square

REMOVAL OF ASBESTOS FLOOR TILE

Contractor shall provide removal of 20,486 square feet of Asbestos Floor Tile (VAT) without Mastic for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. Work can be completed by machine or by hand. The Government will only pay for square footage actually serviced and accepted in the completion of this task. "Estimated Quantities"

0011 5,000 Square

REMOVAL OF LEAD BASED PAINT

Contractor shall provide removal of 5,000 square feet of Lead Base Paint for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. Work can be completed by machine or by hand.

The Government will only pay for square footage actually serviced and accepted in the completion of this task. "Estimated Quantities"

0012 9,000 Square

REMOVAL OF MASTIC CONTAINING ASBESTOS

Contractor shall provide removal of 9,000 square feet of Mastic Containing Asbestos for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for square footage actually serviced and accepted in the completion of this task.

"Estimated Quantities"

0013 5,000 Linear

REMOVE ASBESTOS PIPE INSULATION

Contractor shall provide removal of 5,000 linear feet of asbestos pipe insulation up to 4" diameter pipe for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for linear footage actually serviced and accepted in the

0014 20 Square

REMOVE ASBESTOS PIPE FITTINGS

Contractor shall provide removal of 20 square feet of asbestos pipe fitting insulation up to 4" diameter for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for quantities actually serviced and accepted in the

0015 9,000 Square

POLYETHYLENE SHEETING WALLS AND CEILINGS

Contractor shall cover 9,000 square feet of walls and ceilings with Polyethylene Sheeting, 6 mil, each layer for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for square footage actually serviced and accepted in the

0016 20,486 Square

POLYETHYLENE SHEETING FLOORS

Contractor shall cover 20,486 square feet of floors with Polyethylene Sheeting, 6 mil, each layer for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for square footage actually serviced and accepted in the completion of this task. "Estimated Quantities"

0017 9,000 Square

ROLL DOWN POLYETHYLENE

Contractor shall cover 9,000 square feet of roll down Polyethylene Sheeting and disposal for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for square footage actually serviced and accepted in the completion of this task.

0018 2,276 Each

BULK BAG MATERIAL

Contractor shall provide 2,276 of Bulk Bag Material, Double Bag, and Decontaminate, 3 CF Bags for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for quantities actually furnished and accepted in the

0019 204 Cubic

Yard

DISPOSAL OF ACM

Contractor shall provide disposal of 204 CY Asbestos Containing Material (ACM) for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for quantities actually furnished and accepted in the completion of this task.

ENCAPSULATE WALLS, CEILING, BEAM

REMOVE CHALKBOARD MASTIC, REVMOVE BROWN LAYER PAPER

(INFORMATIONAL PURPOSES ONLY)

(INFORMATIONAL

PURPOSES ONLY)

0020AA 9,000 Square

ENCAPSULATE WALLS, CEILING, BEAM

Contractor shall encapsulate 9,000 square feet of walls, ceilings, beams, and flat surfaces for the work completion related to hazardous material abatement per the specifications outlined in the statement of work. The Government will only pay for square footage actually serviced and accepted in the completion of this task.

0020AB 120 Square

REMOVE CHALKBOARD MASTIC

Contractor shall encapsulate 120 square feet of mastic containing asbestos. The Government will only pay for square footage actually serviced and accepted in the

0020AC 100 Square

REMOVE BROWN LAYER PAPER

Contractor shall encapsulate 100 square feet of asbestos paper. The Government will only pay for square footage actually serviced and accepted in the completion of this task. "Estimated Quantities"

NOT USED

0022 1 Job OPTION Option ITEM 1

Contractor shall provide Terrazzo floor finish in lieu of VCT floor finish with a precast terrazzo base in all Cadet Rooms including Cadet Rooms labeled TAC NCO and TAC Officers. Provide Terrazzo floor finish with precast terrazzo base in lieu of VCT floor finish in all Collaboration rooms and Laundry Rooms. Work shall be completed per specifications outlined in section 09 66 23 of the statement of work. Total cost for this CLIN should reflect the deduction of VCT flooring in these rooms.

0023 1 Job OPTION Option ITEM 2

Contractor shall provide for the installation of Period Style Panel Doors at Public Spaces. Door type P and the design intent for the style of the doors will be identified in the drawings.

This option may be awarded depending on funding constraints.

0024 1 Job OPTION Option ITEM 3

Contractor shall provide all work associated with the repair of existing retaining walls. Price shall include repair areaway retaining wall, including new concrete backup wall, resetting coping stones and reinstalling iron railings. Locations as shown on drawings.

0025 1 Job OPTION Option ITEM 4

Contractor shall provide all work associated with conformance with LEED Indoor Air Quality during construction.

OPTION NOT USED

0027 1 Job OPTION Option ITEM 5

Contractor shall Re-Point, mask and grout all exterior masonry not identified in the base contract per the requirements of Specification 04 01 10.

