QUESTIONS & ANSWERS
Round Three
1. Paragraph 1.2 indicates a new requirement to replace the analog video system with a new system to improve surveillance coverage and security posture. The associated table identifies various video surveillance equipment. Para. 4.1 requires that contractor personnel have a “working knowledge of ...
access control systems”. RFQ CLIN 0001 states in part "Contractor shall provide all labor, equipment, and materials necessary to perform Installation and Access Control Systems Programming."
Please confirm inconsistent work scope requirements to include: a) Confirm that work scope does not include procuring/installing/programming any access control equipment or systems; b) Confirm that work does not include integrating the new video surveillance system/equipment into an existing access control system or other security or building control system; and c) If a. and b. herein are not correct, please provide comprehensive requirements and performance specifications.
Answer: Per the SOW: Replace the existing cameras, NVRs, and peripheral devices. The project does not integrate with an access control system or any other security system
2. Please confirm that the new video surveillance systems in the two buildings (608 and 613) will be standalone (e.g., not interconnected in any way). If this is incorrect, please provide functional specification for interconnection requirements.
Answer: Stand Alone
3. Please confirm that the new video surveillance systems in the two buildings (608 and 613) will be standalone (e.g., not interconnected in any way). If this is incorrect, please provide functional specification for interconnection requirements.
Answer: See Answer to question # 2
4. Are offerors being requested to include any cybersecurity effort in their pricing? If yes, a) Do the existing systems have an active ATO that will be leveraged for this effort?; and b) Please provide detailed requirements for all cybersecurity related activities, deliverables, continuous monitoring, support, applying baseline controls, etc. that will be contractor responsibilities.
Answer: No
5. SOW 1.2 item table includes an entry "POE" with quantity of 4 for Bldg. 610. The requirement is not clear. Please clarify what equipment is being specified and where it is to be installed in Bldg. 610.
Answer: POE requirement is 4 for Bldg. 610
6. Installation narrative description in 3.1 indicates to install four IP IR cameras in Bldg. 610 first floor.
3.1.2 says install the other two in the gym. The diagram shows two cameras in room 10104 which is labeled as storage. Please confirm that room 10104 is the gym.
Answer: Bldg. 610 Room 104 is the Gym
7. Please clarify which NVR the four new cameras in Bldg. 610 are to be connected to and recorded
(Reference SOW 2.1, 3.x).
Answer: NVR located in Bldg. 610
8. Please provide an overall site plan clearly identifying the locations for Bldg. 608, 610, and 613 so that offerors can better understand the requirements and develop accurate pricing.
Answer: Long Barracks “As Built” Drawings (Mechanical) have been incorporated into the RFQ
9. Equipment table does not identify any new workstations or monitors. Please confirm that all locations shown on the diagrams for monitors not associated with an NVR are monitors only and do not require a viewing workstation (Reference SOW 1.2, 2.x).
Answer: See Answer to question # 8
10. Please clarify that the cameras shown in Bldg. 610 are replacing existing cameras (Reference SOW
3.1).
Answer: Yes, SOW states replacing of existing cameras
11. Bldg. 610 requirements are not clear. Are the cameras shown in Bldg. 610 supposed to connect to and record on the NVR in Bldg. 608 and be monitored at the Bldg. 608 monitors? Please clarify
(Reference SOW 1.2, 2.x).
Answer: Camera location is Bldg. 610, NVR and Monitors are located in Bldg. 608
12. Drawings depict multiple monitors in Bldg. 608 and 613. Parts list includes HDMI splitters. Is the intent for all monitors in a location to connect to the associated NVR and display the same imagery without the ability to select/view different cameras? If this is not correct, please clarify.
Answer: Cameras are to connect to the NVR associated with the location of the cameras. Bldg. 610 cameras will be shown in Bldg. 608. Cameras located in Bldg. 613 will display on monitors in Bldg. 613
13. Please provide drawings depicting available conveyances that are available for use in Bldg. 613 to aid offerors in developing accurate pricing.
Answer: See Answer to question # 8
14. Video Surveillance equipment listing on the sheet indicates two (2) monitors but no monitors are depicted on the sheet. Please clarify.
Answer: Will be using existing monitors already installed and in place
15. Sheet legend indicates nine (9) fixed cameras and diagram depicts 9 cameras but diagram does not show the associated building numbers. Please clarify which camera types are required for these locations.
Answer: 9 fixed cameras in Bldg. 613, office suite, stairwells, and Sally Port (Main Entrance Throughway)
16. Paragraph 2.2 indicates to install the required wiring system from the three (3)
2’ x 4’ J-Box with 1” back to the main control system at building 613 room 205 and to the three (3) main monitoring stations at building 613 room numbers 213, 219 and 221. Please clarify the size of these J-boxes. Are they really 2 feet by 4 feet?
