W91248-17-Q-A001_27JUNE17.pdf
PDF 436 KB Posted
- Attached to
- Demolition Services Federal contract opportunity
- Solicitation number
- W91248-17-Q-A001
About this file
Solicitation
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W91248-17-Q-A001 27-Jun-2017
b. TELEPHONE NUMBER
270-798-6196
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 27 Jul 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912489. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SSG PATRICK KENNISON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0010995165
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
MICC - FORT CAMPBELL
6923 38TH AND DESERT STORM
FORT CAMPBELL KY 42223
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W34GM5 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DIRECTORATE OF PUBLIC WORKS
ED FREER
CONTRACT MANAGEMENT BLDG 846 GA AVE
FORT CAMPBELL KY 42223-5130
TEL: 270-798-5514 FAX:
FAX:
TEL: (270)798-7857 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$15,000,000
NAICS:
238910
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
X
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF105
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W91248-17-Q-A001
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each Demolition Services Base Year
FFP
Demolition services in accordance with the PWS FOB: Destination
PURCHASE REQUEST NUMBER: 0010995165
NET AMT
0002 1 Each Contractor Manpower Reporting
FFP
Contractor Manpower Reporting in accordance with PWS paragrahp 5.2
1001 1 Each OPTION Demolition Services OY1
FFP
Demolition services in accordance with the PWS
1002 1 Each OPTION Contractor Manpower Reporting
FFP
Contractor Manpower Reporting in accordance with PWS paragrahp 5.2
2001 1 Each OPTION Demolition Services OY2
FFP
Demolition services in accordance with the PWS
2002 1 Each OPTION Contractor Manpower Reporting
FFP
Contractor Manpower Reporting in accordance with PWS paragrahp 5.2
3001 1 Each OPTION Demolition Services OY3
FFP
Demolition services in accordance with the PWS
3002 1 Each OPTION Contractor Manpower Reporting
FFP
Contractor Manpower Reporting in accordance with PWS paragrahp 5.2
4001 1 Each OPTION Demolition Services OY4
FFP
Demolition services in accordance with the PWS
4002 1 Each OPTION Contractor Manpower Reporting
FFP
Contractor Manpower Reporting in accordance with PWS paragrahp 5.2
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$300,000.00 $6,900,000.00
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
Building Demolition - Post Wide
FE16097 6J
1.0 Introduction. This is a non-personal services contract to Demolish and Remove Building Structures – Post Wide on Ft Campbell, KY. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Background: FT Campbell has an ongoing requirement to Demolish Unserviceable Buildings on the installation. Utilities will have been disconnected by the government.
In addition, the government will have inspected for and removed asbestos containing items. However, see paragraph 5.1.2.4.1(l) for discovery of Suspect Asbestos Containing Materials. This Demolition PWS includes multi-story Masonry Type Structures, wood and metal structures and Relocatable Buildings (hereafter referred to as Building Demolition) on Ft Campbell, KY
1.2 Objectives: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services as directed by individual Delivery Orders. All work shall be performed IAW the Best Management Practices (BMPs) and to the standards defined in this PWS.
1.3 Scope: The contractor shall provide all labor, supplies/materials (unless otherwise specified), and necessary equipment to perform building dismantling, demolition, or removal of improvements to include steps, piers, and foundation. Associated work such as utility disassembly, handling/disposal of PCB ballast, demolition, filling, and backfilling, and placement of top soil or gravel, and seeding / mulch will be detailed in the Building Demolition Specification, as necessary. Also, this Performance Work Statement (PWS) may include demolition where buildings were deconstructed by other previous demolition projects. The Contractor shall perform to the standards of this PWS as defined in this Performance Work Statement (PWS). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall perform to the standards of this PWS and UFGS. All performance times referred to in this PWS are calendar days, unless otherwise specified.
1.4 General Requirements
1.4.1 Protection of Existing Property: Before beginning any work, the Contractor shall carefully survey the site and the extent of the work. Items damaged by the contractor shall be repaired or replaced as approved by the Contracting Officer at no additional cost to the Government.
1.4.2 Dig/Excavation Permits: Contractor to obtain TN One Call clearance before beginning the demolition. All contractors and their subcontractors shall be required to obtain a dig permit any time ground may be disturbed. A copy shall be available on site, as well as provided to the COR. The government reserves the right to assess monetary damages against any contractor for repair of damage to underground utilities when excavations are performed without the referenced permit.
