01_22_00.00_10_Am_2.pdf
PDF 46 KB Posted
- Attached to
- Bradys Run Bank Stabilization
- Solicitation number
- w911wn18b8000
About this file
Section 01 22 00.00 10 revised per Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Results.pdf | ||
| W911WN18B8000-0002.pdf | ||
| W911WN18B8000_Amendment_0001.pdf | ||
| Technical_Specifiations.pdf | ||
| W911WN18B8000_Brady's_Run_Stream_Bank_Protection.pdf | ||
| Plans_-_Bradys_Run_Final.pdf | ||
| Price_Schedule.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sect i on 14 Br adys Run Bank St abi l i zat i on
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 22 00. 00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 JOB PAYMENT I TEMS
1. 1. 1 Rei mbur sement For Act ual Per f or mance And Payment Bond Pr emi ums
1. 1. 1. 1 Payment
1. 1. 1. 2 Uni t of Measur e
1. 1. 1. 3 Payment I t ems
1. 1. 2 Tempor ar y Er osi on and Sedi ment Cont r ol s
1. 1. 2. 1 Payment
1. 1. 2. 2 Uni t of Measur e
1. 1. 2. 3 Payment I t ems
1. 1. 3 Bypass Pumpi ng
1. 1. 3. 1 Payment
1. 1. 3. 2 Uni t of Measur e
1. 1. 3. 3 Payment I t ems
1. 1. 4 Si t e Demol i t i on
1. 1. 4. 1 Payment
1. 1. 4. 2 Uni t of Measur e
1. 1. 4. 3 Payment I t ems
1. 1. 5 Si t e Rest or at i on
1. 1. 5. 1 Payment
1. 1. 5. 2 Uni t of Measur e
1. 1. 5. 3 Payment I t ems
1. 2 UNI T PRI CE I TEMS
1. 2. 1 Pr ogr ess Phot ogr aphs
1. 2. 1. 1 Payment
1. 2. 1. 2 Measur ement
1. 2. 1. 3 Uni t of Measur e
1. 2. 1. 4 Payment I t ems
1. 2. 2 I nst al l at i on of Chai n Li nk Fence
1. 2. 2. 1 Payment
1. 2. 2. 2 Measur ement
1. 2. 2. 3 Uni t of Measur e
1. 2. 2. 4 Payment I t ems
1. 2. 3 I nst al l at i on of Gat es
1. 2. 3. 1 Payment
1. 2. 3. 2 Measur ement
1. 2. 3. 3 Uni t of Measur e
1. 2. 3. 4 Payment I t ems
1. 2. 4 Cl ear i ng and Gr ubbi ng
1. 2. 4. 1 Payment
1. 2. 4. 2 Measur ement
1. 2. 4. 3 Uni t of Measur e
1. 2. 4. 4 Payment I t ems
1. 2. 5 Excavat i on and Di sposal
1. 2. 5. 1 Payment
1. 2. 5. 2 Measur ement
1. 2. 5. 3 Uni t of Measur e
SECTI ON 01 22 00. 00 10 Page 1 Cer t i f i ed Fi nal Document s Revi sed by Amendment 0002
1. 2. 5. 4 Payment I t ems
1. 2. 6 Backf i l l and Gr adi ng
1. 2. 6. 1 Payment
1. 2. 6. 2 Measur ement
1. 2. 6. 3 Uni t of Measur e
1. 2. 6. 4 Payment I t ems
1. 2. 7 Geot ext i l e Separ at i on Layer
1. 2. 7. 1 Payment
1. 2. 7. 2 Measur ement
1. 2. 7. 3 Uni t of Measur e
1. 2. 7. 4 Payment I t ems
1. 2. 8 St one Pr ot ect i on
1. 2. 8. 1 Payment
1. 2. 8. 2 Measur ement
1. 2. 8. 3 Uni t of Measur e
1. 2. 8. 4 Payment I t ems
1. 2. 9 Manhol e Gr ade Adj ust ment
1. 2. 9. 1 Payment
1. 2. 9. 2 Measur ement
1. 2. 9. 3 Uni t of Measur e
1. 2. 9. 4 Payment I t ems
1. 2. 10 Pavi ng
1. 2. 10. 1 Payment
1. 2. 10. 2 Measur ement
1. 2. 10. 3 Uni t of Measur e
1. 2. 10. 4 Payment I t ems
1. 2. 11 Gui der ai l
1. 2. 11. 1 Payment
1. 2. 11. 2 Measur ement
1. 2. 11. 3 Uni t of Measur e
1. 2. 11. 4 Payment I t ems
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 22 00. 00 10 Page 2
SECTI ON 01 22 00. 00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, shal l be i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l suppl i es, l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, i ncl udi ng r el at ed t r af f i c cont r ol r equi r ed t o per f or m t he wor k, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
1. 1. 1 Rei mbur sement For Act ual Per f or mance And Payment Bond Pr emi ums
1. 1. 1. 1 Payment
Payment f or r ei mbur sement f or act ual per f or mance and payment bond pr emi ums wi l l be made as speci f i ed i n Sect i on 00 70 00 CONDI TI ONS OF THE CONTRACT, FAR 52. 228- 13 ALTERNATI VE PAYMENT PROTECTI ONS and FAR 52. 228- 15
PERFORMANCE AND PAYMENT BONDS- - CONSTRUCTI ON.
