Site Visit Design-Build Hayman Igloo, Hill AFB, UT
Solicitation number
W91238-09-R-0057
Issued by

About this file

Amendment 0002 Specifications

View the file

Other files

File Type Posted
J A-SPK09-23.pdf PDF
J A-SPK09-24.pdf PDF
W91238-09-R-0057-0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001 Specifications.pdf PDF
SF30 Amendment 0001.pdf PDF
Int_Ex_Igloo_Sep_17_09.pdf PDF
Ext_Ex_Igloo_Jul_31_09.pdf PDF
Adj_Ex_Igloo_Constr_2005.pdf PDF
PreProposal Conference 17 Sept 09.pdf PDF
Hayman Site Visit Sign-In Sheet.pdf PDF
RFP 09-R-0057 Hayman.pdf PDF
W91238-09-R-0057_VOL2_TechSpecs.pdf PDF
Wage Determination 09-R-0057.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hayman Type Igloo Bldg 2590 1712 Hill AFB, UT

2. Contractors with projects disturbing one to five acres of soil surface area will submit a sediment and erosion control plan to the project manager for subsequent review and approval by the Environmental Compliance Office (OO-ALC/EMC). The contractor shall receive approval of the plan and implement approved best management practices before starting construction.

3. Contractors with projects more than one acre of soil surface area will submit a plan for permanent stabilization of disturbed area to the project manager for subsequent review and approval by the Environmental Compliance Office (OO-ALC/EMC). The contractor shall receive approval of the plan and implement approved best management practices before contract closeout.

Examples of best management practices are available at the following web sites:

http://cfpub.epa.gov/npdes/stormwater/menuofbmps/con_site.cfm http://cfpub.epa.gov/npdes/stormwater/menuofbmps/post.cfm

(G) The Contractor shall participate in the Red Zone Meeting as outlined in the Attachment.

(H) Protection to Contractor personnel or their equipment cannot be provided by the Government at the worksites nor at the travel routes to/from the worksites.

(I) A list shall be generated by the Prime contractor of all contractors and laborers that will be working at the site. This list shall be submitted to Security Forces at least 14 days before construction begins for background checks. Those individuals on the list, who have been cleared by Security Forces, may be granted entry through the gate if escorted by a fully authorized sponsor. No personnel may be permitted to work on the site unless they are actually constructing the site (i.e. no administrative secretaries will be allowed). Employees without badges found unescorted outside of the construction site boundaries, but within the security gated area will be subject removal from the project site.

(J) Explosive Safety

(1) Contractor will be required to attend an initial explosive safety briefing. The class is conducted every Monday @ 2:30 P.M. in Bldg 383, Room 227. No sign up is needed.

(2) Smoking by any personnel is not permitted within the explosive area or free zone

(3) Any open flame or welding requires a permit from wing safety and fire dept

(4) All personnel must follow posted speed limits, and are not to stray outside of the established free zone

(5) No cameras or picture taking is permitted

(6) Contractor and his personnel, must maintain a clean/combustion free worksite

1.13 CONTRACTOR SAFETY PERSONNEL REQUIREMENTS

(A) Full-time, on-site, safety coverage by contractors shall be required for the life of the contract.

(B) The following conditions shall be met:

(1) The Contractor shall employ, to cover all hours of work at the project site(s), at least one safety and health person to manage the Contractor's safety program; duties which are not germane to the safety program shall not be assigned to this person(s). The principal safety and

01 00 00.00 41- 9

Hayman Type Igloo Bldg 2590 1712 Hill AFB, UT health person shall report to and work directly for the Contractor's top on-site manager, corporate safety office, or other high-level official of equivalent position. The safety and health person(s) shall have the authority to take immediate steps to correct unsafe or unhealthful conditions. The employment of a safety and health person(s) shall not abrogate the safety and health responsibilities of other personnel.

(2) Qualifications for Safety and Health Person(s).