1.4.3 Underground Utilities: The Contractor shall notify the COR immediately in case unexpected utilities are encountered during performance of any work.
1.5 Period of Performance:
Base Year 01 September 2017 – 31 March 2018 Option Year 1 01 April 2018 – 31 March 2019 Option Year 2 01 April 2019 – 31 March 2020 Option Year 3 01 April 2020 – 31 March 2021 Option Year 4 01 April 2021 – 31 March 2022
1.6 General Information
1.6.1 Federal Observed Holidays. The Contractor’s performance shall not be required on the legal public holidays listed below. Holidays occurring on weekends will be observed as directed by the published Army calendar.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.6.2 Hours of Operation: Government business hours are 0730 to 1630 Monday through Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
a) Contractor must coordinate at least 48 hours in advance with the COR to work on weekends and holidays, when not identified on current work schedule.
(Coordination is required to ensure facilities where contractor wants to work are available). Upon review and concurrence, the contractor may work the weekend or holiday at no additional cost to the Government. Note: The C&D landfill is a government operated facility and is open only during Government Business hours.
b) On work days that the military has identified as Days of No Scheduled Activities
(DONSA), the Mabry Road Gate and Angels Road Gate leading to the Training Areas are routinely closed. Contractor will need to use alternate routes into their work areas during DONSAs (i.e. Palmyra Road, or 101st Airborne Division Road), and revise their work schedules accordingly.
c) Unsafe Weather and Other Delays: In the event of inclement weather (rain, snow, lightning, or other severe weather), and/or other causes beyond the contractor’s control, such as limitations for access to work areas, the contractor shall immediately coordinate with the COR to adjust the period of performance, if needed.
d) When an unforeseen installation closure occurs on a regularly scheduled day of work, the contractor shall coordinate with the COR to reschedule the work on any day that is mutually agreed upon.
e) Performance on Delivery Orders. The period of performance for delivery orders issued against this contract are as follows: It is anticipated that the contractor will typically be issued a 60-90 day period of performance for the individual delivery orders.
1) Contractor shall initiate work on any delivery order within 3 days of receipt of delivery order.
2) Contractor shall provide a tentative work schedule to the GPM upon receipt of a delivery order.
3) The PM/APM shall provide a written report with the number of people working each day, the area of work and any work that could be hazardous to public safety. Areas that remain hazardous overnight or for an extended period of time shall be reported to the COR.
4) At no additional cost to the Government, any unsatisfactory work shall be corrected within 24 hours after notification to the PM/APM.
5) Further, the PM/APM shall notify the COR when deficiencies have been corrected.
1.6.3 Place of Performance. The work to be performed on this PWS will be performed at Ft Campbell.
1.6.4 Quality Control Program (QCP). Quality Control is the responsibility of the Contractor. The Contractor shall provide and maintain a quality control system that is acceptable to the Government. The Contractor shall submit a Quality Control Plan to the Government Project Manager (GPM) within 30 days after contract commencement.
This plan shall specify forms, inspection methods, how the Contractor intends to meet the requirements/standards of the contract, and list individuals/positions responsible for Quality Control.
1.6.4.1 Quality Control Plan The offeror shall develop and maintain an effective QCP to ensure services are performed in accordance with (IAW) this PWS. The QCP must be forwarded to and accepted by the Government Project Manager (GPM). The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of deficiencies. The Contractor’s QCP is the means by which the Contractor assures that the work complies with the requirement of the contract.
a.) The QCP is to be delivered with the proposal.
b.) Post award, an updated QCP shall be submitted to the GPM within five working days when changes in Key Personnel are made.
c.) After acceptance of the QCP the contractor shall submit to the GPM any proposed changes to the QCP for approval.
d.) The plan shall identify personnel, procedures, instructions, records, and forms to be used.
e.) If the contractor fails to submit an acceptable QC plan within the time herein prescribed, the Contracting Officer (KO) may refuse to allow work to start until an acceptable interim plan is provided.
f.) The offeror shall maintain current records of quality control operations and activities performed including the work of suppliers and subcontractors. These records shall include the numbers of personnel working, any delays encountered, and acknowledgment of deficiencies noted along with the corrective actions taken on current and previous deficiencies.
g.) Working Conditions: The offeror is advised to visit and inspect the areas stated on the delivery order and document the actual conditions of the work to be accomplished. Streets in the area shall be kept free of debris and shall remain open during the performance of work, unless notification has been given to the COR as specified herein.
h.) The offeror shall provide and maintain an inspection system to ensure that all services are acceptable and conform to contract specifications, whether performed by the Contractor or procured from Sub Contractors.
i.) It shall be the Contractor’s responsibility to inform all of his employees of “OFF LIMITS” areas. Off limits areas may include, but are not limited to, secure areas such as 160th and various airfield operations.
