Amendment_0003_Pershing_AppendicesRV.pdf
PDF 32 MB Posted
- Attached to
- Pershing Barracks Renovation/Modernization, West Point New York Federal contract opportunity
- Solicitation number
- W912DS-16-B-0010
About this file
Amendment 0003_Pershing_AppendicesRV
View the file
Other files for this federal contract opportunity
Show all 50
Pershing Barracks Renovation/Modernization, West Point New York has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDICES
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO
APPENDIX A WEST POINT DESIGN QUALITy CONTROL PLAN ....................A-1 APPENDIX B DISCIPLINE CHECKLISTS ...........................................................B-1
APPENDIX C ATKINS RESUméS .......................................................................C-1 APPENDIX D DD FORm 1391 ............................................................................D-1 APPENDIX E AS-BUILT DRAWING EXCERPTS ................................................E-1 APPENDIX F POINT CLOUD SURVEy ............................................................... F-1 APPENDIX G HAzARDOUS mATERIAL TESTING ............................................ G-1
APPENDIX H SURFACE PENETRATING RADAR RESULTS .............................H-1
APPENDIX I PROBE AND CORE RESULTS ...................................................... I-1 APPENDIX J COUPON RESULTS ...................................................................... J-1 APPENDIX K LIFE SAFETy/CODE ANALySIS ..................................................K-1 APPENDIX L THERmAL ImAGING INVESTIGATION REPORT ......................... L-1 APPENDIX m PROPOSED LAyOUTS ................................................................ m-1 e3enmjas Cross-Out e3enmjas Cross-Out e3enmjas Cross-Out
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO E-1
E
AS-BUILT DRAWING
EXCERPTS
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOE-2
THIS PAGE INTENTIONALLY LEFT BLANK files provided in an amendmnet
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-1
F
POINT CLOUD SURVEY
Point Cloud – Revit Coordination
Pershing Barracks
USMA West Point
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-2
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review and Revit Integrating: Exterior
Point CloudUpdated Revit Model + Point CloudUpdated Revit Model
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review and Revit Integrating: Exterior
Point CloudUpdated Revit Model + Point CloudNew phase windows update as per existing windows size and location
New phase window location before update
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-3
Point Cloud Files Review and Revit Integrating: Exterior
Point CloudUpdated Revit Model + Point CloudNew phase windows update as per existing windows size and location
New phase window location after update
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review and Revit Integrating: Roof Exterior
Point CloudUpdated Revit Model + Point CloudUpdated Revit Model
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-4
Point Cloud Files Review and Revit Integrating: Roof Exterior
Previous Revit ModelPrevious Revit Model + Point CloudUpdated Revit Model + Point CloudUpdated Revit Model
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Previous revit modelPrevious Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-5
Point Cloud Files Review and Revit Integrating: Roof Exterior
Updated Revit modelPrevious Revit modelPrevious Revit ModelPrevious Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Previous Revit ModelPrevious Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-6
Previous Revit ModelPrevious Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model
Point Cloud Files Review and Revit Integrating: Roof Exterior
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review and Revit Integrating: Roof Parapet
Point Cloud
View 01
View 02
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-7
Point Cloud Files Review and Revit Integrating: Roof Parapet
Point Cloud
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review and Revit Integrating: Roof Parapet
Point Cloud + Updated Revit Model
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-8
Point Cloud Files Review and Revit Integrating: Roof Parapet
Updated Revit Model
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review and Revit Integrating: Roof Parapet
Point Cloud
View 01 View 02
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-9
Point Cloud Files Review and Revit Integrating: Roof Parapet
Point Cloud + Updated Revit Model
View 01 View 02
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review and Revit Integrating: Roof Parapet
Updated Revit Model
View 01 View 02
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-10
Point Cloud Files Review and Revit Integrating: Roof Parapet
Point Cloud
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review and Revit Integrating: Roof Parapet
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-11
Point Cloud Files Review and Revit Integrating: Roof Parapet
Updated Revit Model
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review & Revit Integrating: Structural Steel at Attic space
Point Cloud
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-12
Point Cloud Files Review & Revit Integrating: Structural Steel at Attic space
Point Cloud + Updated Revit Model
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review & Revit Integrating: Structural Steel at Attic space
Updated Revit Model
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-13
Point Cloud Files Review and Revit Integrating: Structural Steel
Point Cloud
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review and Revit Integrating: Structural Steel
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-14
Point Cloud Files Review and Revit Integrating: Structural Steel
Updated Revit Model
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-15
Point Cloud Files Review and Revit Integrating: Structural Steel
Point Cloud + Updated Revit Model
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-16
Point Cloud Files Review and Revit Integrating: Structural Steel
Point Cloud
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-17
Point Cloud Files Review and Revit Integrating: Structural Steel
Updated Revit Model
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-18
Point Cloud Files Review and Revit Integrating: Structural Steel
Point Cloud + Updated Revit Model
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-19
Point Cloud Files Review and Revit Integrating: Load bearing walls
Point Cloud + Revit Model
View 01
View 02
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review and Revit Integrating: Load bearing walls
Revit Model
View 01
View 02
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-20
Previous Revit model + Point Cloud
