07.1-16R0061_AMD_0001.pdf

PDF 23 KB Posted

Attached to
400 Aircraft Parking Ramp Phase I
Solicitation number
W91238-16-R-0061
Issued by

About this file

Amendment No. 01 - SF30

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is:

A. SF 1442, block 11 and FAR 52.211-10 have been amended to reflect a revised period of performance.

B. A07.1-1Atch_1_SOW: Paragraphs 1 and 2.1 have been revised.

C. Specif ication Section 01 56 00 has been revised. The separate Section 01 56 00 attachment supercedes the version of Section 01 56 00 located w ithin the attachment labeled: "2046_TRAVIS_REPAIR 400 RAMP_31May2016"

D. See summary of changes.

See block 11 of this document for instructions on how to acknow ledge receipt of this amendment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91238-16-R-0061

X 9B. DATED (SEE ITEM 11)

01-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jun-2016

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91238-16-R-0061

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION - CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 1-Atch_1_SOW_Rev-

31May2016

4 31-MAY-2016

Attachment 2 2-

2046_TRAVIS_REPAIR

400 RAMP_31MAY16

861 31-MAY-2016

Attachment 3 3-Atch 2 Supplemental

Contract Requirements

1 31-MAY-2016

Attachment 4 4-Atch 3 Wage Rate

Determination

45 31-MAY-2016

Attachment 5 5-Atch 4 CLIN Schedule

Phase I

3 01-JUN-2016

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 1-Atch_1_SOW_Rev-

16Jun2016

4 16-JUN-2016

Attachment 2 2-

2046_TRAVIS_REPAIR

400 RAMP_31MAY16

861 31-MAY-2016

Attachment 3 3-Atch 2 Supplemental

Contract Requirements

1 31-MAY-2016

Attachment 4 4-Atch 3 Wage Rate

Determination

45 31-MAY-2016

Attachment 5 5-Atch 4 CLIN Schedule

Phase I

3 01-JUN-2016

Attachment 6 A07.01-Spec 01 56

00_rev-16JUN16

54 16-JUN-2016

SECTION 00 10 00 - SOLICITATION

The contractor period of performance end date has decreased by 115 days from 410 days to 295 days.

W91238-16-R-0061

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 295 calendar days after notice to proceed issuance. The time stated for completion shall include final cleanup of the premises.

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .