Attachment_9_-_Hazardous_Materials_Data_(AMD_003).pdf

PDF 178 KB Posted

Attached to
Munitions Storage Magazines at Hill, AFB Federal contract opportunity
Solicitation number
W91238-17-R-0025
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

Attachment 9

View the file

Other files for this federal contract opportunity

Other files attached to Munitions Storage Magazines at Hill, AFB, newest first.
File Type Posted
Section_01_10_10_(AMD_0005).pdf PDF
W123817R00250005.pdf PDF
Attachment_7_-_MSM_Box_Type_Std_421-80-08_(AMD_0005).pdf PDF
W123817R00250004.pdf PDF
Section_01_45_00_(AMD_003).pdf PDF
Drawing_Sheet_C-141_SITE_PLAN_(AMD_003).pdf PDF
17R0025_0002.docx DOCX document
Pre-Proposal_Site_Walk_Photos-rev_(AMD_003).pdf PDF
Attachment_7_-_MSM_Box-Type_Std_421-80-08_Dwg_Set_(AMD_003).pdf PDF
17R0025_A0003.docx DOCX document
Section_01_10_10_(AMD_003).pdf PDF
Attachment_20_-_Geobase_Contour_Map_(AMD_003).pdf PDF
Drawing_Sheet_E-101_ELECTRICAL_SITE_PLAN_(AMD_003).pdf PDF
Attachment_9_-_Hazardous_Materials_Data_(AMD_003).pdf PDF
Section_01_33_16_(AMD_003).pdf PDF
Drawing_Sheet_C-131_DEMO_PLAN_(AMD_003).pdf PDF
17R0025_0002.docx DOCX document
Drawing_Sheet_E-101_ELECTRICAL_SITE_PLAN_(AMD_003).pdf PDF
Attachment_20_-_Geobase_Contour_Map_(AMD_003).pdf PDF
Section_01_33_16_(AMD_003).pdf PDF
17R0025_A0003.docx DOCX document
Section_01_10_10_(AMD_003).pdf PDF
Drawing_Sheet_C-131_DEMO_PLAN_(AMD_003).pdf PDF
17R0025_Conformed_Copy.docx DOCX document
Pre-Proposal_Site_Walk_Photos-rev_(AMD_003).pdf PDF
Attachment_7_-_MSM_Box-Type_Std_421-80-08_Dwg_Set_(AMD_003).pdf PDF
17R0025_0002.docx DOCX document
Drawing_Sheet_C-141_SITE_PLAN_(AMD_003).pdf PDF
Section_01_45_00_(AMD_003).pdf PDF
W91238-17-R-0025-0002.pdf PDF
Atch_2_Supplemental_Contract_Requirements.pdf PDF
Site_Walk_Instructions.pdf PDF
A07.03_Atch_3_Wage_Rate_Determination.pdf PDF
A07.04_Atch_4_Acknowledgement_Statement.pdf PDF
W9123817R0025.docx DOCX document
A07.02_Atch_1_SOW1.pdf PDF
A07.02_FY17_649_MUNS_MSM_Specs.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY17 649 MUNS MUNITIONS STORAGE MAGAZINES 2093

Amendment 003

ATTACHMENT 9

HAZARDOUS MATERIALS DATA

SIGNATURE:

PREPARED BY: Traver Andreasen (ASB#-4397, PB#-2085)

DEMOLISH IGLOOS

FACILITY:

FACILITY CONSTRUCTION DATE:

REQUESTER:

ORGANIZATION:

THIS REPORT IS NOT TO BE USED FOR BIDDING PURPOSES

REQUESTED:

1460 & 1461

LEAD BASED PAINT

ASBESTOS

JACOB REID

649 MUNS

06 July 2016

LIMITED INSPECTION REPORT

Utah Certified State Inspector: Traver Andreasen (ASB#-4397, PB#-2085)

INSPECTION DATE: 25 July 2016

58356WORK ORDER #:

DEPARTMENT OF THE AIR FORCE

75TH CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

ASBESTOS

21% Chrysotile

15% Chrysotile

Assumed

FRIABILITY *LOCATIONS FOUND

*Per UDAQ definition.

QUANTITY

Waterproofing, Black

Non Friable Category I 1,000 Square

Feet

This inspection was performed in accordance with the Utah Division of Air Quality (DAQ) requirements as found in the Utah Air Quality Rule R307-801-10. This inspection report is required to be on site during all abatement, renovation, and demolition activities. Samples referenced in this report were analyzed by polarized light microscopy (PLM) utilizing method 600R-93-116 by The Science and Engineering Laboratory

(AIHA Acc.#-101572) at Hill Air Force Base, Utah.

The quantities within this report are estimates and are not to be used for bidding purposes.

Table 1

SUMMARY OF ASBESTOS CONTAINING MATERIALS FOUND

MATERIAL TYPE

Category I Non-Friable ACM: Asbestos-containing packings, gaskets, resilient floor coverings, or asphalt roofing products containing more than 1% asbestos as determined by using the method specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM).