Point Cloud Files Review and Revit Integrating: Exterior Elevations
Updated Revit model + Point CloudUpdated Revit model
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Previous Revit model + Point CloudUpdated Revit model + Point Cloud
Point Cloud Files Review and Revit Integrating: Exterior Elevations
Updated Revit model
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-21
Point Cloud Files Review and Revit Integrating: Exterior Elevation
Previous Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Previous Revit model + Point Cloud
Point Cloud Files Review and Revit Integrating: Exterior Elevation
Updated Revit model + Point CloudUpdated Revit model
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-22
Previous Revit model + Point CloudUpdated Revit model + Point Cloud
Point Cloud Files Review and Revit Integrating: Exterior Elevation
Updated Revit model A
B
A B
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Previous Revit model + Point Cloud
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-23
Point Cloud Files Review and Revit Integrating: Exterior Elevation
Updated Revit modelPrevious Revit model + Point CloudUpdated Revit model + Point Cloud
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Updated Revit modelPrevious Revit model + Point CloudUpdated Revit model + Point Cloud
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-24
Point Cloud Files Review and Revit Integrating: Basement Level
Previous Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review & Revit Integrating: Basement Level
Previous Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-25
Point Cloud Files Review and Revit Integrating: Load bearing walls
Point Cloud
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review and Revit Integrating: Load bearing walls
Updated Revit Model + Point Cloud
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-26
Point Cloud Files Review and Revit Integrating: Load bearing walls
Point Cloud
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review and Revit Integrating: Load bearing walls
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-27
Point Cloud Files Review and Revit Integrating: Load bearing walls
Point Cloud and stair 3 and 4 load bearing walls comparison
Section - Stair 3 Walls Section - Stair 4 Walls
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review and Revit Integrating: Stairs
Point CloudUpdated Revit Model + Point CloudUpdated Revit Model + Point Cloud Updated Revit Model
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-28
Previous Revit model + Point Cloud
Point Cloud Files Review and Revit Integrating: Basement Level
Updated Revit model + Point CloudUpdated Revit model
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Previous Revit model + Point Cloud
Point Cloud Files Review and Revit Integrating: Basement Level
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-29
Previous Revit model + Point Cloud
Point Cloud Files Review and Revit Integrating: Basement Level
Updated Revit model + Point CloudUpdated Revit model
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Point Cloud Files Review and Revit Integrating: Basement Level
Previous Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-30
Point Cloud Files Review and Revit Integrating: 2nd Floor Corridor
Updated Revit modelPrevious Revit model + Point CloudUpdated Revit model + Point Cloud
USMA WEST POINT – Pershing Barracks – Point Cloud Comparison
Thank You…
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO G-1
G
HAZARDOUS MATERIAL
TESTING
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOG-2
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO G-3
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOG-4
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO G-5
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOG-6
SEE PT5236CE-01-11-14 for Hazardous Abatement test posted in amend 2
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-1
H
Pershing Dormitory West Point Military Academy
West Point, NY
Field Investigation Report
DRAFT
Appendix A – Surface Penetrating
Radar Report
March 3, 2015
SURFACE PENETRATING
RADAR RESULTS
H
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOH-2
Atkinson-Noland & Associates 2619 Spruce Street 32 Old Slip, 10th Floor Consulting Engineers Boulder, CO 80302 New York, NY 10005 www.ana-usa.com 303.444.3620 917.647.9530
PROJECT REPORT
SURFACE PENETRATING RADAR INVESTIGATION REPORT
PERSHING BARRACKS
WEST POINT, NY
ANA Job #: 14-099
Prepared by:
Atkinson-Noland & Associates, Inc.
32 Old Slip, 10th Floor New York, NY 10005 917-647-9530
Prepared for:
Robert Silman Associates.
32 Old Slip, 10th Floor New York, NY 10005
August 18, 2014 Revised: December 23, 2014
INTRODUCTION
Surface Penetrating Radar (SPR) investigations were carried out by Atkinson-Noland & Associates (ANA) at the Pershing Barracks at the U.S. Military Academy at West Point.
Personnel involved in the site work included Carlo Citto and Zach Adkison of ANA. Field work was done during the period from July 21 to July 24, 2014. The objective of the nondestructive testing using SPR was to locate floor framing members and determine typical cross sections at each floor. Additional SPR investigations were carried out by Carlo Citto on November 20, 2014 during the thermal imaging investigation. The purpose of the additional radar work was to confirm previous observations at selected locations and investigate typical construction of selected walls.
This report describes the investigation methods, locations evaluated, and the results of the investigations.
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-3
SPR Investigation 2 Atkinson-Noland & Associates, Inc. August 18, 2014 (Rev. December 23, 2014)
SURFACE PENETRATING RADAR INVESTIGATION
SPR was used at Pershing Barracks to investigate floor framing and typical cross sections at each floor. The equipment used was a Geophysical Survey Systems Incorporated (GSSI) SIR-3000 ground penetrating radar unit with 1600 MHz antenna. The SPR method involves the transmission of high frequency electromagnetic radio (radar) pulses into the object of interest and measuring the time elapsed between transmission, reflection off a buried discontinuity, and reception back at a surface radar antenna. A pulse of radar energy is generated on a dipole transmitting antenna that is placed on the surface of the floor or wall. The resulting wave of electromagnetic energy propagates into the material where portions of it are reflected back to the surface at discontinuities. The discontinuities where reflections occur are usually created by changes in electrical properties of the underlying material. Void spaces, which may be encountered, will also generate significant radar reflections due to a significant change in radar wave velocity at the interface.
