Amendment_0003_Pershing_AppendicesRV.pdf

PDF 32 MB Posted

Attached to
Pershing Barracks Renovation/Modernization, West Point New York Federal contract opportunity
Solicitation number
W912DS-16-B-0010
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

Amendment 0003_Pershing_AppendicesRV

View the file

Other files for this federal contract opportunity

Other files attached to Pershing Barracks Renovation/Modernization, West Point New York, newest first.
File Type Posted
Bid_Abstract.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0005_Project_Table_of_Contents_IFB_final.pdf PDF
Amendment_0005_Sections_Specsrr.pdf PDF
Amendment_0005_PERSHING_DRAWINGS2.pdf PDF
Amendment_0005_CD101_-_Exhibit_-_Temporary_Fence.pdf PDF
W912DS-16-B-0010-Amendment_0004.pdf PDF
Amendment_0003_Historical_Pictures.pdf PDF
Amendment_0003_Drawings.pdf PDF
Amendment_0003_03_30_00_Cast_In_Place_Concrete.pdf PDF
Amendment_0003.pdf PDF
Amendment_0003_West_Point_J As.pdf PDF
Amendment_0003_Pershing_Field_Investigation_Report.pdf PDF
B-1_Pershing_751_Framing_plbg_roof.pdf PDF
Pershing_738_740_751_Repair Shower Rooms.pdf PDF
6833.tif TIF image
Amendment_0002_Site_Visit_Sign_In_Sheet.pdf PDF
Amendment_0002.pdf PDF
7687-5942.tif TIF image
B-7_Pershing_751_painting.pdf PDF
36993_00751_01.dwg DWG drawing
Amendment_0002_Geotechnical_Evaluation.pdf PDF
36993_00751_04.dwg DWG drawing
Pages from C-6_Pershing_751_fixtures_roof plan_windows.pdf PDF
1261.tif TIF image
7687-5941.tif TIF image
A-1_Pershing_751_Maint and Repairs.pdf PDF
LIFE SAFETY Pages from A-1_Pershing_751_Maint and Repairs 1.pdf PDF
36993_00751_02.dwg DWG drawing
C-7_Pershing_751_flooring_painting.pdf PDF
7687-5945.tif TIF image
7687-5940.tif TIF image
B-6_Pershing_751_Floor_roof plans.pdf PDF
36993_00751_L1.dwg DWG drawing
Amendment_0002_Asbestos_Report.pdf PDF
9189.tif TIF image
A-7_Pershing_751_acoustics_elec.pdf PDF
36993_00751_03.dwg DWG drawing
Amendment_0001_Section_28_08_10.pdf PDF
PLANS_Pages_51-100rd.pdf PDF
PLANS_Pages_251-320.pdf PDF
PLANS_Pages__151-200.pdf PDF
PLANS_Pages_101-150.pdf PDF
PLANS_Pages_201-250.pdf PDF
PLANS_Pages_1-50.pdf PDF
W912DS-16-B-0010.pdf PDF
2016_0608_Pershing_IFB_Specs_Volume_1R.pdf PDF
2016_0608_Pershing_IFB_Specs_Volume_2.pdf PDF
Show all 50

Pershing Barracks Renovation/Modernization, West Point New York has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDICES

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO

APPENDIX A WEST POINT DESIGN QUALITy CONTROL PLAN ....................A-1 APPENDIX B DISCIPLINE CHECKLISTS ...........................................................B-1

APPENDIX C ATKINS RESUméS .......................................................................C-1 APPENDIX D DD FORm 1391 ............................................................................D-1 APPENDIX E AS-BUILT DRAWING EXCERPTS ................................................E-1 APPENDIX F POINT CLOUD SURVEy ............................................................... F-1 APPENDIX G HAzARDOUS mATERIAL TESTING ............................................ G-1

APPENDIX H SURFACE PENETRATING RADAR RESULTS .............................H-1

APPENDIX I PROBE AND CORE RESULTS ...................................................... I-1 APPENDIX J COUPON RESULTS ...................................................................... J-1 APPENDIX K LIFE SAFETy/CODE ANALySIS ..................................................K-1 APPENDIX L THERmAL ImAGING INVESTIGATION REPORT ......................... L-1 APPENDIX m PROPOSED LAyOUTS ................................................................ m-1 e3enmjas Cross-Out e3enmjas Cross-Out e3enmjas Cross-Out

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO E-1

E

AS-BUILT DRAWING

EXCERPTS

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOE-2

THIS PAGE INTENTIONALLY LEFT BLANK files provided in an amendmnet

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-1

F

POINT CLOUD SURVEY

Point Cloud – Revit Coordination

Pershing Barracks

USMA West Point

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-2

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review and Revit Integrating: Exterior

Point CloudUpdated Revit Model + Point CloudUpdated Revit Model

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review and Revit Integrating: Exterior

Point CloudUpdated Revit Model + Point CloudNew phase windows update as per existing windows size and location

New phase window location before update

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-3

Point Cloud Files Review and Revit Integrating: Exterior

Point CloudUpdated Revit Model + Point CloudNew phase windows update as per existing windows size and location

New phase window location after update

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review and Revit Integrating: Roof Exterior

Point CloudUpdated Revit Model + Point CloudUpdated Revit Model

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-4

Point Cloud Files Review and Revit Integrating: Roof Exterior

Previous Revit ModelPrevious Revit Model + Point CloudUpdated Revit Model + Point CloudUpdated Revit Model

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Previous revit modelPrevious Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-5

Point Cloud Files Review and Revit Integrating: Roof Exterior

Updated Revit modelPrevious Revit modelPrevious Revit ModelPrevious Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Previous Revit ModelPrevious Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-6