0028 35 Each OPTION Option ITEM 6

Contractor shall provide an allowance of $176,372.00 for all work associated with the providing Custom Decorative Chandeliers identified as Fixture type F13 on floors 1-4. Not to exceed allowance amount of $176,372.00 to be included in bid as shown and not changed. Actual payment will be based on actual costs up to the not to exceed amount.

$176,372.00

0029 2 Each OPTION Option ITEM 7

Contractor shall provide all work associated with the providing Aluminum framed Skylights per the requirements of 08 60 45

0030 2,792 Square

OPTION Option ITEM 8 Contractor shall provide for removal of existing standing seam metal roofs and for the installation of an entirely new and watertight copper roof as identified in the specifications sections 02 41 00 and 07 41 13.16. Replacement of the standing seam metal roof that is a part of CLIN 0001 shall not be part of this CLIN.

OPTION NOT USED

0032 1 Lump Sum OPTION Option ITEM 9

Contractor shall provide work related to the refurbishment in the Clock Tower Spiral Stair. The work shall include refurbishment of the cast iron spiral staircase and exterior enclosure improvements as indicated on the drawings.

0033 102 Each OPTION Option ITEM 10

Contractor shall provide work related to providing 3’x 3’ solid surface shower pans and porcelain tile in lieu of the larger pans identified on the drawings. Pricing should include work for additional floor drains, ceramic/porcelain tile, 2 shower rods per shower and two shower curtains per shower. "Estimated Quantities"

0034 1 Each OPTION Option ITEM 11

EXISTING FURNITURE REMOVAL AND RELOCATION

Contractor shall provide work related to the provision and installation related to the removal all furniture from Pershing Barracks and relocate that furniture to Scott Barracks and Grant Barracks. Reconfigure all furniture in any Cadet rooms in Scott Barracks and Grant Barracks where furniture from Pershing Barracks has been relocated to. "Estimated Quantities"

0035 1,500 Each OPTION Option ITEM 12

EXISTING FURNITURE REMOVAL

Contractor shall provide work related to the provision for removal and disposal of all existing furniture in Pershing Barracks. "Estimated Quantities"

0036 800 Square

OPTION Option ITEM 13

BIOLOGICAL WASTE REMOVAL

Contractor shall provide work related to the removal and abatement of biological wastes by birds and rodents. "Estimated Quantities"

0037 1 Job OPTION Option ITEM 14

Underpinning Contractor shall provide work related to the underpinning required for installation of the new elevator pit. The work shall include underpinning the walls to the west, north, and east of the new elevator pit location, to the extent indicated by a test pit performed under the base contract. Assumed amount of underpinning required is shown on drawings.

TOTALS

TOTAL BASE BID CLINS (0001 - 0021) _________________

TOTAL OPTIONS ITEMS CLINS (0022-0037) _________________

TOTAL BASE BID PLUS OPTIONAL ITEMS CLINS (0001 – 0037) _____________________

NOTES

NOTES:

1. Any bid which is materially unbalanced as to prices for the Base Bid Items may be rejected. An unbalanced bid is one, which is based on the prices significantly less than cost for some work and prices, which are significantly overstated for other work.

2. Bidders are required to bid on all items or their bids will be rejected

3. Bidders are reminded that they must bid on the issued plans and specifications as amended.

Any deviations, conditions, or attachments made by the bidder himself thereto may render the bid non-responsive and may be caused for its rejection.

4. The low bidder for the purpose of award will be the conforming responsible bidder offering the lowest amount for the Total Base Bid & Optional Items. The Government is under no obligation to award any Optional Item.

5. The optional Items, if awarded, will be awarded within 180 calendar days from issuance of the

Notice to Proceed (NTP). NO Additional time will be added

Pershing Barracks Renovation/Modernization, West Point New York

Amendment 0005

To Bidders

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED and NOT REISSUED:

-A-124: Add general note, “Walls under flat roof areas are to go to deck. Walls under open sloped roof areas are to extend 6” minimum above the ceiling” -A-401/402: Corrected dimension for LC1 to be 1’-3”W x 1’-6”D x 7’-0” H -A-443: Add note: For bidding purposes assume 2 ½” treads at all stairs.

-A-543: add keynote 2 43 on lower coping shown on detail B1/543 -A-601: Removed general note 1/2” PLASTER NOTED IN THE SCHEDULE ABOVE IS AN

ADDITIVE ITEM.

-A612: Replace 6”x36, Thickness .120” with 12”x24”, Thickness .120”

2. The following DRAWINGS have been REVISED and REISSUED:

-DRAWINGS (85 Total) – Civil: Exhibit CD-101

Structural: S-100, S-101, S-102, S-103, S-104, S-106, S-107, S-201, S-203, S-204, S-207, S-208, S-300.