Calibration Calibration of the radar antenna to determine approximate depth was performed at destructive probe locations that were performed by others under the direction of Robert Silman Associates (RSA). Information from probes done at room 442, 443A, 346A, 238A and basement room 01 were used for the calibration. ANA observed only the probe opening at room 442. Observations at the other locations were provided by RSA.
Once the radar antenna is properly calibrated, SPR investigations can provide accurate information about the location and depth of embedded elements. Because materials typically encountered in construction have distinct reflections, SPR is also a reliable method to locate concealed elements. However, reconstructing a typical floor section is a complex process and requires a detailed interpretation of the radar traces. Typical floor construction at Pershing Barracks includes multiple layers of different materials with different dieletric constants and moisture content and this may affect the accuracy of the radar investigation. While the SPR survey provided detailed information about the floor construction, the estimated location (i.e.
depth) and typology of the elements comprising the structural floors may deviate from existing conditions.
Documentation Methodology and Observations At Pershing Barracks, 155 radar traces were collected by ANA. At each floor, SPR investigations were conducted at corridors, cadet rooms, and latrines. Locations were selected with the assistance of RSA. Radar traces collected along two orthogonal directions provided information about the framing direction of the floor beams. Using SPR, typical floor cross sections at each floor were reconstructed. Examples of radar profiles recorded during the field work are shown in Figure 1 through Figure 5. From these profiles, the distinctive elements of the floor system are clearly visible. A brief description of each floor section is provided below.
Appendix A provides detailed information about areas investigated and typical floor sections.
• North and south wings corridors o 2nd to 4th floor (except 3rd floor at north wing): terrazzo topping, setting bed with wire mesh, concrete filling, terra cotta flat arch between steel beams.
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOH-4
SPR Investigation 3 Atkinson-Noland & Associates, Inc. August 18, 2014 (Rev. December 23, 2014) o 3rd floor at north wing: terrazzo topping, setting bed with wire mesh, concrete fill between steel beams.
o 1st floor: terrazzo topping, setting bed with wire mesh, filling, masonry arch between steel beams.
• Main hall corridors o 3rd and 4th floors: terrazzo topping, setting bed with wire mesh, concrete filling, terra cotta flat arch between steel beams.
o 1st and 2nd floors: terrazzo topping, setting bed with wire mesh, filling, masonry arch between steel beams.
• North and south wings cadet rooms o 2nd to 4th floor: wood floor, concrete filling, terra cotta flat arch between steel beams.
o 3rd floor, rooms 345, 346, 348, and 350: the floor construction at these location was not investigated and may differ from typical construction.
o 1st floor: wood floor, filling, masonry arch between steel beams.
• Main wing cadet rooms o 3rd and 4th floors: wood floor, concrete filling, terra cotta flat arch between steel beams.
o 1st and 2nd floors: wood floor, filling, masonry arch between steel beams.
• North and south wings latrines o 2nd to 4th floor (except 3rd floor at north wing): floor tile, mortar bed with wire mesh (rebar mesh at showers), concrete filling, terra cotta flat arch between steel beams.
o 3rd floor at north wing: floor tile, mortar bed with wire mesh (rebar mesh at showers), concrete fill between steel beams.
o 1st floor: floor tile, mortar bed with wire mesh (rebar mesh at showers), filling, masonry arch between steel beams.
During the additional SPR work carried out on November 20, 2014, ANA investigated typical construction of selected partition walls along the main hall corridors on the 3rd and 4th floors. A limited investigation of the 1st floor exterior walls was also attempted from room 105. This investigation was not successful due to the metal lath in the plaster that covers the interior face of the wall. The presence of the metal lath prevented obtaining any information, with SPR, on the materials beyond the metal lath. The following partition walls were investigated:
• 4th floor o Wall between doors to rooms 433 and 435.
o Wall between doors to rooms 421 and 423.
o Wall between door to room 430 and adjacent column.
• 3rd floor o Wall between doors to rooms 333 and 335.
o Wall between doors to rooms 322 and 324.
o Wall between door to rooms 332 and 334.
Based on the investigation results, the partition walls appear to be 6” CMU walls with empty cells. An example of radar profile recorded at one of the corridor walls is shown in Figure 6.
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-5
SPR Investigation 4 Atkinson-Noland & Associates, Inc. August 18, 2014 (Rev. December 23, 2014)
Figure 1. Typical radar profile recorded at basement floor (radar trace #153). Visible reflections in the radar profile are from the steel beams, masonry arch and fill material (approximate location shown with black lines). Note the larger steel beam used at the left end of the image.
Figure 2. Typical radar profile recorded at 1ST floor cadet room (room 138, radar trace #50). Visible reflections in the radar profile are from the steel beams, wood floor, masonry arch, and fill material (approximate location shown with black lines).