Previous Revit ModelPrevious Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model

Point Cloud Files Review and Revit Integrating: Roof Exterior

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review and Revit Integrating: Roof Parapet

Point Cloud

View 01

View 02

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-7

Point Cloud Files Review and Revit Integrating: Roof Parapet

Point Cloud

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review and Revit Integrating: Roof Parapet

Point Cloud + Updated Revit Model

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-8

Point Cloud Files Review and Revit Integrating: Roof Parapet

Updated Revit Model

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review and Revit Integrating: Roof Parapet

Point Cloud

View 01 View 02

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-9

Point Cloud Files Review and Revit Integrating: Roof Parapet

Point Cloud + Updated Revit Model

View 01 View 02

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review and Revit Integrating: Roof Parapet

Updated Revit Model

View 01 View 02

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-10

Point Cloud Files Review and Revit Integrating: Roof Parapet

Point Cloud

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review and Revit Integrating: Roof Parapet

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-11

Point Cloud Files Review and Revit Integrating: Roof Parapet

Updated Revit Model

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review & Revit Integrating: Structural Steel at Attic space

Point Cloud

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-12

Point Cloud Files Review & Revit Integrating: Structural Steel at Attic space

Point Cloud + Updated Revit Model

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review & Revit Integrating: Structural Steel at Attic space

Updated Revit Model

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-13

Point Cloud Files Review and Revit Integrating: Structural Steel

Point Cloud

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review and Revit Integrating: Structural Steel

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-14

Point Cloud Files Review and Revit Integrating: Structural Steel

Updated Revit Model

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-15

Point Cloud Files Review and Revit Integrating: Structural Steel

Point Cloud + Updated Revit Model

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-16

Point Cloud Files Review and Revit Integrating: Structural Steel

Point Cloud

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-17

Point Cloud Files Review and Revit Integrating: Structural Steel

Updated Revit Model

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-18

Point Cloud Files Review and Revit Integrating: Structural Steel

Point Cloud + Updated Revit Model

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-19

Point Cloud Files Review and Revit Integrating: Load bearing walls

Point Cloud + Revit Model

View 01

View 02

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review and Revit Integrating: Load bearing walls

Revit Model

View 01

View 02

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-20

Previous Revit model + Point Cloud

Point Cloud Files Review and Revit Integrating: Exterior Elevations

Updated Revit model + Point CloudUpdated Revit model

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Previous Revit model + Point CloudUpdated Revit model + Point Cloud

Point Cloud Files Review and Revit Integrating: Exterior Elevations

Updated Revit model

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-21

Point Cloud Files Review and Revit Integrating: Exterior Elevation

Previous Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Previous Revit model + Point Cloud

Point Cloud Files Review and Revit Integrating: Exterior Elevation

Updated Revit model + Point CloudUpdated Revit model

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-22

Previous Revit model + Point CloudUpdated Revit model + Point Cloud

Point Cloud Files Review and Revit Integrating: Exterior Elevation

Updated Revit model A

B

A B

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Previous Revit model + Point Cloud

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-23

Point Cloud Files Review and Revit Integrating: Exterior Elevation

Updated Revit modelPrevious Revit model + Point CloudUpdated Revit model + Point Cloud

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Updated Revit modelPrevious Revit model + Point CloudUpdated Revit model + Point Cloud

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-24

Point Cloud Files Review and Revit Integrating: Basement Level

Previous Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review & Revit Integrating: Basement Level

Previous Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-25

Point Cloud Files Review and Revit Integrating: Load bearing walls

Point Cloud

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review and Revit Integrating: Load bearing walls

Updated Revit Model + Point Cloud

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-26

Point Cloud Files Review and Revit Integrating: Load bearing walls

Point Cloud

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review and Revit Integrating: Load bearing walls

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-27

Point Cloud Files Review and Revit Integrating: Load bearing walls

Point Cloud and stair 3 and 4 load bearing walls comparison

Section - Stair 3 Walls Section - Stair 4 Walls

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review and Revit Integrating: Stairs

Point CloudUpdated Revit Model + Point CloudUpdated Revit Model + Point Cloud Updated Revit Model

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-28

Previous Revit model + Point Cloud

Point Cloud Files Review and Revit Integrating: Basement Level

Updated Revit model + Point CloudUpdated Revit model

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Previous Revit model + Point Cloud

Point Cloud Files Review and Revit Integrating: Basement Level

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO F-29

Previous Revit model + Point Cloud

Point Cloud Files Review and Revit Integrating: Basement Level

Updated Revit model + Point CloudUpdated Revit model

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Point Cloud Files Review and Revit Integrating: Basement Level

Previous Revit model + Point CloudUpdated Revit model + Point CloudUpdated Revit model

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOF-30

Point Cloud Files Review and Revit Integrating: 2nd Floor Corridor

Updated Revit modelPrevious Revit model + Point CloudUpdated Revit model + Point Cloud

USMA WEST POINT – Pershing Barracks – Point Cloud Comparison

Thank You…

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO G-1

G

HAZARDOUS MATERIAL

TESTING

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOG-2

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO G-3

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOG-4

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO G-5

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOG-6

SEE PT5236CE-01-11-14 for Hazardous Abatement test posted in amend 2

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-1

H

Pershing Dormitory West Point Military Academy

West Point, NY

Field Investigation Report

DRAFT

Appendix A – Surface Penetrating

Radar Report

March 3, 2015

SURFACE PENETRATING

RADAR RESULTS

H

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOH-2

Atkinson-Noland & Associates 2619 Spruce Street 32 Old Slip, 10th Floor Consulting Engineers Boulder, CO 80302 New York, NY 10005 www.ana-usa.com 303.444.3620 917.647.9530

PROJECT REPORT

SURFACE PENETRATING RADAR INVESTIGATION REPORT

PERSHING BARRACKS

WEST POINT, NY

ANA Job #: 14-099

Prepared by:

Atkinson-Noland & Associates, Inc.

