Technical_Specifiations.pdf
PDF 1 MB Posted
- Attached to
- Bradys Run Bank Stabilization
- Solicitation number
- w911wn18b8000
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Results.pdf | ||
| 01_22_00.00_10_Am_2.pdf | ||
| W911WN18B8000-0002.pdf | ||
| W911WN18B8000_Amendment_0001.pdf | ||
| W911WN18B8000_Brady's_Run_Stream_Bank_Protection.pdf | ||
| Plans_-_Bradys_Run_Final.pdf | ||
| Price_Schedule.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911WN18B8000
Bradys Run Emergency Streambank Protection Project
Bradys Run Sanitary Authority Beaver County, Pennsylvania
Certified Final Documents Technical Specifications June 2018
Sect i on 14 Br adys Run Bank St abi l i zat i on
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 22 00. 00 10 MEASUREMENT AND PAYMENT
01 30 00. 00 08 ADMI NI STRATI VE REQUI REMENTS
01 32 17 CONSTRUCTI ON PROGRESS SCHEDULE
01 32 23 SURVEY AND ALI GNMENT CONTROL
01 32 33 DI GI TAL PROGRESS I MAGES
01 33 00 SUBMI TTAL PROCEDURES
01 35 00. 00 08 SPECI AL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE( RMS CM)
01 45 01 USACE QUALI TY CONTROL
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 50 10 PROJECT AND SAFETY SI GNS
01 57 20. 00 10 ENVI RONMENTAL PROTECTI ON
01 57 23. 00 08 STORM WATER POLLUTI ON CONTROL
01 78 02. 00 15 CLOSEOUT SUBMI TTALS ( AS- BUI LT DRAWI NGS)
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 11 01 MI SCELLANEOUS WORK
02 42 00 DI SPOSAL OF MATERI ALS
DI VI SI ON 31 - EARTHWORK
31 05 19 GEOTEXTILES
31 11 00. 00 08 CLEARI NG AND GRUBBI NG
31 23 00 EARTHWORK
31 37 16. 00 08 STONE PROTECTI ON
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 11 23 AGGREGATE BASES
32 12 16. 00 08 BI TUMI NOUS PAVEMENT CONSTRUCTI ON
32 31 13 CHAI N LI NK FENCES AND GATES
32 92 19 SEEDING
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 1 Cer t i f i ed Fi nal Document s
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. 1 DESCRI PTI ON OF WORK
PART 2 PRODUCTS
PART 3 EXECUTI ON
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 11 00 Page 1
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. 1 DESCRI PTI ON OF WORK
The wor k i s l ocat ed al ong Br adys Run adj acent t o t he Br adys Run Sani t ar y Aut hor i t y Wast ewat er Tr eat ment Pl ant i n Beaver Count y, Pennsyl vani a. The gener al descr i pt i on of t he wor k i s t o f ur ni sh al l equi pment , l abor , mat er i al s, l ayout of wor k, and super vi s i on t o const r uct t he f ol l owi ng:
a. St r eambank pr ot ect i on, i ncl udi ng cl ear i ng, gabi on demol i t i on, chai n l i nk f ence and gat e r emoval and r epl acement , excavat i on, gr adi ng, f ur ni shi ng and pl aci ng geot ext i l e f abr i c, and R- 6 and R- 7 st one pr ot ect i on f or appr oxi mat el y 1200 l i near f eet al ong Br adys Run.
b. Const r uct i on of acces r amp.
c. I nst al l at i on of t empor ar y er osi on and sedi ment cont r ol measur es i ncl udi ng si l t f ence, er osi on cont r ol bl anket s, wet l and pr ot ect i on const r uct i on ent r ances, t empor ar y seedi ng, t empor ar y mul chi ng, and per manent seedi ng.
d. Const r uct i on of t empor ar y i n st r eam di ver si on al ong ar ea of r i p r ap pl acement .
Desi gns shown on pl ans and descr i bed i n speci f i cat i ons ar e based on t he condi t i ons of t he pr oj ect obser ved dur i ng t he desi gn pr ocess. The Cont r act or shal l conduct t he pr econdi t i on sur vey and appl y t hese desi gns and st andar d sect i ons f or t he bank st abi l i zat i on wor k pl an.
PART 2 PRODUCTS
PART 3 EXECUTI ON
- - End of Sect i on - -
SECTI ON 01 11 00 Page 2
Section 14 Bradys Run Bank Stabilization
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
1.1.1 Reimbursement For Actual Performance And Payment Bond Premiums
1.1.1.1 Payment
1.1.1.2 Unit of Measure
1.1.1.3 Payment Items
1.1.2 Temporary Erosion and Sediment Controls
1.1.2.1 Payment
1.1.2.2 Unit of Measure
1.1.2.3 Payment Items
1.1.3 Bypass Pumping
1.1.3.1 Payment
1.1.3.2 Unit of Measure
1.1.3.3 Payment Items
1.1.4 Site Demolition
1.1.4.1 Payment
1.1.4.2 Unit of Measure
1.1.4.3 Payment Items
1.1.5 Site Restoration
1.1.5.1 Payment
1.1.5.2 Unit of Measure
1.1.5.3 Payment Items
1.2 UNIT PRICE ITEMS
1.2.1 Progress Photographs
1.2.1.1 Payment
1.2.1.2 Measurement
1.2.1.3 Unit of Measure
1.2.1.4 Payment Items
1.2.2 Installation of Chain Link Fence
1.2.2.1 Payment
1.2.2.2 Measurement
1.2.2.3 Unit of Measure
1.2.2.4 Payment Items
1.2.3 Installation of Gates
1.2.3.1 Payment
1.2.3.2 Measurement
1.2.3.3 Unit of Measure
1.2.3.4 Payment Items
1.2.4 Clearing and Grubbing
1.2.4.1 Payment
1.2.4.2 Measurement
1.2.4.3 Unit of Measure
1.2.4.4 Payment Items
1.2.5 Excavation and Disposal
1.2.5.1 Payment
1.2.5.2 Measurement
1.2.5.3 Unit of Measure
SECTION 01 22 00.00 10 Page 1
1. 2. 5. 4 Payment I t ems
1. 2. 6 Backf i l l and Gr adi ng
1. 2. 6. 1 Payment
1. 2. 6. 2 Measur ement
1. 2. 6. 3 Uni t of Measur e
1. 2. 6. 4 Payment I t ems
1. 2. 7 Geot ext i l e Separ at i on Layer
1. 2. 7. 1 Payment
1. 2. 7. 2 Measur ement
1. 2. 7. 3 Uni t of Measur e
1. 2. 7. 4 Payment I t ems
1. 2. 8 St one Pr ot ect i on
1. 2. 8. 1 Payment
1. 2. 8. 2 Measur ement
1. 2. 8. 3 Uni t of Measur e
1. 2. 8. 4 Payment I t ems
1. 2. 9 Manhol e Gr ade Adj ust ment
1. 2. 9. 1 Payment
1. 2. 9. 2 Measur ement
1. 2. 9. 3 Uni t of Measur e
1. 2. 9. 4 Payment I t ems
1. 2. 10 Pavi ng
1. 2. 10. 1 Payment
1. 2. 10. 2 Measur ement
1. 2. 10. 3 Uni t of Measur e
1. 2. 10. 4 Payment I t ems
1. 2. 11 Gui der ai l
1. 2. 11. 1 Payment
1. 2. 11. 2 Measur ement
1. 2. 11. 3 Uni t of Measur e
1. 2. 11. 4 Payment I t ems
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 22 00. 00 10 Page 2
Section 14 Bradys Run Bank Stabilization
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, shall be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed shall constitute full compensation for furnishing all supplies, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Reimbursement For Actual Performance And Payment Bond Premiums
1.1.1.1 Payment
Payment for reimbursement for actual performance and payment bond premiums will be made as specified in Section 00 70 00 CONDITIONS OF THE CONTRACT, FAR 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS and FAR 52.228-15
PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION.
