EXHIBIT_D-1_SEED_PROJECT_LSGA132007-Mod.pdf

PDF 206 KB Posted

Attached to
SYNOPSIS FOR CONSTRUCTION MATOC USPFO FL Federal contract opportunity
Solicitation number
W911YN-18-R-0001
Issued by
Department of the Army National Guard National Capital Region Integrated Air Defense System

About this file

This solicitation notice seeks proposals for multiple indefinite delivery/indefinite quantity construction contracts for facilities throughout Florida. Work will include repairs, renovations, HVAC, plumbing, electrical, site work and other construction services for various National Guard and Air Force bases. The government intends to award a minimum of eight MATOC contracts for a base two-year period plus three one-year options, not to exceed five years total. Task orders will range from $2,000 to $5 million each and total no more than $10 million per contractor. Interested small businesses must register in SAM and at FedBizOpps to access the solicitation releasing on January 8, 2018, with proposals due February 8. A pre-proposal conference will be held January 18-19. The primary NAICS codes are 236220 and 237990. This is a total small business set-aside.

Modification of D-1 to include Division 33- Utilities

View the file

Other files for this federal contract opportunity

Other files attached to SYNOPSIS FOR CONSTRUCTION MATOC USPFO FL, newest first.
File Type Posted
Posting_of_Received_Proposals_9_MAY_18.pdf PDF
QandA_for_MATOC_DTD_Response_APRIL_30_2018.docx DOCX document
W911YN-18-R-0001-0004.pdf PDF
W911YN-18-R-0001-0003.pdf PDF
QandA_for_MATOC_DTD_APRIL_27_2018.docx DOCX document
Attachment_4_Spec_087100_Rev_27APR2018.pdf PDF
Attachment__1_Plans_SK-1_27APR2018.pdf PDF
Site_Visit_attendance_11Apr18.pdf PDF
QandA_for_MATOC_DTD_APRIL_26_2018.docx DOCX document
W911YN-18-R-0001-0002.pdf PDF
QandA_for_MATOC_DTD_APRIL_20_2018.docx DOCX document
Q30-FDZD3001_Combined_PDF_-_Rev_2_6.pdf PDF
Q33_Tankless_Water_Heater_for_EEW.pdf PDF
Q32_Compressed_air_detail.JPG JPG image
QandA_for_MATOC_DTD_APRIL_12_2018.docx DOCX document
EXHIBIT_D-1_SEED_PROJECT_LSGA132007_Rev1.pdf PDF
Attachment_7_ACM_Survey_LBP_Inspection.pdf PDF
EXHIBIT_D-2_SEED_PROJECT_LSGA132001_Rev1.pdf PDF
W911YN-18-R-0001-0001.pdf PDF
MATOC_Preproposal_Conference.pptx PPTX presentation
Pre-Proposal_Site_Visit_Minutes.doc DOC document
SIGN_IN_SHEETS.pdf PDF
EXHIBIT_E.docx DOCX document
EXHIBIT_D-2_SEED_PROJECT_LSGA132001.pdf PDF
W911YN-18-R-0001.pdf PDF
EXHIBIT_B.docx DOCX document
EXHIBIT_C_Reference_Questionnaire_Package.docx DOCX document
Attachment_6_MATOC_DIVISION_01_Special_Contract_Requirements.docx DOCX document
EXHIBIT_D-1_SEED_PROJECT_LSGA132007.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: W911YN-18-R-0001

EXHIBIT D-1 – SEED PROJECT INFORMATION AND PRICING

W911YN-18-R-0001

16 March 2018

PROJECT TITLE: Add to and Alter Weapons Release Building 1019, Project # LSGA132007