Answer: 2 inches by 4 inches. Typo mistake (“) vs. (‘)
17. Paragraph 2.2 indicates to install the required wiring system from the three (3)
2’ x 4’ J-Box with 1” back to the main control system at building 613 room 205 and to the three (3) main monitoring stations at building 613 room numbers 213, 219 and 221. Requirement is not clear. Please identify the location of each of the three 2'x4' J-boxes on the building floor plans.
Answer. See Answer to question # 8
18. Paragraph 2.2 indicates to install the required wiring system from the three (3)
2’ x 4’ J-Box with 1” back to the main control system at building 613 room 205 and to the three (3) main monitoring stations at building 613 room numbers 213, 219 and 221. The drawing plan identifies 6 monitors. What about the wiring for the other 3 monitors depicted on this sheet? 1) Please clarify the associated room number for MON-006. 2) If MON-006 is located in Room 219 which of the two monitors in this room is considered to be one of the three main monitoring locations (MON-004 or MON-006)? 3)
Please clarify the wiring requirements for the monitor (MON-003) in Room 201. 4) Please identify the wiring requirements for location of each of the three 2'x4' J-boxes on the building floor plans.
Answer: See the Long Barracks “As Built” Drawings (Mechanical) have been incorporated into the RFQ for location of 2”x4” J-box. Request for CAT 5 cables be installed from the NVR room 205 pulled to room
19. Please provide an existing system wiring diagram depicting the camera and monitor wiring from the current NVR location in Room 216 to the three (3) 2'x4' J-boxes and the six (6) monitors, 6 cameras on the 2nd floor, and 5 cameras on the first floor to enable offerors to accurately estimate wiring/conduit requirements. If drawings do not exist or are not available, please indicate the basis (how many feet of new conduit and CAT cabling) offerors should use for developing pricing.
Answer: No wiring diagram available, use the Long Barracks “As Built” Drawings (Mechanical) have been incorporated into the RFQ for measurement of needed CAT 5 cabling
20. Paragraph 2.2 indicates to install the required wiring system from the three (3)
2’ x 4’ J-Box with 1” back to the main control system at building 613 room 205 and to the three (3) main monitoring stations at building 613 room numbers 213, 219 and 221. Requirement is not clear. Please clarify if the phrase "with 1" back to the main control system" means to run a single new 1" conduit from each of the three 2'x4' J-boxes back to the main control station.
Answer: 1 inch conduit back to each of the 2 x 4 J-boxes
21. Equipment list in SOW 1.2 does not include monitors but they are depicted on several drawing sheets. Please confirm that all monitors depicted on all sheets are existing. If not, please clarify.
Answer: Will use existing monitors / additional monitors are on hand
22. Solicitation posted 2/6/23 states, "Purpose of this Revision to the Solicitation W9124J-23-Q-0001 is to provide another version of the same Drawing, one that does require permission for access through the SAM.gov portal. Again, drawing has not changed but only the removal of the required permission for access to this drawing." The updated drawings are different from the previously issued drawings. For example, sheet 2 of 5 (aerial overview) removed the two monitor icons on the drawing but still lists two monitors in the Video Surveillance equipment table on the sheet. The new sheet also obliterated the camera id numbers. Sheet 4 of 5 added two monitor icons to the Bldg. 608 diagram but the Video
Surveillance equipment table on the sheet does not list any monitors. a) Please confirm that this latest drawing set (HQ+MICC+Camera+Drawings+Updated.pdf) supersedes the prior version; and b) In cases where the updated drawings conflict with the original SOW, which document takes precedence?
Answer: HQ+MICC+Camera+Drawings+Updated.pdf supersedes the previous version
23. SOW is not clear. Please clarify which cameras are existing cameras to be replaced and which locations do not have existing cameras but require new cameras (Reference SOW 3.x).
Answer: Replace all existing cameras, two additional cameras were added to the hallway in bldg. 613
24. SOW 1.2 specifies that the existing systems are analog but the SOW 3.3.2 indicates that replacement cameras will use the existing CAT 5 cabining. Please clarify the apparent inconsistency.
Answer: Use the existing CAT 5 cabling
25. Drawing sheet 2 appears to be incomplete. The plan appears to show a combination of some interior cameras and exterior cameras, but not all cameras. Please clarify which cameras depicted on this sheet
(2 of 5) correspond to cameras listed in SOW 1.2 and described in SOW 3.x.
Answer: Sheet #5 is the only set of cameras which are exterior
26. Is there an existing dedicated unswitched power circuit (minimum 120V AC 15A circuit) in Bldg. 613
Room 205 to support the new CCTV equipment? If not, please indicate nearest source of available power and circuit/panel rating (Reference SOW 2.1).