1.6.4.2 Damages: Contractors shall be responsible for repair or replacement of any damage caused by his actions. The Contractor shall bear all costs associated with replacement and reinstallation. Any such damage shall be brought to the immediate attention of the appointed COR prior to repair/replacement/installation. The Contractor shall be aware that Government property includes existing structures, grounds, or improved areas, trees, beds and turf i.e. wounded trees or scalped turf - shall be repaired and/or restored to its original state. All repair work shall be performed to the satisfaction of the Contracting Officer.
1.6.5 Quality Assurance (QA):
1.6.5.1 The Government will evaluate the Contractor’s performance under the contract, IAW the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the Contractor has performed IAW the performance standards. The Government plan defines how the performance standards will be applied, the frequency of surveillance, and items to be inspected. Although the Government will develop a QASP, Government surveillance of Contractor performance is not limited to the QASP or the performance objectives, incentives/remedies, etc.
outlined in the Performance Requirements Summary (PRS). The Government retains the right to inspect and test all services called for by the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work. If any of the services performed do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount
1.6.5.2 All contract services will be inspected IAW FAR 52.212-4(a), Contract Terms and Conditions - Commercial Items. At times, the Contracting Officer or his designated representative may observe unsatisfactory performance by the Contractor that is minor in nature. These observations will be noted and the Contractor will be informed. A large number of defects may indicate a continuing and more serious problem and may be cause for the Contracting Officer to take more severe action i.e., issuance of a Cure Notice, as part of Termination for Cause proceedings. Any discrepancy noted during the course of the inspection will require the Contractor to correct the discrepancy in a timely manner. Unsatisfactory performance will be documented on a Contract Discrepancy Report and will require the Contractor to reply in writing within ten (10) days to the Contracting Officer.
1.6.5.3 SURVEILLANCE PROCEDURES: PERIODICAL INSPECTIONS
a) The COR will monitor performance, and observe all services required by the order/contract are successfully performed. Successful or exceptional performance will be documented as well as deficiencies in Contractor performance. Documentation will be maintained for future reference, audit, and proof of inspection.
b) The COR will notify the Contractor, in person, each time an unacceptable observation has been recorded and ask the Contractor to correct the problem per the PWS. The Contractor will be given 24 hours after notification to correct the deficiency in accordance with requirements of the contract. Deficiencies that cannot be corrected within 24 hours will be reported to the Contracting Officer.
c) The COR will report more serious (systemic in nature) deficiencies or recurring deficiencies in the same area that could indicate a trend by using a Contract Discrepancy Report (CDR). The CDR will state the Contract Requirement, the specific contract reference and the specific violation to the requirement. The COR will forward copies of CDR to the KO within one working day. The KO will notify the Contractor and request corrective action. The KO may require the Contractor to re-perform any services that do not meet contract requirements at no additional cost to the Government. The Contractor will return a copy of the completed and signed CDR to the KO for inclusion in the contract/order file.
d) The COR will re-inspect services that were found deficient to ensure corrections were made within the timeframe outlined in the contract or other agreed upon time. The COR/QAE will not consider the services complete until all deficiencies have been corrected. Contractor’s failure to complete corrective actions will be reported immediately to the KO for further action. The COR will accept the services provided and authorize payment upon satisfactory completion of the work. This is done by approving the Contractor’s invoice in Wide Area Workflow
(WAWF).
