PWS_Tent_Power_Equipment-Revised.DOC

DOC document 174 KB Posted

Attached to
ARCENT Steppe Eagle Exercise Federal contract opportunity
Solicitation number
W9124C-18-T-0003
Issued by
Department of the Army

View the file

Other files for this federal contract opportunity

Other files attached to ARCENT Steppe Eagle Exercise, newest first.
File Type Posted
Q_A.docx DOCX document
PWS_Tent_Power_Equipment.pdf PDF
PWS_Laundry.pdf PDF
PWS_Food_Svcs.docx DOCX document
PWS_Showers_Trailers.pdf PDF
PWS_Portable_Chem_Toilets.docx DOCX document
Additional_Clauses.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

Basic Life Support Services to Support US Army Central (ARCENT) Steppe Eagle Exercise 29 May 2018

PART 1

GENERAL INFORMATION

1. General. This is a non-personal services requirement to provide Basic Life Support (BLS). The personnel rendering the services herein are not subject to the supervision and control of the Government. Such personnel shall be accountable solely to the Contractor who, in turn, is responsible to the Government. The Government shall not exercise any supervision or control over the contract service providers performing the services herein.

1.1. Description of Services/Introduction. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform temporary Basic Life Support Services at McCrady Training Center, as defined in this Performance Work Statement (PWS), except for those items specified as Government furnished property and services. . The Contractor’s performance will be observed by the Government Contracting Officer’s Representative (COR).

1.2. Background. : United States Army Central (ARCENT) will be conducting a military exercise 2-23 Aug 2018 which will require Basic Life Support on MCrady Training Center (FOB Palmetto).

1.3. Objectives. The objectives of this requirement are to provide billeting tent set-up 8 sleeping tents , one DFAC tent and one Medical Tent , power generation, air conditioner units, interior lighting for each tent and also provide four 10 yard dumpsters or similar. Two dumpsters will be located on FOB Palmetto, one on Fob Kabul, and one on FOB Alsad. All dumpster should be dumped twice a day. Once at 0830hrs and 2000hrs

1.4. Scope. The Contractor shall provide Basic Life Support Services with the ability to provide full LSA set-up, including, but not limited to: management, maintenance, and removal of tents, sufficient power generation, air conditioner unit, lighting and also provide four 10 yard dumpster or similar .Two dumpsters will be located on FOB Palmetto, one on Fob Kabul, and one on FOB Alsad. All dumpster should be dumped twice a day. Once at 0830hrs and 2000hrs

1.5. Period of Performance. The period of performance for this exercise shall be 20 days 2-23 August 2018.

1.6. General Information.

1.6.1. Quality Control. The Contractor shall develop and maintain an effective Quality Control Program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s Quality Control Plan (QCP) is the means by which it assures that its work complies with the requirement of the contract. One copy of a comprehensive written Quality Control Plan shall be submitted to the Contracting Officer (KO) and Contracting Officer’s Representative (COR) within 10 days of award. After Government acceptance of the QCP, the Contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to his QC system.

1.6.2. Quality Control Reports. The Contractor shall submit a monthly Quality Control Report for each functional area identified in the contract. The report shall be submitted to the COR and KO on the last day of the month for review as part of the Contractor's QCP.

1.6.3. Quality Assurance. The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.4. Recognized Holidays. There is no Federal or public Holidays during the period of performance

1.6.4.1. Hours of Operation: The Contractor will provide power generation and air conditioner units for all 10 tents. Services will be required seven days a week, with 24 hour on-call availability. The Contractor shall, at all times, maintain an adequate workforce to ensure uninterrupted performance of all tasks defined within this PWS. The Contractor shall keep in mind that the stability and continuity of the workforce are essential. The Contractor shall ensure response to emergency can be responded to within and.

1.6.4.2. Locations. The Contractor shall provide services as required at the established Life Support Area on McCrady Training Center ( FOB Palmetto).

1.6.5. Security. Contractor personnel performing work under this proposed contract must be able to access the life support area of McCrady Training Center Compound. The Contractor shall provide services under this requirement at the non-established Life Support Area on McCrady Training Center. Contractor personnel must have Identification Card in accordance with Mccrady Training Center security measures and in conjunction with Base Access requirements.

1.6.5.1. physical Security. The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use in accordance with the Army Physical Security Program.