*RACM

*Category I *Category II

DEPARTMENT OF THE AIR FORCE

75 CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

Demolish Igloos 1460 and 1461.Statement of Work:

LIMITED ASBESTOS INSPECTION REPORT INFORMATION

Civil Engineering personnel also reviewed previous asbestos inspection reports of suspect asbestos containing materials (ACM) that could potentially be encountered in the proposed area/areas. The information gathered from all current and previous inspections is shown below by homogenous area.

RACM: Regulated Asbestos-Containing Material (RACM)" means friable ACM, Category I non-friable ACM that has become friable, Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation project operations.

Category II Non-Friable ACM: Any material, excluding Category I non- friable ACM, containing more than 1% asbestos as determined by using the methods specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM) that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.

Building 1461

Sealant, Black Non Friable Category I 1,000 Square

Feet Building 1461

Door Insulation, White

Friable RACM 200 Square

Feet Inside of the Main Doors

A total of 30 6

None Detected GM162313 North Center, Bay None Detected GM162314 Northwest, Exterior None Detected

Waterproofing, Black, Exterior, 1,000 Square Feet

GM162315 Northwest, Exterior None Detected GM162316 Southwest, Exterior

Per Hill AFB requirements, all materials containing any detectable amount of asbestos shall be handled as Asbestos Containing Material (ACM). Table 2 shows the summary of materials containing ≤1% that were identified via "Point Counting". Per EPA/UDAQ ≤1% is not considered to be an asbestos containing material, but special handling/packaging requirements are necessary per OSHA 29CFR 1926.1101 and

29CFR 1910.1001

Thermal System Pipe Fitting Insulation, Brown Sealant, Black Thermal System Pipe Insulation, White/Yellow

Per EPA requirements, all materials analyzed as containing ≤10% asbestos are point counted utilizing EPA method 600/R-93/116 this information is summarized in Table

2.

Table 2.

ASBESTOS

N/A

QUANTITY

N/A

Duct Sealant, White Thermal System Pipe Fitting Insulation, White Waterproofing, Black

The following is a list of the "Suspect Materials" that were sampled as part of this inspection:

suspect materials assessed as part of the inspection.

Sample # samples reference the

Building 1460

Duct Sealant, White, Bay and Exterior, 100 Linear Feet

GM162312

ResultsSample Location

Northwest, Bay

The following table summarizes the sampling data.

Homogenous Building Material, Description, Location, Quantity.

Locations found: Locations of building materials as described in this report indicate where they were found, but do not necessarily mean that these are the only locations where these materials may be encountered during the project.

*LOCATIONS FOUND

N/A N/A

Table 3.

MATERIAL TYPE

None Detected GM162317 North Center, Exterior None Detected

Sealant, Black, Exterior, 1,000 Square Feet GM162318 Northwest, Exterior None Detected GM162319 Northwest, Exterior None Detected GM162320 Southwest, Exterior None Detected

Thermal System Pipe Insulation, White Over Yellow, Exterior, 500 Linear Feet

GM162321 Northwest, Exterior None Detected GM162322 Northwest, Exterior None Detected GM162323 North Center, Exterior None Detected

Thermal System Pipe Fitting Insulation, White, Exterior, 10 Linear Feet

GM162324 Northwest, Exterior None Detected GM162325 Northwest, Exterior None Detected

Thermal System Pipe Fitting Insulation, Brown, Exterior, 10 Linear Feet

GM162326 Northwest, Exterior None Detected

Supervisor: Traver Andreasen: DSN: (801)586-7094

Asbestos/LBP Shop 75 CES(CEOHA)

CONTACT INFORMATION

Table 4.

POTENTIAL FOR ADDITIONAL MATERIALS:

Asbestos/LBP Shop Personnel

DSN:(801)777-8006

This inspection report only encompasses the areas/materials designated within this report. Should the scope of the project be altered in any way or any materials found that are not identified in this report shall require additional assessment. This report cannot be used for any other projects within the building.

Any questions or concerns regarding this inspection report or if any new suspect asbestos containing material (ACM) is encountered, stop work and contact the personnel listed below for further assistance.

Cell: (801)430-3976

Building 1461

Duct Sealant, White, Bay and Exterior, 100 Linear Feet

GM162327 Northwest, Bay None Detected GM162328 Northwest, Bay None Detected GM162329 Northwest, Exterior None Detected

Waterproofing, Black, Exterior, 1,000 Square Feet

GM162330 West Center, Exterior 18% Chrysotile GM162331 Southwest, Exterior 16% Chrysotile GM162332 Southwest, Exterior 21% Chrysotile

Sealant, Black, Exterior, 1,000 Square Feet GM162333 Northwest, Exterior 13% Chrysotile GM162334 North Center, Exterior 15% Chrysotile GM162335 Northwest, Exterior 12% Chrysotile

Thermal System Pipe Insulation, White Over Yellow, Exterior, 500 Linear Feet

GM162336 Northwest, Exterior None Detected GM162337 Northwest, Exterior None Detected GM162338 North Center, Exterior None Detected

Thermal System Pipe Fitting Insulation, White, Exterior, 10 Linear Feet

GM162339 Northwest, Exterior None Detected GM162340 Northwest, Exterior None Detected

Thermal System Pipe Fitting Insulation, Brown, Exterior, 10 Linear Feet

GM162341 Northwest, Exterior None Detected

Table 1.