e) QUALITY ASSURANCE SURVEILLANCE FILE. The COR file shall contain the following:
Copy of the COR appointment letter from the KO, any changes to that letter, and any termination letters
Training Certificates for COR Copy of the contract and all contract modifications Copy of the applicable Quality Assurance Surveillance Plan (QASP) Copy of the contractor’s Quality Control Plan (QCP) All correspondence initiated by authorized representatives (Contractor or
Government) concerning performance of the contract Names, position titles and contact information of all key personnel assigned to this contract both Government and Contractor Monthly surveillance schedule & Surveillance Checklists Records of all inspections performed and the results Student Critique Forms and summary of student critiques Memoranda for record of minutes of any meeting, telephone conversations and discussions with the contractor or others pertaining to the contract or contract performance
Documentation pertaining to acceptance of services, reports or data
All records will be retained for the life of this contract. The COR will forward these records to the KO upon completion of the contract/order
1.6.6 Type of Contract: The government will award a Indefinite delivery Contract, IAW
FAR16.5
1.6.7 Security Requirement. Access and General Protection/Security Policy and Procedures. The Contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by a Government representative). The Contractor workforce must comply with all personal identity verification requirements as directed by DOD, Headquarters Department of the Army (HQDA), and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
1.6.7.1 Anti-Terrorism and Operations Security: See Attachment #9
1.6.7.2 Special Qualifications:
Contractor must have Asbestos Awareness Training Hot Work Permit: No welding or flame cutting shall be allowed on Fort Campbell without first obtaining a “Hot Work Permit” as required by the fire department.
Contact Fire Station 1 at 270-798-7171 for requirements
Tennessee Level 2 Design Principals for Erosion Prevention and Sediment Control (EPSC) at Construction Sites
1.6.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend the post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart
42.5. The KO and Contracting Officer’s Representative (COR) will meet periodically with the Contractor to review the Contractor's performance, if needed. Written minutes of such meetings will be recorded by the Government and signed by the Program/Project Manager and the Contracting Officer, or COR and distributed within five (5) workdays after the meeting. The Contractor may request a meeting with the Contracting Officer or COR when the Contractor believes such a meeting is necessary.
Written minutes of such meetings shall be recorded by the Contractor and signed by all participants involved and distributed within five (5) workdays after the meeting. In either case, if the Contractor does not concur with any portion of the minutes, recorded by the Government or the Contractor, such non-concurrence shall be provided in writing to the Contracting Officer within two (2) calendar days following receipt of the minutes.
1.6.8.1 Contract Administration. Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination between the Government and the Contractor.
1.6.8.2 The following provides the roles and their respective authority during the performance of the contract:
1.6.8.3 Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely in the KO.
In the event the Contractor effects any such change at the direction of any person other than the KO, the change will be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be effected by the KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. There will be no changes or deviation from the stated terms and conditions of the contract without a written modification to the contract, executed by the KO authorizing such changes.
1.6.8.4 Contracting Officer’s Representative (COR). The KO shall designate contract level CORs during the term of this contract, under Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.201-7000 “Contracting Officer’s Representative.” The COR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR will perform in accordance with the responsibilities and duties identified in the Interim Army Contracting Command – Contracting Officer’s Representative Policy Guide Pamphlet 70-1, (ACC PAM 70-1, dated 26 March 2010).
1.6.8.5 COR Authority. A letter of designation issued to the COR by the KO, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.
1.6.8.6 The Contractor shall not in any way represent that it is a part of the U. S.
Government, or that it has the authority to contract or procure supplies for the account of the United States of America.
1.6.8.7 COR Functions. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: Observe that the Contractor performs the technical requirements of the contract; Perform inspections necessary, in connection with contract performance;
Maintain written and oral communications with the Contractor concerning technical aspects of the contract; Monitor Contractor's performance and notify both the KO and Contractor of any deficiencies; Coordinate availability of Government-furnished property; and, Provide site entry of Contractor personnel.
1.6.8.8 The CORT- Contracting Officer Representative Tracking (CORT) Tool accessed through Wide Area Work Flow (WAWF) e-suites will be used for nomination, tracking, documentation, and management of CORs.
1.6.8.9 Government POC.
Contracting Officer Contract Specialist/
Administrator Contracting Officer’s Representative
Name: Brad Davis Address MICC, BLDG 6923 38th & Desert Storm Ft Campbell, KY 42223 Email:
bradford.a.davis.civ@mail.mil Phone number: 270-798-
Name SSG Kennison, Patrick Address: MICC, BLDG 6923 38th & Desert Storm Ft Campbell, KY 42223 Email:
patrick.v.kennison.mil@mail.mil Phone number 270-798-7852
Name Address: Contracts MGMT Branch, BLDG 846 Ft Campbell, KY 42223 Email:
Phone number:
1.6.8.10 Key Personnel: Within ten days after award, the Contractor shall provide a letter with name and contact information of the Project Manager (PM) and a designated alternate, who shall be responsible for the performance of the work under this contract.
