This is Amendment 0004 under W912BU-10-R-0020 for Worldwide Power Contingency Response.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 06.pdf | ||
| Amendment 05.pdf | ||
| Amendment 03.pdf | ||
| Amendment 02.pdf | ||
| Bid Schedule - Excell Version.xls | XLS spreadsheet | |
| Amendment 01.pdf | ||
| WWP Solicitation FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
e5ctskdp Typewritten Text e5ctskdp Typewritten Text e5ctskdp Typewritten Text e5ctskdp Typewritten Text x34
Section B, Pricing Schedule
Base Year
Item Number Unit of Total Purchase Price
0001 Mobilization/Demobilization LS $ XX *
0002 Labor
0002AA Journeyman Electrician Hour $ XX *
0002AB Master Electrician Hour $ XX *
0002AC High Voltage Electrician Hour $ XX *
0002AD Maintenance Technician Hour $ XX *
0002AE Administrator Hour $ XX *
0002AF Logistical Liaison Hour $ XX *
0002AG Laborer Hour $ XX *
0002AH Fuel Handler Hour $ XX *
0002AL Site Manager Hour $ XX *
0002AF Linguist (translator) Hour $ XX *
0002AG Quality Control Officer Hour $ XX *
0002AH Health and Safety Officer Hour $ XX *
* Labor rates will be determined at time of individual task order award.
Offerors are not expected to provide cost pricing in these categories for the MATOC proposal.
0003 Transportation LS $ XX *
0004 Bill of Materials (BOM) LS $ XX *
0005 Other Direct Costs LS $ XX * (Includes Security, Fuel, Meetings, Etc)
* These CLINs will be determined at time of individual task order award.
Offerors are not expected to provide cost pricing in these categories for the MATOC proposal.
Option 1
Item Number Unit of Total Purchase Price
1001 Mobilization/Demobilization LS $ XX *
1002 Labor
1002AA Journeyman Electrician Hour $ XX *
1002AB Master Electrician Hour $ XX *
1002AC High Voltage Electrician Hour $ XX *
1002AD Maintenance Technician Hour $ XX *
1002AE Administrator Hour $ XX *
1002AF Logistical Liaison Hour $ XX *
1002AB Laborer Hour $ XX *
1002AC Fuel Handler Hour $ XX *
1002AD Site Manager Hour $ XX *
* Labor rates will be determined at time of individual task order award.
Offerors are not expected to provide cost pricing in these categories for the MATOC proposal.
1003 Transportation LS $ XX *
1004 Bill of Materials (BOM) LS $ XX *
1005 Other Direct Costs LS $ XX * (Includes Security, Fuel, Meetings, Etc)
Option 2
Purchase Price
2001 Mobilization/Demobilization LS $ XX *
2002 Labor
2002AA Journeyman Electrician Hour $ XX *
2002AB Master Electrician Hour $ XX *
2002AC High Voltage Electrician Hour $ XX *
2002AD Maintenance Technician Hour $ XX *
2002AE Administrator Hour $ XX *
2002AF Logistical Liaison Hour $ XX *
2002AB Laborer Hour $ XX *
2002AC Fuel Handler Hour $ XX *
2002AD Site Manager Hour $ XX *
* Labor rates will be determined at time of individual task order award.
Offerors are not expected to provide cost pricing in these categories for the MATOC proposal.
2003 Transportation LS $ XX *
2004 Bill of Materials (BOM) LS $ XX *
2005 Other Direct Costs LS $ XX * (Includes Security, Fuel, Meetings, Etc)
Option 3
Purchase Price
3001 Mobilization/Demobilization LS $ XX *
3002 Labor
3002AA Journeyman Electrician Hour $ XX *
3002AB Master Electrician Hour $ XX *
3002AC High Voltage Electrician Hour $ XX *
3002AD Maintenance Technician Hour $ XX *
3002AE Administrator Hour $ XX *
3002AF Logistical Liaison Hour $ XX *
3002AB Laborer Hour $ XX *
3002AC Fuel Handler Hour $ XX *
3002AD Site Manager Hour $ XX *
* Labor rates will be determined at time of individual task order award.
Offerors are not expected to provide cost pricing in these categories for the MATOC proposal.
3003 Transportation LS $ XX *
3004 Bill of Materials (BOM) LS $ XX *
3005 Other Direct Costs LS $ XX * (Includes Security, Fuel, Meetings, Etc)
Option 4
Purchase Price
4001 Mobilization/Demobilization LS $ XX *
4002 Labor
4002AA Journeyman Electrician Hour $ XX *
4002AB Master Electrician Hour $ XX *
4002AC High Voltage Electrician Hour $ XX *
4002AD Maintenance Technician Hour $ XX *
4002AE Administrator Hour $ XX *
4002AF Logistical Liaison Hour $ XX *
4002AB Laborer Hour $ XX *
4002AC Fuel Handler Hour $ XX *
4002AD Site Manager Hour $ XX *
* Labor rates will be determined at time of individual task order award.