STEEL BEAM
BOTTOM OF ARCH
BOTTOM OF FILL
STEEL BEAM BOTTOM OF ARCH BOTTOM OF FILL
BOTTOM OF
WOOD FLOOR
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOH-6
SPR Investigation 5 Atkinson-Noland & Associates, Inc. August 18, 2014 (Rev. December 23, 2014)
Figure 3. Typical radar profile recorded at 3RD floor corridor (room 351A, radar trace #21). Visible reflections in the radar profile are from the steel beams, wire mesh in the setting bed, concrete fill, and plaster ceiling with metal lath (approximate location shown with black lines).
Figure 4. Typical radar profile recorded at 4TH floor corridor (room 444A, radar trace #13). Visible reflections in the radar profile are from the steel beams, wire mesh in the setting bed, concrete slab, and terra cotta flat arch (approximate location shown with black lines).
STEEL BEAM
WIRE MESH IN
SETTING BED
BOTTOM OF
CONCRETE FILL
PLASTER CEILING
WITH METAL LATH
STEEL BEAM WIRE MESH IN
SETTING BED
BOTTOM OF
CONCRETE SLAB
BOTTOM OF TERRA
COTTA FLAT ARCH
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-7
SPR Investigation 6 Atkinson-Noland & Associates, Inc. August 18, 2014 (Rev. December 23, 2014)
Figure 5. Typical radar profile recorded at 4TH floor cadet room (room 442, radar trace #16). Visible reflections in the radar profile are from the steel beams, wood floor, concrete fill, and terra cotta flat arch (approximate location shown with black lines). Observations from a probe opening at this location were used to calibrate the radar antenna. The probe also revealed that the concrete fill is of low quality at this location.
Figure 6. Typical radar profile recorded at partition wall between doors to rooms 421 and 423 at 4th floor. Visible reflections in the radar profile are from the back of the wall (approximate location shown with black line) and the empty cells. The thickness of the wall is approximately 6 inches.
STEEL BEAM BOTTOM OF
WOOD FLOOR
BOTTOM OF
CONCRETE FILL
BOTTOM OF TERRA
COTTA FLAT ARCH
BACK OF WALL EMPTY CELL, TYP.
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOH-8
SPR Investigation 7 Atkinson-Noland & Associates, Inc. August 18, 2014 (Rev. December 23, 2014)
APPENDIX A
SPR INVESTIGATION RESULTS
Drawings Provided by Robert Silman Associates
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-9
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-11
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-13
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-15
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-17
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-19
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-21
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-23
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-25
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-27
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-29
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-1
I
Appendix B - Probe and Core Results
PROBE AND CORE
RESULTS
I
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-2
THIS PAGE INTENTIONALLY LEFT BLANK
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-3
5'-4" 14'-9"
Probe B-2, into ceiling
C3
Probe B-1, into ceiling, flush against exterior wall.
Coupon C3: 6.5"x1.5" segment out of north side of bottom flange, starting 3.5" from face of wall
Bottom of girder observed 14" below bottom of beam
Plate girder
5'-0", Typ.
11" rise in brick arches between steel beams. Beam flanges 5" wide.
Beams above arches
C1
12" brick bearing wall
Probe B-3, into wall. Beams north and south of wall are not in line.
Coupon C1: 2"x2" taken from bottom flange of steel beam, approx. 16" from brick bearing wall.
C2
Coupon C2: 2"x2" segment taken from bottom flange of steel beam, approx. 6" from face of wall. Brick arches observed to have 5" rise between beams.
Exposed tie rod observed between two beams
Typical rise in brick arches between steel beams observed to be 4"-5"
LEGEND
Indicates existing steel joist observed in floor above
Indicates existing steel girder observed in floor above
Indicates approximate probe location
Indicates existing masonry load bearing wall
Indicates steel coupon taken at locationC#
N
Notes:
1. This plan shows the First Floor beams.
Walls shown extend up from the Basement to the First Floor.
2. Beams are shown schematically, unless dimensioned.
3. Framing and walls shown in red are assumed due to symmetry, geometry, etc., but were not observed in field. See results from SPR survey for additional framing information.
Beams at 5'-0" o.c., Typ.
FIRST FLOOR FRAMING ON BASEMENT ARCHITECTURAL PLAN
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-5
4'-11" 14'-10"
Beams at 5'-5" o.c., typ.
Probe 1-1, into ceiling above
2'-6"
2'-6"
Probe 1-3, into First Floor from above.
Probe 1-2, into wall at edge of window opening
LEGEND
Indicates existing steel joist observed in floor above
Indicates existing steel girder observed in floor above
Indicates approximate probe location
Indicates existing masonry load bearing wall
Wall originally believed to be partition, but field investigation revealed to be bearing from basement to underside of fourth floor
N
Notes:
1. This plan shows the Second Floor beams.
Walls shown extend up from the First Floor to the Second Floor.
2. Beams are shown schematically, unless dimensioned.
3. Framing and walls shown in red are assumed due to symmetry, geometry, etc., but were not observed in field. See results from SPR survey for additional framing information.
Bulb tees observed at Second Floor stair landing, Typ.
SECOND FLOOR FRAMING ON FIRST FLOOR ARCHITECTURAL PLAN
Lintel observed replacing arch
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-7
LEGEND
Indicates existing steel joist observed in floor above
Indicates existing steel girder observed in floor above
Indicates approximate probe location
Indicates existing masonry load bearing wall
Indicates existing phoenix column observed in field
Indicates existing column of unknown shape and material, observed in field
Probe 2-1, into ceiling above at column, joist (E-W), and girder (N-S)
Probe 2-3, into Second Floor from above.