The letter of authority shall define the scope and limitations of the representative’s authority. Materials and correspondence delivered to the Contractor’s Representative are (deemed to have been) delivered to the Contractor. The PM or Alternate Project Manager (APM) shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. This individual(s) shall be at the work site during normal working hours when DO have been issued to the contractor. Work site is defined as area where demolition operations are taking place. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The Project Manager or alternate shall be available at all times whenever their contract personnel are working on Ft. Campbell property. The Key Personnel shall be available for the COR to contact him/her when contract personnel are working. If Key Personnel are not on site, the contractor shall ensure physical onsite supervision of their personnel.
1.6.8.10.1 The contractor representative and alternate(s) must be able to read, write, speak and understand English.
1.6.8.10.2 Any changes to the working status of these key personnel shall be transmitted (in writing) to the GPM within 24 hours of the proposed change. If, for any reason, any of the key personnel becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 14 calendar days the contractor shall promptly replace personnel with personnel who possess qualifications equal to or better than that of the original employee. The Contractor shall ensure all key personnel terminated or released from employment under this contract are replaced within 5 calendar days of the termination.
a) The Project Manager shall maintain his ability to have access to the installation for the duration of the contract.
b) The Project Manager and the QC person (may be same person), and the Alternate Project Manager (APM) (if designated) are the only personnel considered by the Government as Key Personnel on this contract.
c) Project Manager (PM): The PM shall meet or exceed the following minimum qualifications: (1) Valid Driver’s license with Vehicle Insurance for the Work Vehicles and (2) knowledge of the PWS and the ongoing work on the PWS.
d) The APM shall meet or exceed the same qualifications as the PM.
e) Contractor shall provide a means of communication for the COR to be able to contact the Project Manager (contractor) at all times.
1.6.9 Identification of Contractor Employees: All contract personnel shall be identified as a Contractor, i.e., badge, company logo, or uniform. All contract personnel are required to identify themselves such that they avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all correspondence (documents, emails etc.) or reports produced by the Contractor are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.6.10 Contractor Personnel Conduct: Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure that personnel present a professional appearance. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substances. The Contractor is responsible for ensuring that any contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove from the job site any employee for reasons of misconduct or security. In accordance with DOD Directive 5500.7-R, “Joint Ethics Regulation”, Contractor employees must avoid improper influence in the execution of their duties under the contract. Particular attention should be paid to acceptance of gifts/ gratuities, and on non-disclosure of sensitive or classified information. The Contractor shall ensure employee conduct complies with 41 U.S. C 423 relative to release of acquisition related information or actions or discussions which may prejudice future competitions. The Contractor shall ensure no contractor employees conduct political related activities or events on the installation.
1.6.10.1 Contractor Personnel Appearance and Performance: It is essential that all Contractor personnel meet the highest standards of professionalism and personal integrity. The Contractor shall ensure their personnel do not perform work under the influence of alcohol, marijuana, illegal prescribed drugs or any other incapacitating agents. Contractor shall ensure employees utilize protective equipment, in compliance with EM385-1-1, while working to include at a minimum: high-visibility/reflective shirts
(with short sleeves at a minimum, i.e. no cut-off shirt sleeves) with company Logo clearly legible, hardhats, and leather safety boots.
a) All contractor personnel must be fully clothed at all times, to include upper garment to cover body from the waist to the neck and long pants or slacks.
Garments that have a message, slogan or printing of any kind other than the Contractor’s business attire are prohibited. Contractor Uniforms are acceptable.
However, the entire workforce shall be wearing the same uniform.
b) Contractor personnel are not to engage in loud or boisterous behavior, angry outbursts or use profane or abusive language at any time on Government premises. Playing radios and/or electronic games/devices, or smoking or chewing tobacco products, shall only be done at lunchtime and in a designated work area.
c) Contractor personnel shall consume food and beverage only within areas designated by the COR(s). Intoxication, and violence or criminal acts of any kind will not be tolerated - and is cause for immediate removal from Government property. Use or sale of intoxicating beverages and/or drugs is strictly prohibited.