1.1.1.2 Unit of Measure
Unit of measure: Job
1.1.1.3 Payment Items
0001 REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMIUMS,
BASE CONTRACT
1001 REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMIUMS,
AWARDABLE OPTION
1.1.2 Temporary Erosion and Sediment Controls
1.1.2.1 Payment
This work is specified in Section 01 57 23.00 15 STORM WATER POLLUTION CONTROL. Payment will be made for costs associated with furnishing, installing, maintaining and removing sediment and erosion controls measures including; but not limited to; silt barrier, rock construction entrance, erosion control blanket, mulch used for erosion control, temporary seeding etc; as shown in the construction drawings. Price shall include all materials, labor, equipment, and supplies as required by the specifications, Contract Drawings, Erosion and Sediment Control plan, and all applicable regulatory authorities.
SECTION 01 22 00.00 10 Page 3
1. 1. 2. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 2. 3 Payment I t ems
0003 Tempor ar y Er osi on and Sedi ment Cont r ol s
1. 1. 3 Bypass Pumpi ng
1. 1. 3. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h i nst al l at i on, r el ocat i on and r emoval of t he bypass pumpi ng syst em. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s wor k.
1. 1. 3. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 3. 3 Payment I t ems
0004 Bypass Pumpi ng
1. 1. 4 Si t e Demol i t i on
1. 1. 4. 1 Payment
Payment shal l be made f or cost s associ at ed wi t h r emoval of al l gabi on basket s, aggr egat e and ot her mi scel l aneous st r eambank r epai r mat er i al s pl aced al ong t he al i gnnment , and al l exi st i ng chai n l i nk f ence and gat es al ong t he cur r ent f ence al i gnment and exi st i ng gui de r ai l at t he nor t h ent r ance t o t he s i t e as shown i n t he cont r act dr awi ngs, i ncl udi ng al l concr et e associ at ed wi t h f ence and gat es. Payment shal l al so be made f or pr ovi di ng t empor ar y por t abl e chai n l i nk const r uct i on f ence of t ype speci f i ed, al ong t he t r eat ment pl ant st r eambank ar ea. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s wor k.
1. 1. 4. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 4. 3 Payment I t ems
0005 Si t e Demol i t i on
1. 1. 5 Si t e Rest or at i on
1. 1. 5. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng and i nst al l i ng accept abl e seed, mul ch, and per manent er osi on pr ot ect i on cont r ol bl anket s i n di st ur bed ar eas as speci f i ed. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s wor k.
1. 1. 5. 2 Uni t of Measur e
Uni t of measur e: Job
SECTI ON 01 22 00. 00 10 Page 4
1. 1. 5. 3 Payment I t ems
0016 Si t e Rest or at i on
1. 2 UNI T PRI CE I TEMS
Cont r act wor k payment i t ems r equi r i ng cont r act uni t pr i ce payment s shal l be made as l i s t ed i n t he BI D SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l suppl i es, l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and al l wor k r equi r ed f or each uni t pr i ce i t em.
1. 2. 1 Pr ogr ess Phot ogr aphs
1. 2. 1. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng mont hl y di gi t al pr ogr ess i mages, as speci f i ed i n Sect i on 01 32 33 DI GI TAL PROGRESS I MAGES. Each set shal l consi st of al l speci f i ed har d copi es and el ect r oni c copi es of each phot ogr aphi c sessi on as speci f i ed. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s work.
1. 2. 1. 2 Measurement
Measur ement wi l l be made of t he number of set s of phot ogr aphs t aken and del i ver ed t o t he Cont r act i ng Of f i cer as appr oved or di r ect ed by t he Cont r act i ng Of f i cer or aut hor i zed r epr esent at i ve. Each set shal l consi st of al l speci f i ed har d copi es and el ect r oni c copi es of each phot ogr aphi c sessi on as speci f i ed.
1. 2. 1. 3 Uni t of Measur e
Uni t of measur e: Set s
1. 2. 1. 4 Payment I t ems
0002 Di gi t al Pr ogr ess I mages
1. 2. 2 I nst al l at i on of Chai n Li nk Fence
1. 2. 2. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 32 31 13 CHAI N LI NK FENCES AND GATES.
Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng and accept abl e i nst al l at i on of chai n l i nk f ence, i ncl udi ng al l pol es, concr et e, f oundat i ons, f enci ng, and appur t enances and har dwar e f or t he execut i on of t hi s wor k, as speci f i ed and as shown on t he cont r act dr awi ngs. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s work.
1. 2. 2. 2 Measurement
Measur ement f or payment shal l be by t he act ual l i neal f oot of f ence i nst al l ed, i ncl udi ng t he l engt h of t he gat es.
SECTI ON 01 22 00. 00 10 Page 5
1. 2. 2. 3 Uni t of Measur e
Uni t of measur e: Li near Foot
1. 2. 2. 4 Payment I t ems
0006 Chai n Li nk Fence
1. 2. 3 I nst al l at i on of Gat es
1. 2. 3. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 32 31 13 CHAI N LI NK FENCES AND GATES.
Payment wi l l be made f or each per sonnel gat e or vehi cul ar gat e i nst al l ed, i ncl udi ng gat e post s, assembl i ng f r amewor k, and al l ot her such oper at i ons as ar e r equi r ed t o meet t he r equi r ement s of t he pl ans and speci f i cat i ons.
1. 2. 3. 2 Measurement
Measur ement shal l be by t he number of each t ype of gat e f ur ni shed and installed.
1. 2. 3. 3 Uni t of Measur e
Uni t of measur e: Each
1. 2. 3. 4 Payment I t ems
0007 Per sonnel Swi ng Gat es 0008 Vehi cul ar Swi ng Gat es
1. 2. 4 Cl ear i ng and Gr ubbi ng
1. 2. 4. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 31 11 00. 00 08 CLEARI NG AND GRUBBI NG.
