00902.pdf

PDF 40 KB Posted

Attached to
Site work for temporary hospital building Joplin MO
Solicitation number
W912DS-12-R-0002
Issued by

About this file

Amendment 0001 summary

View the file

Other files

File Type Posted
St John's Interim Hospital Dv Lay.pdf PDF
W912DS-12-R-0002 0008.pdf PDF
W912DS-12-R-0002 0007.pdf PDF
W912DS-12-R-0002 0006.pdf PDF
W912DS-12-R-0002 0005.pdf PDF
W912DS-12-R-0002 0004.pdf PDF
W912DS-12-R-0002 0003.pdf PDF
Site Visit - Sign-in Sheet - dtd 2011-10-25.pdf PDF
W912DS-12-R-0002 0002.pdf PDF
E505 ELECTRICAL DETAILS.pdf PDF
1980DR_E502.pdf PDF
1980DR_ES101.pdf PDF
1980DR_GI_CVR.pdf PDF
26 20 00.pdf PDF
63095_Site_Add01.pdf PDF
22 00 70.pdf PDF
W912DS-12-R-0002 0001.pdf PDF
10 14 01.pdf PDF
33 40 00.pdf PDF
00901.pdf PDF
33 70 02.00 10.pdf PDF
63095_Site_Final_Specs.pdf PDF
63095_Site_Final_Dwgs.pdf PDF
W912DS-12-R-0002.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

St. John’s Interim Hospital Site Design

SECTION 00902

SUMMARY OF CHANGES

FOR

CONSTRUCTION DRAWINGS AND SPECIFICATIONS

ISSUED IN AMENDMENT 1

(FOR INFORMATIONAL PURPOSES ONLY)

St. John’sTemporary Hospital Facility 14 October, 2011 Joplin, MO ADDENDUM No. 1 – Page 1 of 8