Architectural: AD-100, AD-101, AD-102, AD-103, AD-104, AD-120, AD-121, AD-122, AD-124, AD- 140, AD-201, AD-202, AD-205, AD-401, AD-402, AD-501, AD-502, AD-520, AD-521, AD-541, AD- 542, A-101, A-102, A-103, A-104, A-120, A-121, A-141, A-201, A-202, A-203, A-204, A-205, A-208, A-401, A-402, A-403, A-410, A-411, A-412, A-413, A-421, A-422, A-423, A-424, A-425, A-426, A-442, A-504, A-521, A-522. A-601, A-610, A-611, A-612, A-615, A-620, A-621, A-622, A-701, Interiors: I-111, I-113, I-114

Mechanical: M-601, M-602, M-604, M-701, M-704, M-705, M-802

Electrical: E-101, Security: SE-303, SE-304

3. The following DRAWINGS have been ADDED:

None

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- Section 00 90 01 Staging Plans and Lay Down

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- 09 51 00-ACOUSTICAL CEILINGS

- 11 31 13-ELECTRONIC REFRIGERATOR

3. The following SPECIFICATION SECTIONS have REVISED and REISSUED:

02 41 00.3.1.17, 05 50 13, 06 10 00, 07 81 00, 09 64 00, 09 67 23.14, 09 90 00, 09 97 30, 10 51 13, 10 56 13, 28 08 10, 28 10 05, Table of Contents, Submittal Register

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

- Section 09 65 00 - Delete paragraphs 2.4 and 3.7 from the specification

- Section 00 73 00 -revise paragraph 1.37 in its entirety and replace as below:

“1.37 WORKING CONDITIONS, WORKING HOURS, AND NON-WORKING DAYS

a. Working Hours: Normal working hours shall occur Monday – Saturday, between 0700 - 1730 hours.

Additionally, the adjacent buildings will be occupied. The contractor shall coordinate major demolition activities or any other activities that will create noise, dust and/ or vibrations that could impact the adjoining areas with the USMA and COR.

b. Non-Working Days: During the course of this contract the Contractor shall not perform any physical work during the activities listed below. The dates provided are the “on or about” dates of the activities.

(1) Graduation Week: (3 days in Mid-May)

(2) Reception Day: (1 day in June)

(3) All Government Holidays: Ten (10) days.

(4) Football Home Games: Five (5) home football games per year. Exact dates will be furnished to the Contractor on request in the year that they will occur.

(5) The Contractor should anticipate four (4) additional days each calendar year on which no physical work shall be performed. These will be at the Governments discretion. The actual "No Work" days will be confirmed by the Government during the work phase in conjunction with the construction plan approval. The Contractor's schedule must reflect the above anticipated "no work" days.

c. Working Conditions:

(1) Open trenches or road restrictions will not be permitted without the approval of the Contracting Officer.

(2) Sallyports and other access ways shall be fully usable.

(3) Parades, reviews or similar ceremonies are routinely conducted three or four times a week. Hours of such ceremonies are normally 5:00 p.m. on weekdays and 11:30 a.m. on Saturdays, although there are exceptions to these hours. Detailed schedules of ceremonies may be obtained two (2) months in advance on request from the Contacting Officer. In addition the following requirements shall apply to all Contractor's activities in connection with these ceremonies:

(a) Right of way shall be given to cadets marching in formation.

(b) During the actual ceremonies, the Contractor's activities that produce noise to an extent which would distract or interfere with the ceremony, such as the operation of extremely loud and noisy machinery, shall be suspended until the ceremony is over.

(4) All cost for conformance with the above stated requirements shall be included with the lump sum contract amount and no claim for extra cost shall be considered.”

Questions and Answers:

(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only” and do not revise the solicitation, plans or specifications.)

Q1-(Q4am3): Several specs (05 12 00, 05 30 00, 09 29 00) reference fireproofing systems but there is no spec for fireproofing. Please advise if fireproofing is required and provide specification for same.

Response: Specification section 07 81 00 has been added to the documents. See structural drawings for locations required.

Q2-(Q15AM3) -Plumbing drawings call out fixture L-2 in all cadet rooms. This is scheduled as a “wall hung lavatory.” Plans appear to show a counter-top mounted lavatory (similar to the existing fixtures).

Please confirm the intent here.

Response: The L2 callout on the drawings and the L-2 fixture on the schedule is correct. L-2 sinks are solid surface counters with integral bowl. No modifications required.

Q3-(Q39AM3)-Shower basins are specified as Fiat RM 36” x 36”. They are shown on drawings as 36” x 72”. Please advise on which size is correct.

Response: Revised drawing P-001 was issued with a prior amendment revising the shower size to 36” x 72”.

Q4-(Q46am3)-Key Note 2 on Drawing E‐101 states that “Existing Historical Fixtures are to be Replaced with New”. Spec Section 265610 indicates that Existing Historical Fixtures are to be Re furbished. Please clarify.

Response: Revised drawing E-101 is included in this amendment calling for refurbished fixtures.

Q5-(Q47am3)-Please confirm that the correct Lighting Fixture associated with CLIN 0028 (Option 7) is F13 and not F7. Bid Form states F7 which is a 2 x 4 drop in.