PROJECT DESCRIPTION: The objective of this project is to repair/renovate the existing 4,000 sf, single story building, and build a 3,200 sf addition. Work will include, but not limited to the upgrade of all electrical, mechanical, lighting, fire suppression and detection, HVAC, plumbing, security, and communication infrastructure systems, reconfiguration of work spaces to include secure and non-secure areas, and replacement of interior finishes, resurfacing of external walls, replacement of windows and doors, and installation of new metal seamed roof system. There are delegated designs for certain aspects of construction to include, but not limited to Fire sprinkler piping and Duct design. Option items will include installation and construction of structural system and demountable partition and gypsum board partitions, furnish and installation of lockers and benches, furnish and installation of photovoltaic collection system, replacement of an existing HVAC unit. The contract will be funded by multiple funds which will be identified in the price schedule

NAICS CODE: 236220

MAGNITUDE OF PROJECT:

☐ $25,000 - $100,000 ☐ $100,000 - $250,000 ☐ $250,000 - $500,000 ☐ $500,000 - $1,000,000 ☒$1,000,000 - $5,000,000

Funds are not presently available for this contract. Currently, the Government anticipates funds will become available prior to but no later than midnight 30 Sep 2018. This action has been identified on the National Guard priority list for award if funds become available and the prices received are within an awardable range.

PERFORMANCE PERIOD 365 Days, after receipt of Notice to Proceed (see 52.211-10)

All terms and conditions of the Basic Contract are incorporated in the resulting task order by reference unless otherwise stated.

BRAND NAME and/or SOLE SOURCE REQUIREMENTS ☐ Brand Name and/or Sole Source Requirements are applicable to the following items:

PART I-PROVISIONS

A Bid Bond is required for all solicitations estimated over $150,000.

Bid Guarantee (Sep 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, x cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds --

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3M, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

The Following Provisions if marked [X] are applicable to this task order solicitation

☐ Instructions to Offerors. Alternate Proposal. The government at its option will accept and evaluate alternate proposals; however offerors must also price the project as specified. Alternate proposals should include enough detail for the Government to understand the alternate as well as its benefits. Costs and or credits shall be listed separately. Offerors who do not provide alternate proposals may not be notified in the event the government elects to accept an alternate proposal from another offeror.

☒ FAR 52.217-5 Evaluation of Options applies to this solicitation.

☒ DFARS 252.236-7006 Cost Limitation (JAN 1997)

(a) Certain items in this solicitation are subject to statutory cost limitations. The limitations are stated in the Schedule.

(b) An offer which does not state separate prices for the items identified in the Schedule as subject to a cost limitation may be considered nonresponsive.

(c) Prices stated in offers for items subject to cost limitations shall include an appropriate apportionment of all costs, direct and indirect, overhead, and profit.

(d) Offers may be rejected which—(1) Are materially unbalanced for the purpose of bringing items within cost limitations; or(2) Exceed the cost limitations, unless the limitations have been waived by the Government prior to award.

PART II-CLAUSES

THIS PART WILL ALSO BE INCLUDED IN THE RESULTING TASK ORDER

All work shall be in strict accordance with the:

☒Plans/Drawings dated December 13, 2017 and Specifications dated January 6, 2016 (Designer of Record Jacobs)

PERFORMANCE & PAYMENT BONDS: In accordance with FAR Clause 52.228-15 Performance and Payment Bonds-Construction, Offerors are reminded that any amount awarded over $35,000 shall require Payment Bonds and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.

ALTERNATIVE PAYMENT METHODS

(Only applies to awards > $35,000 but < $150,000) IAW 52.228-13 The following Alternative Payment Methods are applicable:

☐ Payment Bond ☐ Irrevocable Letter of Credit (ILC) ☐ Tripartite Escrow Agreement ☐ Certificates of Deposit ☐ A Deposit of the type of security listed in FAR 28.204-1 and 28.204-2

WAGE DETERMINATION: Currently, General Decision Number FL180246 Modification No. 0 dated 01/05/2018 for Duval County is applicable to this task order. Rates can be found at http://www.wdol.gov/wdol/scafiles/davisbacon/FL.html. However, the current prevailing Wage Determination will be incorporated at the time of award. In the event the current prevailing Wage Determination is changed by the Department of Labor after the closing date of this solicitation, the updated Wage Determination will be incorporated by amendment and issued to all Offerors that have not been eliminated from the competition. If applicable, these Offerors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. This does not constitute and shall not constitute as discussions if award without discussions is contemplated.