32 Old Slip, 10th Floor New York, NY 10005 917-647-9530

Prepared for:

Robert Silman Associates.

32 Old Slip, 10th Floor New York, NY 10005

August 18, 2014 Revised: December 23, 2014

INTRODUCTION

Surface Penetrating Radar (SPR) investigations were carried out by Atkinson-Noland & Associates (ANA) at the Pershing Barracks at the U.S. Military Academy at West Point.

Personnel involved in the site work included Carlo Citto and Zach Adkison of ANA. Field work was done during the period from July 21 to July 24, 2014. The objective of the nondestructive testing using SPR was to locate floor framing members and determine typical cross sections at each floor. Additional SPR investigations were carried out by Carlo Citto on November 20, 2014 during the thermal imaging investigation. The purpose of the additional radar work was to confirm previous observations at selected locations and investigate typical construction of selected walls.

This report describes the investigation methods, locations evaluated, and the results of the investigations.

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-3

SPR Investigation 2 Atkinson-Noland & Associates, Inc. August 18, 2014 (Rev. December 23, 2014)

SURFACE PENETRATING RADAR INVESTIGATION

SPR was used at Pershing Barracks to investigate floor framing and typical cross sections at each floor. The equipment used was a Geophysical Survey Systems Incorporated (GSSI) SIR-3000 ground penetrating radar unit with 1600 MHz antenna. The SPR method involves the transmission of high frequency electromagnetic radio (radar) pulses into the object of interest and measuring the time elapsed between transmission, reflection off a buried discontinuity, and reception back at a surface radar antenna. A pulse of radar energy is generated on a dipole transmitting antenna that is placed on the surface of the floor or wall. The resulting wave of electromagnetic energy propagates into the material where portions of it are reflected back to the surface at discontinuities. The discontinuities where reflections occur are usually created by changes in electrical properties of the underlying material. Void spaces, which may be encountered, will also generate significant radar reflections due to a significant change in radar wave velocity at the interface.

Calibration Calibration of the radar antenna to determine approximate depth was performed at destructive probe locations that were performed by others under the direction of Robert Silman Associates (RSA). Information from probes done at room 442, 443A, 346A, 238A and basement room 01 were used for the calibration. ANA observed only the probe opening at room 442. Observations at the other locations were provided by RSA.

Once the radar antenna is properly calibrated, SPR investigations can provide accurate information about the location and depth of embedded elements. Because materials typically encountered in construction have distinct reflections, SPR is also a reliable method to locate concealed elements. However, reconstructing a typical floor section is a complex process and requires a detailed interpretation of the radar traces. Typical floor construction at Pershing Barracks includes multiple layers of different materials with different dieletric constants and moisture content and this may affect the accuracy of the radar investigation. While the SPR survey provided detailed information about the floor construction, the estimated location (i.e.

depth) and typology of the elements comprising the structural floors may deviate from existing conditions.

Documentation Methodology and Observations At Pershing Barracks, 155 radar traces were collected by ANA. At each floor, SPR investigations were conducted at corridors, cadet rooms, and latrines. Locations were selected with the assistance of RSA. Radar traces collected along two orthogonal directions provided information about the framing direction of the floor beams. Using SPR, typical floor cross sections at each floor were reconstructed. Examples of radar profiles recorded during the field work are shown in Figure 1 through Figure 5. From these profiles, the distinctive elements of the floor system are clearly visible. A brief description of each floor section is provided below.

Appendix A provides detailed information about areas investigated and typical floor sections.

• North and south wings corridors o 2nd to 4th floor (except 3rd floor at north wing): terrazzo topping, setting bed with wire mesh, concrete filling, terra cotta flat arch between steel beams.

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOH-4

SPR Investigation 3 Atkinson-Noland & Associates, Inc. August 18, 2014 (Rev. December 23, 2014) o 3rd floor at north wing: terrazzo topping, setting bed with wire mesh, concrete fill between steel beams.

o 1st floor: terrazzo topping, setting bed with wire mesh, filling, masonry arch between steel beams.

• Main hall corridors o 3rd and 4th floors: terrazzo topping, setting bed with wire mesh, concrete filling, terra cotta flat arch between steel beams.

o 1st and 2nd floors: terrazzo topping, setting bed with wire mesh, filling, masonry arch between steel beams.

• North and south wings cadet rooms o 2nd to 4th floor: wood floor, concrete filling, terra cotta flat arch between steel beams.

o 3rd floor, rooms 345, 346, 348, and 350: the floor construction at these location was not investigated and may differ from typical construction.

o 1st floor: wood floor, filling, masonry arch between steel beams.

• Main wing cadet rooms o 3rd and 4th floors: wood floor, concrete filling, terra cotta flat arch between steel beams.

o 1st and 2nd floors: wood floor, filling, masonry arch between steel beams.

• North and south wings latrines o 2nd to 4th floor (except 3rd floor at north wing): floor tile, mortar bed with wire mesh (rebar mesh at showers), concrete filling, terra cotta flat arch between steel beams.

o 3rd floor at north wing: floor tile, mortar bed with wire mesh (rebar mesh at showers), concrete fill between steel beams.

o 1st floor: floor tile, mortar bed with wire mesh (rebar mesh at showers), filling, masonry arch between steel beams.