Response: F13 not F7. Bid schedule is revised and corrected in this amendment.

Q6-(Q48am3)-Please provide the Specification for the Emergency Lighting Central Battery System.

Nothing is noted in Section 265100.

Response: Emergency Lighting Central Battery System is specified under paragraph 2.10 of section 265100, and shown on drawing E-403.

Q7-(Q53am3)-How are the ERU “Pre‐Cooling” and “Reheat” Coils controlled?

Response: Provide reheat coil automatic by-pass damper integral to the ERU. BAS shall provide by-pass damper actuator. BAS shall provide temperature transmitter at discharge of the reheat coil. BAS shall modulate by-pass open when the reheat coil discharge air temperature rises above the reheat coil discharge air temperature set-point of 68 deg. F (adjustable).

Q8-(Q54am3)-Base Standard for Unit Heaters, Cabinet Heaters and FTR Control is stand‐alone with a thermostat and aquastat. Please confirm, or clarify that this equipment is to be controlled by the DDC.

Response: Unit heaters and cabinet unit heaters shall be controlled by local thermostats with aquastat, delete BAS analog control valve output shown on 2/M-705.Provide room temperature sensor and monitor through the BAS and alarm.

Q9-(Q56am3)-There are multiple references and depictions on the Structural Drawings and Demolition Drawings to “Fireproofing” with reference “See Arch. Drawings. Drawing A‐001 does not include Key Note for Fireproofing and none of the Architectural Drawings show or call for Fireproofing. There is no Fireproofing Specification Section in the RFP Documents. Please clarify.

Response: Specification section 07 81 00 is included in this amendment for fireproofing requirements. Revised structural drawings are issued with this amendment correcting the reference to architectural and defining the fireproofing scope of work.

Q10-(Q57am3)-Demolition Drawings, General Note 23 states “REMOVE EXISTING PAINT FROM

EXPOSED STEEL STRUCTURAL COMPONENTS AND PREPARE SURFACES TO RECEIVE NEW

INTUMESCENT FIREPROOF COATINGS”. Specification Section 099730 calls out the application of

Intumescent Paint at “the Exposed Metal Ceilings in the Vestibules”. Please clarify and quantify scope for the application of Intumescent Paint.

Response: General Note 23 on AD series sheets is revised in this amendment to read “REMOVE

EXISTING PAINT FROM EXPOSED STEEL STRUCTURALCOMPONENTS AND PREPARE

SURFACES TO RECEIVE NEW FINISH. REFER TO FINISH PLANS AND LEGENDS”.

Revised specification Section 09 97 30 is issued in this Amendment.

Q11-(Q62am3)-Storage Equipment Legend on the RFP Drawings calls out Steel Shelving Types SS2 and SS4. Spec Section 105613 identifies Steel Shelving Types SS2, SS3 and SS4 which have different nominal sizes than are shown on the Drawings. Please confirm that SS3 is not used and that the sizes in the Specification are incorrect.

Response: Revised section 10 56 13 is included in this amendment removing the reference to SS3.

Nominal shelf width is called out in the spec. The dimension shown on the Legend includes 4.25” for the common posts shared by interior shelves.

Q12-(Q84am3)-Drawing 1‐111, Detail B1 shows Cadet Room to receive Chair Rail CR1. The Elevations and Floor Plans note Chair Rail CR2 at the Cadet Rooms. Please clarify.

Response: Revised sheets A-403, A-410, A-411, A-412, A-413, A-421, A-422, A-424, A-701, I-111 are included in this amendment identifying correct locations for CR1 and CR2.

Q13-(Q85am3)-Please clarify discrepancies between Drawing A‐003 and A‐101 relative to the labeling of Rooms 227 and 228.

Response: Room 227 is TAC NCO Office, Room 228 is a Cadet Room. A-003 is correctly labeled.

A-101 is a first floor plan and does not have rooms 227 and 228. No revision required.

Q14-(Q86-am3)-Please clarify discrepancies between Drawing A‐004 and A‐104 relative to the labeling of Rooms 427, 429 and 430.

Response: Room 427 is Storage, Room 429 is TAC NCO Office, Room 430 is a TAC Office. No revision required.

Q15-Please provide light fixture specification/manufacturer and model number for alternate item number 0028, option item 7, Custom Decorative Chandelier.

Response: This will be a custom fixture, therefore no specific model/manufacturer is available. A revised bid form with an allowance amount for this item is included in this amendment (CLIN 28 Option ITEM 7).

Q16-Drawing AD-101 indicates selective demolition of broken ceramic tile in stair 1. Please provide a quantity for bidding purposes.

Response: Revised drawing AD-101 was included in amendment 3 stipulating 20% removal and replacement of existing ceramic tile for bidding purposes.

Q17-Drawing A-612 – Finish Level and Schedule shows a tag for floor finish SC-1, Stained and Sealed Concrete and SC-2, Sealed Concrete. Please provide a specification section for these products.

