This is Amendment 0004 under W912BU-10-R-0020 for Worldwide Power Contingency Response.

View the file

Other files

File Type Posted
Amendment 06.pdf PDF
Amendment 05.pdf PDF
Amendment 03.pdf PDF
Amendment 02.pdf PDF
Bid Schedule - Excell Version.xls XLS spreadsheet
Amendment 01.pdf PDF
WWP Solicitation FINAL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

e5ctskdp Typewritten Text e5ctskdp Typewritten Text e5ctskdp Typewritten Text e5ctskdp Typewritten Text x34

Section B, Pricing Schedule

Base Year

Item Number Unit of Total Purchase Price

0001 Mobilization/Demobilization LS $ XX *

0002 Labor

0002AA Journeyman Electrician Hour $ XX *

0002AB Master Electrician Hour $ XX *

0002AC High Voltage Electrician Hour $ XX *

0002AD Maintenance Technician Hour $ XX *

0002AE Administrator Hour $ XX *

0002AF Logistical Liaison Hour $ XX *

0002AG Laborer Hour $ XX *

0002AH Fuel Handler Hour $ XX *

0002AL Site Manager Hour $ XX *

0002AF Linguist (translator) Hour $ XX *

0002AG Quality Control Officer Hour $ XX *

0002AH Health and Safety Officer Hour $ XX *

* Labor rates will be determined at time of individual task order award.

Offerors are not expected to provide cost pricing in these categories for the MATOC proposal.

0003 Transportation LS $ XX *

0004 Bill of Materials (BOM) LS $ XX *

0005 Other Direct Costs LS $ XX * (Includes Security, Fuel, Meetings, Etc)

* These CLINs will be determined at time of individual task order award.

Offerors are not expected to provide cost pricing in these categories for the MATOC proposal.

Option 1

Item Number Unit of Total Purchase Price

1001 Mobilization/Demobilization LS $ XX *

1002 Labor

1002AA Journeyman Electrician Hour $ XX *

1002AB Master Electrician Hour $ XX *

1002AC High Voltage Electrician Hour $ XX *

1002AD Maintenance Technician Hour $ XX *

1002AE Administrator Hour $ XX *

1002AF Logistical Liaison Hour $ XX *

1002AB Laborer Hour $ XX *

1002AC Fuel Handler Hour $ XX *

1002AD Site Manager Hour $ XX *

* Labor rates will be determined at time of individual task order award.

Offerors are not expected to provide cost pricing in these categories for the MATOC proposal.

1003 Transportation LS $ XX *

1004 Bill of Materials (BOM) LS $ XX *

1005 Other Direct Costs LS $ XX * (Includes Security, Fuel, Meetings, Etc)

Option 2

Purchase Price

2001 Mobilization/Demobilization LS $ XX *

2002 Labor

2002AA Journeyman Electrician Hour $ XX *

2002AB Master Electrician Hour $ XX *

2002AC High Voltage Electrician Hour $ XX *

2002AD Maintenance Technician Hour $ XX *

2002AE Administrator Hour $ XX *

2002AF Logistical Liaison Hour $ XX *

2002AB Laborer Hour $ XX *

2002AC Fuel Handler Hour $ XX *

2002AD Site Manager Hour $ XX *

* Labor rates will be determined at time of individual task order award.

Offerors are not expected to provide cost pricing in these categories for the MATOC proposal.

2003 Transportation LS $ XX *

2004 Bill of Materials (BOM) LS $ XX *

2005 Other Direct Costs LS $ XX * (Includes Security, Fuel, Meetings, Etc)

Option 3

Purchase Price

3001 Mobilization/Demobilization LS $ XX *

3002 Labor

3002AA Journeyman Electrician Hour $ XX *

3002AB Master Electrician Hour $ XX *

3002AC High Voltage Electrician Hour $ XX *

3002AD Maintenance Technician Hour $ XX *

3002AE Administrator Hour $ XX *

3002AF Logistical Liaison Hour $ XX *

3002AB Laborer Hour $ XX *

3002AC Fuel Handler Hour $ XX *

3002AD Site Manager Hour $ XX *

* Labor rates will be determined at time of individual task order award.

Offerors are not expected to provide cost pricing in these categories for the MATOC proposal.

3003 Transportation LS $ XX *

3004 Bill of Materials (BOM) LS $ XX *

3005 Other Direct Costs LS $ XX * (Includes Security, Fuel, Meetings, Etc)

Option 4

Purchase Price

4001 Mobilization/Demobilization LS $ XX *

4002 Labor

4002AA Journeyman Electrician Hour $ XX *

4002AB Master Electrician Hour $ XX *

4002AC High Voltage Electrician Hour $ XX *

4002AD Maintenance Technician Hour $ XX *

4002AE Administrator Hour $ XX *

4002AF Logistical Liaison Hour $ XX *

4002AB Laborer Hour $ XX *

4002AC Fuel Handler Hour $ XX *

4002AD Site Manager Hour $ XX *

* Labor rates will be determined at time of individual task order award.