During the additional SPR work carried out on November 20, 2014, ANA investigated typical construction of selected partition walls along the main hall corridors on the 3rd and 4th floors. A limited investigation of the 1st floor exterior walls was also attempted from room 105. This investigation was not successful due to the metal lath in the plaster that covers the interior face of the wall. The presence of the metal lath prevented obtaining any information, with SPR, on the materials beyond the metal lath. The following partition walls were investigated:

• 4th floor o Wall between doors to rooms 433 and 435.

o Wall between doors to rooms 421 and 423.

o Wall between door to room 430 and adjacent column.

• 3rd floor o Wall between doors to rooms 333 and 335.

o Wall between doors to rooms 322 and 324.

o Wall between door to rooms 332 and 334.

Based on the investigation results, the partition walls appear to be 6” CMU walls with empty cells. An example of radar profile recorded at one of the corridor walls is shown in Figure 6.

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-5

SPR Investigation 4 Atkinson-Noland & Associates, Inc. August 18, 2014 (Rev. December 23, 2014)

Figure 1. Typical radar profile recorded at basement floor (radar trace #153). Visible reflections in the radar profile are from the steel beams, masonry arch and fill material (approximate location shown with black lines). Note the larger steel beam used at the left end of the image.

Figure 2. Typical radar profile recorded at 1ST floor cadet room (room 138, radar trace #50). Visible reflections in the radar profile are from the steel beams, wood floor, masonry arch, and fill material (approximate location shown with black lines).

STEEL BEAM

BOTTOM OF ARCH

BOTTOM OF FILL

STEEL BEAM BOTTOM OF ARCH BOTTOM OF FILL

BOTTOM OF

WOOD FLOOR

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOH-6

SPR Investigation 5 Atkinson-Noland & Associates, Inc. August 18, 2014 (Rev. December 23, 2014)

Figure 3. Typical radar profile recorded at 3RD floor corridor (room 351A, radar trace #21). Visible reflections in the radar profile are from the steel beams, wire mesh in the setting bed, concrete fill, and plaster ceiling with metal lath (approximate location shown with black lines).

Figure 4. Typical radar profile recorded at 4TH floor corridor (room 444A, radar trace #13). Visible reflections in the radar profile are from the steel beams, wire mesh in the setting bed, concrete slab, and terra cotta flat arch (approximate location shown with black lines).

STEEL BEAM

WIRE MESH IN

SETTING BED

BOTTOM OF

CONCRETE FILL

PLASTER CEILING

WITH METAL LATH

STEEL BEAM WIRE MESH IN

SETTING BED

BOTTOM OF

CONCRETE SLAB

BOTTOM OF TERRA

COTTA FLAT ARCH

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-7

SPR Investigation 6 Atkinson-Noland & Associates, Inc. August 18, 2014 (Rev. December 23, 2014)

Figure 5. Typical radar profile recorded at 4TH floor cadet room (room 442, radar trace #16). Visible reflections in the radar profile are from the steel beams, wood floor, concrete fill, and terra cotta flat arch (approximate location shown with black lines). Observations from a probe opening at this location were used to calibrate the radar antenna. The probe also revealed that the concrete fill is of low quality at this location.

Figure 6. Typical radar profile recorded at partition wall between doors to rooms 421 and 423 at 4th floor. Visible reflections in the radar profile are from the back of the wall (approximate location shown with black line) and the empty cells. The thickness of the wall is approximately 6 inches.

STEEL BEAM BOTTOM OF

WOOD FLOOR

BOTTOM OF

CONCRETE FILL

BOTTOM OF TERRA

COTTA FLAT ARCH

BACK OF WALL EMPTY CELL, TYP.

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOH-8

SPR Investigation 7 Atkinson-Noland & Associates, Inc. August 18, 2014 (Rev. December 23, 2014)

APPENDIX A

SPR INVESTIGATION RESULTS

Drawings Provided by Robert Silman Associates

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-9

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-11

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-13

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-15

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-17

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-19

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-21

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-23

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-25

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-27

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO H-29

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-1

I

Appendix B - Probe and Core Results

PROBE AND CORE

RESULTS

I

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-2

THIS PAGE INTENTIONALLY LEFT BLANK

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-3

5'-4" 14'-9"

Probe B-2, into ceiling

C3

Probe B-1, into ceiling, flush against exterior wall.

Coupon C3: 6.5"x1.5" segment out of north side of bottom flange, starting 3.5" from face of wall

Bottom of girder observed 14" below bottom of beam

Plate girder

5'-0", Typ.

11" rise in brick arches between steel beams. Beam flanges 5" wide.

Beams above arches

C1

12" brick bearing wall

Probe B-3, into wall. Beams north and south of wall are not in line.

Coupon C1: 2"x2" taken from bottom flange of steel beam, approx. 16" from brick bearing wall.

C2

Coupon C2: 2"x2" segment taken from bottom flange of steel beam, approx. 6" from face of wall. Brick arches observed to have 5" rise between beams.

Exposed tie rod observed between two beams

Typical rise in brick arches between steel beams observed to be 4"-5"

LEGEND

Indicates existing steel joist observed in floor above

Indicates existing steel girder observed in floor above

Indicates approximate probe location

Indicates existing masonry load bearing wall

Indicates steel coupon taken at locationC#

N

Notes:

1. This plan shows the First Floor beams.

Walls shown extend up from the Basement to the First Floor.

2. Beams are shown schematically, unless dimensioned.

3. Framing and walls shown in red are assumed due to symmetry, geometry, etc., but were not observed in field. See results from SPR survey for additional framing information.