Response: Revised drawing A-612 is included in this amendment. SC-1 has been changed to Epoxy finish. New specification sections 09 67 23.14 and 09 90 00 are included in this amendment for SC-1 and SC-2. Surface preparation requirements are included in the added specification sections.

Q18-Drawing A – 612 Indicates floor finish SC-1 and SC-2 at areas of the basement flooring. Based on the walk-through, the existing basement floor is a coated concrete finish. The basement demolition plan AD-100 does not indicate and demo scope: sanding, grinding, or preparation of the existing slab for a new finish. Please confirm existing finish, any required demolition, and indicate new finish.

Response: Revised drawing A-612 is included in this amendment. SC-1 has been changed to Epoxy finish. New specification sections 09 67 23.14 and 09 90 00 are included in this amendment for SC-1 and SC-2. Surface preparation requirements are included in the added specification sections.

Q19-Please reference drawing D3/A-206. Please provide window tags.

Response: Answered in amendment 3

Q20- Please reference drawings A-620, A-621 and A-622. Window type elevations with dimensions are missing for the following window types: A, A1, A2, A3, A5, A6, A7, A8, A9, A10, A12, A13, A14, A16, A18, A19, A20, A22, A25, A26, A27, A30, A31, A34, A37, A38, A39, A41, J1, J2, J3, J5, J6 and J7.

Please provide window type elevations similar to those on A-621 and A-622.

Response: Revised drawings A-620, A-621, A-622 are issued with this amendment addressing these windows.

Q21-Please reference drawing D2/A-206 and A-620. A-206 indicates window type x69 but this window type is not scheduled on A-620. Please provide schedule information.

Response: X69 was shown on A-208, not A-206. Revised sheet A-208 is included in this amendment removing window type x69.

Q22-Window schedule sheet A-620: There is a window call out J12, we are unable to locate this window in the plans or elevations. Please clarify if this window is required.

Response: Revised sheet A-620 is included in this amendment removing window type J12. J12 is not required.

Q23-Peerless Windows (Basis of Design) has stated that Window Types A4, AA1, AA2, AA4, AA5, AA6, AA7, AA8, AA9, B1, B2, B3, B4, B5, B6, B9, BB1, C, C1, C2, C3, C4, C5, C6, C7, C8, D, D1, D2, D3, D4, D5, DD, DD1 and DD2 cannot be manufactured to meet ATFP Blast Load Requirements as detailed on Drawings A‐621 and A‐622. See attached mark‐ups (red) indicating where transoms and mullions need to be added.

Response: Revised sheets A-201, A-202, A-203, A-204, A-205, A-621, A-622 are issued in this amendment revising these window types.

Q24-General Notes on Drawing S‐203 reference Unit Prices for unquantified Steel Reinforcing. There is no provision on the Bid Form for these Unit Prices. Please clarify.

Response: Revised Sheet S-203 is included in this amendment removing the request for unit pricing.

Q25-General Notes Drawing S‐204 reference Unit Prices for unquantified Terra Cotta Removal and Repair. There is no provision on the Bid Form for these Unit Prices. Please clarify.

Response: Revised Sheet S-204 is included in this amendment removing the request for unit pricing.

Q26-Please identify where the electric refrigerators are to be located in the plans.

Response: Requirement for refrigerators is removed from the contract by this amendment.

Section 11 31 13 has been removed.

Q27-Drawings A‐621 and A‐622 provide reference Head Details for Window Types A4, B1, B2 and B3.

Details D4/A‐521 and D2/A‐522 call for Break Metal Interior Trim. Since there are no Large Scale Head Details for the other Window Types, please indicate which are to receive Break Metal.

Response: Revised sheets A-521, A-522 are issued in this amendment clarifying break metal locations.

Q28-Specification Section 238219.0040 calls for the FCU Manufacturer to factory install DDC Components furnished by the DDC Controls Contractor. The Basis of Design FCU Manufacturer (IEC) will not perform this service on Horizontal FCUs. Please confirm that Controls are to be field installed for this equipment.

Response: We have been in contact with an IEC authorized representative who has confirmed with IEC directly that IEC will provide this service. Comply with specifications.

Q29-Detail D2/A‐208 shows two windows marked “x69”. These window do not appear on the Window Schedule (A‐620) or Window Type Elevations (A‐621, A‐622).

Response: X69 was shown on A-208, not A-206. Revised sheet A-208 is included in this amendment removing window type x69.

Q30-The following windows appear on the drawings and Window Schedule, but do not appear on the Window Type Elevations drawings (A‐621, A‐622): A, A1, A2, A3, A5, A6, A7, A8, A9, A10, A12, A13, A14, A16, A18, A19, A20, A22, A25, A26, A27, A30, A31, A34, A37, A38, A39, A41, HM3, J2, J3, J5, J6, J7, J8, J12.

Response: Revised drawings A-620, A-621, A-622 are issued with this amendment addressing these windows.