Answer: 110 v power is available at all locations, both 613 and 608. Outlets are co-located near the
NVRs
27. Are the environmental controls in the new Bldg. 613 NVR location (Room 205 break/copy room) adequate to support the new CCTV equipment (Reference SOW 2.1)?
Answer: Yes
28. Is there available space in Bldg. 613 Room 205 to support the new CCTV equipment and rack
(Reference SOW 2.x)?
Answer: Adequate space is available
29. Please identify the ceiling configuration within Bldgs. 608, 610, and 613 (acoustic tile, hard pan, sheet rock, etc.).
Answer: Tile ceiling with existing historic “Tin” ceiling above the acoustic tile ceiling – easily removable
30. Please confirm that all exterior camera locations have existing available penetrations and conduit installed. If not, please clarify requirements (Reference SOW 3.x).
Answer: Yes, there is a 1” EMT Conduit at each location for each exterior camera
31. Please confirm that all existing system camera and NVR wiring is clearly labeled at each end and each intermediate junction/termination point (i.e., in the j-boxes, at network switches, etc.) Reference SOW
2.2.
Answer: Unknown. The previous camera install was in 2014 and 2015. Do not remember if cables are
“Clearly Labeled”
32. As-built drawings provided in the amendment on 2/9 show multiple camera locations with sheet note 7 which states, "2" x 4" J-Box Surface mounted for future camera with 1"C back to cable tray."
Some of the locations are depicted on the solicitation drawings and others are not depicted on the solicitation drawings (HQ+MICC+Camera+Drawings+Updated.pdf; Specifically, As_Built_Drawings_volume_2+64+613.pdf ). Please confirm that offerors are only required to bid the locations shown on the solicitation drawings.
Answer: Offerors are only required to bid the locations shown on the solicitation drawings. Correct
33. For the locations depicted on the solicitation drawings but not shown on the as-builts, should offerors assume that each location has an existing 2" x 4" surface mounted J-Box with 1" C running via the shortest path to the nearest cable tray? If not, please clarify (Reference
FSH_Long_Barracks_As_Built_Drawings_Volume_2… files).
Answer: Correct. Each location has existing 2 x 4 J-Box with 1” Conduit
34. Is surface mounted conduit acceptable for the Bldg. 613 exterior cameras?
Answer: Yes
35. Drawing does not show any existing camera locations, conduit, or cable tray for the gym. Drawing shows other cameras at the building entrance doors with sheet note 2 which states, "2" X 4" J-BOX
SURFACE MOUNTED FOR FUTURE CAMERA WITH 1 "C BACK TO CABLE TRAY IN BUILDING B-609." Please clarify 1) if the (Reference FSH_Long_Barracks_As_Built_Drawings_Volume_2+68+610.pdf).
Answer: Bldg. 609 is in-between 610 and 608. Cable tray is a throughway for cabling
36. Drawing does not show any existing camera locations, conduit, or cable tray in the gym or in the building. Please confirm that there is existing conduit, cabling, j-boxes, etc. to support installing the SOW specified cameras in each location in this building (Reference
FSH_Long_Barracks_As_Built_Drawings_Volume_2+68+610.pdf).
Answer: Yes, there is a cable tray which runs North and South through the building
37. Question 5 indicates to provide a new UPS. Please confirm that offerors are to bid providing a new
UPS for each NVR (Reference Round+Two+of+QUESTIONS+-+ANSWERS.pdf).
Answer: Yes, UPS is required for install for both NVRs
38. Question 5 indicates to provide a new UPS. Please clarify 1) required runtime for new UPS and 2) what equipment needs to be powered by the UPS (i.e., NVR only, network switches, cameras, monitors, etc.) so that offerors can determine the proper battery capacity (Reference
Round+Two+of+QUESTIONS+-+ANSWERS.pdf).
Answer: Equivalent to the UPS currently being used…. CyberPower CP1500AVRLCD UPS Batteries (Replacement) - 12 Volts 7.5 AH F2 terminal. Our brand new replacement battery set for the CyberPower CP1500AVRLCD Uninterruptible Power Supply (UPS) unit includes 2 SigmasTek SP12-7.5HR batteries (12 Volts 7.5 AH).
39. Please identify the required storage capacity for the NVRs.
Answer:
• ExacqVision ELP Series
• Continuously record up to 200Mbps of video, audio and data
• Available with 8 or 16 analog inputs
• Includes 4 IP camera licenses, expandable to 24 per video server
• Use the configuration calculator to find the perfect exacqVision server for your application
• Store up to 12 TB storage per server using continuous duty, enterprise-class hard drives
• Linux operating system pre-installed on a solid state drive
• Monitor hardware status with the free exacqVision client or e-mail notification https://www.exacq.com/config/