Probe 2-2, into ceiling above
Probe 2-4, into Wall at Ceiling, observed pier
Filler beam observed in Core 3-1 (Third Floor)
N
Notes:
1. This plan shows the Third Floor beams.
Walls shown extend up from the Second Floor to the Third Floor.
2. Beams are shown schematically, unless dimensioned.
3. Framing and walls shown in red are assumed due to symmetry, geometry, etc., but were not observed in field. See results from SPR survey for additional framing information.
THIRD FLOOR FRAMING ON SECOND FLOOR ARCHITECTURAL PLAN
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-9
Indicates existing steel joist observed in floor above
Indicates existing steel girder observed in floor above
Indicates approximate probe location
Indicates existing masonry load bearing wall
Indicates existing phoenix column observed in field
Probe 3-4, medicine cabinet removed to observe void space behind.
Probe 3-1, into exterior wall south of window
Probe 3-3, into wall and ceiling above
Probe 3-2, into masonry encasing phoenix column.
Core 3-1, into Third Floor from above. Located 1'-11" from partition wall to north.
'-6
.5
4'-11"
Steel beam observed in Fourth Floor at Probe 4-2
N
Girder revealed by Probe 3-3 believed to be tie beam for trusses above, not a bearing girder.
Notes:
1. This plan shows the Fourth Floor beams.
Walls shown extend up from the Third Floor to the Fourth Floor.
2. Beams are shown schematically, unless dimensioned.
3. Framing and walls shown in red are assumed due to symmetry, geometry, etc., but were not observed in field. See results from SPR survey for additional framing information.
C of w in do w
L
FOURTH FLOOR FRAMING ON THIRD FLOOR ARCHITECTURAL PLAN
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-11
Indicates existing steel joist observed in floor above
Indicates existing steel girder observed in floor above
Indicates approximate probe location
Indicates existing masonry load bearing wall
Indicates existing phoenix column observed in field
Indicates base of existing roof arch truss observed in field
AA
Beam centered between windows
Pier observed
CMU wall observed
BB
Probe 4-1, into base of wall at corner
CMU wall observed
Core 4-1, into Fourth Floor from above
Probe 4-2 into Fourth Floor from above.
See plan of Third Floor for beam located in Fourth Floor via this probe.
'-1
1.
5"
4'-11"
N
12.5"18"
Section A-A
14"35"
Section B-B
Notes:
1. This plan shows the Fourth Floor ceiling beams. Walls shown extend up from the Fourth Floor to the dropped ceiling above.
2. Beams are shown schematically, unless dimensioned.
3. Framing and walls shown in red are assumed due to symmetry, geometry, etc., but were not observed in field. See results from SPR survey for additional framing information. Finished ceiling
Cont. moveable partition wall track
FOURTH FLOOR FRAMING ON FOURTH FLOOR ARCHITECTURAL PLAN
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-13
~23'
Steel Bulb Tee, Typ.
around opening
Steel I-shape, Typ.
Truss arch, Typ.
Secondary Truss Arch
Note: continuous angle displaying some signs of corrosion observed at eave level of north and southeast roofs, between roof and walls.
Northwest Corner Roof
Northeast Corner Roof Southeast Corner Roof
Truss-bearing corbel
N
Notes:
1. This plan shows the Roof framing beams.
Walls shown extend up from the Fourth Floor to the Roof.
2. Beams are shown schematically, unless dimensioned.
3. Framing and walls shown in red are assumed due to symmetry, geometry, etc., but were not observed in field. See results from SPR survey for additional framing information.
LEGEND
Indicates existing steel joist observed in roof
Indicates existing steel arch truss observed in roof
Indicates approximate probe location
Indicates existing masonry load bearing wall
Roof opening framed out but closed over in previous renovation
Roof opening framed out but closed over in previous renovation, Typ.