1.6.5.2. Contractor and Subcontractor’s Employees. The Contractor and Subcontractor’s employees will not be permitted on the installation when their presence is considered detrimental to the security of the installation. The Government reserves the right to require removal from the job site any Contractor employee who endangers persons or property, whose continued employment is considered inconsistent with the interest of military security or who is found to be incapacitated or under the influence of alcohol, drugs, or other substances. Removal of employees for any reason does not relieve the Contractor of the requirements to perform services specified herein. The Contractor shall be responsible for ensuring that all employees adhere to military installation access procedures according to the Host Nation Jordanian Armed Forces Directorate of Military Security Protocol.

1.6.5.3. Identification Badges. When on site, the Contractor shall adhere to all installation policies and procedures. In order to gain access to respective bases, the Contractor shall submit a list of all Contractors’ personnel, to include ID number, to McCrady Training Site to be vetted no less than 30 days in advance of the exercise performance period or as dictated by McCrady authorities. When required, the Contractor will be escorted into the facilities by military personnel and issued a badge.

1.6.5.3.1. Identification of Contractor Employees. The Contractor (to include Subcontractors) shall provide each employee an Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name and a color photo of the employee. ID Badges for Key Personnel shall also indicate their job title. ID Badges shall be worn at all times during which the employee is performing work under this contract. Each Contractor (to include Subcontractors) employee shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include Subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. A listing of issued identification cards shall be furnished to the COR prior to the contract performance date and updated as needed to reflect Contractor and Subcontractor personnel changes. They must also ensure that all documents or reports produced by the Contractor are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.6.5.4 Installation Access Based on recent guidance from the Secretary of the Army and COS Army, Senior Commanders and supporting garrison leadership are not authorized to grant unescorted installation access without the required identity proofing and vetting using the National Crime Information Center Interstate Identification Index (NCIC-III).

Civilian personnel requesting access must have a valid reason to be on the federal installation, be sponsored by a DOD Civilian/military card holder, and be favorably vetted against the FBI's database. Once these conditions have been met, the Government will issue credentials in the form of either a pass or DOD identification card from the DBIDS System that the Government currently has in place. (Defense Biometric Identification System).

Personnel not affiliated with DOD and/or not vetted against NCIC-III or for a short term visit, must escorted while on the installation.

National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) Criteria for Denial.

Army Senior Commanders will, in the absence of an approved waiver, deny uncleared individuals unescorted access to the installation based on the results of the NCIC-III and TSDB checks that contain credible derogatory information indicating that the individual may present a threat to the good order, discipline, or health and safety on the installation. Such derogatory information includes, but is not limited to, the following:

1. The NCIC-III contains criminal arrest information about the individual that causes the senior commander to determine that the individual presents a potential threat to the good order, discipline, or health and safety on the installation.

2. The installation is unable to verify the individuals claimed identity based on the reasonable belief that the individual has submitted fraudulent information concerning his or her identity in the attempt to gain access.

3. The individual has a current arrest warrant in NCIC, regardless of the offense or violation.

4. The individual is currently barred from entry or access to a federal installation or facility.

5. The individual has been convicted of crimes encompassing sexual assault, armed robbery, rape, child molestation, production or possession of child pornography, trafficking humans, drug possession with the intent to sell or drug distribution.

6. The individual has a U.S. conviction for espionage, sabotage, treason, terrorism or murder.

7. The individual is a registered sex offender.

8. The individual has a felony conviction within the last 10 years, regardless of the offense or violation.

9. The individual has been convicted of a felony firearms or explosives violation.

10. The individual has engaged in acts or activities designed to overthrow the U.S. Government by force.

11. The individual is identified in the TSDB as known to be or suspected of being a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity. When this capability becomes available to DOD, installation access control personnel will strictly follow the Federal Bureau of Investigations published engagement protocols.

*Only Government officials whom the senior commander designates will perform fitness determinations. Designations will be in writing by duty position and codified in local guidance.

DBIDS information required to issue passes/cards.

Stateside license, Personal data Ht/Wt/, who the sponsor is, finger print/photo.

Before issuing ID cards to new employees or contractors, the standard requires agencies to conduct a background investigation of employees and contractors "who require long-term access to federally controlled facilities and/or information systems." This investigation would include agency initiation of the National Agency Check with Written Inquiries (NACI) or a similar type of national security investigation. In the event credentials are issued without a completed NACI, the ID must be electronically distinguishable from those issued to individuals for whom the investigation has been completed. The Contractor is responsible for meeting Antiterrorism/Operations Security Requirements. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete all mandatory training to include Antiterrorism (AT) and Operations Security (OPSEC) training required by government employees and directed by the command.

The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

The Government may prohibit a Contractor employee from entering the installation if evidence reveals his or her entrance is detrimental to the security of the reservation. The Contracting Officer will advise the Contractor of the reason for the employee’s removal or for barring the employee’s entrance to the reservation. Removal or barring employee(s)’ entrance to the reservation does not relieve the Contractor from total performance obligations for services herein nor subject the Government to any expense to replace a removed employee.

