Amendment 03.pdf

PDF 32 KB Posted

Attached to
Worldwide Power Contingency Response
Solicitation number
W912BU-10-R-0020
Issued by

About this file

This is amendment 03 under W912BU-10-R-0020 Worldwide Power Contingency Response.

View the file

Other files

File Type Posted
Amendment 06.pdf PDF
Amendment 05.pdf PDF
Amendment 04.pdf PDF
Amendment 02.pdf PDF
Bid Schedule - Excell Version.xls XLS spreadsheet
Amendment 01.pdf PDF
WWP Solicitation FINAL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: KARYN D. PRICE

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Worldw ide Contingency Pow er Response

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jun-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-10-R-0020

X 9B. DATED (SEE ITEM 11)

28-May-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jun-2010

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE E5CTSKDP

FACILITY CODECODE

EMAIL:TEL:

W912BU-10-R-0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

This is amendment 03 under W912BU-10-R-0020 for Worldwide Contingency Power Response.

Please make the following changes:

1. Please replace the Equipment Rental Schedule with the attached. CLINs 0009 through

0013 were missing in Amendment 02.

2. Please replace the sample task order, Burkina Faso with the attached. The period of performance is revised from 120 days to 60 days from issuance of task order to completion for commissioning.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

BURKINA -SAMPLE TO DESCRIPTION

Situation:

Conflict support power plant

Location: Vicinity of Leo, Burkina Faso, Africa

Period of Performance: 60 days from issuance of task order to completion of commissioning and a full

365 for O&M and full support (include mob and demob costs)

Site is fully secured

Government to provide fuel (JP8 or similar), if other fuel is required the contractor must furnish this

Government shall supply a 400X400 foot plot of land for the power plant

Road conditions unknown

Initial equipment requirement:

10 MW (continuous) power plant

2.5 MW reserve capacity

Must be able to operate 7 days at 80% load from on site fuel tanks

Ability to service eight feeders at 4160 Volts @ 60 HZ primary

Secondary voltage 120/208 Volts @ 60 HZ

Eight kilometers of 3 phase underground distribution

All installations to be in compliance with NEC, NESC, IEEE, NFPA and other applicable

US Standards (in effect at time of solicitation)

6 Ea 500 kVA transformers

2 ea mVA transformers

Load connections beyond the transformers shall be accomplished by another entity

Mobilization

Demobilization

Support housing and facilities supplied by contractor

Complete O&M of installed feeders (not to include low voltage) and all future feeders

Water, waste water, and black water services supplied by the government

Equipment Rental Schedule

Item QTY: * Unit of Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Number Purchase Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price

* For purposes of evaluation the below listed quantities will be used. Monthly unit prices will be considered binding in the MATOC contract.

0006 Equipment (Contractor Furnished)

Base (0006) Base (0006) 1st Opt (1006) 1st Opt (1006) 2nd Opt (2006) 2nd Opt (2006) 3rd Opt (3006) 3rd Opt (3006) 4th Opt (4006) 4th Opt (4006)

XXXXAA 55 KW 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 100 KW 6 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAC 250 KW 6 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAD 550 KW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAE 1 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

0007 Power Plants (mobilized for initial power) Base (0007) Base (0007) 1st Opt (1007) 1st Opt (1007) 2nd Opt (2007) 2nd Opt (2007) 3rd Opt (3007) 3rd Opt (3007) 4th Opt (4007) 4th Opt (4007)

XXXXAA 1 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 2 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAC 3 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAD 5 MW 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAE 7 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAF 10 MW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAG 15 MW 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAH 20 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

0008 Power Plants (mobilized to augment existing power plant) Base (0008) Base (0008) 1st Opt (1008) 1st Opt (1008) 2nd Opt (2008) 2nd Opt (2008) 3rd Opt (3008) 3rd Opt (3008) 4th Opt (4008) 4th Opt (4008)

XXXXAA 1 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 2 MW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAC 3 MW 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAD 5 MW 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAE 7 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAF 10 MW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAG 15 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAH 20 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

Item Unit of Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly

Note: Generators (all sizes plus or minus 10%) to include all materials to connect to load to include: cabling appropriate to generator rating, all grounding materials, and maintenance

Number Purchase Price Price Price Price Price Price Price Price Price Price

0009 Underground Distribution assume: 4160 Volts Base (0009) Base (0009) 1st Opt (1009) 1st Opt (1009) 2nd Opt (2009) 2nd Opt (2009) 3rd Opt (3009) 3rd Opt (3009) 4th Opt (4009) 4th Opt (4009)

XXXXAA 1 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 2 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAC 3 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAD 5 KM 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAE 7 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAF 10 KM 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAG 15 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAH 20 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

0010 Underground Distribution assume: 13,800 Volts Base (0010) Base (0010) 1st Opt (1010) 1st Opt (1010) 2nd Opt (2010) 2nd Opt (2010) 3rd Opt (3010) 3rd Opt (3010) 4th Opt (4010) 4th Opt (4010)

XXXXAA 1 KM 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 2 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAC 3 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAD 5 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAE 7 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAF 10 KM 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAG 15 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAH 20 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

0011 Overhead Distribution assume: 13,800 Volts Base (0011) Base (0011) 1st Opt (1011) 1st Opt (1011) 2nd Opt (2011) 2nd Opt (2011) 3rd Opt (3011) 3rd Opt (3011) 4th Opt (4011) 4th Opt (4011)

XXXXAA 1 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 2 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAC 3 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAD 5 KM 5 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAE 7 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAF 10 KM 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAG 15 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAH 20 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

0012 Overhead Transmission assume: level terrain, transmission towers spaced 250 Feet apart, at a voltage of 220 kV Base (0012) Base (0012) 1st Opt (1012) 1st Opt (1012) 2nd Opt (2012) 2nd Opt (2012) 3rd Opt (3012) 3rd Opt (3012) 4th Opt (4012) 4th Opt (4012)

XXXXAA 5 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 10 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAC 50 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

0013 High Voltage Transformation Base (0013) Base (0013) 1st Opt (1013) 1st Opt (1013) 2nd Opt (2013) 2nd Opt (2013) 3rd Opt (3013) 3rd Opt (3013) 4th Opt (4013) 4th Opt (4013)

XXXXAA 16 mVA 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

XXXXAB 20 mVA 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______

File details come from the government source that posted it. Updated .