ROOF FRAMING ON ROOF ARCHITECTURAL PLAN
Area of original skylight infilled with wood
Probe R-1, into wall at intersection of sloped roof beam and exterior wall
Probe R-2, into wall at intersection of roof truss top chord and exterior wall
Probe R-3, into infilled skylight at intersection of roof truss top chord and east-west roof beam
Steel I-shaped rafter beams spanning north-south, TYP. at each bay
15'-0"x8'-0" existing skylight infilled with tongue-in-groove precast concrete planks on 8" open web joists @ 30" o.c. east-west
Terra cotta flat arch spanning between steel beams, typical
Probe R-4, into wall at intersection of roof truss top chord and exterior wall
HI
HI
HI
HI
HI
HI
H I
HI
HI
HI
HI
HI
HI
HI
HI
HI
HI
HI
Beams marked "HI" observed at higher elevation than typical roof beams
Bulkhead above supported by elevator and ventilator shafts. Lattice column located at southeast corner of ventilator shaft
Water tank located under raised roof area
Sallyport wall ends above 4th floor at central corridor, replaced with built-up girder at high elevation
Terra cotta book tiles span between beams at mansard roof
Terra cotta book tiles span between beams at mansard roof
Lintel replaces arch
Steel lintel replaces arch
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-15
Probe B-1
Photo 1 – Probe location
Photo 2 – Steel beam supporting brick arch
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-16
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-17
Probe B-2
Photo 3 – Probe location
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-18
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-19
Photo 4 – Brick arch with wooden sleepers above
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-20
Probe B-3
Photo 5 – Probe location
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-21
Photo 6 – Brick bearing wall behind void space at back of glazed block wall
Photo 7 – Steel beam and brick arch
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-22
Probe 1-1
Photo 8 – Terra cotta block supported by steel beam; tie rod is also observed
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-23
Photo 9 – Location of probe
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-24
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-25
Probe 1-2
Photo 10 – Terra cotta bricks
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-26
Photo 11 - Probe location
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-27I-27
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-28
Probe 1-3
Photo 12 – Wooden floor, sleepers, and brick below
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-29
Photo 13 - Measurement to top of brick
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-30
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-31
Probe 2-1
Photo 14 – Obscure shaped column with beams framing in from either side
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-32
Photo 15 – Close up of column and beam connection
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-33
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-34
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-35
Probe 2-2
Photo 16 – Steel beam framing into column with double angle clip connection
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-36
Photo 17 – Close up of double clip, and channel below
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-37
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-39
Probe 2-3
Photo 18 – Probe drilled into floor through terrazzo finish
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-40
Photo 19 – Brick observed below terrazzo and fill
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-41
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-43
Probe 2-4
Photo 20 – Brick pilaster observed behind plaster-on-mesh wall finish
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-44
Probe 3-1
Photo 21 – Cores taken from drilling horizontally into wall
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-45
Photo 22 – Approximate depth of exterior wall
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-46
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-47
Probe 3-2
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-48
Photo 23 - Phoenix column observed
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-49
Photo 24 – Location of probe, from two sides of column
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-50
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-51
Probe 3-3
Photo 25 – Location of probe
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-52
Photo 26 – At least to bottom flanges of steel shapes observed, with terra cotta spanning parallel
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-53
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-54
Probe 3-4
Photo 27 - Location of probe behind medicine cabinet
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-55
Photo 28 – Void space behind medicine cabinet
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-56
Probe 4-1
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-57
Photo 29 - Location of probe
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-58
Photo 30 – Decorative base of column
Photo 31 – View up column from probe location
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-59
Probe 4-2
Photo 32 – Probe reveals steel beam supporting terra cotta floor structure
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-60
Photo 33 – Close-up of terra cotta and beam web
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-61
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-62
Probe R-1
Photo 34 – Steel rafter beam bearing on exterior wall
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-63
Photo 35 – Steel channel providing bearing surface at exterior wall
Photo 36 – Corrosion observed at base of rafter beam
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-64
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-65
Probe R-2
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-66
Photo 37 – Truss arch top chord framing into exterior wall
Photo 38 – Channel above granite block providing base plate
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-67
Photo 39 – Corrosion observed at steel rafter beam
Photo 40 - Corrosion determined to be severe. Drill bit pushed through beam web by hand
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-68
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-69
Probe R-3
Photo 41 – Probe through plaster ceiling at infilled original skylight
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-70
Photo 42 – View up roof above plaster ceiling
Photo 43 - Original steel rafter beams for skylight
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-71
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-72
Probe R-4
Photo 44 – Same geometry observed as that at Probe R-2
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-73
Photo 45 – Base of roof truss arch
Photo 46 – Terra cotta ceiling penetrated for exhaust pipe
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-74
Truss Arch Base Detail
Photo 47 – Base of roof truss arch
Photo 48 – View down truss arch base toward 4th Floor
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-75
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-76
Core 3-1
Photo 49 – Core hit steel beam below
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-77
Photo 50 – Core removed and measured
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-78
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-79
Core 4-1
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-80
Photo 51 – Large core through terrazzo and fill, then small core through concrete to terra cotta
Photo 52 – Cores removed and measured
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-81
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-82
Basement
Photo 53 – Manhole cover
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-83
Photo 54 – Brick arch observed
Photo 55 – Tie rod observed
Photo 56 – Open crawl space area
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-84
Roof Investigations
Photo 57 – Roof truss arches meeting at apex of roof in North Wing
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-85
Photo 58 – Base of roof truss arch in North Wing
Photo 59 – Terra cotta and steel beams above hung ceiling at low roof in central building area
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-86
Photo 60 – Low roof truss with triangular shape to create roof slope
Photo 61 – Roof barrel vault above and north of sallyport
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-87
Photo 62 – Ventilation shaft south of elevator shaft (photo looking up)
Photo 63 – Lattice column at ventilation shaft southeast corner
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-88
Photo 64 – Roof truss bearing at southeast elevator shaft corner, above level of dropped ceiling
Photo 65 – Water tank located in south wing low roof area
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-89
Photo 66 – Steel lintel replacing arch in bearing wall over main corridor
Exterior Envelope Survey
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-90
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-91
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-92
Photo 67 – Balcony at south side of building
Photo 68 – Crack observed in underside of balcony at support. Crack is also visible from above.