The COR is the Point of Contact for all required OPSEC and iWatch training requirements identified in the contract.

See Section H of the solicitation for the Fort Jackson Vetting Policy/Documents.

1.6.5.4.1. Security of Classified Items, Systems and Information: The Contractor, as a general rule, shall not have access to classified information; however, should classified documents fall into the possession of the Contractor, the Contractor shall immediately contact the COR for disposition instructions.

1.6.6. Special qualifications: The Contractor is responsible for ensuring all employees possess all required licenses for operating all equipment and vehicles in accordance with US and McGrady rules, regulations, and laws.

1.6.7. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.

1.6.8. COR. The COR will be identified at time of award. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government Furnished Property; and provide site entry of Contractor personnel. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.9. Contract Management: The Contractor shall provide a Program Manager (PM) for management of overall contracting issues and an On-site Manager at each location who shall be responsible for the performance of the work under this proposed contract. The PM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this proposed contract. The Project Manager shall be physically available from 0700 am to 1000pm, seven days a week, Sunday thru Saturday.

PART 2

DEFINITIONS & ACRONYMS

1. Definitions. For purposes of this Performance Work Statement (PWS) the following terms shall have the meanings presented below:

1.1. Contract Administrator. The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.

1.1.2 Contractor. A supplier or Contractor awarded a contract to provide specific supplies or services to the Government. The term used in this contract refers to the prime.

1.1.3. Contracting Officer (KO). A person with authority to enter into, administers, and/or terminates contracts, and makes related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

1.1.4. Contracting Officer’s Representative (COR). An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

1.1.5. Controlled Area. A controlled space extending upward and outward from a specified point. This area is typically designated by a commander or director, wherein sensitive information or operations occur and requires limitations of access.

1.1.6. Defective Service. A service output that does not meet the standard of performance associated with the PWS.

1.1.7. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

1.1.8. Government-Furnished Property (GFP) or Government Property (GP). Property in the possession of, or directly acquired by, the Government and subsequently made available to the Contractor.

1.1.9. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

1.1.10. Physical Security. Actions that prevent the loss or damage of Government property.

1.1.11. Quality Assurance. The Government procedures to verify that services being performed by the Contractor are acceptable IAW established standards and requirements of this contract.

1.1.12. Quality Assurance Specialist. An official Government representative concerned with matters pertaining to the contract administration process and quality assurance/quality control. Acts as technical advisor to the Contracting Officer in these areas.

1.1.13. Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.

1.1.14. Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

1.1.15. Subcontractor. One that enters into a contract with a prime Contractor. The Government does not have privet of contract with the Subcontractor.

1.1.16. Work Day. The number of hours per day the Contractor provides services IAW the contract.

1.1.17. Work Week. Sunday through Saturday.

2.2. Acronyms.

ACOR

Alternate Contracting Officer's Representative

ACSA

Acquisition Cross Service Agreement

AFARS

Army Federal Acquisition Regulation Supplement

AKO

Army Knowledge Online

AMEDD

Army Medical Department

APHC

Army Public Health Command

AR

Army Regulation

AT

Antiterrorism

CCE

Contracting Center of Excellence

CENTCOM

Central Command

CFR

Code of Federal Regulations

CLIN

Contract Line Item Number

CMR

Contract Manpower Reporting

COCO

Contractor-Owned/Contractor Operated

COIC

Combined Operations Information Center

CONUS

Continental United States (excludes Alaska and Hawaii)

COR

Contracting Officer Representative

COTS

Commercial-Off-the-Shelf

DA

Department of the Army

DBA

Defense Base Act (Worker’s Compensation)

DD250

Department of Defense Form 250 (Receiving Report)

DD254

Department of Defense Contract Security Requirement List

DFARS

Defense Federal Acquisition Regulation Supplement

DMDC

Defense Manpower Data Center

DOD

Department of Defense

FAR

Federal Acquisition Regulation

FPCON

Force Protection Condition

FSC

Federal Supply Code

HACCP

Hazard Analysis Critical Control Point

HAZMAT

Hazardous Material

HIPPA

Health Insurance Portability and Accountability Act of 1996

IAW

In Accordance With

IDIQ

Indefinite Deliverable, Indefinite Quantity

JELC

Joint Exercise Lifecycle

JER

Joint Ethics Regulation

JTR

Joint Travel Regulation

KO

Contracting Officer

LSA

Life Support Area

MHE

Material Handling Equipment

OCI

Organizational Conflict of Interest

ODC

Other Direct Costs

PIPO

Phase In/Phase Out

POC

Point of Contact

PRS

Performance Requirements Summary

PWS

Performance Work Statement

QA

Quality Assurance

QAP

Quality Assurance Program

QASP

Quality Assurance Surveillance Plan

QC

Quality Control

QCP

Quality Control Program

SOW

Statement of Work

SPOT

Synchronized Pre-deployment Operational Tracker

SPV

Subsistence Prime Vendor

TE

Technical Exhibit

TISA

Troop Issue Subsistence Activity

UIC

Unit Identification Code

USARCENT

United States Army Central (Command)