ADDENDUM No. 01

St. John’s Temporary Hospital Facility Site Development Package

1980DR-MO-COE-NPD-07-TO#6

DRAWING MODIFICATIONS

GI-CVR TITLE SHEET AND INDEX

1. Updated drawing index to include Way Finding Drawings

G1000 GENERAL, ACCESS AND STAGING NOTES

1. Modified Note 3 of IV Excavation and Trenches, to remove “flashing red lights” requirement.

G1001 SITE AND UTILITY NOTES

1. Added utility company contacts information

G1002 LEGEND AND ABBREVIATIONS

1. Updated legends and abbreviations list

GC101 EXISTING CONDITIONS

1. Added survey benchmark information

2. Added building foundation footprint coordinates

3. Modified aggregate hatch pattern

GC102 ACCESS AND STAGING PLAN

1. Modified aggregate hatch pattern

GC103 PHASING PLAN

1. Added drawing in its entirety

CD100 DEMOLITION PLAN

1. Separated pavement removal into two phases, based on Hospital equipment removal timeframe

CP100 OVERALL SITE PLAN

1. Increased parking lot entrance radii

2. Added existing parking striping

CP101 LAYOUT PLAN SHEET 1 OF 4

1. Updated spot locations

2. Added curve information

3. Adjusted text and callouts for improved drawing clarity

Joplin, MO ADDENDUM No. 1 – Page 2 of 8

CP102 LAYOUT PLAN SHEET 2 OF 4

1. Updated spot locations

2. Added curve information

4. Added existing parking lot striping for reference.

CP103 LAYOUT PLAN SHEET 3 OF 4

CP104 LAYOUT PLAN SHEET 4 OF 4

CP105 LAYOUT COORDINATES

1. Updated and added point information

CP200 OUTER ROAD ALIGNMENT PLAN

1. Updated background for radii adjustment

CP201 ROAD PROFILE SHEET 1 OF 3

1. Added cross slope information

CP202 ROAD PROFILE SHEET 2 OF 3

1. Added cross slope information

CP203 ROAD PROFILE SHEET 3 OF 3

1. Added cross slope information

CS101 SITE PLAN SHEET 1 OF 4

1. Added bollards at bulk oxygen facility and trash enclosure

2. Removed curve information

4. Added parking blocks at handicap spaces

CS102 SITE PLAN SHEET 2 OF 4

1. Added valley gutter at intersection of outer road and St. John’s Blvd

2. Removed curve information

CS103 SITE PLAN SHEET 3 OF 4

1. Adjusted asphalt limits to extend one foot beyond the helipad security fence

2. Added “Emergency Vehicle Only” signs at ambulance entrances

3. Removed curve information

4. Adjusted text and callouts for improved drawing clarity

Joplin, MO ADDENDUM No. 1 – Page 3 of 8

CS104 SITE PLAN SHEET 4 OF 4

1. Added valley gutter at intersection of outer road and St. John’s Blvd

2. Removed curve information

CS105 ENLARGEMENT PLAN

1. Added drawing in its entirety. Added enlargement site and elevation plans of sidewalk ramp are-as.

CG100 OVERALL GRADING PLAN

1. Removed Project-Specific Grading Note 1

2. Relabeled Project Note 2 as General Grading Note 9

3. Added General Grading Note 10 to state that slopes from outer road to existing grade to be 4:1.

4. Relabeled “Note” 1 to General Grading Note 11.

5. Adjusted text and callouts and removed extraneous graphics for improved drawing clarity

CG101 GRADING PLAN SHEET 1 OF 4

1. Adjusted modular wall grades to reflect top of wall elevations and finish grade below the top at wall face.

2. Moved flared end section to toe of slope and adjusted surrounding grading

3. Adjusted text and callouts and removed extraneous graphics for improved drawing clarity

CG102 GRADING PLAN SHEET 2 OF 4

1. Adjusted text and callouts and removed extraneous graphics for improved drawing clarity

CG103 GRADING PLAN SHEET 3 OF 4

1. Adjusted modular wall grades to reflect top of wall elevations and finish grade below the top at wall face.

2. Moved flared end section to toe of slope and adjusted surrounding grading

CG104 GRADING PLAN SHEET 4 OF 4

1. Removed manhole, curb inlet, and flared end section symbols at outer road entrance, since this storm line was relocated.

2. Adjusted text and callouts and removed extraneous graphics for improved drawing clarity

CG105 EROSION CONTROL PLAN SHEET 1 OF 4

1. Added contour labels

2. Removed extraneous graphics for improved drawing clarity

CG106 EROSION CONTROL PLAN SHEET 2 OF 4

CG107 EROSION CONTROL PLAN SHEET 3 OF 4

Joplin, MO ADDENDUM No. 1 – Page 4 of 8

CG108 EROSION CONTROL PLAN SHEET 4 OF 4

1. Removed curb inlet drain filter and FES/RipRap at outer road entrance, since this storm line was relocated.

2. Added contour labels

3. Removed extraneous graphics for improved drawing clarity

JP101 PAVEMENT JOINTING AND ELEVATION PLAN SHEET 1 OF 2

1. Updated Grid 1 perimeter joints

2. Updated Grid 3 pcc/retaining wall joint

JP102 PAVEMENT JOINTING AND ELEVATION PLAN SHEET 2 OF 2

1. Removed extraneous graphics for improved drawing clarity

CU100 OVERALL UTILITY LAYOUT

1. Added detention chamber storage volumes and detention notes.

2. Revised storm system on the west side of the site to reflect relocation of Storm Line 2.

3. Revised communication lines layout on west side of the building.

4. Relocated the RPZ on the domestic water service line and added a heated enclosure for the

RPZ.

5. Revised the sanitary sewer service lines on the sanitary main on the east side of the site.

6. Added Note 4 for Hot water piping specification location and Note 5 to state building utility inter-face distance of 5 feet from foundation.

CU101 UTILITY PLAN SHEET 1 OF 4

1. Revised sanitary sewer service connections to sewer main to add service connections to all 3 building wings. All connections to the main are now shown as tees in lieu of wyes previously shown.

CU102 UTILITY PLAN SHEET 2 OF 4

1. Added Notes 3 and 4 in regard to water distribution installation responsibilities.

2. Relocated the RPZ on the domestic water service line next to the building and added Note 5 to include RPZ information, concrete pad and heated enclosure for the RPZ.

CU103 UTILITY PLAN SHEET 3 OF 4

1. Extended 1.5 inch water service line for the Johnson Portable Units to within 5 foot of the build-ing.

2. Adjusted Storm Line 3 away from building to allow room for roof drain connection fittings.

3. Relocated Storm Line 2, from the detention cell, to the south in lieu of the west as previously shown.

4. Lengthened Storm Line 5 to match toe of revised slope.

5. Realigned communication lines to central junction box for entry into the building on the west face.

CU104 UTILITY PLAN SHEET 4 OF 4

1. Relocated Storm Line 2 from the west side of the site near the access road entrance to the south side of the detention cell and extending south to valley on the west side of the helipad.