1.6.11 Reserved
1.6.12 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.), or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO, and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.13 Emergency Services: The Contractor shall make available competent personnel trained and capable of dealing with minor personnel injuries. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor will, in turn, notify the Contracting Officer (KO) or Contracting Officer’s Representative (COR) within two (2) hours of the incident.
1.6.13.1. Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor.
1.6.13.2 Emergency Medical Service: Medical services for contractor personnel are the responsibility of the contractor. However, the Government will provide, on an emergency basis, medical services for job-related injuries while an employee is performing under this contract on a reimbursable basis. Emergency medical care is available to the contractor employees at Blanchfield Army Community Hospital (BACH).
For emergency ambulance service, call 911(Cell phone users call (270) 798- 1221/1224).
1.6.13.3 Police and Fire Protection: Law Enforcement by Fort Campbell Military Police, telephone (270) 798-2677 and Fire Protection by the Fort Campbell Fire Department, telephone ( 270) 798-3473, Emergency 911 (Cell phone users call (270) 798- 1221/1224).
1.6.13.4 Permits:
1.6.13.4.1 Photography: Photography is not authorized on Fort Campbell without prior written approval through DPW
1.7 ENVIRONMENTAL.
1.7.1 Environmental Compliance. The Contractor shall comply with all federal, state, local and installation environmental laws, rules and plans. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation in accordance with industry standards, local, federal and state laws, and according to manufactures' recommendations.
Contractor to comply with the FT Campbell Environmental Management System and its applicability to contracted services and compliance with applicable standards for the prevention, control and abatement of environmental pollution in full cooperation with the Installation, Federal, State, and local Governments. The FT Campbell Environmental policies are available at:
http://www.campbell.army.mil/campbell/directorates/DPW/envdiv/Pages/default.aspx
1.7.1.1 Penalty charges resulting from citations against Department of Defense, Department of the Army, or FT Campbell, Kentucky, or its agents, officers, or employees due to the contractor's failure to comply with environmental laws, regulations, and programs, that relate to or may arise under the performance of this contract may be deducted or set--off by the Government from any monies due the contractor, and with respect to such citations, the contractor will further take any corrective or remedial actions as directed by such agencies
1.7.1.2 The Emergency Planning and Community Right-To-Know Act (EPCRA) requires site specific information concerning hazardous chemicals use and releases be provided.
A hazardous material as per 29 CFR 1910.1200 is any substance which is a physical or health hazard. The Contractor is required to maintain an inventory of hazardous materials and associated SDS sheets using the attached FTCKY Hazmat Inventory Form. This inventory shall be provided as a submittal to the GPM within 10 days of notice to proceed.
1.7.1.2.1 The Contractor will provide Safety Data Sheets (SDS) on all materials with the HAZ MAT Submittal, to the GPM. The Contractor shall make all environmental and hazardous material records available, at the beginning of the next duty day after the Government’s request to view the records.
1.7.1.3 Reserved
1.7.1.4 The Contractor shall control the disposal of fuels, oils, bituminous, calcium chloride, acids, or harmful materials, both on and off the Government premises, and .shall comply with applicable Federal, State, County, and Municipal laws concerning pollution of rivers and streams while performing work under this contract. Special measures shall be taken to prevent soil, chemicals, fuels, oils, greases, bituminous materials, herbicides, and insecticides from entering public waters.
1.7.1.5 Air pollution restrictions applicable to this project. Do not allow materials to be burned on the Government installation. Explosives are not authorized to be used.
1.7.1.6 The contractor shall submit a General Conformity Report (GCR) to provide information concerning equipment types; hours of operation, number of personnel, etc.
The GCR form will be prepared with each specific Delivery Order. The Air Quality Program team will then do calculations for estimated emissions. This submittal is due within 10 days after notice to proceed and shall list whatever type equipment will be used and estimated hours of use.
1.7.1.7 Contractor shall only perform routine maintenance on equipment at job site as would normally be expected to support normal daily construction activities (such as addition of lubricants and fuel). Contractor shall take all necessary precautions to insure lubricants and fuel are not introduced into the environment by utilizing drip pans and/or other means to capture spilled or leaking petroleum products. Maintenance on equipment beyond that which would be expected for routine daily upkeep shall be done at the contractor’s off-post facilities.