WAWF

Wide Area Work Flow

VETCOM

Veterinary Command

PART 3

GOVERNMENT FURNISHED ITEMS AND SERVICES

3.1. General: The Government shall provide the facilities, equipment, materials, and/or services listed below.

3.2. Equipment/Materials: None.

3.3. Services: None

3.3.1. Utilities: None.

3.4. Facilities: The Government will furnish the necessary real estate (land) at: McCrady Training Site for the duration of the contract period of performance, to include established life support areas, and must maintain the level of security required for the life of the contract.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4.1. General: Except those items specifically stated to be Government-furnished in Part 3, the Contractor shall furnish everything required to perform this PWS.

PART 5

SPECIFIC TASKS

5.1. Basic Life Support Services: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform temporary Basic Life Support Services McCrady Training Center( FOB Palmetto), as defined in this Performance Work Statement (PWS), except for those items specified as Government furnished property and services. The Contractor shall perform to the standards outlined in the PWS. The Contractor’s performance will be observed by the Government Contracting Officer’s Representative (COR).

5.1.1. Standard BLS Requirements

5.1.1.1. Tents. (Billeting). The Contractor shall set up tents nominally sized 30 meter x 10 meter. There shall be at a minimum 12 feet of spacing between each tent and 30 feet of spacing between rows. Tents should be able to fit at least 30 personnel per tent. The Contractor shall provide at least 40 cubic feet of space per person and two industrial strength environmental control units (ECUs) to ensure tents can stay evenly cooled to a temperature between 64 to 77 Fahrenheit (F). The Contractor shall provide enough electrical power with RCD circuit breakers to safely power the ECUs, overhead fluorescent lights and convenience outlets. ECU’s shall have an electrical isolation switch installed next to the unit outside, if its source power circuit breaker is not within direct eye sight. There shall be one 13A, 110V, switched, two gang convenience outlet for every tent Outlet shall be powered by single phase 20A circuit breakers. There shall not be more than four two gang receptacles per 20A circuit breaker. The Contractor shall ensure that each shelter is water proof and equipped with a liner to reduce light during daytime hours to allow for proper rest of personnel during daytime hours and a wooden canopy doorway to assist in maintaining temperature, reduce sand and dust, and ambient noise reduction. The Contractor shall provide a level floor covering (indoor/outdoor matting) in each of the living areas sufficient to cover the entire area and reduce dust and provide a barrier between the living area and the ground as well as prevent any water damage during inclement weather.

5.1.1.2. Tent (DFAC Tent).

The Contractor shall set up one 10 meter x 10 meter tent to serve as the DFAC tent operating area as required.. The Contractor shall provide enough electrical power, lightning and weather/ ambient protection as listed in paragraph 5.1.1.1. Additionally, the Mayor Cell tent will include 25 tables and 130 chairs, and a sliding door type refrigeration unit to maintain cool liquids.

5.1.1.3. Dumpsters: The contractor shall provide four 10 yard dumpsters area similar. Two dumpsters will be located on FOB Palmetto, one on Fob Kabul, and one on FOB Alsad. All dumpster should be dumped twice a day. Once at 0830hrs and 2000hrs

5.1.2. Additional Special Requirements Offered by Request.

5.1.2.1. Tent (Medical/First Aid Station) – Where requested, the Contractor shall set a tent to serve as a medical/first aid station. Two tent sizes are available and one size shall be specified with request, either a 10 meter X 10 meter or 10 meter X 20 meter tent. Both size tents shall include: self-sufficient power, operating independently from the main grid powering up the LSA; flooring shall be wooden for stability and covered by a non-absorbent, cleanable surface such as linoleum in order to avoid possible blood (or other fluid) absorption; 2-4 padded tables (depending on tent size) to serve as medical tables; 5 work tables and 20 folding chairs; and refrigeration with freezer capability.

5.2. Lighting. Each structure shall have sufficient fluorescent lighting to allow personnel to see adequately while living.