Q31-Drawing AD‐100 General Demolition Note N. 4 “Remove the following from the Building:

Non‐Structural Topping Slabs”. Drawing S‐204 Sections indicate “Cinder Fill to Remain”. Is the Cinder Fill Structural to remain in the existing Topping Slabs or to be removed? Please add a unit price item to the Bid Schedule or indicate the quantity Non‐Structural Topping Slab Demolition and Replacement.

Response: Cinder Fill is not considered a topping slab and shall remain as indicated in S-204.

Q32-Confirming roof coping on detail B1/A-543

- The lower coping is not labeled, is it new?

- Roof Demolition Photo B3/AD-542 does not show the lower coping.

Response: The lower coping is existing and not new. Remove, clean and re-install with new copper flashing per keynote 2 43.

Q33- Please provide an updated Table of Contents including the latest changes to the Specification Sections.

Response: A revised and updated Table of Contents is issued with this amendment.

Q34-Please confirm that any costs associated with dealing with either Historic, impacted, contaminated, hazardous soils and/or ground water and/or solid waste will be paid for as additional costs to the contract.

Response: The Contractor is responsible for all costs of dealing with identified historic, impacted, contaminated, hazardous soils and/or ground water and/or solid waste. Any condition that may arise that was not identified in the Plans and Specifications would be handled under the differing site clause.

Q35-Please confirm that the existing soil considered is environmentally clean.

Response: The existing soil is considered environmentally clean; any other conditions will invoke different site conditions.

Q36- (k5) Reference Demolition Drawing Legend regarding Terrazzo, which directs the Contractor to Remove the Terrazzo Floor with Topping Slab to remain. What type of terrazzo is currently in place? If it is thin set, it will be impossible to remove the fully bonded terrazzo from the topping.

Response: Revised sheets AD-101, AD-102, AD-103 and AD-104 are issued with this amendment eliminating the requirement for terrazzo demolition.

Q37-Reference Demolition Drawing Legend regarding Selective Demolition of Damaged Tile. Please provide a quantity for bidding purposes. Additionally, what material will replace the tile that is removed?

Q38-Reference Demolition Drawing Legend regarding Terrazzo, which states “See CLIN Item for Terrazzo Floor Removal (Additive Bid Option). There is no Additive Bid Option on the Bid Schedule.

Please clarify.

Response: Revised sheets AD-101, AD-102, AD-103 and AD-104 are issued with this amendment eliminating the requirement for terrazzo demolition.

Q39-Reference Detail on Drawing S‐208 which addresses the Unistrut Attachment for MEP Hanging.

This Detail is not shown or referenced on the MEP Drawings (Plumbing, Fire Sprinkler, Electrical, HVAC) even though it pertains directly to the scope of work. Please add this detail by reference to all pertinent disciplines.

Response: Refer to Special Conditions Note “1” on M-001, General Notes on New Work HVAC Sheets and Note on individual details for hung equipment, duct and piping. The information more than adequately describes requirement. Mechanical drawings will not include structural details as the mechanical engineer is not a registered structural engineer. Revised Sheets M-601, M-602 and

M-604 are included in this amendment referencing sheet S-208. It is the contractor’s responsibility to coordinate this requirement across all trades.

Q40-Keynote 15/CU‐101 indicates 8” LP and 3” R Steam Pipes are to be direct buried. Drawing M‐200 shows an 8” LPS, 3” P.C. and a 4” H.P.S. at this location. Neither drawing indicates if the T connections at the mains are to be replaced. Please clarify what is required.

Response: Piping is required per M-200. M-200 indicates point of connection between existing and new. Use of weldolets is an acceptable means for connecting new to existing steam piping. Existing main sizes are as follows: 18” HPS, 20” LPS, 12” LPR.

Q41-Roof top Duct on Drawing M‐106 is depicted with a continuation line at Gridline 4, but the duct is not continued anywhere on the drawing. Drawing M‐104 locates these risers past Line 4. Please confirm these 3 Duct risers penetrate the standing seam roof or revise Drawing M‐106.

Response: The duct continues as shown on Section 1/M-501 and then continues down to 4th floor ceiling as shown on A1/M-104.

Q42-Refer to Drawing A-101: There are tags in the corridors for items “BB2” and “MB2”. These are not referenced on the interior elevations, notes, or project specification. Please provide a description and a specification for these items.

Response: A legend for these items is located on A-703.

Q43-Refer to Drawings A-610, A-611, A-612 & I-111: Detail D1 on I-111 shows a Typical Cadet Room with what appears to be a 3 color pattern of 12”x24” tiles. The Finish Schedules (A-610 & A-611) along with the Finish Legend (A-612) call out the Cadet Rooms as “RF-1” and specify a tile size of 6”x36”.

Kindly clarify the tile size and product intended as well as a desired pattern, if any.

Response: Tiles are Luxury Vinyl Tile by Centiva as specified on A-612. Size is 12” x 24” in 3 colors to be determined. Sheets A-610, A-611 and A-612 are modified by this amendment.

