A07.04_Atch_4_Acknowledgement_Statement.pdf

PDF 217 KB Posted

Attached to
Munitions Storage Magazines at Hill, AFB Federal contract opportunity
Solicitation number
W91238-17-R-0025
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

Atch 4 Acknowledgement Statement

View the file

Other files for this federal contract opportunity

Other files attached to Munitions Storage Magazines at Hill, AFB, newest first.
File Type Posted
W123817R00250005.pdf PDF
Attachment_7_-_MSM_Box_Type_Std_421-80-08_(AMD_0005).pdf PDF
Section_01_10_10_(AMD_0005).pdf PDF
W123817R00250004.pdf PDF
17R0025_A0003.docx DOCX document
Attachment_9_-_Hazardous_Materials_Data_(AMD_003).pdf PDF
Section_01_33_16_(AMD_003).pdf PDF
Drawing_Sheet_C-131_DEMO_PLAN_(AMD_003).pdf PDF
Section_01_45_00_(AMD_003).pdf PDF
Drawing_Sheet_C-141_SITE_PLAN_(AMD_003).pdf PDF
17R0025_0002.docx DOCX document
Pre-Proposal_Site_Walk_Photos-rev_(AMD_003).pdf PDF
Attachment_7_-_MSM_Box-Type_Std_421-80-08_Dwg_Set_(AMD_003).pdf PDF
Section_01_10_10_(AMD_003).pdf PDF
Attachment_20_-_Geobase_Contour_Map_(AMD_003).pdf PDF
Drawing_Sheet_E-101_ELECTRICAL_SITE_PLAN_(AMD_003).pdf PDF
Drawing_Sheet_E-101_ELECTRICAL_SITE_PLAN_(AMD_003).pdf PDF
Attachment_20_-_Geobase_Contour_Map_(AMD_003).pdf PDF
Section_01_33_16_(AMD_003).pdf PDF
17R0025_A0003.docx DOCX document
17R0025_Conformed_Copy.docx DOCX document
Pre-Proposal_Site_Walk_Photos-rev_(AMD_003).pdf PDF
Attachment_7_-_MSM_Box-Type_Std_421-80-08_Dwg_Set_(AMD_003).pdf PDF
17R0025_0002.docx DOCX document
Drawing_Sheet_C-141_SITE_PLAN_(AMD_003).pdf PDF
Section_01_45_00_(AMD_003).pdf PDF
17R0025_0002.docx DOCX document
Attachment_9_-_Hazardous_Materials_Data_(AMD_003).pdf PDF
Section_01_10_10_(AMD_003).pdf PDF
Drawing_Sheet_C-131_DEMO_PLAN_(AMD_003).pdf PDF
W91238-17-R-0025-0002.pdf PDF
Atch_2_Supplemental_Contract_Requirements.pdf PDF
Site_Walk_Instructions.pdf PDF
W9123817R0025.docx DOCX document
A07.02_Atch_1_SOW1.pdf PDF
A07.02_FY17_649_MUNS_MSM_Specs.pdf PDF
A07.03_Atch_3_Wage_Rate_Determination.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91238-17-R-xxxx

Attachment 4 – Acknowledgement Statement

FY17 649 MUNS Munitions Storage Magazines

Hill AFB, UT February 8, 2017

CONTRACT ACKNOWLEDGEMENT STATEMENT

The offeror agrees to perform the work required at the prices specified and in strict accordance with the terms of the contract.

1. Name, Address, and DUNS Number of Contractor

2. Telephone Number

3. Contract No.:

4. Title of Project: FY17 649 MUNS Munitions Storage Magazines

5. Name and Title of Person Authorized to Sign Offer:

Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

6. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation:

7. Signature:

8. Offer Date:

9. Amendments (Number & Date of Acknowledgement):

10. Offers providing less than ___90___ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

11. Proposed Period of Performance for completion of all work is: __730_____ calendar days after NTP date.

12. Total Amount $_________________________

13. The offeror’s proposal is valid for __________________ calendar days

(a)-Note that your statement must include your acknowledgment of all amendments; and (b)-Include the completed pricing schedule. This is a Job pricing. Provide price breakout as follows:

FY17 649 MUNS Munitions Storage Magazines

CLIN Breakout Schedule

CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH

IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.

UNIT OF TOTAL

CLIN DESCRIPTION QUANTITY MEASURE PRICE

0001 Provide all labor, management, 1 JOB $_______________ supervision, tools, materials, equipment and transportation for DESIGN of the Modular Storage Magazines (Igloos), at Hill AFB, UT in strict accordance with all RFP documents, drawings and specifications.

Includes code verification and coordination for Department of Defense Explosive Safety Board (DDESB) approval of the project design.

0002 Provide all labor, management, 1 JOB $_______________ supervision, tools, materials, equipment and transportation for CONSTRUCTION of the Modular Storage Magazines (Igloos) and associated Site improvements at Hill AFB, UT in strict accordance with all RFP documents, drawings and specifications.

Includes demolition of buildings 1460 and,1461.

0003 Contractor Manpower Reporting 1 JOB $_______________

This CLIN is used for pricing the collection And reporting of Contractor Manpower Reporting data. Reporting period will be the period of Performance not to exceed twelve months ending 30 September of each Government Fiscal Year and must be reported by 31 October of each calendar year.

TOTAL PRICE (ITEMS 0001-0003 $__________________

END OF CLIN SCHEDULE

1. Prices must be submitted on all individual items of this CLIN Schedule. Failure to do so may cause the proposal to be determined "unacceptable".

2. If a modification to a price is submitted which provides for a job adjustment to the total price, the application of the job adjustment to each item in the CLIN Schedule must be stated. If it is not stated, the offeror agrees that the job adjustment shall be applied on a pro rata basis to every item in the CLIN Schedule.

FY17 649 MUNS Munitions Storage Magazines

3. The offeror shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the Pricing Schedule. The Government will review all submitted Pricing Schedules for any unbalancing of the items. Any submitted CLIN Schedule determined to be unbalanced may cause the proposal to be determined "unacceptable".

4. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended proposed price. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.

UAI 52.214-5000 ARITHMETIC DISCREPANCIES

(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of Pricing Schedule as submitted by the bidder:

(1) Obviously misplaced decimal points will be corrected;

(2) Discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

(5) The successful offeror grants the options listed in the Pricing Schedule to the Government. The options may be exercised up to 60 calendar days after receipt of notice to proceed (NTP).

(6) Exercise of the option occurs upon mailing of written notice to the Contractor. Exercise will be made by the Contracting Officer. The price for exercise of the option includes all work and effort associated with the scope of that item.

(7) Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

File details come from the government source that posted it. Updated .