5.3. While on the base, the Contractor’s employees are prohibited from taking items out of the dumpsters for their personal use or ownership. The Contractor shall immediately report to the COR if items or materials are discarded or found near the dumpsters that are classified or sensitive. Examples of this are:

5.3.1. Maps of American Military Bases

5.3.2. Future dates of incoming forces or planned operations

5.3.3. Folders or papers marked secret/sensitive information

5.3.4. Military Uniforms

5.3.5. Fuel. The Contractor shall provide all required fuel for LSA operations. The Contractor shall provide an appropriately licensed operator to draw, transport, and deliver fuel to ensure continuous and uninterrupted operations of the LSA. The Contractor shall provide the fuel truck or transportation system. All Government Furnished Equipment associated with the LSA and in support of LSA operations will be refueled by the Contractor as well as all Contractor furnished equipment in support of the LSA.

5.3.6. Material Handling Equipment (MHE). The Contractor shall provide required MHE and operator(s) to support LSA deployment, set-up, tear-down, and redeployment of equipment and materials. The Contractor shall include all costs associated with deployment, set-up, tear-down, redeployment, and management costs associated with the execution of these requirements to include ensuring that the location for the base camp is clean and free of debris prior to the vendor’s departure.

5.3.7. HAZMAT Removal. The Contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform recycling, and hazardous waste removal services. The Contractor shall meet all requirements in this Performance Work Statement (PWS) and all local host nation requirements. The Contractor shall provide a crew foreman (and contact information) who is fluent in English and accessible during the daily times of service so that the COR may contact the foreman in the event any issue(s) may need resolution.

5.3.8. Recyclable and Hazardous Waste Collection Specific Requirements.

Materials which are listed within the Recyclable Items list should be recycled to the maximum extent practical. The Contractor will only be permitted to remove items from the base which has been demonstrated by the vendor that proper licenses and permits have been obtained from the proper Host Nation authorities. The Contractor shall demonstrate the safe transportation, storage, management, treatment and disposal without impact to the Host Nation environment. Maximum recycling shall be accomplished by the Contractor.

Recyclable Items:

aluminum cans scrap vehicles/equipment scrap metal wood/metal furniture shredded paper scrap AC/units cardboard plastic bottles used oils/fuels lubricants glass bottles

Hazardous/Other Wastes

POL debris

5.3.9. Vehicles. The Contractor shall provide all vehicles necessary to fulfill the requirements of this proposed contract. Vehicles shall be in operable condition and meet local and base entry requirements. Vehicles shall present a clean, neat appearance and have the Contractor's name and contact phone number affixed on it (in English) for easy identification. All vehicles shall be in serviceable condition and shall not leak any petroleum, corrosive or waste fluids at any time. In the event of a vehicle breakdown or mechanical failure causing a hydraulic, oil or fuel spill, the Contractor shall provide a repair mechanic and/or alternate collection vehicle(s) as soon as possible, upon notification. The Contractor shall be responsible for the cleanup of petroleum/synthetic spills and disposal of the clean-up debris at an acceptable off base Jordanian disposal site. All spills shall be reported immediately by the Contractor to the COR.

5.3.10 Supplies and services to be provided by the Contractor:

- Planning, organizing, and executing recyclable and hazardous waste pick-up

- All tools and equipment

- Vehicles and fuel

- Laborers, drivers, supervisor

- Transportation to/from work in marked vehicles

- Clean, identifiable uniforms with company logo

- Personal protective equipment, as required

- Food and water for employees, as required

- All licenses and permits required by McGrady Trianing Site regulations to transport, treat and dispose of all recyclable and hazardous wastes.

- Requirements to fulfill the obligations of this contract not specifically identified as being provided by either Government or the Contractor will be the responsibility of the Contractor to provide.

- Escort services for security

5.3.11 Recycling and Hazardous Waste Reports.

The Contractor shall provide a report after each disposal to the COR listing all quantities of recycling and hazardous waste collected by commodity.

5.3.12. Disposal. The Contractor shall be licensed to transport all recycling and hazardous wastes from the base. The disposal and/or treatment of hazardous waste shall be in accordance with existing regulations in the host nation licensed and approved disposal site. The Contractor shall be responsible for all permits and fees associated with the use of off-base disposal facilities. The Contractor shall provide copies of all licenses and permits to the U.S Government upon request to verify that treatment or disposal can be conducted in accordance with local (city, town, country) requirements.

5.3.13. Written Plan for Disposal and/or Recycling of Materials. The Contractor shall provide a written plan for disposal of Hazardous Waste and/or Recycling to the COR within 10 days of award for review and approval (with technical comments from ECES/CEPV Environmental Office) on what methods and procedures will be used to process recycle materials and dispose or treat hazardous waste materials removed from respective locations prior to the commencement of work.