For the purposes of this offering, it is implied that, that any and all parties agree to a Criminal History Background Check once entered into any contract/task order. Any documents that are provided and found fraudulent to include, but not limited to driver’s licenses, contracting licenses, etc., will result in an arrest and potential termination for default from the contract. All contractors are subject to search in order to obtain entry onto the installation and while working on the installation. Any refusal to submit to a search of their person or vehicle will be deemed as a violent act of aggression against the installation and will be cause for dismissal from the installation and revocation of future privileges and installation access.

PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385- 1-1 To access the manual use the link below http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx

The Following Provisions/Clauses if marked [X] are applicable to this task order solicitation and resulting task order

☒ FAR 52.217-7 Option for Increased Quantity- Separately Priced Line Item applies to award when option(s) not taken at time of award. The Government reserves the right to award option individual line items at time of basic line item award or after award, but not later than [to be determined] days after Notice to Proceed. Performance period upon award of options will/will not be [to be determined] extended.

http://www.wdol.gov/wdol/scafiles/davisbacon/FL.html http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx

☒ FAR 52.246-21 Warranty of Construction is applicable to the resulting task order.

☒ FAR 52.211-12 Liquidated Damages. If applicable, the following amounts will be applicable to this TASK ORDER $491.80/day, a one-time charge of $153.00 for legal services, and per trip charge of $214.00 for each round trip required by the contracting officer to the jobsite.

☒ FAR 52.236-14 Availability and Use of Utility Services The Contracting Officer has determined that Government-operated utilities are adequate and will be furnished to the contractor without charge where existing outlets are available. The contractor is responsible for installing temporary service outlets, as necessary, at its expense IAW the clause entitled “Availability and Use of Utility Services” (FAR Clause 52.236-14). The following utilities will be available:

Power, Water

IF TASK ORDER IS OVER $25,000 FAR 52.204-10 Reporting Executive Compensation and First Tier Subcontract Awards (Aug 2012) is applicable to this order. The following are the codes needed to accomplish the reporting:

TAS [INSERT TAS CODE] Agency 5700 (this information is dependent upon funding and will be furnished upon task order award)

☒ DFARS 252.236-7006 Cost Limitation (JAN 1997)

(a) Certain items in this solicitation are subject to statutory cost limitations. The limitations are stated in the Schedule.

(b) An offer which does not state separate prices for the items identified in the Schedule as subject to a cost limitation may be considered nonresponsive.

(c) Prices stated in offers for items subject to cost limitations shall include an appropriate apportionment of all costs, direct and indirect, overhead, and profit.

(d) Offers may be rejected which—(1) Are materially unbalanced for the purpose of bringing items within cost limitations; or(2) Exceed the cost limitations, unless the limitations have been waived by the Government prior to award.

☐ PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE NATIONAL COMMAND

AUTHORITY. (September 2002) This special contract clause is applicable to this task order.

☒ AT OPSEC Information from the Contract Requirements Package

The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

AT Level I Training. This standard language is for contractor employees with an area of performance within a Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness Training is available through https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf. Find JS-US007: Level I Antiterrorism Awareness Training

The Following is provided to assist in submission of WAWF Invoices

PARTIAL PAYMENTS ARE AUTHORIZED FOR THIS TASK ORDER

WIDE AREA WORKFLOW STATEMENT

IAW 252.232-7003 (Jun 2012), all invoices must be submitted via WAWF. It is mandatory that you use this E-Invoicing system to ensure timely payment of your invoice.

The web site for this system is https://wawf.eb.mil. There are no charges to use WAWF. All questions relating to system setup and vendor training can be directed to the help desk at Ogden. Their number is 1-866-618-5988.

THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICES AND ADDITIONAL E-

MAILS CORRECTLY THROUGH WAWF.