Payment wi l l be made f or cost s associ at ed wi t h c l ear i ng and gr ubbi ng, as r equi r ed t o per f or m t he wor k. Payment shal l i ncl ude, but not be l i mi t ed t o, r emoval of t opsoi l and or gani c mat t er ; r emoval of al l woody debr i s ( bushes, t r ees, st umps, et c. ) ; r emoval of obj ect i onabl e mat er i al , r ubbi sh, and t r ash wi t hi n t he pr oj ect l i mi t s; di sposal of r emoved mat er i al ; sal vage of mat er i al , i f r equi r ed, i ncl udi ng t empor ar y st or age and del i ver y; and pr epar i ng excess soi l mat er i al f or di sposal of f s i t e. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s wor k.
1. 2. 4. 2 Measurement
Measur ement f or payment shal l be by t he act ual ar ea of c l ear i ng and gr ubbi ng accept abl y per f or med based on t he sur f ace ar ea cover ed. Al l measur ement s f or payment shal l be made by or i n pr esence of t he Cont r act i ng Officer.
1. 2. 4. 3 Uni t of Measur e
Uni t of measur e: Squar e Yar d
1. 2. 4. 4 Payment I t ems
0009 Cl ear i ng and Gr ubbi ng
SECTI ON 01 22 00. 00 10 Page 6
1. 2. 5 Excavat i on and Di sposal
1. 2. 5. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 31 23 00 EARTHWORK. Payment wi l l be made f or cost s associ at ed wi t h excavat i on of t he exi st i ng soi l t o t he gr ades shown on t he const r uct i on dr awi ngs, i ncl udi ng but not l i mi t ed t o:
gr ades r equi r ed f or pr oper pl acement of st one ar mor i ng ( r i p r ap) , end pr ot ect i on and t r ench f or geot ext i l e anchor age. Payment wi l l al so be made f or cost s associ at ed wi t h t est i ng, l oadi ng, haul i ng and di sposal of excavat ed and excess soi l mat er i al s f r om excavat i ons on si t e. I t i s t he Cont r act or s sol e r esponsi bi l i t y t o ensur e t hat t he mat er i al i s di sposed of i n accor dance wi t h al l l ocal , st at e and f eder al gui del i nes, or di nances and l aws gover ni ng mat er i al s of t he char act er t o be di sposed. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s work.
1. 2. 5. 2 Measurement
Measur ement of excavat i on quant i t i es wi l l be made f or t he act ual vol ume of common excavat i on compl et ed wi t hi n t he l i mi t s, l i nes and gr ades shown on t he cont r act dr awi ngs. No al l owance wi l l be made f or over dept h excavat i on of f or t he r emoval of any mat er i al out s i de t he r equi r ed l i nes unl ess aut hor i zed by t he Cont r act i ng Of f i cer . The vol ume of mat er i al r emoved shal l be det er mi ned by t he aver age- end- ar ea met hod based on cr oss sect i ons t aken by f i el d sur vey pr i or t o and af t er compl et i on of common excavat i on or ot her met hod appr oved by t he Cont r act i ng Of f i cer . The cr oss sect i on sur veys shal l be obt ai ned by t he Cont r act i ng Of f i cer at a maxi mum 50- f oot i nt er val over t he l engt h of channel di st ur bance pr i or t o and af t er excavat i on t o det er mi ne t he act ual amount of mat er i al r emoved. Vol ume comput at i ons shal l be per f or med by t he Cont r act or , and copi es of al l cr oss sect i on dat a and comput at i ons shal l be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n 48 hour s f ol l owi ng compl et i on of t he f i el d cr oss sect i ons.
Measur ement f or payment of di sposal shal l be made based on t he act ual vol ume, i n cubi c yar ds, of mat er i al di sposed as speci f i ed. Measur ement wi l l be det er mi ned usi ng cer t i f i ed wei ght s l i ps.
1. 2. 5. 3 Uni t of Measur e
Uni t of measur e: Cubi c Yar d
1. 2. 5. 4 Payment I t ems
0010 Excavat i on and Debr i s Removal
1. 2. 6 Backf i l l and Gr adi ng
1. 2. 6. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 31 23 00 EARTHWORK. Payment wi l l be made f or cost s associ at ed wi t h pl aci ng, gr adi ng, and compact i ng f i l l mat er i al al ong t he st r eambank sl opes as shown i n t he cont r act dr awi ngs and as speci f i ed. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s wor k.
1. 2. 6. 2 Measurement
Measur ement of quant i t i es wi l l be made f or t he act ual vol ume of backf i l l
SECTI ON 01 22 00. 00 10 Page 7 pl aced and gr aded wi t hi n t he l i mi t s, l i nes and gr ades shown on t he cont r act dr awi ngs. No al l owance wi l l be made f or any mat er i al pl aced out si de t he r equi r ed l i nes unl ess aut hor i zed by t he Cont r act i ng Of f i cer .
The vol ume of mat er i al pl aced shal l be det er mi ned by t he aver age- end- ar ea met hod, based on cr oss sect i ons t aken by f i el d sur vey pr i or t o and af t er compl et i on of backf i l l , or ot her met hod appr oved by t he Cont r act i ng Of f i cer . The cr oss sect i on sur veys shal l be obt ai ned by t he Cont r act i ng Of f i cer at a maxi mum 50- f oot i nt er val over t he l engt h of channel di st ur bance pr i or t o and af t er backf i l l pl acement t o det er mi ne t he act ual amount of mat er i al pl aced f or backf i l l . Vol ume comput at i ons shal l be per f or med by t he Cont r act or , and copi es of al l cr oss sect i on dat a and comput at i ons shal l be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n 48 hour s f ol l owi ng compl et i on of t he f i el d cr oss sect i ons.
1. 2. 6. 3 Uni t of Measur e
Uni t of measur e: Cubi c Yar d
1. 2. 6. 4 Payment I t ems
0011 Backf i l l and Gr adi ng
1. 2. 7 Geot ext i l e Separ at i on Layer
1. 2. 7. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 31 05 19 GEOTEXTI LES. Payment wi l l be made f or cost s associ at ed wi t h pl acement of woven geot ext i l e f abr i c as shown on t he const r uct i on dr awi ngs. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s wor k.
1. 2. 7. 2 Measurement
Measur ement f or payment shal l be by t he act ual ar ea, i n squar e yar ds, of geot ext i l e accept abl y i nst al l ed based on t he sur f ace ar ea cover ed.
Over l aps wi l l not be measur ed f or payment . Al l measur ement s f or payment shal l be made by or i n pr esence of t he Cont r act i ng Of f i cer .
1. 2. 7. 3 Uni t of Measur e
Uni t of measur e: Squar e Yar d
1. 2. 7. 4 Payment I t ems
0012 Geot ext i l e Separ at i on Layer
1. 2. 8 St one Pr ot ect i on
1. 2. 8. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 31 37 16. 00 08 STONE PROTECTI ON.
Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng and pl aci ng R- 6 and R- 7 st one f or t he r ock l i ned st r eam embankment , as shown i n t he const r uct i on dr awi ngs. I nci dent al t o t hi s wor k shal l be al l r el at ed mi scel l aneous wor k such as const r uct i ng a wat er t r ench, const r uct i ng pi pe ext ensi on( s) , and pl aci ng r i p r ap ar ound exi st i ng endwal l s, headwal l s, pi pe penet r at i ons, et c. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s wor k.
SECTI ON 01 22 00. 00 10 Page 8
1. 2. 8. 2 Measurement
Measur ement f or payment wi l l be made f or t he act ual vol ume of st one pl aced wi t hi n t he l i mi t s, l i nes and gr ades shown on t he cont r act dr awi ngs. The vol ume of mat er i al shal l be det er mi ned by t he aver age- end- ar ea met hod based on cr oss sect i ons t aken by f i el d sur vey pr i or t o and af t er compl et i on of st one i nst al l at i on or ot her met hod appr oved by t he Cont r act i ng Of f i cer . The cr oss sect i on sur veys shal l be obt ai ned by t he Cont r act i ng Of f i cer at a maxi mum 50- f oot i nt er val over t he l engt h of t he ar ea pr i or t o and af t er st one i nst al l at i on t o det er mi ne t he act ual amount of mat er i al pl aced. Vol ume comput at i ons shal l be per f or med by t he Cont r act or , and copi es of al l cr oss sect i on dat a and comput at i ons shal l be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n 48 hour s f ol l owi ng compl et i on of t he f i el d cr oss sect i ons.
1. 2. 8. 3 Uni t of Measur e
Uni t of measur e: Cubi c Yar d
1. 2. 8. 4 Payment I t ems
0013 St r eambank St one Pr ot ect i on, ( R- 6 Ri pr ap) 0014 St r eambank St one Pr ot ect i on, ( R- 7 Ri pr ap)
1. 2. 9 Manhol e Gr ade Adj ust ment
1. 2. 9. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 02 11 01 MI SCELLANEOUS WORK. Payment f or manhol e gr ade adj ust ment shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , pl ant , and t ool s; and f or l abor and ot her i nci dent al s necessar y t o compl et e t he wor k r equi r ed as speci f i ed, and as shown on t he Cont r act Dr awi ngs.
1. 2. 9. 2 Measurement
Manhol e gr ade adj ust ment s wi l l be measur ed f or payment by t he ver t i cal l i near f oot , of manhol e gr ade adj ust i ng r i ng or r i ser accept abl y installed.
1. 2. 9. 3 Uni t of Measur e
Uni t of measur e: Ver t i cal Li near Foot
1. 2. 9. 4 Payment I t ems
0015 Manhol e Adj ust ment
1. 2. 10 Paving
1. 2. 10. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 32 12 16. 00 08 BI TUMI NOUS PAVEMENT CONSTRUCTI ON. Payment s f or dr i veway r econst r uct i on shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , pl ant , and t ool s;
and f or l abor and ot her i nci dent al s necessar y t o compl et e t he wor k r equi r ed as speci f i ed, r emove exi st i ng sub base mat er i al t o r equi r ed dept h, pr oof r ol l i ng subgr ade, i nst al l new subbase t o dept h speci f i ed, SECTI ON 01 22 00. 00 10 Page 9 gr adi ng subbase t o al l ow posi t i ve dr ai nage, compact i on, t ack coat , i nst al l at i on of speci f i ed t hi ckness of bi t umi nous bi nder and wear i ng cour ses t o gr ades r equi r ed, and al l cost s i n connect i on t her ewi t h shal l be i ncl uded i n t he appl i cabl e pavement t o whi ch t he wor k appl i es.
1. 2. 10. 2 Measurement
Accept ance wi l l be based on a t wo- di mensi onal measur ement of t he act ual ar ea of pavement cr oss- sect i on ( subbase, bi t umi nous poi nt ) compl et ed i n pl ace. The Cont r act i ng Of f i cer shal l appr ove al l met hods and pr ocedur es f or quant i t y sur veys.
1. 2. 10. 3 Uni t of Measur e
Uni t of measur e: Squar e Yar d
1. 2. 10. 4 Payment I t ems
1002 Reconst r uct Sout h Access Dr i veway
1. 2. 11 Guiderail
1. 2. 11. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h r emoval of exi st i ng gui de r ai l ( gui de r ai l el ement s, r ai l post s, t er mi nal sect i ons, and har dwar e) and wi t h f ur ni shi ng and i nst al l i ng t he new gui de r ai l meet i ng t he speci f i ed r equi r ement s.
1. 2. 11. 2 Measurement
Thi s wor k i s speci f i ed i n Sect i on 02 11 01 MI SCELLANEOUS WORK. Gui de r ai l wi l l be measur ed f or payment by t he l i near f oot . Measur ement shal l be made al ong t he t op edge of t he compl et ed gui de r ai l i n pl ace and t o t he end of t er mi nal el ement s. Lengt h measur ed at t er mi nal el ement s shal l not i ncl ude t he por t i on of t he t er mi nal el ement t hat cur ves back on i t sel f f r om t he ext r eme end of t he t er mi nal el ement . No ext r a l engt h wi l l be gi ven or payment made f or over l aps of r ai l el ement s or bet ween r ai l el ement s and t er mi nal el ement s.
1. 2. 11. 3 Uni t of Measur e
Uni t of measur e: Li near Foot
1. 2. 11. 4 Payment I t ems
1003 New Gui der ai l and Post s
- - End of Sect i on - -
SECTI ON 01 22 00. 00 10 Page 10
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 30 00. 00 08
ADMI NI STRATI VE REQUI REMENTS
PART 1 GENERAL
1. 1 SUMMARY
1. 2 REFERENCES
1. 3 ACRONYMS
1. 4 LOCATI ON AND DESCRI PTI ON OF WORK
1. 5 USACE ACQUI SI TI ON I NSTRUCTI ONS ( AUI )
1. 5. 1 USACE ACQUI SI TI ON I NSTRUCTI ONS ( AUI )
1. 5. 1. 1 EQUAL OPPORTUNI TY FOR VETERANS. UAI 5122. 1302- 100
1. 5. 1. 2 UAI 5152. 231- 9000 5152. 231- 9000 EQUI PMENT OWNERSHI P AND
OPERATI NG EXPENSE SCHEDULE
1. 5. 1. 3 5152. 236- 9009 PARTNERI NG ( FEB 2000)
1. 5. 1. 4 5136. 249- 9000 BASI S FOR SETTLEMENT OF PROPOSALS ( MAR 2009)
PART 2 PRODUCTS
PART 3 EXECUTI ON
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 30 00. 00 08 Page 1
SECTI ON 01 30 00. 00 08
ADMI NI STRATI VE REQUI REMENTS
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i ons cont ai ns cont r act admi ni st r at i ve r equi r ement s whi ch ar e not cover ed i n Sect i on 00 70 00 CONDI TI ONS OF THE CONTRACT or Sect i on 00 73 00
SUPPLEMENTARY CONDI TI ONS.