1.7.1.8 Contractor shall maintain any/all excavations, stockpiles, access roads, waste areas, and all other work areas free from excess dust to such a reasonable degree as to avoid causing a hazard or nuisance.
1.7.1.8.1 Contractor to cease work if they unearth human remains during excavations.
COR will notify Cultural Resources.
1.7.1.9 Material Storage: Potential polluting materials, including but not limited to, hazardous chemicals, oils and other petroleum products shall be stored properly within the contractor's off-post maintenance facility/building.
1.7.1.10 Spills: The Contractor shall submit a Spill Response Plan to the GPM fourteen
(14) calendar days after contract award. Upon approval, the plan will be made available to all employees, emergency response teams and local emergency personnel.
Contractor will be required to initiate the cleanup action of any spills within 24 hours of the spill at the Contractor’s own expense that are a result of his actions or agents and personnel.
1.7.1.11 Spill Responsibility: The Contractor shall be solely responsible for any spills, which occur as the result of the actions of its agents and personnel during the performance of this contract. When possible, emergency response to prevent eminent danger to human health and the environment will be provided by the Fort Campbell Fire Department. The Contractor shall clean such spills to the satisfaction of the Government and in a manner that complies with applicable federal, state and local laws and regulations. The cleanup shall be at no cost to the Government.
1.7.1.12 Equipment Cleaning: Heavy equipment may be washed down at the North or South Centralized Vehicle Wash Facilities. Contractor may be denied access to a particular wash facility due to military activities. If access is denied, the contractor will not be entitled to a contract adjustment.
1.7.1.13 Environment and OSHA: The contractor shall comply with all local, State, and Federal environmental and occupational safety laws, rules, and regulations.
1.7.1.14 Burning: Burning will not be allowed on post or for any reason as a part of this contract.
1.7.1.15 Miscellaneous Hazardous Waste: Hazardous waste, contaminated soil or other special waste shall be disposed in accordance with applicable regulations. Contact DPW, Environmental Division, Pollution Prevention Branch, for instructions, through the COR. Contractors that generate hazardous waste at Fort Campbell are responsible for proper disposal of the waste. The Contractor must have the transportation manifest signed by an authorized representative of the DPW, Environmental Division. Hazardous materials partially used and remaining at the end of the contract shall be retained by the Contractor and removed from the post.
1.7.1.16 Waste Management. A Complete Waste Management Plan must be filled out in conformance to the Ft Campbell Mandatory Policy per ACCIM Policy. All Wastes & Recyclables generated from construction and demolition projects on Ft Campbell remain the property of the Federal Government until properly disposed in an approved manner. For this Building Demolition PWS, the contractor will be given Salvage Rights for the demolished steel and metals.
1.7.1.16.1 The management of C&D waste/recyclables must be in compliance with the ACSIM policy “Sustainable Management of Waste in Military Construction, Renovation, and Demolition activities” dated 6 FEB 2006 and the Ft Campbell policy. Requirement goal is 60% diversion rate. Note: Waste Management guidance can be found on the Installation Technical Design Guide, Sections: 02 41000; 2.1.5, and Appendix A-7.
1.7.1.16.2 A Waste Management Plan is required prior to beginning all projects. The Waste Management Plan shall include the following items and shall be submitted and approved by GPM prior to commencing any demolition work.
1.7.1.16.3 Procedures for accomplishment of demolition work to remove building(s), covered walkway(s), foundations, concrete ramps, sidewalks, utility tunnels, power and telephone poles, fences, parking areas, trees, bushes, signage, and all utilities and structures.
a) Describe the procedures for accomplishment of demolition work to remove building(s), covered walkway(s), foundations, concrete ramps, sidewalks, utility tunnels, power and telephone poles, fences, parking areas, trees, bushes, signage, and all utilities and structures.
b) Describe procedures to ensure safe conduct of the Work and Work Site including verification that the building is vacant [daily] prior to demolition (Activity Hazard Analysis)
c) Describe the removal and disposition of materials specified to be salvaged.
d) Describe the procedures for protection of property which is to remain undisturbed.
e) Coordination with other demolition/construction work in progress in the general area.
f) Detailed description of the methods and equipment to be used for each operation.
g) Identify the name and location of the landfill / facility where demolition materials will be disposed.
h) Methods and material to be used in the removal of PCB-containing light ballasts.
i) Spill Plan: Contractor shall provide a site specific spill contingency plan to deal with potential environmental spills either inside or outside facilities. Contractor to include this contingency plan as an entry in the Waste Management Plan.