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-93
Photo 69 – Deteriorated brick observed behind flashing at parapet
Photo 70 – Roof parapets showing flashing and staining
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-94
Photo 71 – Areaway walls surrounding building
Photo 72 – Areaway wall viewed from parking lot
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO J-1
J
COUPON RESULTS
DRAFT Field Investigation Report Page 2 August 20, 2014 ROBERT SILMAN ASSOCIATES
Field Investigation Report – DRAFT
APPENDIX J – Coupon Results
October 17, 2014
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOJ-2
REPORT NO. F14359-REV1
WELDABILITY AND MECHANCIAL PROPERTY
DETERMINATION OF STEEL COUPONS
WEST POINT PERSHING BARRACKS
RSA PROJECT NO. 16034
ROBERT SILMAN ASSOCIATES
SEPTEMBER 9, 2014
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO J-3
September 9, 2014
Report No. F14359-Rev 1
Robert Silman Associates 32 Old Slip, 10th Floor New York, NY 10005
Attention: Mr. Michael Chiodo, P.E.
Subject: WELDABILITY AND MECHANICAL PROPERTY DETERMINATIONS
OF STEEL COUPONS WEST POINT PERSHING BARRACKS RSA
PROJECT NO. NO. 16034
1.0 INTRODUCTION
LPI was requested by Robert Silman Associates to provide engineering services in determining the weldability of two steel coupons removed from structural members from the Pershing Barracks on the campus of the West Point Military Academy, in West Point, NY. A third coupon from the Pershing Barracks was submitted for a determination of mechanical properties. We were advised that the Pershing Barracks were built in the 1890’s. In this regard, if should be noted that there were no universal governing standards for steel composition for this vintage material.
2.0 WORK SCOPE
To this end, LPI performed visual examination, chemical analysis, metallography, and weldability determination on the submitted steel coupons.
3.0 PROCEDURES AND OBSERVATIONS
3.1 Visual Examination
The submitted coupons, shown in the as-received condition in Fig. 1, were identified as Room No.16, Room No. 20, and Steam Room. Arrows on the wrapping materials identified the longitudinal direction of the structural members from which the coupons were removed, as show in Fig. 1. The coupons from
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOJ-4
Robert Silman Associates September 9, 2014 Attention: Mr. Michael Chiodo, P.E. Report No. F14359-Rev 1
Room Nos. 16 and 20 consisted of saw cut square sections, as shown in Fig. 2.
The coupon identified as Room No. 16 measured 1.5 in. long x 1.8 in. wide and varied in thickness from 0.60 to 0.80 in. The coupon identified as Room No. 20 measured 1.9 in. long x 2.1 in. wide and varied in thickness from 0.45 to 0.75 in.
The coupon identified as Steam Room measured 6.25 in. long x 1.60 in. wide and varied in thickness from 0.60 to 0.80 in.
3.2 Chemical Analysis
Compositions of the coupons were determined by direct reading atomic emissions spectroscopy. Results of the analysis, given in Table 1, revealed that both coupons did not conform to the compositional limits of ASTM A36, “Standard Specification for Carbon Structural Steel” with phosphorous and sulfur in excess of that specified.
TABLE 1
CHEMICAL ANALYSIS RESULTS (WT, %)
Element Per ASTM A36 Room No. 16 Room No. 20 B - 0.0014 0.0022 C 0.26 Max 0.096 0.11 Cr - 0.001 0.001 Cu - 0.046 0.045 Mn - 0.57 0.57 Mo - <0.001 <0.001 Ni - 0.036 0.037 P 0.04 Max 0.058 0.051 S 0.05 Max 0.056 0.077 Si 0.40 Max <0.001 <0.001 V - 0.008 0.006
3.3 Tensile Testing
One 0.505 in. round tensile specimen was machined from the sample identified as the Steam Room and tested in accordance with ASTM A370, “Standard Test Methods and Definitions for Mechanical Testing of Steel Products”. For the sake of comparison, the results of the testing, presented in Table 1, revealed that the sample from the Steam Room conformed to the mechanical properties specified for ASTM A36 grade structural steel.
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO J-5
Attention: Mr. Michael Chiodo, P.E. Report No. F14359-Rev 1
TABLE 2
TENSION TESTING RESULTS
Sample Yield Strength (ksi) Tensile Strength (ksi) Elongation (%) Steam Room 36.0 59.0 34.6
Per ASTM A36 36 Min 58 – 80 21 min
3.4 Metallographic Examination
One longitudinal microspecimen was prepared from the coupons identified as Room Nos. 16 and 20 in accordance with standard metallographic procedures. As shown in Fig. 3, suitable etching revealed the general microstructures of coupons from Rooms No. 16 and 20 consisted of pearlite in a ferrite matrix. Both microstructures were considered typical of plain carbon structural steel.
3.5 Weldability Determination
The weldability of each coupon was determined by the carbon equivalent (CE) method according to the following equation:
CE = C + (Mn)/6 + (Cr+Mo+V)/5 + (Ni+Cu)/15 (1)
The CE’s of the coupons from Room Nos. 16 and 20 were 0.198 and 0.212, respectively. With CEs between 0.2 and 0.3 and actual carbon content (wt%) on the order of 0.1, the hydrogen control method is recommended. By this method, the estimated preheat necessary to allow enough hydrogen to diffuse out of the joint and prohibit cracking is determined using the compositional parameter (PCM) as follows:
PCM = C + Si/30 + Mn/20 + Cu/20 + Ni/60 + Cr/20 + Mo/15 + V/10 + 5B (2)
The PCM’s of the coupons from Room Nos. 16 and 20 were 0.135 and 0.153, respectively. The PCM’s and thicknesses of the coupons were used to determine the minimum preheat and interpass temperatures. Taking into consideration that it is an existing structure being modified and assuming E70XX low hydrogen welding electrodes will be utilized, the recommended minimum preheat and interpass temperatures were determined to be 65°F.