TYPE OF INVOICE SUBMISSION:

Invoice

Invoice and Receiving Report (Combo)

X Invoice as 2-in-1 (Services Only)

Not available Construction Invoice

X CAGE Code: Six (6) digit code in Block 14

X Pay DoDAAC:

X Issue DoDAAC: W911YN

X Admin DoDAAC: W911YN

X Inspect By DODAAC: F6U3CE

X Contracting Officer/Service Acceptor DODAAC: W911YN

Required Fields in WAWF

Contractor: WAWF will prompt asking for "additional E-mail submissions" after clicking

"SIGNATURE".

The following E-Mail addresses MUST be input in order to prevent delays in processing:

Inspector (COR): Brandon.c.pruitt2.mil@mail.mil

Buyer/Administrator: Rutha.t.lawrence.civ@mail.mil

Contracting Officer: brian.j.williams9.mil@mail.mil mailto:Brandon.c.pruitt2.mil@mail.mil mailto:Rutha.t.lawrence.civ@mail.mil mailto:brian.j.williams9.mil@mail.mil mailto:j.williams9.mil@mail.mil

Invoices:

Failure to include email address will delay payment. The Government is not responsible for delays caused by improper submission and notification in WAWF.

The paying office DoDAAC and mailing address can be located on the front of your award. You can easily track your payment information on the DFAS website at http://myinvoice.csd.disa.mil/index.html.

Your purchase order/contract number or invoice number will be required to inquire status of your payment.

☒ Contractor Manpower Reporting. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract at the secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://www.ecmra.mil

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at https://www.ecmra.mil.

http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise-wide_Contractor_Manpower_Reporting_Application_memorandum.pdf

End of clauses/provisions

Point of Contact for this requirement is Rutha T. Lawrence, (904) 823-0566, rutha.t.lawrence.civ@mail.mil

//SIGNED//

BRIAN J. WILLIAMS

Attachment: Contracting Officer Proposal Form, Notes and Provision(s) http://myinvoice.csd.disa.mil/index.html http://www.ecmra.mil/ http://www.ecmra.mil/ http://www.ecmra.mil/ http://www.ecmra.mil/ http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise-mailto:rutha.t.lawrence.civ@mail.mil

MATOC SEED TASK ORDER PROPOSAL FORM

PROJECT NO. LSGA132007

PROJECT TITLE: ADD TO AND ALTER WEAPONS RELEASE BUILDING 1019

PROJECT DESCRIPTION: Project provides for the furnishing of all plant, labor, material, equipment, appliances and supervision necessary in accordance with the task order requirements for “Add to and Alter Weapons Release Building 1019”. Project consists of repair/renovate the existing 4,000 sf, single story building, and build a 3,200 sf addition. Work will include, but not limited to the upgrade of all electrical, mechanical, lighting, fire suppression and detection, HVAC, plumbing, security, and communication infrastructure systems, reconfiguration of work spaces to include secure and non-secure areas, and replacement of interior finishes, resurfacing of external walls, replacement of windows and doors, and installation of new metal seamed roof system. There are delegated designs for certain aspects of construction to include, but not limited to Fire sprinkler piping and Duct design. Option items will include installation and construction of structural system and demountable partition and gypsum board partitions, furnish and installation of lockers and benches, furnish and installation of photovoltaic collection system, replacement of an existing HVAC unit. The contract will be funded by multiple funds which will be identified in the price schedule. This project is for a Firm Fixed Task Order against a resulting MATOC IDIQ Contract. Items 0001-0002 are subject to a statutory limit of $1,000,000.00.

DFARS Provision 252.236-7006 Cost Limitation is applicable.