Beams at 5'-0" o.c., Typ.

FIRST FLOOR FRAMING ON BASEMENT ARCHITECTURAL PLAN

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-5

4'-11" 14'-10"

Beams at 5'-5" o.c., typ.

Probe 1-1, into ceiling above

2'-6"

2'-6"

Probe 1-3, into First Floor from above.

Probe 1-2, into wall at edge of window opening

LEGEND

Indicates existing steel joist observed in floor above

Indicates existing steel girder observed in floor above

Indicates approximate probe location

Indicates existing masonry load bearing wall

Wall originally believed to be partition, but field investigation revealed to be bearing from basement to underside of fourth floor

N

Notes:

1. This plan shows the Second Floor beams.

Walls shown extend up from the First Floor to the Second Floor.

2. Beams are shown schematically, unless dimensioned.

3. Framing and walls shown in red are assumed due to symmetry, geometry, etc., but were not observed in field. See results from SPR survey for additional framing information.

Bulb tees observed at Second Floor stair landing, Typ.

SECOND FLOOR FRAMING ON FIRST FLOOR ARCHITECTURAL PLAN

Lintel observed replacing arch

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-7

LEGEND

Indicates existing steel joist observed in floor above

Indicates existing steel girder observed in floor above

Indicates approximate probe location

Indicates existing masonry load bearing wall

Indicates existing phoenix column observed in field

Indicates existing column of unknown shape and material, observed in field

Probe 2-1, into ceiling above at column, joist (E-W), and girder (N-S)

Probe 2-3, into Second Floor from above.

Probe 2-2, into ceiling above

Probe 2-4, into Wall at Ceiling, observed pier

Filler beam observed in Core 3-1 (Third Floor)

N

Notes:

1. This plan shows the Third Floor beams.

Walls shown extend up from the Second Floor to the Third Floor.

2. Beams are shown schematically, unless dimensioned.

3. Framing and walls shown in red are assumed due to symmetry, geometry, etc., but were not observed in field. See results from SPR survey for additional framing information.

THIRD FLOOR FRAMING ON SECOND FLOOR ARCHITECTURAL PLAN

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-9

Indicates existing steel joist observed in floor above

Indicates existing steel girder observed in floor above

Indicates approximate probe location

Indicates existing masonry load bearing wall

Indicates existing phoenix column observed in field

Probe 3-4, medicine cabinet removed to observe void space behind.

Probe 3-1, into exterior wall south of window

Probe 3-3, into wall and ceiling above

Probe 3-2, into masonry encasing phoenix column.

Core 3-1, into Third Floor from above. Located 1'-11" from partition wall to north.

'-6

.5

4'-11"

Steel beam observed in Fourth Floor at Probe 4-2

N

Girder revealed by Probe 3-3 believed to be tie beam for trusses above, not a bearing girder.

Notes:

1. This plan shows the Fourth Floor beams.

Walls shown extend up from the Third Floor to the Fourth Floor.

2. Beams are shown schematically, unless dimensioned.

3. Framing and walls shown in red are assumed due to symmetry, geometry, etc., but were not observed in field. See results from SPR survey for additional framing information.

C of w in do w

L

FOURTH FLOOR FRAMING ON THIRD FLOOR ARCHITECTURAL PLAN

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-11

Indicates existing steel joist observed in floor above

Indicates existing steel girder observed in floor above

Indicates approximate probe location

Indicates existing masonry load bearing wall

Indicates existing phoenix column observed in field

Indicates base of existing roof arch truss observed in field

AA

Beam centered between windows

Pier observed

CMU wall observed

BB

Probe 4-1, into base of wall at corner

CMU wall observed

Core 4-1, into Fourth Floor from above

Probe 4-2 into Fourth Floor from above.

See plan of Third Floor for beam located in Fourth Floor via this probe.

'-1

1.

5"

4'-11"

N

12.5"18"

Section A-A

14"35"

Section B-B

Notes:

1. This plan shows the Fourth Floor ceiling beams. Walls shown extend up from the Fourth Floor to the dropped ceiling above.

2. Beams are shown schematically, unless dimensioned.

3. Framing and walls shown in red are assumed due to symmetry, geometry, etc., but were not observed in field. See results from SPR survey for additional framing information. Finished ceiling

Cont. moveable partition wall track

FOURTH FLOOR FRAMING ON FOURTH FLOOR ARCHITECTURAL PLAN

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-13

~23'

Steel Bulb Tee, Typ.

around opening

Steel I-shape, Typ.

Truss arch, Typ.

Secondary Truss Arch

Note: continuous angle displaying some signs of corrosion observed at eave level of north and southeast roofs, between roof and walls.

Northwest Corner Roof

Northeast Corner Roof Southeast Corner Roof

Truss-bearing corbel

N

Notes:

1. This plan shows the Roof framing beams.

Walls shown extend up from the Fourth Floor to the Roof.

2. Beams are shown schematically, unless dimensioned.

3. Framing and walls shown in red are assumed due to symmetry, geometry, etc., but were not observed in field. See results from SPR survey for additional framing information.

LEGEND

Indicates existing steel joist observed in roof

Indicates existing steel arch truss observed in roof

Indicates approximate probe location

Indicates existing masonry load bearing wall

Roof opening framed out but closed over in previous renovation

Roof opening framed out but closed over in previous renovation, Typ.