2. Relocated Curb Inlet, Structure SDI 5.

CU201 STORM PROFILE SHEET 1 OF 5

1. Revised profiles to reflect the relocation of Storm Lines 1 and 2

Joplin, MO ADDENDUM No. 1 – Page 5 of 8

CU202 STORM PROFILE SHEET 2 OF 5

1. Added note to state that Storm Inlet, SDI 6, is to be incorporated into the detention cell design.

CU203 STORM PROFILE SHEET 3 OF 5

1. Adjusted Storm Line 5 profile to lengthen pipe to match revised toe of slope.

CU204 STORM PROFILE SHEET 4 OF 5

1. Added foundation locations for reference in profiles.

CU205 STORM PROFILE SHEET 5 OF 5

1. Adjusted and relabeled Storm Line 10 for additional pipe to end at toe of revised slope.

2. Added foundation location for reference.

CU206 SANITARY PROFILE

1. Revised profile to reflect pipe lengths from manhole to manhole. Added service connections for the 3 building wings.

CS501 MISCELLANEOUS SITE DETAILS

1. Detail 2 - Added double-swing gate width requirement

2. Detail A - Removed removable guard post concrete fill requirement

3. Detail 4 - Removed privacy fence manufacturer requirement

4. Detail 5 - Added Precast Concrete Parking Block detail

CS502 SITE DETAILS

1. Detail 2 - Added trash enclosure curb and gutter requirement

2. Detail 4 - Removed trash enclosure concrete wall requirement

3. Detail 4 - Adjusted trash enclosure gate cross support requirement

4. Detail 5 - Adjusted typical guardrail detail requirements

5. Detail 6 - Adjusted modular wall dimension requirements

6. Detail 7 - Added Concrete Retaining Wall/Sidewalk Interface detail

CS503 PAVEMENT DETAILS SHEET 1 OF 2

1. Detail 5 - Removed sidewalk typical section Note 3

2. Detail 7 - Added Valley Gutter detail

CS504 PAVEMENT DETAILS SHEET 2 OF 2

1. No revisions

CS505 PAVEMENT MARKING AND SIGNAGE DETAILS

1. Detail 1 - Added parking block requirement for handicap parking

2. Detail 1 - Adjusted handicap parking requirements

3. Detail 3 - Adjusted handicap parking sign requirements

4. Detail 8 - Added Emergency Vehicle Entrance Only Sign detail

CG501 EROSION AND SEDIMENT CONTROL DETAILS

1. Detail 4 - Adjusted concrete flume curb layout requirement

CU501 STORM DETAILS

1. Detail 3 - revised table for only 2 flared end section sizes.

2. Detail 4 - Added dimensions

3. Detail 6 - Removed note referencing the 7 foot distance from building to trunkline.

Joplin, MO ADDENDUM No. 1 – Page 6 of 8

CU502 WATER DETAILS SHEET 1 OF 3

1. Detail 3 - Replaced detail entirely.

CU503 WATER DETAILS SHEET 2 OF 3

1. No revisions

CU504 WATER DETAILS SHEET 3 OF 3

2. No revisions

CU505 SANITARY DETAILS

1. Detail 4 - Edited text to reflect the service line pipe size as 6” in lieu of the 8” previously shown.

WF101 WAY FINDING OVERALL LAYOUT PLAN

1. Added drawing in its entirety.

WF501 SIGNAGE DETAILS

1. Added drawing in its entirety.

WF502 SIGNAGE DETAILS

1. Added drawing in its entirety.

WF503 SIGNAGE DETAILS

1. Added drawing in its entirety.

WF504 SIGNAGE DETAILS

1. Added drawing in its entirety.

WF505 SIGNAGE DETAILS

1. Added drawing in its entirety.

WF506 SIGNAGE DETAILS

1. Added drawing in its entirety.

WF507 SIGNAGE DETAILS

1. Added drawing in its entirety.

E000 ELECTRICAL LEGEND AND LUMINAIRE SCHEDULE

1. Added light fixture type “K” and “L” to luminaire schedule for way finding signage.

2. Added symbols to electrical legend.

3. Note added to listed notes.

ES101 SITE POWER AND COMMUNICATIONS PLAN

1. Sheet name revised to read “Site Power and Communications Plan”.

2. Revised Keyed Notes.

3. Removed junction boxes and empty conduit for way finding signage.

4. Routing of telecommunication conduits revised to reflect stopping within 5’-0” of hospital and

CUP. Conduits no longer routed within crawl space. Handhole added for telecommunication ca-bling.