Item Number Description Quantity Unit Amount

0001 Project No. LSGA132007 ADDITION (Minor Construction (MC)) As shown on drawing A-101 and others As “MC”. Does not include selective Demolition as shown on drawing C-101 (statutory limitation $1,000,000 Combined with 0002)

1 JOB $

0002 Option for Addition (MC) Option Add structural system and demountable

Partition and gypsum board partitions to Conceal stacked door panels at room 115 See Spec Section 01 23 00, identified as “Bid Option 1”. Reference Drawing A-101

Number of days after NTP government may Exercise option at proposed price

0003 Project No. LSGA132007 ALTER (Sustainment Restoration

Modernization (SRM)) As shown on drawing A-101 and others As “SRM”. Includes all selective Demolition as shown on drawing C-101

0004 Option 1 for SRM Option Delivery and installation of lockers and

Benches within rooms 107 and 110.

See Spec Section 01 23 00, identified As “Bid Option 2”

0005 Option 2 for SRM Option Delivery and installation of fully

Operational photovoltaic collection System, installed on the new standing Seam metal roof. All inverters, meters And controlling equipment is to be Installed in Mechanical/Electrical Rm 102.

Note: The ‘base-bid’ structure, including trusses and truss supporting members, are not designed or detailed to accommodate the additional imposed loads of the proposed rooftop mounted photovoltaic (PV) collection system.

Acceptance of this OLI will require Winning bidder to provide the imposed loads, reactions, PV locations, anchor locations, connections and other design criteria to A/E for evaluation, review and approval. If accepted, a revision to the Contract Documents will be necessary to incorporate the proposed PV system.

See Spec Section 01 23 00, identified as Bid Option 3.

0006 Option 3 for SRM Option Replacement of existing HVAC Unit

19-2. Scope shall include demolition and Removal of existing AHU and condensing Unit along with all ductwork modifications To accommodate installation of new heat Pump unit of equal size. All Misc piping, Ductwork, concrete pad, equipment

Supports, insulation electrical service And reconnection to existing controls System shall be included. See Spec Section 01 23 00, identified as “Bid Option 4”.

0007 Contractor Manpower Reporting 1 JOB $

INSTRUCTION TO OFFERORS ON PROPOSAL PREPARATION AND EVALUATION OF OFFERS

AND AWARD OF “SEED” TASK ORDER

Instructions: Per Section 00110, 3.2.8., Subfactor 5, Scheduling Methodology, provide a construction schedule in a Gantt chart that shows the complete project schedule for this task order project from notice to proceed, to include all construction activities as well as concurrent activities, and outline the critical path activities that will show successful execution of the construction project within the period of performance requirements outlined in this Exhibit. Also include a narrative discussing the scheduling processes and resource allocation that ensure completion and control of schedule progress from beginning to the end of the project.

Evaluation: The offeror’s proposal shall be evaluated as described in the MATOC Solicitation.

The Government will evaluate the offeror’s ability in scheduling methodology to determine if they have scheduling processes that ensure completion and control of the project from beginning to the end of the project.

The proposal narrative should demonstrate an understanding of the limitations of a schedule as well as an understanding that an appropriate schedule will result in successful completion of projects. A successful project schedule will provide the Government confidence that the project is structured to be executable for the resources indicated, is task oriented and indicates dates on which milestones will be achieved, and shows a total completion date within the time required by this Exhibit.

The Task Order Project Schedule will be evaluated as part of the Offeror’s Technical Proposal. Price will be evaluated to determine reasonableness of the proposed price. Unreasonable Offers cannot be selected for award.

DETAILED PRICE PROPOSAL

Divisions of the Detailed Offer Spreadsheet must coincide with the Divisions within the specifications dated 01/06/2016 for Add to and Alter Weapons Release Building 1019. Division prices must be split into material/equipment and labor. Include only the materials and labor listed in the Part 1 General and Part 2 Products portions of each Division in the specifications. Prices must include all applicable sales tax, overhead and profit for the requirements of that specification Division.

