QUESTIONS & ANSWERS
Round Two
1. Are Scaled Drawings available, if so please post.
Answer: See Mechanical Drawings provided
2. Are Ceilings Suspended? Or Hard Lid?
Answer: Standard Tile Ceilings with some areas having Tin Ceiling tiles. All removable.
3. Are there existing Cable Trays for wiring above ceilings?
Answer: Yes. See Diagram/Drawing
4. Can Existing Wiring be utilized?
Answer: Yes.
5. Is a “UPS” required? If so, What Time/Power Duration is required?
Answer: Equivalent to the UPS currently being used - CyberPower CP1500AVRLCD UPS Batteries (Replacement) - 12 Volts 7.5 AH F2 terminal. Our brand-new replacement battery set for the CyberPower CP1500AVRLCD Uninterruptible Power Supply (UPS) unit includes 2 SigmasTek SP12-7.5HR batteries (12 Volts
7.5 AH).
6. Are “Or Equal” Equipment substitutions allowed?
Answer: Yes.
7. Is “Plenum Wire” acceptable?
Answer: No. Not needed.
8. Is “After Hours Access” for said work, available to contractor at no add ’l cost to the Gov’t?
Answer: Core hours of work to be completed is 0730 AM to 4:00 PM Monday thru Thursday.
9. What is the height of Exterior Cameras? (If any)
Answer: From Floor to Ceiling approximately 15 feet.