Offerors are not expected to provide cost pricing in these categories for the MATOC proposal.
4003 Transportation LS $ XX *
4004 Bill of Materials (BOM) LS $ XX *
4005 Other Direct Costs LS $ XX * (Includes Security, Fuel, Meetings, Etc)
Equipment Rental Schedule
Item QTY: * Unit of Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Number Purchase Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price
* For purposes of evaluation the below listed quantities will be used. Monthly unit prices will be considered binding in the MATOC contract.
0006 Equipment (Contractor Furnished) assume: 50 Feet to load, ratings to be Prime Power, unlimited run time rating 120/208 @ 60 HZ Base (0006) Base (0006) 1st Opt (1006) 1st Opt (1006) 2nd Opt (2006) 2nd Opt (2006) 3rd Opt (3006) 3rd Opt (3006) 4th Opt (4006) 4th Opt (4006)
XXXXAA 55 KW 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 100 KW 6 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAC 250 KW 6 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAD 550 KW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAE 1 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
0007 Power Plants (mobilized for initial power) assume: ratings to be Prime Power, unlimited run time rating, 4160 Volts @ 60 HZ Base (0007) Base (0007) 1st Opt (1007) 1st Opt (1007) 2nd Opt (2007) 2nd Opt (2007) 3rd Opt (3007) 3rd Opt (3007) 4th Opt (4007) 4th Opt (4007)
XXXXAA 1 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 2 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAC 3 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAD 5 MW 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAE 7 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAF 10 MW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAG 15 MW 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAH 20 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
0008 Power Plants (mobilized to augment existing power plant) assume: ratings to be Prime Power, unlimited run time rating, 4160 Volts @ 60 HZ Base (0008) Base (0008) 1st Opt (1008) 1st Opt (1008) 2nd Opt (2008) 2nd Opt (2008) 3rd Opt (3008) 3rd Opt (3008) 4th Opt (4008) 4th Opt (4008)
XXXXAA 1 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 2 MW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAC 3 MW 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAD 5 MW 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAE 7 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAF 10 MW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAG 15 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAH 20 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
Item Unit of Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly
Note: Generators (all sizes plus or minus 10%) to include all materials to connect to load to include: cabling appropriate to generator rating, all grounding materials, and maintenance
Number Purchase Price Price Price Price Price Price Price Price Price Price
0009 Underground Distribution assume: 4160 Volts Base (0009) Base (0009) 1st Opt (1009) 1st Opt (1009) 2nd Opt (2009) 2nd Opt (2009) 3rd Opt (3009) 3rd Opt (3009) 4th Opt (4009) 4th Opt (4009)
XXXXAA 1 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 2 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAC 3 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAD 5 KM 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAE 7 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAF 10 KM 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAG 15 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAH 20 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
0010 Underground Distribution assume: 13,800 Volts Base (0010) Base (0010) 1st Opt (1010) 1st Opt (1010) 2nd Opt (2010) 2nd Opt (2010) 3rd Opt (3010) 3rd Opt (3010) 4th Opt (4010) 4th Opt (4010)
XXXXAA 1 KM 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 2 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAC 3 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAD 5 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAE 7 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAF 10 KM 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAG 15 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAH 20 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
0011 Overhead Distribution assume: 13,800 Volts assume: level terrain, at a voltage of 13,800 Volts Base (0011) Base (0011) 1st Opt (1011) 1st Opt (1011) 2nd Opt (2011) 2nd Opt (2011) 3rd Opt (3011) 3rd Opt (3011) 4th Opt (4011) 4th Opt (4011)
XXXXAA 1 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 2 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAC 3 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAD 5 KM 5 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAE 7 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAF 10 KM 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAG 15 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAH 20 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
0012 Overhead Transmission assume: 220 kV assume: level terrain, at a voltage of 220 kV utilizing 220-kV double-circuit LST Poles Base (0012) Base (0012) 1st Opt (1012) 1st Opt (1012) 2nd Opt (2012) 2nd Opt (2012) 3rd Opt (3012) 3rd Opt (3012) 4th Opt (4012) 4th Opt (4012)
XXXXAA 5 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 10 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAC 50 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
0013 High Voltage Transformation assume 220 kV to 20 kV Base (0013) Base (0013) 1st Opt (1013) 1st Opt (1013) 2nd Opt (2013) 2nd Opt (2013) 3rd Opt (3013) 3rd Opt (3013) 4th Opt (4013) 4th Opt (4013)
XXXXAA 16 mVA 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 20 mVA 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
| base.pdf |
| Base Year |
| option 1.pdf |
| Option 1 |
| option 2.pdf |
| Option 2 |
| option 3.pdf |
| Option 3 |
| option 4.pdf |
| Option 4 |
| equipment rental schedule.pdf |
| Equipment CLINs |
File details come from the government source that posted it. Updated .