Base Line Item Description Total

0001 ADD

Division 01

General Requirements—do not include separately. General Requirements should be allocated to the other Divisions

Division 03 Concrete $

Division 04 Masonry

Division 05 Metals

Division 06 Wood, Plastics & Composites

Division 07 Thermal & Moisture Protection

Division 08 Openings

Division 09 Finishes

Division 21 Fire Suppression

Division 23 HVAC

Division 26 Electrical

Division 27 Communications

Division 28 Electronic Safety & Security

Division 31 Earthwork

Total Base $

Option Line

Description

Total

0002 ADD

Option

Add structural system and demountable Partition and gypsum board partitions to

Conceal stacked door panels at room 115

Division 08 Openings $

Base Line Item Description Total

0003 ALTER

(SRM)

Division 01

General Requirements—do not include separately. General Requirements should be allocated to the other Divisions

Division 02

Existing Conditions (selective demolition, includes demolition of canopy)

Division 03 Concrete

Division 05 Metals

Division 06 Wood, Plastics & Composites

Division 07 Thermal & Moisture Protection

Division 08 Openings

Division 09 Finishes

Division 10 Specialties

Division 12 Furnishings

Division 21 Fire Suppression

Division 22 Plumbing

Division 23 HVAC

Division 26 Electrical

Division 27 Communications

Division 28 Electronic Safety & Security

Division 33 Utilities

Total Base $

0004 SRM

Option

Lockers and benches

Division 10 Specialties $

0005 SRM

Photovoltaic collection system

Division 26 Electrical $

0006 SRM

Replace existing HVAC unit

Division 23 HVAC $

General Decision Number: FL180246 01/12/2018 FL246

Superseded General Decision Number: FL20170246

State: Florida

Construction Type: Building

County: Duval County in Florida.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/12/2018

ASBE0013-001 09/01/2017

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 23.50 10.85

CARP0702-001 08/01/2017

Rates Fringes

CARPENTER (Includes Drywall Hanging and Form Work)...........$ 21.77 11.09

ELEC0177-004 01/02/2017

Rates Fringes

ELECTRICIAN (Includes Low Voltage Wiring)..................$ 26.90 11.60 http://www.dol.gov/whd/govcontracts

* ELEV0049-001 01/01/2018

ELEVATOR MECHANIC................$ 39.32 32.645

FOOTNOTE:

A. Employer contributions 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; Employer contributions 6% of regular hourly rate to vacation pay credit for employee who has worked in business less than 5 years.

Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; The Friday after Thanksgiving Day; and Christmas Day.

ENGI0487-021 07/01/2016

OPERATOR: Crane

All Cranes 160 Ton Capacity and Over...........$ 33.05 9.20 All Cranes Over 15 Ton Capacity....................$ 32.05 9.20

OPERATOR: Forklift..............$ 23.25 9.20 OPERATOR: Mechanic..............$ 32.05 9.20 OPERATOR: Oiler.................$ 23.50 9.20

IRON0402-001 02/01/2017

IRONWORKER, ORNAMENTAL...........$ 23.00 10.99

PLUM0234-006 09/01/2017

Rates Fringes

PLUMBER..........................$ 29.14 12.90

PLUM0234-011 09/01/2017

Rates Fringes

PIPEFITTER (Includes HVAC Pipe and Unit Installation)......$ 29.14 12.90

* SFFL0821-004 01/01/2018

SPRINKLER FITTER (Fire

Sprinklers)......................$ 27.68 18.89

SHEE0435-003 07/01/2017

Rates Fringes

SHEET METAL WORKER (Includes HVAC Duct Installation)..........$ 22.71 14.93

A: Holiday Pay: New Year's Day, Memorial Day, July Fourth, Labor Day, Thanksgiving Day, Day after Thanksgiving and Christmas Day