1. 2 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EP 1110- 1- 8 ( 2016) Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e
1. 3 ACRONYMS
DFARS - Def ense Feder al Acqui s i t i on Regul at i ons Suppl ement EP - Engi neer Pamphl et FAR - Feder al Acqui s i t i on Regul at i ons SAT - Si mpl i f i ed Acqui s i t i on Thr eshol d UAI - USACE Acqui s i t i on I nst r uct i ons
1. 4 LOCATI ON AND DESCRI PTI ON OF WORK
Locat i on. The wor k i s l ocat ed Br adys Run adj acent t o t he Br adys Run Sani t ar y Aut hor i t y Wast ewat er Tr eat ment Pl ant i n Beaver Count y, Pennsylvania.
Descr i pt i on of Wor k. The gener al descr i pt i on of t he wor k i s t o f ur ni sh al l equi pment , l abor , mat er i al s, l ayout of wor k, and super vi s i on t o const r uct t he f ol l owi ng:
a. St r eambank pr ot ect i on, i ncl udi ng cl ear i ng, gabi on demol i t i on, chai n l i nk f ence and gat e r emoval and r epl acement , excavat i on, gr adi ng, f ur ni shi ng and pl aci ng geot ext i l e f abr i c, and R- 6 and R- 7 st one pr ot ect i on f or appr oxi mat el y 1200 l i near f eet al ong Br adys Run.
b. Const r uct i on of acces r amp.
c. I nst al l at i on of t empor ar y er osi on and sedi ment cont r ol measur es i ncl udi ng si l t f ence, er osi on cont r ol bl anket s, wet l and pr ot ect i on const r uct i on ent r ances, t empor ar y seedi ng, t empor ar y mul chi ng, and per manent seedi ng.
d. Const r uct i on of t empor ar y i n st r eam di ver si on al ong ar ea of r i p r ap pl acement .
SECTI ON 01 30 00. 00 08 Page 2
Desi gns shown on pl ans and descr i bed i n speci f i cat i ons ar e based on t he condi t i ons of t he pr oj ect obser ved dur i ng t he desi gn pr ocess. The Cont r act or shal l conduct t he pr econdi t i on sur vey and appl y t hese desi gns and st andar d sect i ons f or t he bank st abi l i zat i on wor k pl an.
1. 5 USACE ACQUI SI TI ON I NSTRUCTI ONS ( AUI )
1. 5. 1 USACE ACQUI SI TI ON I NSTRUCTI ONS ( AUI )
1. 5. 1. 1 EQUAL OPPORTUNI TY FOR VETERANS. UAI 5122. 1302- 100
I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n Sect i on 00 70 00 CONDI TI ONS OF THE CONTRACT, FAR Par t 22. 13 EQUAL OPPORTUNI TY FOR
VETERANS, FAR 52. 222- 35 EQUAL OPPORTUNI TY FOR VETERANS, FAR 52. 222- 37
EQUAL OPPORTUNI TY FOR VETERANS WI TH DI SABI LI TI ES, and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE cont r act .
Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USACE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE cont r act or s i n t hei r out r each ef f or t s:
U. S. Depar t ment of Labor Vet er ans empl oyment : www. vet s. gov/
Feder al vet er an empl oyment i nf or mat i on: www.fedshirevets.gov/index.aspx
Vet er ans' Empl oyment and Tr ai ni ng Ser vi ce ( VETS) :
http://www.dol.gov/vets /
Vet er ans Oppor t uni t y t o Wor k ( VOW) Pr ogr am: http://benefits.va.gov/vow/
Hi r i ng Our Her oes i ni t i at i ve:
www.uschamberfoundation.org/hiring-our-heroes
Gui de t o Hi r i ng Vet er ans:
https://obamawhitehouse.archives.gov/sites/default/files/docs/white_house _busi ness_counci l - gui de_t o_hi r i ng_vet er ans_0. pdf
1. 5. 1. 2 UAI 5152. 231- 9000 5152. 231- 9000 EQUI PMENT OWNERSHI P AND OPERATI NG
EXPENSE SCHEDULE
( a) Thi s c l ause does not appl y t o t er mi nat i ons. See UAI 5152. 249- 9000, Basi s f or Set t l ement of Pr oposal s, and Feder al Acqui s i t i on Regul at i on ( FAR) par t 49 TERMI NATI ON OF CONTRACTS.
( b) Al l owabl e cost s f or const r uct i on and mar i ne pl ant and equi pment i n sound wor kabl e condi t i on owned or cont r ol l ed and f ur ni shed by a cont r act or or subcont r act or at any t i er shal l be based on act ual cost dat a f or each pi ece of equi pment or gr oups of s i mi l ar ser i al and ser i es f or whi ch t he Gover nment can det er mi ne bot h owner shi p and oper at i ng cost s f r om t he cont r act or ' s account i ng r ecor ds. When bot h owner shi p and oper at i ng cost s cannot be det er mi ned f or any pi ece of equi pment or gr oups of s i mi l ar ser i al or ser i es equi pment f r om t he cont r act or ' s account i ng r ecor ds, cost s f or t hat equi pment shal l be based upon t he appl i cabl e pr ovi s i ons of EP 1110- 1- 8, Regi on I .
Wor ki ng condi t i ons shal l be consi der ed t o be aver age f or det er mi ni ng
SECTI ON 01 30 00. 00 08 Page 3 equi pment r at es usi ng t he schedul e unl ess speci f i ed ot her wi se by t he cont r act i ng of f i cer . For equi pment not i ncl uded i n t he schedul e, r at es f or compar abl e pi eces of equi pment may be used or a r at e may be devel oped usi ng t he f or mul a pr ovi ded i n t he schedul e. For f or war d pr i c i ng, t he schedul e i n ef f ect at t he t i me of negot i at i ons shal l appl y. For r et r oact i ve pr i c i ng, t he schedul e i n ef f ect at t he t i me t he wor k was per f or med shal l appl y.
( c) Equi pment r ent al cost s ar e al l owabl e, subj ect t o t he pr ovi s i ons of FAR 31. 105( d) ( i i ) CONSRUCTI ON AND ARCHI TECT- ENGI NEER CONTRACTS and FAR 31. 205- 36 RENTAL COSTS. Rat es f or equi pment r ent ed f r om an or gani zat i on under common cont r ol , l ease- pur chase ar r angement s, and sal e- l easeback ar r angement s, wi l l be det er mi ned usi ng t he schedul e, except t hat act ual r at es wi l l be used f or equi pment l eased f r om an or gani zat i on under common cont r ol t hat has an est abl i shed pr act i ce of l easi ng t he same or s i mi l ar equi pment t o unaf f i l i at ed l essees.