5.3.14. The Contractor shall be responsible for removal of its own HAZMAT.

5.4 Surge Increase

5.4.1. On Order, the Contractor shall provide billeting that can house multiple additional personnel and have the ability to surge as needed with a 3 day notification from the US Government.

5.4.2. General Safety: The Contractor shall provide and properly maintain 10 # ABC Type Fire Extinguisher within each structure assembled for Government use.

5.4.3. In order to provide safety control for protection to the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this contract, the Contractor shall comply with the following Safety Accident Prevention Standards: 29 CFR 1910, Occupational Safety and Health Standards; 29 CFR 1926, Safety and Health regulations for Construction; Army Corps of Engineers Manual 385-1-1, Safety and Health Requirements Manual. The Contractor shall comply with the above and all other applicable DoD, Army, Federal, State and Local safety and health requirements and ensure they are in compliance for inspection by USACE Electrical Engineering inspection team at each location to ensure that all electrical engineering meets the requirements outlined in the British Standard 7671:2008.

5.4.4. Reporting of Fire and Safety Hazards. The Contractor shall train personnel to recognize fire and safety hazards and encourage personnel in the performance of their duties to report fire and safety hazards and unsafe conditions to their supervisor. The Contactor shall take corrective action to remedy reported deficiencies IAW the terms of this contract. The COR shall be notified of deficiencies beyond the terms of this contract.

5.4.5. Specific Electrical Safety Requirements. All circuits shall have a continuous earthing conductor of appropriate size from where it receives source power. All applicable equipment shall have an installed equipment earthing conductor. Outdoor power distribution panel boards shall be outdoor rated with IEC 60309 pin and sleeve connections. Facility panel boards shall be rated for the environment installed. Panel board directories shall be accurate and complete, labeling shall be in English and Arabic. Cable shall be sized according to the circuit breaker, parallel runs of cable shall be the same size and length and are allowed only between circuit breakers. Cable shall be outdoor rated from the panel board if any part of the circuit is outdoor. Cable glands shall be used when routing cables outside panel boards. All electrical splices/joints shall be inside an enclosure rated for the environment it is located, this enclosure shall not be the panelboard. Lighting and convenience outlets shall be on 20A branch circuits.

5.4.6. Specific Generator Requirements. If generator power is the only source at a site, a backup generator shall be onsite and connected to a manual transfer switch throughout the scope of performance. If a generator is found to be non-mission capable the contractor shall provide a replacement immediately. Generators shall have an earth neutral bond connection, output cables shall be sized to the generator circuit breaker. The generator shall be earthed to an electrode that is a minimum 10 feet (3.0 meter) in length and ¾ inch (19 millimeter) diameter. Provide copper-clad steel or solid copper earthing electrodes. All earthing connections shall not have a resistance greater than 25 ohms. Spacing for driving additional electrodes must be a minimum of 10 feet (3.0 meter). Bond these driven electrodes together with a minimum of 4 AWG (25 square millimeter) soft drawn bare copper wire buried to a depth of at least 12 inches (300 millimeter). Fuel tanks that are not permanently attached to the generator shall be separately earthed from the generator.

5.4.7. Environment and OSHA. The Contractor shall comply with all local, environmental and occupational safety laws, rules, and regulations. Any apparent conflict between compliance with OSHA environmental and occupational safety laws, rules, regulations, and compliance with the requirements of the contract shall be immediately brought to the attention of the Contracting Officer and COR for final resolution. The Contractor shall notify the Contracting Officer and COR in writing in addition to any verbal notification of such conflict. The Contractor shall be liable for all fines, penalties, and costs which result from violations of, or failure to comply with, all OSHA regulations. All unsafe acts or conditions fostered by the Contractor or Contractor personnel may be grounds for the Contracting Officer or COR to halt any and all Contractor performance with a commensurate deduction of monies due to the Contractor until such unsafe conditions are corrected. The Contractor shall take due caution not to endanger personnel during performance of this contract. Upon discovery of a serious hazard such as, but not limited to, fire, or large fuel spill, the Contractor shall notify the Contracting Officer and COR.

5.4.8. Reporting Mishaps. The Contractor shall adhere to reporting of mishaps IAW AR 385-10, The Army Safety Program and DA Pam 385-40, Army Accident Investigations and Reporting. In addition the Contractor shall report: (1) Injury or occupational illness to on-duty Contractors; (2) Damage to GFM, GFP, or GFE provided to a Contractor; (3) Contractor accidents involving Army property and personnel.