ROOF FRAMING ON ROOF ARCHITECTURAL PLAN

Area of original skylight infilled with wood

Probe R-1, into wall at intersection of sloped roof beam and exterior wall

Probe R-2, into wall at intersection of roof truss top chord and exterior wall

Probe R-3, into infilled skylight at intersection of roof truss top chord and east-west roof beam

Steel I-shaped rafter beams spanning north-south, TYP. at each bay

15'-0"x8'-0" existing skylight infilled with tongue-in-groove precast concrete planks on 8" open web joists @ 30" o.c. east-west

Terra cotta flat arch spanning between steel beams, typical

Probe R-4, into wall at intersection of roof truss top chord and exterior wall

HI

HI

HI

HI

HI

HI

H I

HI

HI

HI

HI

HI

HI

HI

HI

HI

HI

HI

Beams marked "HI" observed at higher elevation than typical roof beams

Bulkhead above supported by elevator and ventilator shafts. Lattice column located at southeast corner of ventilator shaft

Water tank located under raised roof area

Sallyport wall ends above 4th floor at central corridor, replaced with built-up girder at high elevation

Terra cotta book tiles span between beams at mansard roof

Terra cotta book tiles span between beams at mansard roof

Lintel replaces arch

Steel lintel replaces arch

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-15

Probe B-1

Photo 1 – Probe location

Photo 2 – Steel beam supporting brick arch

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-16

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-17

Probe B-2

Photo 3 – Probe location

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-18

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-19

Photo 4 – Brick arch with wooden sleepers above

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-20

Probe B-3

Photo 5 – Probe location

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-21

Photo 6 – Brick bearing wall behind void space at back of glazed block wall

Photo 7 – Steel beam and brick arch

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-22

Probe 1-1

Photo 8 – Terra cotta block supported by steel beam; tie rod is also observed

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-23

Photo 9 – Location of probe

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-24

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-25

Probe 1-2

Photo 10 – Terra cotta bricks

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-26

Photo 11 - Probe location

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-27I-27

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-28

Probe 1-3

Photo 12 – Wooden floor, sleepers, and brick below

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-29

Photo 13 - Measurement to top of brick

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-30

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-31

Probe 2-1

Photo 14 – Obscure shaped column with beams framing in from either side

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-32

Photo 15 – Close up of column and beam connection

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-33

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-34

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-35

Probe 2-2

Photo 16 – Steel beam framing into column with double angle clip connection

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-36

Photo 17 – Close up of double clip, and channel below

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-37

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-39

Probe 2-3

Photo 18 – Probe drilled into floor through terrazzo finish

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-40

Photo 19 – Brick observed below terrazzo and fill

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-41

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-43

Probe 2-4

Photo 20 – Brick pilaster observed behind plaster-on-mesh wall finish

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-44

Probe 3-1

Photo 21 – Cores taken from drilling horizontally into wall

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-45

Photo 22 – Approximate depth of exterior wall

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-46

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-47

Probe 3-2

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-48

Photo 23 - Phoenix column observed

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-49

Photo 24 – Location of probe, from two sides of column

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-50

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-51

Probe 3-3

Photo 25 – Location of probe

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-52

Photo 26 – At least to bottom flanges of steel shapes observed, with terra cotta spanning parallel

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-53

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-54

Probe 3-4

Photo 27 - Location of probe behind medicine cabinet

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-55

Photo 28 – Void space behind medicine cabinet

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-56

Probe 4-1

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-57

Photo 29 - Location of probe

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-58

Photo 30 – Decorative base of column

Photo 31 – View up column from probe location

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-59

Probe 4-2

Photo 32 – Probe reveals steel beam supporting terra cotta floor structure

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-60

Photo 33 – Close-up of terra cotta and beam web

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-61

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-62

Probe R-1

Photo 34 – Steel rafter beam bearing on exterior wall

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-63

Photo 35 – Steel channel providing bearing surface at exterior wall

Photo 36 – Corrosion observed at base of rafter beam

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-64

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-65

Probe R-2

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-66

Photo 37 – Truss arch top chord framing into exterior wall

Photo 38 – Channel above granite block providing base plate

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-67

Photo 39 – Corrosion observed at steel rafter beam

Photo 40 - Corrosion determined to be severe. Drill bit pushed through beam web by hand

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-68

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-69

Probe R-3

Photo 41 – Probe through plaster ceiling at infilled original skylight

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-70

Photo 42 – View up roof above plaster ceiling

Photo 43 - Original steel rafter beams for skylight

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-71

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-72

Probe R-4

Photo 44 – Same geometry observed as that at Probe R-2

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-73

Photo 45 – Base of roof truss arch

Photo 46 – Terra cotta ceiling penetrated for exhaust pipe

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-74

Truss Arch Base Detail

Photo 47 – Base of roof truss arch

Photo 48 – View down truss arch base toward 4th Floor

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-75

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-76

Core 3-1

Photo 49 – Core hit steel beam below

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-77

Photo 50 – Core removed and measured

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-78

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-79

Core 4-1

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-80

Photo 51 – Large core through terrazzo and fill, then small core through concrete to terra cotta

Photo 52 – Cores removed and measured

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-81

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-82

Basement

Photo 53 – Manhole cover

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-83

Photo 54 – Brick arch observed

Photo 55 – Tie rod observed

Photo 56 – Open crawl space area

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-84

Roof Investigations

Photo 57 – Roof truss arches meeting at apex of roof in North Wing

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-85

Photo 58 – Base of roof truss arch in North Wing

Photo 59 – Terra cotta and steel beams above hung ceiling at low roof in central building area

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-86

Photo 60 – Low roof truss with triangular shape to create roof slope

Photo 61 – Roof barrel vault above and north of sallyport

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-87

Photo 62 – Ventilation shaft south of elevator shaft (photo looking up)

Photo 63 – Lattice column at ventilation shaft southeast corner

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-88

Photo 64 – Roof truss bearing at southeast elevator shaft corner, above level of dropped ceiling

Photo 65 – Water tank located in south wing low roof area

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-89

Photo 66 – Steel lintel replacing arch in bearing wall over main corridor

Exterior Envelope Survey

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-90

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-91

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-92

Photo 67 – Balcony at south side of building

Photo 68 – Crack observed in underside of balcony at support. Crack is also visible from above.