Offerors are not expected to provide cost pricing in these categories for the MATOC proposal.

4003 Transportation LS $ XX *

4004 Bill of Materials (BOM) LS $ XX *

4005 Other Direct Costs LS $ XX * (Includes Security, Fuel, Meetings, Etc)

Equipment Rental Schedule

Item QTY: * Unit of Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Number Purchase Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price

* For purposes of evaluation the below listed quantities will be used. Monthly unit prices will be considered binding in the MATOC contract.

0006 Equipment (Contractor Furnished) assume: 50 Feet to load, ratings to be Prime Power, unlimited run time rating 120/208 @ 60 HZ Base (0006) Base (0006) 1st Opt (1006) 1st Opt (1006) 2nd Opt (2006) 2nd Opt (2006) 3rd Opt (3006) 3rd Opt (3006) 4th Opt (4006) 4th Opt (4006)

XXXXAA 55 KW 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 100 KW 6 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAC 250 KW 6 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAD 550 KW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAE 1 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

0007 Power Plants (mobilized for initial power) assume: ratings to be Prime Power, unlimited run time rating, 4160 Volts @ 60 HZ Base (0007) Base (0007) 1st Opt (1007) 1st Opt (1007) 2nd Opt (2007) 2nd Opt (2007) 3rd Opt (3007) 3rd Opt (3007) 4th Opt (4007) 4th Opt (4007)

XXXXAA 1 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 2 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAC 3 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAD 5 MW 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAE 7 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAF 10 MW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAG 15 MW 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAH 20 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

0008 Power Plants (mobilized to augment existing power plant) assume: ratings to be Prime Power, unlimited run time rating, 4160 Volts @ 60 HZ Base (0008) Base (0008) 1st Opt (1008) 1st Opt (1008) 2nd Opt (2008) 2nd Opt (2008) 3rd Opt (3008) 3rd Opt (3008) 4th Opt (4008) 4th Opt (4008)

XXXXAA 1 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 2 MW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAC 3 MW 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAD 5 MW 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAE 7 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAF 10 MW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAG 15 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAH 20 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

Item Unit of Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly

Note: Generators (all sizes plus or minus 10%) to include all materials to connect to load to include: cabling appropriate to generator rating, all grounding materials, and maintenance

Number Purchase Price Price Price Price Price Price Price Price Price Price

0009 Underground Distribution assume: 4160 Volts Base (0009) Base (0009) 1st Opt (1009) 1st Opt (1009) 2nd Opt (2009) 2nd Opt (2009) 3rd Opt (3009) 3rd Opt (3009) 4th Opt (4009) 4th Opt (4009)

XXXXAA 1 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 2 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAC 3 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAD 5 KM 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAE 7 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAF 10 KM 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAG 15 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAH 20 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

0010 Underground Distribution assume: 13,800 Volts Base (0010) Base (0010) 1st Opt (1010) 1st Opt (1010) 2nd Opt (2010) 2nd Opt (2010) 3rd Opt (3010) 3rd Opt (3010) 4th Opt (4010) 4th Opt (4010)

XXXXAA 1 KM 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 2 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAC 3 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAD 5 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAE 7 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAF 10 KM 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAG 15 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAH 20 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

0011 Overhead Distribution assume: 13,800 Volts assume: level terrain, at a voltage of 13,800 Volts Base (0011) Base (0011) 1st Opt (1011) 1st Opt (1011) 2nd Opt (2011) 2nd Opt (2011) 3rd Opt (3011) 3rd Opt (3011) 4th Opt (4011) 4th Opt (4011)

XXXXAA 1 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 2 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAC 3 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAD 5 KM 5 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAE 7 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAF 10 KM 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAG 15 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAH 20 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

0012 Overhead Transmission assume: 220 kV assume: level terrain, at a voltage of 220 kV utilizing 220-kV double-circuit LST Poles Base (0012) Base (0012) 1st Opt (1012) 1st Opt (1012) 2nd Opt (2012) 2nd Opt (2012) 3rd Opt (3012) 3rd Opt (3012) 4th Opt (4012) 4th Opt (4012)

XXXXAA 5 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 10 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAC 50 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

0013 High Voltage Transformation assume 220 kV to 20 kV Base (0013) Base (0013) 1st Opt (1013) 1st Opt (1013) 2nd Opt (2013) 2nd Opt (2013) 3rd Opt (3013) 3rd Opt (3013) 4th Opt (4013) 4th Opt (4013)

XXXXAA 16 mVA 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 20 mVA 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

base.pdf
Base Year
option 1.pdf
Option 1
option 2.pdf
Option 2
option 3.pdf
Option 3
option 4.pdf
Option 4
equipment rental schedule.pdf
Equipment CLINs

File details come from the government source that posted it. Updated .