Q44-Refer to Drawings A-610 & A-611: The Cadet Rooms, TAC NCO and TAC Offices, Janitorial Room 201, Laundry 208 & 408 and Collaboration 220 & 424 are noted in the Floor Finish Columns as “RF-1/SEE CLIN 0026. Should this read /SEE CLIN 0022? As 0022 pertains to the flooring alternate-terrazzo in lieu of VCT.

Response: Confirmed: CLIN 0022 is the correct reference.

Q45-Refer to Spec Section 096500: Paragraphs 2.4 & 3.7 list the use of resilient stair risers. Are these being used or are the risers painted? They are not called out on the Finish Legend or Finish Schedules. If we are responsible, kindly advise of a specific product and locations desired.

Response: No resilient stair risers are required. Remove references in paragraphs 2.4 & 3.7 pertaining to resilient stair risers. Stairs 1-6 are to receive new terrazzo treads as called for in the documents. Risers are to be painted.

Q46-Refer to Spec Section 281005, paragraphs 1.6.1.2 and 2.1: The specification reads that all security equipment is by the Division 28 contractor. Drawings SE-303 and SE-304 have notes that read equipment is “Government Furnished, Government Installed.” Drawing E-001 matrix shows only cameras provided and installed by Owner. Please confirm what equipment is to be carried in the Division 28 scope and what equipment is to be provided and installed by others.

Response: Revised drawings SE-303, SE-304, and revised specification sections 28 08 10, 28 10 05 are included in this amendment clarifying contract requirements for this work.

Q47-Per CLIN 0032 (Option 11), regarding refurbishment of the Clock Tower Spiral Stair, description states to condition ‘the space as indicated on the drawings.’ No conditioning system is apparent on the mechanical drawings for this space. Please advise.

Mechanical Response: Correct, there is no requirement in the mechanical documents for new air conditioning in the clock tower. The requirement to “condition the space” is referring to the finishes called for in the space.

Q48-Per CLIN 0035 (Option 14), Please clarify if the furniture to be moved in this alternate is being relocated on campus, sold, or discarded.

Response: EXISTING FURNITURE REMOVAL Per CLIN 0035 Contractor shall provide work related to the provision for removal and disposal of all existing furniture in Pershing Barracks.

Q49-Please reference Specification 04 01 10 section 1.1.1 Work Included. “the work of this section consists of repointing all the masonry joints of Pershing Barracks,” and subsequent parts “a” and “b”.

This section would indicate that all the exterior masonry is to be repointed, while building elevations onA-201 do not indicate significant repointing. Please confirm the extent of repointing and repair work.

Response: Base bid is to re-point only specific areas identified in the drawings. Bid Option is for re-pointing the remainder of the building.

Q50-CLIN item 0021 calls for the repair and replacement of all limestone window sills, jambs and heads on the building exterior. The details on sheet A-521 have tags 2 40: “Existing stone trim to remain in place” and tag 2 37: “Existing Stone Trim – See Elevations for Removal Locations if required”.

Referencing the elevations (starting on A-201), the explicit locations of the repairs are not noted. Please provide specific locations for each of the required repairs.

Response: CLIN item 0021 will be removed from the bid schedule as it is not applicable.

Q51-Question about the solid surface showers. The side walls are approx. 76" the specified material is 36" wide sheets. Are you looking for seamless walls? or 2 - 36" panels with a 6" batten strip? or 2 - 36" walls with hard seams and a 6" trim? The price difference between hard seams and battens is huge.

If you would like a hard seam please consider Avonite Wet Walls. The panels are available in 36", 48" and 60". This would be more cost effective if the full 76" is desired, resulting in 1 hard seam and not 2.

Response: Provide seamless walls.

Q52-Reference drawing A-701: Detail E5/A-701 is calling for p-lam interiors for the upper cabinets.

There are no specifications or references to p-lam on drawing A-612 finish ledgend and schedule. Please provide.

Response: Details E3, E4, E5 on sheet A-701 have been revised to note PL1. The finish legend on A-612 has also been revised to include PL1.

Q53-Reference drawings M-101 thru. M-104, M-604 and Specification 23 00 00: Paragraph 2.10.2.1 in specification section 23 00 00 requires a drain pan at coils. Detail 1/M604 shows a secondary drain pan in the Ceiling FCU’s. There is an access door directly under the FCU, not leaving room for an external pan.

Please confirm the drain pan in the FCU is all that is required.

Response: Detail 1/M604 does not show an external secondary drain pan directly under the unit, the detail shows a secondary drain pan within the unit. See Note on detail 9/M-603; the secondary drain pan shown on 1/M604 and the extended drain pan below control valves noted in 9/M-603 are one in the same. There is no requirement for an external secondary pan below the unit. Comply with details.

Q54-Reference Specification 23 00 00: The specification requires access doors at HVAC controls, dampers, etc. at inaccessible ceilings. There are no specifications for Cord operated Dampers but were required on similar projects on post. Are corded dampers going to be required in lieu of access doors at inaccessible ceilings?