2-The condition column is the condition only of the painted/coated component (See final page for all readings/samples).

5-This inspection report only encompasses the areas/materials designated within this report. Should the scope of the project be altered in any way or any materials found that are not identified within this report shall require additional assessment. This report cannot be used for any other projects within the building.

4-Any effort to disturb lead paint can create lead dust. Ensure that appropriate abatement, cleanup, and disposal will be accomplished and that appropriate safety measures are taken IAW 29 CFR 1926.62. If you have any questions please feel free to call Traver Andreasen at 777-8006.

3-The U.S. Department of Housing and Urban Development defines Lead-based paint as any paint, varnish, stain, or other applied coating that has 1 mg/cm² as measured by an X-ray Fluorescence (XRF) Analyzer or laboratory analysis or 0.5 percent by weight (5,000 µg/g by dry weight) by laboratory analysis, or more of lead.

All other components tested were less than 0.80 mg/cm².

DEPARTMENT OF THE AIR FORCE

75TH CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

LIMITED LEAD-BASED PAINT IDENTIFICATION REPORT INFORMATION

SCOPE OF WORK: Demolish igloos 1450 and 1461.

Building 1460 Metal Hoist Yellow 2.1 Good

1-table 1 below summarizes the painted/coated building components that tested positive for Lead Based Paint.

These components should be segregated or abated prior to renovation or demolition, and a composite TCLP taken of the waste before disposal.

Component ConditionLead ReadingColor

Metal Door Jamb Grey 4.84 Good Metal Door Grey 12.02 Good Metal Door Brown 6.06 Good

Impeller Bracket Yellow 1.34 Good Metal Angle Red 2.5 Good

Building 1461 Metal Hoist Yellow 2 Good

Metal Door Jamb Grey 4.57 Good Metal Door Grey 8 Good Metal Door Brown 10.69 Good

Impeller Bracket Yellow 1.75 Good Metal Angle Red 2.42 Good

953 0.97 984 1.05 954 1.04 985 0.97 955 1.09 986 0.96

Range: .8 to 1.2 Range: .8 to 1.2 Side Condition Color

North Good Yellow North Good Grey East Good Grey West Good Brown West Good Blue West Good Yellow North Good Red West Good Yellow West Good Brown West Good Brown West Good Brown West Good Grey North Good Yellow East Good Grey West Good Grey West Good Brown West Good Yellow West Good Blue North Good Red West Good Yellow West Good Brown South Good Brown

Pre Calibration PbL (mg/cm²) Calibration

Range Model# Serial #

XL Number Room Structure Substrate PbL(mg/cm2) NEG/POS

Post Calibration

PbL (mg/cm²)

Calibration RangeXRF Analyzer XL2 600 (Serial #56999)

Per 20 Second Reading

Per 20 Second Reading

POS

957 Building 1460 Bay Door Jamb Metal 4.84 POS 956 Building 1460 Bay Hoist Metal 2.10

959 Building 1460 Bay Door Metal 6.06 POS 958 Building 1460 Bay Door Metal 12.02 POS

961 Building 1460 Bay Impeller Bracket Metal 1.34 POS 960 Building 1460 Bay Rail Metal 0.07 NEG

963 Building 1460 Bay 4" Floor Line Concrete 0.01 NEG 962 Building 1460 Bay Angle Metal 2.50 POS

965 Building 1460 Bay Bollard Metal 0.01 NEG 964 Building 1460 Bay Moisture Eliminator Metal 0.01 NEG

967 Building 1460 Bay Bracket Metal 0.04 NEG 966 Building 1460 Bay Steam Post Metal 0.01 NEG

969 Building 1461 Bay Door Jamb Metal 4.57 POS 968 Building 1461 Bay Hoist Metal 2.00 POS

971 Building 1461 Bay Door Metal 10.69 POS 970 Building 1461 Bay Door Metal 8.00 POS

973 Building 1461 Bay Rail Metal 0.04 NEG 972 Building 1461 Bay Impeller Bracket Metal 1.75 POS

975 Building 1461 Bay 4" Floor Line Concrete 0.01 NEG 974 Building 1461 Bay Angle Metal 2.42 POS

977 Building 1461 Bay Moisture Eliminator Metal 0.01 NEG 976 Building 1461 Bay Bollard Metal 0.01 NEG

Attachment 9.pdf
Title Page
Asbestos
LBP
Readings

File details come from the government source that posted it. Updated .