( d) When act ual equi pment cost s ar e pr oposed and t he t ot al amount of t he pr i c i ng act i on exceeds t he si mpl i f i ed acqui s i t i on t hr eshol d ( SAT) , t he cont r act i ng of f i cer shal l r equest t he cont r act or t o submi t ei t her cer t i f i ed cost or pr i c i ng dat a, or par t i al / l i mi t ed dat a, as appr opr i at e. The dat a shal l be submi t t ed on St andar d For m 1411, Cont r act Pr i c i ng Pr oposal Cover Sheet .
1. 5. 1. 3 5152. 236- 9009 PARTNERI NG ( FEB 2000)
I n or der t o most ef f ect i vel y accompl i sh t hi s cont r act , t he Gover nment pr oposes t o f or m a par t ner shi p wi t h t he Cont r act or t o devel op a cohesi ve bui l di ng t eam. I t i s ant i c i pat ed t hat t hi s par t ner shi p woul d i nvol ve t he t he Cont r act or , pr i mar y subcont r act or s and desi gner s, and t he Cor ps of Engi neer s. Thi s par t ner shi p woul d st r i ve t o devel op a cooper at i ve management t eam dr awi ng on t he st r engt hs of each t eam member i n an ef f or t t o achi eve a qual i t y pr oj ect wi t hi n budget and on schedul e. Thi s par t ner shi p woul d be bi l at er al i n member shi p and par t i c i pat i on wi l l be compl et el y vol unt ar y. Any cost associ at ed wi t h ef f ect uat i ng t hi s par t ner shi p, excl udi ng t r avel and l odgi ng cost of Gover nment per sonnel , wi l l be bor ne by each par t y.
The par t ner i ng meet i ngs shal l be hel d i n a pl ace accept abl e t o bot h par t i es. Cost s associ at ed wi t h par t ner i ng wi l l be negot i at ed bi l at er al l y af t er awar d.
1. 5. 1. 4 5136. 249- 9000 BASI S FOR SETTLEMENT OF PROPOSALS ( MAR 2009)
Act ual cost s wi l l be used t o det er mi ne equi pment cost s f or a set t l ement pr oposal submi t t ed on t he t ot al cost basi s under Feder al Acqui s i t i on Regul at i on ( FAR) 49. 206- 2( b) BASI S FOR SETTLEMENT OF PROPOSALS. I n eval uat i ng a t er mi nat i on set t l ement pr oposal usi ng t he t ot al cost basi s, t he f ol l owi ng pr i nci pl es wi l l be appl i ed t o det er mi ne al l owabl e equi pment costs:
( a) Act ual cost s f or each pi ece of equi pment , or gr oups of s i mi l ar ser i al or ser i es equi pment , need not be avai l abl e i n t he cont r act or ' s account i ng r ecor ds t o det er mi ne t ot al act ual equi pment cost s.
( b) I f equi pment cost s have been al l ocat ed t o a cont r act usi ng pr edet er mi ned r at es, t hose char ges wi l l be adj ust ed t o act ual cost s.
( c) Recor ded j ob cost s adj ust ed f or unal l owabl e expenses wi l l be used
SECTI ON 01 30 00. 00 08 Page 4 t o det er mi ne equi pment oper at i ng expenses.
( d) Owner shi p cost s ( depr eci at i on) wi l l be det er mi ned usi ng t he cont r act or ' s depr eci at i on schedul e ( subj ect t o t he pr ovi s i ons of Feder al Acqui s i t i on Regul at i on ( FAR) 31. 205- 11 DEPRECI ATI ON) .
( e) Li cense, t axes, st or age and i nsur ance cost s ar e nor mal l y r ecover ed as an i ndi r ect expense and unl ess t he cont r act or char ges t hese cost s di r ect l y t o cont r act s, t hey wi l l be r ecover ed t hr ough t he i ndi r ect expense r at e.
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTI ON
NOT USED
- - End of Sect i on - -
SECTI ON 01 30 00. 00 08 Page 5
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 32 17
CONSTRUCTI ON PROGRESS SCHEDULE
PART 1 GENERAL
1. 1 SUBMI TTALS
1. 2 QUALI FI CATI ONS
PART 2 PRODUCTS ( Not Appl i cabl e)
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
3. 2 MONI TORI NG CONSTRUCTI ON PROGRESS
3. 3 PROGRESS SCHEDULE - BAR CHART
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 32 17 Page 1
01 32 17
CONSTRUCTI ON PROGRESS SCHEDULE
PART 1 GENERAL
1. 1 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES and as r equi r ed by t he Task Or der :
SD- 01 Pr econst r uct i on Submi t t al s
Pr ogr ess Schedul e - Bar Char t ; G, RO
1. 2 QUALIFICATIONS
The Cont r act or shal l desi gnat e an aut hor i zed r epr esent at i ve who shal l be r esponsi bl e f or t he pr epar at i on of al l r equi r ed pr oj ect schedul e r epor t s.
PART 2 PRODUCTS ( Not Appl i cabl e)
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
Pur suant t o Sect i on 00 70 00 CONDI TI ONS OF THE CONTRACT, FAR 52. 236- 15, SCHEDULE FOR CONSTRUCTI ON CONTRACTS, a Pr oj ect Schedul e as descr i bed bel ow shal l be pr epar ed. The schedul i ng of const r uct i on shal l be t he r esponsi bi l i t y of t he Cont r act or . Cont r act or management per sonnel shal l act i vel y par t i c i pat e i n i t s devel opment . Subcont r act or s and suppl i er s wor ki ng on t he pr oj ect shal l al so cont r i but e i n devel opi ng and mai nt ai ni ng an accur at e Pr oj ect Schedul e. A bar char t shal l be pr epar ed i n accor dance wi t h par agr aph PROGRESS SCHEDULE - BAR CHART. The schedul e shal l be submi t t ed wi t hi n 20 days af t er r ecei pt of Not i ce t o Pr oceed.
3. 2 MONI TORI NG CONSTRUCTI ON PROGRESS
The schedul e shal l be t he basi s f or measur i ng Cont r act or pr ogr ess. Lack of an appr oved schedul e or schedul i ng per sonnel wi l l r esul t i n an i nabi l i t y of t he Cont r act i ng Of f i cer t o eval uat e Cont r act or ' s pr ogr ess.
Fai l ur e of t he Cont r act or t o pr ovi de al l i nf or mat i on, as speci f i ed bel ow, shal l r esul t i n t he di sappr oval of t he ent i r e Pr oj ect Schedul e submi ssi on and t he i nabi l i t y of t he Cont r act i ng Of f i cer t o eval uat e Cont r act or pr ogr ess f or payment pur poses. I n t he case wher e Pr oj ect Schedul e r evi s i ons have been di r ect ed by t he Cont r act i ng Of f i cer and t hose r evi s i ons have not been i ncl uded i n t he Pr oj ect Schedul e, t he Cont r act i ng Of f i cer may hol d r et ai nage up t o t he maxi mum al l owed by cont r act , each payment per i od, unt i l r evi s i ons t o t he Pr oj ect Schedul e have been made.
