Amendment 03.pdf
PDF 32 KB Posted
- Attached to
- Worldwide Power Contingency Response
- Solicitation number
- W912BU-10-R-0020
About this file
This is amendment 03 under W912BU-10-R-0020 Worldwide Power Contingency Response.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 06.pdf | ||
| Amendment 05.pdf | ||
| Amendment 04.pdf | ||
| Amendment 02.pdf | ||
| Bid Schedule - Excell Version.xls | XLS spreadsheet | |
| Amendment 01.pdf | ||
| WWP Solicitation FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: KARYN D. PRICE
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Worldw ide Contingency Pow er Response
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Jun-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-10-R-0020
X 9B. DATED (SEE ITEM 11)
28-May-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Jun-2010
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE E5CTSKDP
FACILITY CODECODE
EMAIL:TEL:
W912BU-10-R-0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
This is amendment 03 under W912BU-10-R-0020 for Worldwide Contingency Power Response.
Please make the following changes:
1. Please replace the Equipment Rental Schedule with the attached. CLINs 0009 through
0013 were missing in Amendment 02.
2. Please replace the sample task order, Burkina Faso with the attached. The period of performance is revised from 120 days to 60 days from issuance of task order to completion for commissioning.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
BURKINA -SAMPLE TO DESCRIPTION
Situation:
Conflict support power plant
Location: Vicinity of Leo, Burkina Faso, Africa
Period of Performance: 60 days from issuance of task order to completion of commissioning and a full
365 for O&M and full support (include mob and demob costs)
Site is fully secured
Government to provide fuel (JP8 or similar), if other fuel is required the contractor must furnish this
Government shall supply a 400X400 foot plot of land for the power plant
Road conditions unknown
Initial equipment requirement:
10 MW (continuous) power plant
2.5 MW reserve capacity
Must be able to operate 7 days at 80% load from on site fuel tanks
Ability to service eight feeders at 4160 Volts @ 60 HZ primary
Secondary voltage 120/208 Volts @ 60 HZ
Eight kilometers of 3 phase underground distribution
All installations to be in compliance with NEC, NESC, IEEE, NFPA and other applicable
US Standards (in effect at time of solicitation)
6 Ea 500 kVA transformers
2 ea mVA transformers
Load connections beyond the transformers shall be accomplished by another entity
Mobilization
Demobilization
Support housing and facilities supplied by contractor
Complete O&M of installed feeders (not to include low voltage) and all future feeders
Water, waste water, and black water services supplied by the government
Equipment Rental Schedule
Item QTY: * Unit of Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Number Purchase Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price
* For purposes of evaluation the below listed quantities will be used. Monthly unit prices will be considered binding in the MATOC contract.
0006 Equipment (Contractor Furnished)
Base (0006) Base (0006) 1st Opt (1006) 1st Opt (1006) 2nd Opt (2006) 2nd Opt (2006) 3rd Opt (3006) 3rd Opt (3006) 4th Opt (4006) 4th Opt (4006)
XXXXAA 55 KW 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 100 KW 6 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAC 250 KW 6 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAD 550 KW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAE 1 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
0007 Power Plants (mobilized for initial power) Base (0007) Base (0007) 1st Opt (1007) 1st Opt (1007) 2nd Opt (2007) 2nd Opt (2007) 3rd Opt (3007) 3rd Opt (3007) 4th Opt (4007) 4th Opt (4007)
XXXXAA 1 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 2 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAC 3 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAD 5 MW 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAE 7 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAF 10 MW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAG 15 MW 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAH 20 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
0008 Power Plants (mobilized to augment existing power plant) Base (0008) Base (0008) 1st Opt (1008) 1st Opt (1008) 2nd Opt (2008) 2nd Opt (2008) 3rd Opt (3008) 3rd Opt (3008) 4th Opt (4008) 4th Opt (4008)
XXXXAA 1 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 2 MW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAC 3 MW 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAD 5 MW 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAE 7 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAF 10 MW 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAG 15 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAH 20 MW 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
Item Unit of Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly
Note: Generators (all sizes plus or minus 10%) to include all materials to connect to load to include: cabling appropriate to generator rating, all grounding materials, and maintenance
Number Purchase Price Price Price Price Price Price Price Price Price Price
0009 Underground Distribution assume: 4160 Volts Base (0009) Base (0009) 1st Opt (1009) 1st Opt (1009) 2nd Opt (2009) 2nd Opt (2009) 3rd Opt (3009) 3rd Opt (3009) 4th Opt (4009) 4th Opt (4009)
XXXXAA 1 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 2 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAC 3 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAD 5 KM 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAE 7 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAF 10 KM 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAG 15 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAH 20 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
0010 Underground Distribution assume: 13,800 Volts Base (0010) Base (0010) 1st Opt (1010) 1st Opt (1010) 2nd Opt (2010) 2nd Opt (2010) 3rd Opt (3010) 3rd Opt (3010) 4th Opt (4010) 4th Opt (4010)
XXXXAA 1 KM 4 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 2 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAC 3 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAD 5 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAE 7 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAF 10 KM 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAG 15 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAH 20 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
0011 Overhead Distribution assume: 13,800 Volts Base (0011) Base (0011) 1st Opt (1011) 1st Opt (1011) 2nd Opt (2011) 2nd Opt (2011) 3rd Opt (3011) 3rd Opt (3011) 4th Opt (4011) 4th Opt (4011)
XXXXAA 1 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 2 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAC 3 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAD 5 KM 5 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAE 7 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAF 10 KM 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAG 15 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAH 20 KM 2 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
0012 Overhead Transmission assume: level terrain, transmission towers spaced 250 Feet apart, at a voltage of 220 kV Base (0012) Base (0012) 1st Opt (1012) 1st Opt (1012) 2nd Opt (2012) 2nd Opt (2012) 3rd Opt (3012) 3rd Opt (3012) 4th Opt (4012) 4th Opt (4012)
XXXXAA 5 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 10 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAC 50 KM 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
0013 High Voltage Transformation Base (0013) Base (0013) 1st Opt (1013) 1st Opt (1013) 2nd Opt (2013) 2nd Opt (2013) 3rd Opt (3013) 3rd Opt (3013) 4th Opt (4013) 4th Opt (4013)
XXXXAA 16 mVA 3 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
XXXXAB 20 mVA 1 EA Each $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______
File details come from the government source that posted it. Updated .