5.4.9. Personnel Safety. The Contractor shall immediately correct all safety deficiencies upon notification of the deficiencies by the Contracting Officer, designated representative or COR, and shall notify the Contracting Officer of the corrective action to be taken.

5.4.10 Contractor Manpower Reporting. The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including Subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address https://cmra.army.mil. The required information includes: (1) Contracting Officer, KO, Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including Sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including Sub-Contractors); (7) Total payments (including Sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and Sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and Sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each Government fiscal year and must be reported by 31 October of each calendar year or as stated in the delivery schedule of the contract.

5.4.11. Proof of DBA Insurance. Contractors shall obtain commercially available DBA insurance from a DOL authorized insurance carrier unless the Contractor is under a self insurance program approved by the DOL or subject to a waiver. There are many companies listed on the Department of Labor (DOL) website who say they can provide DBA insurance, but there are currently only seven major players in the market: ACE, AIG, CNA, Allied World, Zurich, CV Starr and the Chubb Group. AIG, CNA and ACE write the majority of Middle East DBA coverage. The DOL approved carriers and self insured employers are available at http://www.dol.gov/owcp/dlhwc/lscarrier.htm.

5.4.12. If the expiration date of the policy is before the performance ends, then prior to expiration, the Contractor shall provide a new policy or renewal of existing policy to cover the performance to the ending date of performance.

5.4.13. The Contractor shall keep posted in a conspicuous place in and about its place of business either a typewritten or printed notice on Forms LS-241 (Notice to Employees) or LS-242 (Notice to Employees for Self-Insured Employers). Such notice must also contain the name and address of the employer representative to who notice of injury is given, and the carrier, if any, with whom the employer has secured payment of compensation and the date of the expiration of the policy. Posted notice shall be written in the language of the employees. Additional information is available at http://www.dol.gov/owcp/dlhwc/lsdba.htm .

5.4.14. Synchronized Pre-Deployment Operational Tracker (SPOT). The Contractor shall ensure all the employees of the Contractor and all Subcontractors are registered in the Synchronized Pre-Deployment and Operational Tracker (SPOT) program. The Contractor shall ensure registration of all their employees and all Sub-contractors in the Synchronized Pre-deployment and Operational Tracker (SPOT) program. Contractor shall input the necessary information into SPOT within 5 days after contract award. The Contractor shall ensure all updates (to add or delete personnel) occur within 48 hours of the notification of change. The reporting will be done manually or at the designated website available at https://spot.altess.army.mil as directed by the KO. The required information includes: (1) CAGE Code for Vendor/Company that employee works for; (2) Name of Vendor/Company that employee works for; (3) First Name of Employee; (4) Last Name or Surname of Employee; (5) Middle Initial; (6) Gender of Employee (Male or Female); (7) Date of Birth of Employee (mm/dd/yyyy); (8) City in which the Employee was born (Nearest City); (9) Country in which the Employee was born; (10) Social Security Number (If US Citizen); (11) Primary Email Address of Employee or Company; (16) State the name of the contracting effort the employee will be working on (example: Victory Base Housing Construction); (17) Employee start date on contract (mm/dd/yyyy); (18) Employee estimated end date on contract (mm/dd/yyyy); (19) Employee actual arrival date at location for contract (mm/dd/yyyy); (20) Country that the employee will be working; (21) City closest to where the employee is working; (22) Employee's Job Title; (24) Contract Number; (23) Associated Task Order Number (If Applicable); (24) Primary Supporting Organization (Eg. 410th). The SPOT website is located at https://spot.dmdc.mil/privacy.aspx .

5.4.14. Sexual Harassment Training. The Contractor shall comply with and ensure all employees comply with the Sexual Assault and Sexual Harassment Policy outlined in Attachment 1 of this document.

5.4.15. Sexual Harassment Policy Compliance. Contractor shall certify that all employees that shall be performing work in association with this contract have been fully trained per the requirements in Attachment 1. The COR shall be provided with the following information at a minimum: employee’s name, civil identification number and date trained. Proof of Sexual Harassment Policy Compliance is due within 48 hours after initial contract award and prior to new personnel performing on site.

5.4.16. The Contractor shall annually train all employees to prevent sexual assault and sexual harassment. This training must, at a minimum, ensure that all Contractor employees understand the definitions and policy outlined in Attachment 1.

5.4,17. Each employee’s compliance with this training requirement shall be reported to the Contracting Officer Representative prior to the employee being allowed access to the worksite.

5.5. Quality Control Program

5.5.1 The Contractor shall establish and maintain a complete quality control program for the performance requirements within this PWS. The Contractor shall provide a copy of their Quality Control Plan to the Contracting Officer for acceptance within 10 days of award. The Contractor shall provide a copy of the updated plan to the Contracting Officer prior to the contract start date and as changes occur.