SECTI ON 01 32 17 Page 2
3. 3 PROGRESS SCHEDULE - BAR CHART
The pr ogr ess char t t o be pr epar ed by t he Cont r act or pur suant t o Sect i on
00 70 00 CONDI TI ONS OF THE CONTRACT, FAR 52. 236- 15 SCHEDULES FOR
CONSTRUCTI ON CONTRACTS shal l consi st of a bar char t as descr i bed her ei n.
I n pr epar i ng t hi s schedul e, t he schedul i ng of const r uct i on i s t he r esponsi bi l i t y of t he Cont r act or and cont r act or management per sonnel shal l act i vel y par t i c i pat e i n i t s devel opment . The char t may be pr epar ed i n a f or mat pr oposed by t he Cont r act or and appr oved by t he Cont r act i ng Of f i cer . Each act i v i t y shal l i ncl ude t he appl i cabl e Pr i ce Schedul e i t em number and show t he est i mat ed cost . The char t shal l be pr epar ed i n suf f i c i ent det ai l t o c l ear l y show t he Cont r act or ' s pl anned pr ogr ess and t he r el at i onshi p of t he var i ous i t ems of wor k. Lar ger act i v i t i es shal l be br oken down i nt o smal l er act i v i t i es wi t h c l ear l y def i ned l i mi t s ( i . e.
Excavat i on bet ween STA xx and STA yy) . I n gener al , t he est i mat ed cost of any i ndi v i dual act i v i t y shoul d not exceed $50, 000. The sel ect i on and number of act i v i t i es shal l be subj ect t o t he Cont r act i ng Of f i cer ' s appr oval . The char t shal l be updat ed mont hl y t o show act ual pr ogr ess and per cent age of wor k compl et ed f or each act i v i t y. The Cont r act or shal l submi t , as par t of hi s mont hl y r equest f or payment , updat ed copi es of hi s pr ogr ess schedul e i dent i f y i ng t he wor k compl et ed dur i ng t he r epor t i ng per i od. I f t he Gover nment i ssues changes t o t he exi st i ng wor k or adds addi t i onal wor k i t ems t o t he cont r act , t he Cont r act or shal l r evi se hi s pr ogr ess schedul e accor di ngl y. Al l cost s associ at ed wi t h r evi s i ng t he schedul e shal l be i ncl uded as par t of t he modi f i cat i on of t he cont r act .
I f t he Cont r act or ' s pr ogr ess f al l s behi nd hi s pl anned wor k ef f or t , a r evi sed schedul e shal l be f ur ni shed t o show how t he Cont r act or pr oposes t o compl et e t he r emai ni ng wor k wi t hi n t he cont r act t i me. I f t he Cont r act or f ai l s t o submi t updat es as r equi r ed, t he Cont r act i ng Of f i cer may wi t hhol d appr oval of par t i al payment est i mat es, unt i l such submi t t al s ar e made.
- - End of Sect i on - -
SECTI ON 01 32 17 Page 3
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 32 23
SURVEY AND ALI GNMENT CONTROL
PART 1 GENERAL
1. 1 SUMMARY
1. 2 REFERENCES
1. 3 GENERAL REQUI REMENTS
1. 3. 1 Exi st i ng Pr oj ect Sur vey Cont r ol
1. 3. 2 Pr oj ect Sur vey Cont r ol
1. 3. 3 Responsi bi l i t i es
1. 4 QUALI FI CATI ONS AND EXPERI ENCE
1. 5 SUBMI TTALS
PART 2 PRODUCTS ( Not Appl i cabl e)
PART 3 EXECUTI ON
3. 1 PROCEDURES AND METHODOLOGI ES
3. 2 SURVEYS
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 32 23 Page 1
SECTI ON 01 32 23
SURVEY AND ALI GNMENT CONTROL
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on addr esses t he over al l pr oj ect sur vey cont r ol and pr ocedur e r equi r ement s t o meet al l sur vey/ posi t i onal accur acy r equi r ement s f or t hi s cont r act .
1. 2 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 1110- 1- 1005 ( 2007) Cont r ol and Topogr aphi c Sur veyi ng
1. 3 GENERAL REQUI REMENTS
1. 3. 1 Exi st i ng Pr oj ect Sur vey Cont r ol
Exi st i ng pr oj ect basel i ne st at i oni ng wor k poi nt s have been est abl i shed f or t he wor k under t hi s cont r act .
1. 3. 2 Pr oj ect Sur vey Cont r ol
Al l wor k t o be const r uct ed under t hi s cont r act shal l be const r uct ed accur at el y f r om measur ement s made f r om t he pr oj ect basel i ne wor k poi nt s and sur vey cont r ol poi nt s est abl i shed by t he Cont r act or as necessar y t o const r uct al l wor k wi t hi n pr oper al i gnment . The Cont r act or shal l est abl i sh t he pr oj ect basel i ne wor k poi nt s shown on t he dr awi ngs and any ot her t empor ar y sur vey cont r ol as may be necessar y t o car r y out t he r equi r ement s of t hi s cont r act . Al l t empor ar y sur vey cont r ol shal l be based of f t he exi st i ng pr oj ect sur vey cont r ol . The Cont r act or shal l ver i f y t he el evat i ons and posi t i ons of t he exi st i ng pr oj ect sur vey cont r ol s bef or e usi ng t hem t o est abl i sh t he pr oj ect basel i ne wor k poi nt s and hi s sur vey cont r ol poi nt s, and shal l not i f y t he Cont r act i ng Of f i cer of any di scr epanci es pr i or t o commenci ng wor k.
1. 3. 3 Responsibilities
The Cont r act or has t he over al l r esponsi bi l i t y t o det er mi ne t he pr ocedur es, equi pment , and met hodol ogi es t o per f or m al l sur vey r equi r ement s out l i ned i n t hese pl ans and speci f i cat i ons. The gover nment has t he r i ght t o r evi ew and appr ove al l sur vey pl ans, but appr oval does not r el i eve t he Cont r act or of t he r esponsi bi l i t y t o sat i sf y al l posi t i onal accur acy and t ol er ance r equi r ement s of t hese pl ans and speci f i cat i ons.
1. 4 QUALI FI CATI ONS AND EXPERI ENCE
The Cont r act or shal l have a Pr of essi onal Land Sur veyor on st af f and be r esponsi bl e f or al l sur vey wor k per f or med as par t of t hi s cont r act .
SECTI ON 01 32 23 Page 2
1. 5 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng an " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Sur vey Pl an; G, RO
The Cont r act or shal l submi t det ai l ed pl ans showi ng t he equi pment and cal i br at i on r ecor ds, f i el d dat a col l ect i on and dat a pr ocessi ng pr ocedur es, and QC pr ocedur es.