SUFL2014-010 08/16/2016

CEMENT MASON/CONCRETE FINISHER...$ 17.38 0.00

IRONWORKER, REINFORCING..........$ 22.81 11.58

IRONWORKER, STRUCTURAL...........$ 17.66 4.49

LABORER: Common or General, Including Cement Mason Tending...$ 13.62

0.00

LABORER: Pipelayer..............$ 13.73 1.07

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 14.44 1.40

OPERATOR: Bulldozer.............$ 15.40 1.90

OPERATOR: Grader/Blade..........$ 18.97 0.00

OPERATOR: Loader................$ 14.83 1.84

OPERATOR: Roller................$ 14.43 4.78

PAINTER: Brush, Roller and Spray............................$ 15.62 2.05

ROOFER...........................$ 16.99 0.00

TILE SETTER......................$ 18.01 0.00

TRUCK DRIVER: Dump Truck........$ 13.22 2.12

TRUCK DRIVER: Lowboy Truck......$ 14.24 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

http://www.dol.gov/whd/govcontracts

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Solicitation No: W911YN-18-R-0001
EXHIBIT D-1 – SEED PROJECT INFORMATION AND PRICING W911YN-18-R-0001
Funds are not presently available for this contract. Currently, the Government anticipates funds will become available prior to but no later than midnight 30 Sep 2018. This action has been identified on the National Guard priority list for award if fu...
PART I-PROVISIONS
Solicitation No: W911YN-18-R-0001
The Following Provisions if marked [X] are applicable to this task order solicitation
☒ DFARS 252.236-7006 Cost Limitation (JAN 1997)
Solicitation No: W911YN-18-R-0001
PART II-CLAUSES
The Following Provisions/Clauses if marked [X] are applicable to this task order solicitation and resulting task order
Solicitation No: W911YN-18-R-0001
☒ FAR 52.236-14 Availability and Use of Utility Services
☒ DFARS 252.236-7006 Cost Limitation (JAN 1997)
☒ AT OPSEC Information from the Contract Requirements Package
Solicitation No: W911YN-18-R-0001
PARTIAL PAYMENTS ARE AUTHORIZED FOR THIS TASK ORDER
Required Fields in WAWF
Solicitation No: W911YN-18-R-0001
Failure to include email address will delay payment. The Government is not responsible for delays caused by improper submission and notification in WAWF.
http://www.acq.osd.mil/dpap/policy/policyvault/Enterprise- wide_Contractor_Manpower_Reporting_Application_memorandum.pdf
Solicitation No: W911YN-18-R-0001
MATOC SEED TASK ORDER PROPOSAL FORM
Item
0002 Option for Addition (MC)
Number of days after NTP government may Exercise option at proposed price
0004 Option 1 for SRM
Number of days after NTP government may Exercise option at proposed price
Number of days after NTP government may Exercise option at proposed price
Number of days after NTP government may Exercise option at proposed price
Solicitation No: W911YN-18-R-0001
DETAILED PRICE PROPOSAL
Solicitation No: W911YN-18-R-0001
General Decision Number: FL180246 01/12/2018 FL246 Superseded General Decision Number: FL20170246 State: Florida
ASBESTOS WORKER/HEAT & FROST INSULATOR........................$ 23.50 10.85
---------------------------------------------------------------- CARP0702-001 08/01/2017
Rates Fringes CARPENTER (Includes Drywall
Hanging and Form Work)...........$ 21.77 11.09
---------------------------------------------------------------- ELEC0177-004 01/02/2017
Rates Fringes ELECTRICIAN (Includes Low
Voltage Wiring)..................$ 26.90 11.60
Sprinklers)......................$ 27.68 18.89
---------------------------------------------------------------- SHEE0435-003 07/01/2017
Rates Fringes SHEET METAL WORKER (Includes
HVAC Duct Installation)..........$ 22.71 14.93
Backhoe/Excavator/Trackhoe.......$ 14.44 1.40
OPERATOR: Bulldozer.............$ 15.40 1.90
OPERATOR: Grader/Blade..........$ 18.97 0.00
OPERATOR: Loader................$ 14.83 1.84
OPERATOR: Roller................$ 14.43 4.78
PAINTER: Brush, Roller and Spray............................$ 15.62 2.05
ROOFER...........................$ 16.99 0.00
TILE SETTER......................$ 18.01 0.00
TRUCK DRIVER: Dump Truck........$ 13.22 2.12

File details come from the government source that posted it. Updated .