Response: Comply with the specifications

Q55-Reference A600 series of drawings finish schedule: The finish schedule calls for terrazzo at stairs.

There is no detail on the treads – including depth of the terrazzo. Please provide.

Response: New terrazzo depth and details to match existing removed. Assume 2 ½” deep treads for bidding purpose.

Q56-Reference A200 series of Drawing, Specification 04 01 10 and the bid form: Work in the exterior repointing specification includes the removal of all existing mortar and caulk from all joints. The elevations identify areas of mortar removal or cleaning. Option 27 calls to re-point the remaining areas. If the base bid is to repoint all areas, there should not be any remaining areas to repoint. Please confirm base bid from option work in relation to masonry repointing.

Response: Base bid is to re-point only specific areas identified in the drawings. Option is for re-pointing the remainder of the building.

Q57-Reference Clause 52.222-23: The goals for work force are 17% minority and 6.9% female. It reads as this is for work force, not contracting M/WBE firms. Please confirm this is EEO percentage of work force and there are no small business, women business, minority business, etc. requirements on this project.

Response: The goals are for minority and female participation, expressed in percentage terms for the Contractors aggregate workforce in each trade on all construction work in the covered areas.

The 17% minority and 6.9% female are not sub-contracting goals. The sub-contracting goals are located in the IFB under Section 00 72 00 - Contract Clause 52.222-23.

Q58-Can you confirm the height of the masonry walls on the Fourth Floor.

Response: Walls under flat roof areas are to go to deck. Walls under open sloped roof areas are to extend 6” min. above new ceiling.

Q59-Building sections on A-301 do not show them going to roof deck.

- The walls scale 12’ high Response: Walls under flat roof areas are to go to deck. Walls under open sloped roof areas are to extend 6” min. above new ceiling.

Q60-Confirming roof coping on detail B1/A-543

- The lower coping is not labeled, is it new?

- Roof Demolition Photo B3/AD-542 does not show the lower coping.

Architectural Response: The lower coping is existing and not new. Remove, clean and re-install with new copper flashing per keynote 2 43.

Q61-We did not get drawing S-103 when we done loaded the files.

- Listed in Index of Drawings as Third Floor Framing Plan.

Response: Sheet S-103 was issued in amendment 3.

Q62-Transition Detail C4 on Drawing A631 is provided/installed by which trade.

Response: It is the responsibility of the contractor to determine which trades provide the work.

Q63-Rubber Base remains, Only VCT is deleted for Option 23 Item 1 ?

Response: Item 22 Option 1 calls for removal of VCT and Rubber base to provide terrazzo and terrazzo base.

Q64-Transition Legend “ZD” Zinc Divider Strip Terrazzo to Terrazzo, applies for Option 23 Item 1 ?

Response: Yes for CLIN item 22 Option item 1.

Q65-Stair Risers see section 096500 page 5 para 2.4 (will exclude) as of now.

Response: No resilient stair risers are required. Remove references in paragraphs 2.4 & 3.7 pertaining to resilient stair risers. Stairs 1-6 are to receive new terrazzo treads as called for in the documents. Risers are to be painted.

Q66-We have been advised that RB-1 Ecolibrium wall base has been discontinued and Johnsonite is recommending Baseworks vulcanized rubber base as the replacement, will 6” Baseworks be good for this bid.

Response: Contractor to submit substitutions after award.

Q67-Finish Schedule Drawings A-610 & A-611 Cadet Rooms are all RF-1, however Drawing I-111 Detail D1 shows a pattern?

Q68-Similar with Collaboration Rooms, 2 colors of F/S and 3 colors on Drawing I-111 Detail D2.

colors to be determined. Sheets A-610, A-611 and A-612 are modified by this amendment.

Q69-After Demo of existing tile in rooms, we can provide a 6 mil layer of plastic, wire mesh anchored to existing wood subfloor and then 3/4” of 4000 psi Self Level Underlayment. A smooth and sound subfloor is required by Tandus Centiva for warranty. See attached Installation recommendation pdf from Tandus Centiva, Armstrong has the same requirements for the RF-4 and RF-5 spaces on wood subfloor.

Response: Contractor to submit materials and methods proposed to meet the requirements of the documents after award.

Q70-Wood Steps to the Clock Tower, refinish in section 09640 para 1.1.1, we are not figuring.

Response: Bidders musts meet the requirements of the contract documents.

Q71-We are not figuring an Allowance to repair or replace Wood sub floor. We will figure a single skim coat of flash patch on top of by GC repaired and existing plywood subfloor, ready for a single fine flash patch skim coat with a trowel.

Response: Bidders must include all cost of work necessary to meet the requirements of the documents.

Q72-Please identify Existing Floor Construction at Terrazzo Areas. If full depth terrazzo with sand bed is currently in place, how deep is the depression and what is to be used to infill the depression?