1.7.1.16.4 The contractor must have a GPM approved Waste Management Plan on hand prior to placing waste/recycling containers on the job site. No wastes or recyclables shall be disposed off the installation without prior approval of the Waste Management Plan by the GPM.
1.7.1.16.5 The Waste Management Plan with total weight of material disposed or diverted/recycled must be submitted to the GPM at the end of the project.
1.7.1.16.6 Woodlawn landfill construction and Demolition (C&D) material disposal tickets will only be issued to the designated COR for the project. Tickets are available at DPW Pollution Prevention Branch, BLDG 5134 (Wickham AVE).
1.7.1.16.7 Off-Post disposal of any construction and demolition (C&D) material must have written approval from the GPM.
1.7.1.16.8 Options for Disposal:
a) Cardboard, scrap metals (small amounts), undamaged /reusable wood pallets, recyclables (plastics, aluminum cans, mixed paper) may be taken to the Recycling Convenience Center at A Shau Valley road and Airborne Street.
Wood pallets must be segregated from debris going to the Government construction landfill.
b) Liquids cannot be taken to the Woodlawn (C&D) landfill. Contractors are responsible for any excess unused liquids (including paint).
c) Miscellaneous Metals and Scrap Rubber: Scrap metals and scrap rubber may be delivered to DRMO for recycling. The metals can be steel, aluminum, brass, copper and bronze. Empty containers (55 gallon drums, 5 gallon cans, etc.) that have contained petroleum, antifreeze, paint, acid, etc., cannot be accepted as scrap metal and shall be emptied of any liquid contents in accordance with applicable regulations and then flattened and placed in dumpsters at the convenience center.
d) Utility poles become the property of the contractor and must be removed and disposed by contractor in accordance with all state regulations.
e) The Convenience Center does not have scales for weighing materials. There is a scale at the DRLA/LDA Disposition Services located at BLDG 5212.
f) The Point of Contact for soil/gravel waste is Kuany Anyieth (798-0927)
1.8. Restricted Traffic Routes: Contractors are required to observe and adhere to restrictions for roads used for military physical training routes. These roads allow no access or limited access during specific times of the day.
1.9. Safety. The contractor shall comply with requirements of:
a) EM 385-1-1,
b) SAFETY AND HEALTH REQUIREMENTS MANUAL – USACE (See http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequir ementsManual.aspxhttp://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/entire.pdf).
1.9.1 Safety Requirements: In order to provide safety control for protection to the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this contract, the contractor shall comply with EM 385-1-1. The Contractor shall submit for review a Safety Plan within 10 calendar days of award of contract.
1.9.2 Work Site Safety:
a) The Contractor shall furnish and place Safety Barricades and Pylons at areas of possible hazard, or as directed for Traffic Control. Barricades shall also be placed to detour traffic around working areas. All access to working areas shall be restricted until such time that traffic will not have a deleterious effect on the work being performed. Barricades used to detour any lanes of traffic shall have a flagman if it presents a road hazard, or the possibility of traffic being congested.
b) The Contractor shall notify the Contracting Officer of his authorized representative, a minimum of 24 hours prior to placement or removal or barricades that will affect traffic flow. Any complete road closing shall be coordinated a minimum of 2 weeks ahead of proposed closing.
c) The Contractor shall become familiar and comply with Fort Campbell Fire
Regulations and Fire Prevention procedures which are available from the Fort Campbell Fire Department.
1.9.3 Safety Deficiencies: The contractor is responsible for enacting a pro-active, aggressive safety program. Once safety deficiencies or unsafe practices or operations occur, the contractor must correct them immediately. In the event the Government notes unsafe practices, the contractor will be notified and the contractor shall immediately correct all safety deficiencies. Such notice when delivered to the contractor or his representative at the site of work shall be deemed sufficient for this purpose. Also, the contractor is responsible for ensuring that the equipment is in a safe operating condition, that it is used in a safe manner, and that it is used in a safe environment and condition.
a) The PM/APM are to inspect, and maintain in operating order, all contractor vehicles and equipment, per EM385-1-1.
b) Safe Operating…