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOJ-6
Attention: Mr. Michael Chiodo, P.E. Report No. F14359-Rev 1
4.0 CONCLUSIONS AND RECOMMENDATIONS
Results of this analysis revealed that the coupons from coupons from Room Nos. 16 and 20 did not conform to the compositional requirements of ASTM A36 structural steel due to the presence of phosphorous and sulfur contents in excess of that specified. The mechanical properties of the coupon from the Steam Room conformed to those specified for A36 structural steel.
The microstructures of the coupon materials consisted of grains of ferrite and pearlite, consistent with plain carbon steel. Based upon carbon equivalent calculations, the coupons were determined to be readily weldable using E7018 low hydrogen electrodes with minimum preheat and interpass temperatures of 65°F. That the phosphorous and sulfur likely exceed that specified for ASTM A36, strict compliance to preheat and interpass temperatures must be assured to preclude hot cracking during welding.
Respectfully submitted, LPI, INC.
John F. Sculac Principal Engineer
Joseph P. Crosson, P.E.
Principal
JFS:JPC/P:Projects/2014/F14359-Report-RSilmanAssoc–Weldability&TensileofSteelCoupons–PershingBarracksWPMA
This report is rendered upon the condition that it is not to be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special permission in writing. Be advised that all materials submitted for evaluation will be retained for six months. After such time, all material will be discarded unless otherwise notified in writing to retain beyond six months.
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO J-7
Attention: Mr. Michael Chiodo, P.E. Report No. F14359-Rev 1
Fig. 1 Two views showing the three submitted test coupons in the as-received condition. The arrows indicate the longitudinal direction of the beams from which the samples were removed.
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOJ-8
Attention: Mr. Michael Chiodo, P.E. Report No. F14359-Rev 1
Fig. 2 Two views showing the submitted test coupons with the arrows indications their orientation with respect to the longitudinal direction of the beams from which they were removed.
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO J-9
Attention: Mr. Michael Chiodo, P.E. Report No. F14359-Rev 1
Fig. 3 The general microstructure of sample from Room No. 16 (upper) and Room No. 20 (lower) consisted of pearlite colonies in a ferrite matrix typical of plain carbon structural steels.
Room No. 20
Room No. 16
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOJ-10
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO L-1
L
THERMAL IMAGING
INVESTIGATION REPORT
Appendix D – Thermal Imaging
Report
L
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOL-2
Atkinson-Noland & Associates 2619 Spruce Street 32 Old Slip, 10th Floor Consulting Engineers Boulder, CO 80302 New York, NY 10005 www.ana-usa.com 303.444.3620 917.647.9530
PROJECT REPORT
THERMAL IMAGING INVESTIGATION REPORT
PERSHING BARRACKS
WEST POINT, NY
ANA Job #: 14-099
Prepared by:
Atkinson-Noland & Associates, Inc.
32 Old Slip, 10th Floor New York, NY 10005 917-647-9530
Prepared for:
Robert Silman Associates.
32 Old Slip, 10th Floor New York, NY 10005
December 23, 2014
INTRODUCTION
Thermal imaging, also referred to as infrared thermography (IRT), was carried out by Atkinson- Noland & Associates (ANA) at the Pershing Barracks at the U.S. Military Academy at West Point. Carlo Citto of ANA was on site November 20, 2014 to conduct the field work.
The objective of the thermal imaging was to detect moisture variations in the façade, the presence of thermal bridging or air exfiltration, or possibly detect previous alterations if they impacted the exterior wall cross section. This report describes the investigation methods, locations evaluated, and the results of the investigations.
THERMAL IMAGING INVESTIGATION
A FLIR T420 thermal imaging camera was used to evaluate the exterior building envelop at the Pershing Barracks. An infrared camera measures and images the emitted infrared radiation from an object. Among others parameters, the emitted radiation is function of the object surface temperature. Thermal imaging was used to detect moisture variations in the exterior walls, the presence of thermal bridging or air infiltration, or possibly detect previous structural alterations
PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO L-3
IRT Investigation 2 Atkinson-Noland & Associates, Inc. December 23, 2014 to the exterior walls. These events, if present, are likely to produce differences in temperature distribution at the surface of the wall that are captured by an infrared camera.
Documentation Methodology and Observations The thermal imaging of each building elevation was conducted primarily from ground level.
Portions of the north and west elevations were also surveyed from the roof of the adjacent buildings. The back surface of most parapets and the west and south walls of the clock tower were surveyed from the building roof. Most of the thermal images were taken at an angle with respect to the wall surface due to the vicinity of the adjacent buildings.
Temperatures below freezing were recorded at the Stewart International Airport in Newburgh, NY the night before the investigation.
This is the start of the file's text. The full file is on GovTribe.