SD- 07 Cer t i f i cat es
Qual i f i cat i ons and Exper i ence; G, RO
The Cont r act or shal l submi t f or appr oval , evi dence of t he Pr of essi onal Land Sur veyor who wi l l over see al l sur veyi ng as r equi r ed under t hi s cont r act .
PART 2 PRODUCTS ( Not Appl i cabl e)
PART 3 EXECUTI ON
3. 1 PROCEDURES AND METHODOLOGI ES
The Cont r act or shal l use t he appr opr i at e sur vey equi pment and pr ocedur es as deemed necessar y t o assur e t he posi t i onal accur acy r equi r ement s ar e met or exceeded as cal l ed f or t hr oughout t hi s cont r act . The Cont r act or wi l l be r equi r ed t o submi t pl ans t hr oughout t hi s cont r act i n accor dance wi t h ot her t echni cal sect i ons of t hi s speci f i cat i on. These pl ans shal l i ncl ude det ai l ed descr i pt i ons of t he pr ocedur es and equi pment t hat wi l l be used f or t hat r equi r ement .
3. 2 SURVEYS
Al l sur veys per f or med as par t of t hi s cont r act shal l be done i n accor dance wi t h appl i cabl e sect i ons of EM 1110- 1- 1005. Wher e r equi r ement s i n ot her sect i ons of t hese speci f i cat i ons exceed t hose out l i ned i n t he r ef er enced EM, t he r equi r ement s i n t hese speci f i cat i ons shal l t ake pr ecedence over t he EM and t he Cont r act or shal l be r equi r ed t o est abl i sh a sur vey pl an t o meet or exceed t hese r equi r ement s. The Cont r act or shal l submi t a det ai l ed sur vey pl an t o t he Cont r act i ng Of f i cer f or r evi ew and appr oval wi t hi n 45 days pr i or t o per f or mi ng any sur veys.
- - End of Sect i on - -
SECTI ON 01 32 23 Page 3
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 32 33
DI GI TAL PROGRESS I MAGES
PART 1 GENERAL
1. 1 SUMMARY
1. 2 GENERAL REQUI REMENTS
1. 2. 1 Descr i pt i on
1. 2. 2 Di gi t al Phot ogr aphs
1. 3 SUBMI TTALS
1. 4 PHOTOGRAPHER QUALI FI CATI ONS
PART 2 PRODUCTS
2. 1 CONTRACTOR- FURNI SHED EQUI PMENT
2. 1. 1 Di gi t al Camer a
2. 1. 2 Col or Pr i nt er
PART 3 EXECUTI ON
3. 1 PHOTOGRAPHY
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 32 33 Page 1
SECTI ON 01 32 33
DI GI TAL PROGRESS I MAGES
PART 1 GENERAL
1. 1 SUMMARY
The wor k under t hi s sect i on i ncl udes f ur ni shi ng pr ogr ess phot ogr aphs consi st i ng of di gi t al phot ogr aphs showi ng t he pr ogr ess of t he const r uct i on oper at i ons t hr oughout t he cont r act per i od.
1. 2 GENERAL REQUI REMENTS
1. 2. 1 Description
The Cont r act or shal l , dur i ng t he pr ogr ess of t he pr oj ect ( i ncl udi ng pr ogr ess of f abr i cat i on) , f ur ni sh t he Cont r act i ng Of f i cer pr ogr ess phot ogr aphs t o depi ct pr ogr ess of const r uct i on t hr oughout t he l i f e of t he cont r act . The phot ogr aphs shal l be t aken usi ng di gi t al phot ogr aphy equi pment f ur ni shed by t he Cont r act or . El ect r oni c copi es of appr oved phot ogr aphs shal l be f ur ni shed on compact di sk or ot her st or age medi a as appr oved by t he Cont r act i ng Of f i cer .
1. 2. 2 Di gi t al Phot ogr aphs
Di gi t al phot ogr aphs shal l have a CCD r esol ut i on no l ess t han 7. 0 mi l l i on pi xel s per i mage ( 3072 by 2304) whi ch wi l l pr ovi de enough det ai l t o pr i nt an 8- i nch by 10- i nch phot o- r eal i st i c phot ogr aph. The Cont r act or shal l f ur ni sh, usi ng Mi cr osof t Wor d 2013 ver si on, a f i l e wi t h each set of phot ogr aphs whi ch l i s t s t he f ol l owi ng i dent i f y i ng i nf or mat i on f or each phot ogr aphi c i mage:
a. Name and l ocat i on of pr oj ect .
b. Cont r act number .
c. Dat e t aken.
d. Cont r act or ( and subcont r act or i f appl i cabl e) .
e. Or i ent at i on of v i ew and br i ef descr i pt i on of wor k depi ct ed.
Each phot ogr aph shal l be sequent i al l y number ed. The i dent i f y i ng dat a shal l be pl aced i n t he document accompanyi ng t he phot ogr aphs. No i dent i f y i ng dat a, except t he dat e st amp, shal l appear on t he phot ogr aphs.
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng an " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES: +
Submittals
SD- 03 Pr oduct Dat a
Di gi t al Camer a; G, RO
SECTI ON 01 32 33 Page 2
Pr oduct speci f i cat i on sheet s f or each i t em of equi pment .
SD- 11 Cl oseout Submi t t al s
Thumbnai l Har d Copy Pr i nt s of Pr ogr ess I mages; G, RO Gl ossy Pr i nt s of Sel ect ed Of f i c i al Pr ogr ess I mages; G, RO El ect r oni c Copy of Sel ect ed Of f i c i al Pr ogr ess I mages; G, RO El ect r oni c Copy of Al l Ot her Pr ogr ess I mages; G, RO
Copi es of di gi t al pr ogr ess i mages i n el ect r oni c f or m and har d copy f or m shal l be submi t t ed mont hl y f or appr oval i n accor dance wi t h par agr aph " Phot ogr aphy" . Pr ogr ess i mages shal l be submi t t ed i n a t i mel y manner as coor di nat ed wi t h t he Cont r act i ng Of f i cer .
1. 4 PHOTOGRAPHER QUALI FI CATI ONS
Pr ogr ess phot ogr aphs shal l be made by a per son exper i enced i n phot ogr aphy and f ami l i ar wi t h t he phot ogr aphi c equi pment t o be used f or maki ng such photographs.
PART 2 PRODUCTS
2. 1 CONTRACTOR- FURNI SHED EQUI PMENT
The Cont r act or shal l be r esponsi bl e f or f ur ni shi ng al l phot ogr aphi c equi pment t o per f or m t he wor k speci f i ed by t hi s sect i on. I f t he camer a becomes unusabl e f or t hr ee days or mor e due t o def ect s i n mat er i al s or wor kmanshi p, t he Cont r act or shal l be r esponsi bl e f or f ur ni shi ng a t empor ar y r epl acement f or t he per i od i t i s out of ser vi ce. The Cont r act or shal l f ur ni sh t he camer a equi pment wi t hi n 14 days af t er r ecei pt of Not i ce- t o- Pr oceed.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.