Attachment 4 W91238-16-R-0061
CONTRACT ACKNOWLEDGEMENT STATEMENT
The offeror agrees to perform the work required at the prices specified and in strict accordance with the terms of the contract.
1. Name, Address, and DUNS Number of Contractor
2. Telephone Number:
3. Email Address:
4. Title of Project: Repair Aircraft Parking Ramp 400 – Phase 1, Travis AFB, CA
5. Name and Title of Person Authorized to Sign Offer: Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
6. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation:
7. Signature:
8. Offer Date:
9. Amendments (Number & Date of Acknowledgement):
10. Offers providing less than the number of calendar days specified on the SF 1442 for Government acceptance after the date offers are due will not be considered and will be rejected.
11. Proposed Period of Performance is identified at FAR Clause 52.210-11 Commencement, Prosecution and Completion of Work.
12. Total Amount $___________________________
13. The offeror’s proposal is valid for __________________ calendar days
a. Note that your statement must include your acknowledgement of all amendments.
b. Include the completed Contract Line Item Number CLIN pricing schedule. This is a LUMP
SUM pricing. Provide price breakout as follows:
CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
CLIN UNIT OF TOTAL
ITEM DESCRIPTION QTY MEASURE PRICE
BASE CONTRACT LINE ITEM(S)
0001 The Contractor shall provide all material, 1 JOB $_________ $_________ equipment, labor, transportation, and supervision necessary to Construct Phase 1 of the 400 Aircraft Parking Ramp including demolition, excavation, constructing new PCC pavement, Taxiway H, drainage system, pavement markings and appurtenances, all in strict accordance with all plans and specifications. This Base CLIN is the total of items
0001A, 0001B, and 0001C.
PRICING SCHEDULE BREAKOUT:
0001A Mobilization and Demobilization to project site 1 JOB $________ $________ in accordance with plans and specifications
0002B Contractor to provide construction services for 1 JOB $________ $________
Demolition, Remove surface material, Underground Drainage System, 12” lime modified subgrade, 8” Separation layer, 6” stabilized drainage layer, all in strict accordance with plans and specifications
0003C Contractor to provide construction services for 1 JOB $________ $________ Concrete work and all finishing activities in strict accordance with plans and specifications
Total Base Price (CLIN 0001) $___________
Notes:
1. Prices must be submitted on all individual items of this Pricing Schedule. Failure to do so may cause the proposal to be determined "unacceptable".
2. If a modification to a price is submitted which provides for a lump sum adjustment to the total price, the application of the lump sum adjustment to each item in the Pricing Schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every item in the Pricing Schedule.
3. The offeror shall distribute their indirect costs (overhead, profit, bond, etc.) over all the items in the Pricing Schedule. The Government will review all submitted Pricing Schedules for any unbalancing of the items. Any submitted Pricing Schedule determined to be unbalanced may cause the proposal to be determined "unacceptable".
4. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended proposed price. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluation of offers, the following will be utilized in the resolving arithmetic discrepancies found on the face of Pricing Schedule as submitted by the offeror:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of offer evaluation, the Government will proceed on the assumption that the offeror intends the offer to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the offer will be so reflected on the abstract of offers.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which offer is low.
File details come from the government source that posted it. Updated .