(a) Safety and Health Person(s) shall have a degree in engineering or safety in at least a four year program from an accredited school and shall have been engaged in safety and occupational health for at least one (1) year of experience (no time being credited to this one (1) year unless at least fifty (50) percent of the time was devoted to safety and occupational health) and shall have at least one (1) year experience in construction, or--

(b) Safety and Health Person(s) shall have legal registration as a Professional Engineer or a Certified Safety Professional and shall have been engaged in safety and occupational health for at least one (1) year of experience (no time being credited to this one (1) year unless at least fifty (50) percent of the time was devoted to safety and occupational health) and shall have at least one (1) year experience in construction, or--

(c) Safety and Health Person(s) shall have a degree other than that specified in paragraph, Qualifications for Safety and Health Person(s) above, and shall have been engaged in safety and occupational health for at least three (3) years of experience (no time being credited to these three

(3) years unless at least fifty (50) percent of the time each year was devoted to safety and occupational health) and shall have at least two (2) years experience in construction, or--

(d) In lieu of a degree, Safety and Health person(s) shall have been engaged in safety and occupational health for at least five (5) years of experience (no time being credited to these five (5) years unless at least fifty (50) percent of the time each year was devoted to safety and occupational health) and shall have at least two (2) years experience in construction.

(e) First aid work is not a creditable experience.

(3) The name and qualifications of the nominated safety and health person(s) shall be furnished to the Contracting Officer for acceptability and a functional description of duties shall be provided prior to the pre-work conference.

NOTE: The Contractor shall have one or more Safety and Health Persons, each of whom meets the qualifications of (B)(2) Qualifications for Safety and Health Person(s), physically present on the actual site of the work whenever work of any sort is being performed by a Contractor, subcontractor, or supplier personnel on the work site. The foregoing clause language shall not be interpreted to contravene this note.

1.14 AGGREGATE SOURCES

(A) Concrete aggregates may be produced from the approved sources listed below:

(1) Sources of fine aggregate. (List the sources in an appropriate manner.)

(2) Sources of coarse aggregate. (List the sources in an

01 00 00.00 41- 10

01 10 11-9 AM-02

2.6.11 Insulation: Not used.

2.6.12 Structural Standing Seam Metal Roof (SSSMR) System: not used.

2.6.13 Sheet Metalwork

Flashings shall be installed in conformance with the SMACNA Architectural

Sheet Metal Manual.

2.6.14 Firestopping: Not used.

2.6.15 Caulking and Sealants

2.6.15.1 Caulking and sealants shall be selected according to materials they are being applied to for compatibility. These sealants and caulks shall be either a two-component, rubber base, chemical-curing compound based on polysulfide and/or polyurethane; or a single-component, rubber base, chemical-curing compound such as polysulfides, polyurethanes, and silicones.

2.6.15.2 Caulking shall occur around all door frames and at all material changes. The minimum joint width shall be 6 mm (1/4 inch), and joint widths in excess of 6 mm (1/4 inch) shall have a back stop material provided in the joint, and the depth of all joints shall be equal to the width. Color of caulking and sealants shall match adjacent materials.

2.6.16 Steel Doors and Frames

2.6.16.1 Exterior and interior doors shall be heavy duty steel Grade II with steel frames. Both doors and frames shall be hot dipped galvanized (G-60 minimum).

2.6.16.2 Exterior doors shall be insulated (rigid cellular isocyanurate foam in hollow of door with minimum RSI of 0.4) and weather-stripped.

2.6.17 Overhead Rolling Doors: Not used.

2.6.18 Builders’ Hardware: Per http://www.wbdg.org/design/am_rcbox-msm.php Munitions Storage Modules (Hayman Igloo) standard drawings and specifications.

All hardware in this building shall be consistent. All requirements for hardware keying shall be coordinated with the Contracting Officer. Door lock shall be Navy ILD (Internal Locking Device). ILD can be ordered at:

https://portal.navfac.navy.mil/portal/page/portal/navfac/navfac_ww_pp/navfac_n fesc_pp/locks/ild_main/tab_ild_intro

2.6.18.1 Keying

Change keys for lock shall be stamped with change number and the inscription "U.S. Property - Do Not Duplicate." Keys shall be supplied as follows:

Locks: 4 change keys each lock.

Blank keys: 4 total.

The keys shall be furnished to the Contracting Officer.

2.6.19 Gypsum Wallboard: Not used.

https://portal.navfac.navy.mil/portal/page/portal/navfac/navfac_ww_pp/navfac_nfesc_pp/locks/ild_main/tab_ild_intro http://www.wbdg.org/design/am_rcbox-msm.php

01 00 00.00 41 -9
01 00 00.00 41 - 10
01 10 11 - 9

File details come from the government source that posted it. Updated .