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO I-93

Photo 69 – Deteriorated brick observed behind flashing at parapet

Photo 70 – Roof parapets showing flashing and staining

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOI-94

Photo 71 – Areaway walls surrounding building

Photo 72 – Areaway wall viewed from parking lot

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO J-1

J

COUPON RESULTS

DRAFT Field Investigation Report Page 2 August 20, 2014 ROBERT SILMAN ASSOCIATES

Field Investigation Report – DRAFT

APPENDIX J – Coupon Results

October 17, 2014

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOJ-2

REPORT NO. F14359-REV1

WELDABILITY AND MECHANCIAL PROPERTY

DETERMINATION OF STEEL COUPONS

WEST POINT PERSHING BARRACKS

RSA PROJECT NO. 16034

ROBERT SILMAN ASSOCIATES

SEPTEMBER 9, 2014

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO J-3

September 9, 2014

Report No. F14359-Rev 1

Robert Silman Associates 32 Old Slip, 10th Floor New York, NY 10005

Attention: Mr. Michael Chiodo, P.E.

Subject: WELDABILITY AND MECHANICAL PROPERTY DETERMINATIONS

OF STEEL COUPONS WEST POINT PERSHING BARRACKS RSA

PROJECT NO. NO. 16034

1.0 INTRODUCTION

LPI was requested by Robert Silman Associates to provide engineering services in determining the weldability of two steel coupons removed from structural members from the Pershing Barracks on the campus of the West Point Military Academy, in West Point, NY. A third coupon from the Pershing Barracks was submitted for a determination of mechanical properties. We were advised that the Pershing Barracks were built in the 1890’s. In this regard, if should be noted that there were no universal governing standards for steel composition for this vintage material.

2.0 WORK SCOPE

To this end, LPI performed visual examination, chemical analysis, metallography, and weldability determination on the submitted steel coupons.

3.0 PROCEDURES AND OBSERVATIONS

3.1 Visual Examination

The submitted coupons, shown in the as-received condition in Fig. 1, were identified as Room No.16, Room No. 20, and Steam Room. Arrows on the wrapping materials identified the longitudinal direction of the structural members from which the coupons were removed, as show in Fig. 1. The coupons from

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOJ-4

Robert Silman Associates September 9, 2014 Attention: Mr. Michael Chiodo, P.E. Report No. F14359-Rev 1

Room Nos. 16 and 20 consisted of saw cut square sections, as shown in Fig. 2.

The coupon identified as Room No. 16 measured 1.5 in. long x 1.8 in. wide and varied in thickness from 0.60 to 0.80 in. The coupon identified as Room No. 20 measured 1.9 in. long x 2.1 in. wide and varied in thickness from 0.45 to 0.75 in.

The coupon identified as Steam Room measured 6.25 in. long x 1.60 in. wide and varied in thickness from 0.60 to 0.80 in.

3.2 Chemical Analysis

Compositions of the coupons were determined by direct reading atomic emissions spectroscopy. Results of the analysis, given in Table 1, revealed that both coupons did not conform to the compositional limits of ASTM A36, “Standard Specification for Carbon Structural Steel” with phosphorous and sulfur in excess of that specified.

TABLE 1

CHEMICAL ANALYSIS RESULTS (WT, %)

Element Per ASTM A36 Room No. 16 Room No. 20 B - 0.0014 0.0022 C 0.26 Max 0.096 0.11 Cr - 0.001 0.001 Cu - 0.046 0.045 Mn - 0.57 0.57 Mo - <0.001 <0.001 Ni - 0.036 0.037 P 0.04 Max 0.058 0.051 S 0.05 Max 0.056 0.077 Si 0.40 Max <0.001 <0.001 V - 0.008 0.006

3.3 Tensile Testing

One 0.505 in. round tensile specimen was machined from the sample identified as the Steam Room and tested in accordance with ASTM A370, “Standard Test Methods and Definitions for Mechanical Testing of Steel Products”. For the sake of comparison, the results of the testing, presented in Table 1, revealed that the sample from the Steam Room conformed to the mechanical properties specified for ASTM A36 grade structural steel.

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO J-5

Attention: Mr. Michael Chiodo, P.E. Report No. F14359-Rev 1

TABLE 2

TENSION TESTING RESULTS

Sample Yield Strength (ksi) Tensile Strength (ksi) Elongation (%) Steam Room 36.0 59.0 34.6

Per ASTM A36 36 Min 58 – 80 21 min

3.4 Metallographic Examination

One longitudinal microspecimen was prepared from the coupons identified as Room Nos. 16 and 20 in accordance with standard metallographic procedures. As shown in Fig. 3, suitable etching revealed the general microstructures of coupons from Rooms No. 16 and 20 consisted of pearlite in a ferrite matrix. Both microstructures were considered typical of plain carbon structural steel.

3.5 Weldability Determination

The weldability of each coupon was determined by the carbon equivalent (CE) method according to the following equation:

CE = C + (Mn)/6 + (Cr+Mo+V)/5 + (Ni+Cu)/15 (1)

The CE’s of the coupons from Room Nos. 16 and 20 were 0.198 and 0.212, respectively. With CEs between 0.2 and 0.3 and actual carbon content (wt%) on the order of 0.1, the hydrogen control method is recommended. By this method, the estimated preheat necessary to allow enough hydrogen to diffuse out of the joint and prohibit cracking is determined using the compositional parameter (PCM) as follows:

PCM = C + Si/30 + Mn/20 + Cu/20 + Ni/60 + Cr/20 + Mo/15 + V/10 + 5B (2)

The PCM’s of the coupons from Room Nos. 16 and 20 were 0.135 and 0.153, respectively. The PCM’s and thicknesses of the coupons were used to determine the minimum preheat and interpass temperatures. Taking into consideration that it is an existing structure being modified and assuming E70XX low hydrogen welding electrodes will be utilized, the recommended minimum preheat and interpass temperatures were determined to be 65°F.

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOJ-6

Attention: Mr. Michael Chiodo, P.E. Report No. F14359-Rev 1

4.0 CONCLUSIONS AND RECOMMENDATIONS

Results of this analysis revealed that the coupons from coupons from Room Nos. 16 and 20 did not conform to the compositional requirements of ASTM A36 structural steel due to the presence of phosphorous and sulfur contents in excess of that specified. The mechanical properties of the coupon from the Steam Room conformed to those specified for A36 structural steel.

The microstructures of the coupon materials consisted of grains of ferrite and pearlite, consistent with plain carbon steel. Based upon carbon equivalent calculations, the coupons were determined to be readily weldable using E7018 low hydrogen electrodes with minimum preheat and interpass temperatures of 65°F. That the phosphorous and sulfur likely exceed that specified for ASTM A36, strict compliance to preheat and interpass temperatures must be assured to preclude hot cracking during welding.

Respectfully submitted, LPI, INC.

John F. Sculac Principal Engineer

Joseph P. Crosson, P.E.

Principal

JFS:JPC/P:Projects/2014/F14359-Report-RSilmanAssoc–Weldability&TensileofSteelCoupons–PershingBarracksWPMA

This report is rendered upon the condition that it is not to be reproduced wholly or in part for advertising or other purposes over our signature or in connection with our name without special permission in writing. Be advised that all materials submitted for evaluation will be retained for six months. After such time, all material will be discarded unless otherwise notified in writing to retain beyond six months.

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO J-7

Attention: Mr. Michael Chiodo, P.E. Report No. F14359-Rev 1

Fig. 1 Two views showing the three submitted test coupons in the as-received condition. The arrows indicate the longitudinal direction of the beams from which the samples were removed.

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOJ-8

Attention: Mr. Michael Chiodo, P.E. Report No. F14359-Rev 1

Fig. 2 Two views showing the submitted test coupons with the arrows indications their orientation with respect to the longitudinal direction of the beams from which they were removed.

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO J-9

Attention: Mr. Michael Chiodo, P.E. Report No. F14359-Rev 1

Fig. 3 The general microstructure of sample from Room No. 16 (upper) and Room No. 20 (lower) consisted of pearlite colonies in a ferrite matrix typical of plain carbon structural steels.

Room No. 20

Room No. 16

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOJ-10

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO L-1

L

THERMAL IMAGING

INVESTIGATION REPORT

Appendix D – Thermal Imaging

Report

L

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUOL-2

Atkinson-Noland & Associates 2619 Spruce Street 32 Old Slip, 10th Floor Consulting Engineers Boulder, CO 80302 New York, NY 10005 www.ana-usa.com 303.444.3620 917.647.9530

PROJECT REPORT

THERMAL IMAGING INVESTIGATION REPORT

PERSHING BARRACKS

WEST POINT, NY

ANA Job #: 14-099

Prepared by:

Atkinson-Noland & Associates, Inc.

32 Old Slip, 10th Floor New York, NY 10005 917-647-9530

Prepared for:

Robert Silman Associates.

32 Old Slip, 10th Floor New York, NY 10005

December 23, 2014

INTRODUCTION

Thermal imaging, also referred to as infrared thermography (IRT), was carried out by Atkinson- Noland & Associates (ANA) at the Pershing Barracks at the U.S. Military Academy at West Point. Carlo Citto of ANA was on site November 20, 2014 to conduct the field work.

The objective of the thermal imaging was to detect moisture variations in the façade, the presence of thermal bridging or air exfiltration, or possibly detect previous alterations if they impacted the exterior wall cross section. This report describes the investigation methods, locations evaluated, and the results of the investigations.

THERMAL IMAGING INVESTIGATION

A FLIR T420 thermal imaging camera was used to evaluate the exterior building envelop at the Pershing Barracks. An infrared camera measures and images the emitted infrared radiation from an object. Among others parameters, the emitted radiation is function of the object surface temperature. Thermal imaging was used to detect moisture variations in the exterior walls, the presence of thermal bridging or air infiltration, or possibly detect previous structural alterations

PERSHING BARRACKS FIELD INVESTIGATION REPORT ║ FOUO L-3

IRT Investigation 2 Atkinson-Noland & Associates, Inc. December 23, 2014 to the exterior walls. These events, if present, are likely to produce differences in temperature distribution at the surface of the wall that are captured by an infrared camera.

Documentation Methodology and Observations The thermal imaging of each building elevation was conducted primarily from ground level.

Portions of the north and west elevations were also surveyed from the roof of the adjacent buildings. The back surface of most parapets and the west and south walls of the clock tower were surveyed from the building roof. Most of the thermal images were taken at an angle with respect to the wall surface due to the vicinity of the adjacent buildings.

Temperatures below freezing were recorded at the Stewart International Airport in Newburgh, NY the night before the investigation.