5.5.2. The Contractor’s Quality Control Plan shall include:

5.5.2.1 An inspection system covering all performance requirements within this PWS. It shall specify all areas to be inspected on either a scheduled or unscheduled basis, how often inspections will be accomplished, or the titles of who will be performing the inspections.

5.5.2.2 The methods for identifying and preventing defects in the quality of services performed before the level of performance becomes unacceptable.

5.5.2.3 All inspections conducted by the Contractor shall be recorded and made available to the U.S. Government upon request from the Contracting Officer.

5.6 Quality Assurance

5.6.1. Performance Evaluation Meeting. The contract manager will meet at least weekly with the COR and the Contracting Officer during the first month of the contract. Meetings will be held whenever Contracting Discrepancy Report, is issued. The contract manager, Contracting Officer and COR shall sign the written minutes of these meetings. Should the Contractor not concur with the minutes, the Contractor shall state any areas of non-concurrence in writing to the Contracting Officer, within 5 working days of receipt of the signed minutes.

PART 6

APPLICABLE PUBLICATIONS AND FORMS

6. Applicable Publications (Current Editions)

6.1. The Contractor (to include Subcontractors) must abide by all applicable regulations, publications, manuals, and local policies and procedures.

29 CFR 1910, Occupational Health and Safety at https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_number=1910 32 CFR 147.24, The National Agency at http://www.gpo.gov/fdsys/granule/CFR-1999-title32-vol1/CFR-1999-title32-vol1-sec147-24/content-detail.html

5500.7-R Federal Joint Ethics Regulation (FJER) is available at www.dod.mil/dodgc/defense_ethics/ethics_regulation/ AR 190-13, The Army Physical Security at https://armypubs.us.army.mil/epubs/dr_pubs/dr_b/pdf/r190_13.pdf

AR 200-1, Environmental Protection & Enhancement at armypubs.army.mil/epubs/pdf/r200_1.pdf

AR 385-10, The Army Safety Program at https://armypubs.us.army.mil/epubs/pdf/r385_10.pdf AR 700-141, Hazardous Materials Information Resource System that can be located at: www.apd.army.mil/jw2/xmldemo/r700_141/main.asp DA Pam 385-40, Army Accident Investigations and Reporting at https://armypubs.us.army.mil/epubs/pdf/p385_40.pdf

DoD 5200.08-R, Physical Security Program- www.dtic.mil/whs/directives/corres/pdf/520008r.pdf EM 385-1-1 Engineering Manual (EM), General Safety Requirements at http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx Federal Acquisition Regulations are available at http://farsite.hill.af.mil/ References by weblink:

SPOT: https://spot.dmdc.mil/privacy.aspx Contractor Manpower Reporting Act: https://cmra.army.mil US Army Safety Home Page: https://safety.army.mil/

Hazard Analysis Critical Control Point: http://www.fda.gov/food/guidanceregulation/haccp/default.htm

6.2. Forms. Mandatory records and report forms are listed below.

DD254 – Department of Defense Contract Security Classification Specification, available at http://www.dtic.mil/dtic/pdf/formsNguides/dd0254.pdf DD250- Department of Defense-

Material Inspection and Receiving Report at http://www.dtic.mil/whs/directives/infomgt/forms/eforms/dd0250.pdf Technical Exhibit 1

Performance Requirements Summary

The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Technical Exhibit 2

Deliverables Schedule

Deliverable
Frequency
Medium/Format
Submit To

Quality Control Plan

PWS paragraph 1.6.1 and 5.26

Within 10 days of award
Email/ Electronic Copy
Contracting Officer/COR

Contractor Quality Control Report

PWS paragraph 1.6.2

Monthly during Task Order Training Exercises
Email/Electronic Copy
Contracting Officer/COR

Recycling and Hazardous Waste Reports

PWS paragraph 5.14.6

After each disposal during Task Order Training Exercises
Email/Electronic Copy
Contracting Office/COR

Written Plan for Disposal and/or Recycling of Materials

PWS paragraph 5.14.9

10 days after award
Email/Electronic Copy
Contracting Office/COR
Contractor Manpower Reporting PWS paragraph 5.22
NLT 31 Oct of each year
Email/ Electronic Copy; https://cmra.army.mil
Contracting Office/COR

Synchronized Pre-deployment and Operational Tracker (SPOT)

PWS paragraph 5.24

As determined if applicable no later than 5 days after contract award and bi-monthly as new employees are added
https://spot.dmdc.mil/privacy.aspx

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.