5. Ingrade junction box and conduit added for water service hot box.

Joplin, MO ADDENDUM No. 1 – Page 7 of 8

ES201 SITE LIGHTING PLAN

1. Revised General Note #2.

2. Revised Keyed Notes.

3. Added floodlight fixtures “K” and “L” for way finding signage. Conductors and conduits routed to junction box provided by hospital package.

4. Adjusted northeast pedestrian fixtures.

5. Branch circuit sizes indicated for bollard fixtures.

E501 ELECTRICAL DETAILS SHEET 1 OF 7

1. Revised detail 1 dimensions.

2. Revised detail 2 in its entirety.

3. Revised detail 3 dimension and note description.

E502 ELECTRICAL DETAILS SHEET 2 OF 7

1. Added lead wire to details 2 and 3.

2. Added new detail 4, “Typical Buried Conduit Details”.

E503 ELECTRICAL DETAILS SHEET 3 OF 7

1. Revised detail 1 note descriptions.

2. Added duct window sealing to detail 2.

E504 ELECTRICAL DETAILS SHEET 4 OF 7

1. Deleted concrete dimensions to junction box cover in detail 1.

2. Revised conduit quantities to details 3 and 5.

E505 ELECTRICAL DETAILS SHEET 5 OF 7

1. No revisions.

E506 ELECTRICAL DETAILS SHEET 6 OF 7

1. Revised detail 1 note descriptions.

2. Added note descriptions to details 2 and 3.

3. Added new detail 6, “FloodLight Elevation Detail”.

4. Revised General Note #2.

E507 ELECTRICAL DETAILS SHEET 7 OF 7

1. Increase quantity of poles for contactors, “CE” and “CW” to accommodate floodlights for way find-ing signage, detail 1.

2. Revised lighting circuit description from normal power circuits to emergency power circuits, de-tails 1 and 2.

3. Revised description of helipad lighting control switches, detail 2.

SPECIFICATION MODIFICATIONS

SECTION 01 11 00 SUMMARY OF WORK

1. Deleted paragraph 1.5 WORK SCHEDULING

2. Deleted paragraph 1.9.2 Borrow, Excavation, Welding and Burning Permits

Joplin, MO ADDENDUM No. 1 – Page 8 of 8

SECTION 10 14 01 EXTERIOR SIGNAGE

1. Added specification in its entirety

SECTION 22 00 70 PLUMBING, HEALTHCARE FACILITIES

1. Add specification in its entirety.

SECTION 26 20 00 INTERIOR DISTRIBUTION SYSTEM

1. Replaced specification in its entirety:

Deleted paragraph 2.6, “SWITCHES”.

Deleted subparagraph 2.6.1, “Switches with Red Pilot Handle”.

Revised subparagraph 2.6.2, “Disconnect Switches”, to read

NEMA KS 1. Provide heavy duty-type switches where indicated, where switches are rat-ed higher than 240 volts, and for double-throw switches. Fused switches shall utilize Class R fuseholders and fuses, unless indicated otherwise. Provide switches in NEMA 1 enclosure per NEMA ICS 6.

Revised subparagraph 2.7.2, “Cartridge Fuses, Current Limiting Type (Classes J)” to read Cartridge Fuses, Current Limiting Fast Acting Type (Classes J)

SECTION 33 40 00 STORM DRAINAGE UTILITIES

1. Replaced specification in its entirety:

Added ASTM F 2648 reference for HDPE pipe to the bottom of paragraph 1.1, Refer-ences.

Deleted paragraph 2.1.1, Concrete Piping.

Added verbiage to paragraph 2.2.3, PE Detention Chambers, stating the chambers shall meet the requirements of manufacturer’s details and specifications.

Updated material requirement in paragraph 2.5, Downspout Boots, from cast iron to

PVC.

SECTION 33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

1. Replaced specification in its entirety:

Added subparagraph 3.3.3, “Direct-Burial” Added subparagraph 3.3.3.1 “Trenching” Added subparagraph 3.3.3.2, “Cable Burial” Added subparagraph 3.3.3.3, “Other Requirements” Added subparagraph 3.3.3.4 “Cable Joints or Splices” Added subparagraph 3.3.3.5 “Cable Markers”

END OF ADDENDUM NO. 1