1. 1. 1. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 1. 3 Payment I t ems
0001 REI MBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMI UMS,
BASE CONTRACT
1001 REI MBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMI UMS,
AWARDABLE OPTI ON
1. 1. 2 Tempor ar y Er osi on and Sedi ment Cont r ol s
1. 1. 2. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 01 57 23. 00 15 STORM WATER POLLUTI ON CONTROL. Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng, i nst al l i ng, mai nt ai ni ng and r emovi ng sedi ment and er osi on cont r ol s measur es i ncl udi ng; but not l i mi t ed t o; s i l t bar r i er , r ock const r uct i on ent r ance, er osi on cont r ol bl anket , mul ch used f or er osi on cont r ol , t empor ar y seedi ng et c; as shown i n t he const r uct i on dr awi ngs. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es as r equi r ed by t he speci f i cat i ons, Cont r act Dr awi ngs, Er osi on and Sedi ment Cont r ol pl an, and al l appl i cabl e r egul at or y aut hor i t i es.
SECTI ON 01 22 00. 00 10 Page 3
1. 1. 2. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 2. 3 Payment I t ems
0003 Tempor ar y Er osi on and Sedi ment Cont r ol s
1. 1. 3 Bypass Pumpi ng
1. 1. 3. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h i nst al l at i on, r el ocat i on and r emoval of t he bypass pumpi ng syst em. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s wor k.
1. 1. 3. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 3. 3 Payment I t ems
0004 Bypass Pumpi ng
1. 1. 4 Si t e Demol i t i on
1. 1. 4. 1 Payment
Payment shal l be made f or cost s associ at ed wi t h r emoval of al l gabi on basket s, aggr egat e and ot her mi scel l aneous st r eambank r epai r mat er i al s pl aced al ong t he al i gnnment , and al l exi st i ng chai n l i nk f ence and gat es al ong t he cur r ent f ence al i gnment and exi st i ng gui de r ai l at t he nor t h ent r ance t o t he s i t e as shown i n t he cont r act dr awi ngs, i ncl udi ng al l concr et e associ at ed wi t h f ence and gat es. Payment shal l al so be made f or pr ovi di ng t empor ar y por t abl e chai n l i nk const r uct i on f ence of t ype speci f i ed, al ong t he t r eat ment pl ant st r eambank ar ea. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s wor k.
1. 1. 4. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 4. 3 Payment I t ems
0005 Si t e Demol i t i on
1. 1. 5 Si t e Rest or at i on
1. 1. 5. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng and i nst al l i ng accept abl e seed, mul ch, and per manent er osi on pr ot ect i on cont r ol bl anket s i n di st ur bed ar eas as speci f i ed. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s wor k.
1. 1. 5. 2 Uni t of Measur e
Uni t of measur e: Job
SECTI ON 01 22 00. 00 10 Page 4
1. 1. 5. 3 Payment I t ems
0016 Si t e Rest or at i on
1. 2 UNI T PRI CE I TEMS
Cont r act wor k payment i t ems r equi r i ng cont r act uni t pr i ce payment s shal l be made as l i s t ed i n t he BI D SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l suppl i es, l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, i ncl udi ng r el at ed t r af f i c cont r ol r equi r ed t o per f or m t he wor k, t est s and r epor t s, and al l wor k r equi r ed f or each uni t pr i ce i t em.
1. 2. 1 Pr ogr ess Phot ogr aphs
1. 2. 1. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng mont hl y di gi t al pr ogr ess i mages, as speci f i ed i n Sect i on 01 32 33 DI GI TAL PROGRESS I MAGES. Each set shal l consi st of al l speci f i ed har d copi es and el ect r oni c copi es of each phot ogr aphi c sessi on as speci f i ed. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s work.
1. 2. 1. 2 Measurement
Measur ement wi l l be made of t he number of set s of phot ogr aphs t aken and del i ver ed t o t he Cont r act i ng Of f i cer as appr oved or di r ect ed by t he Cont r act i ng Of f i cer or aut hor i zed r epr esent at i ve. Each set shal l consi st of al l speci f i ed har d copi es and el ect r oni c copi es of each phot ogr aphi c sessi on as speci f i ed.
1. 2. 1. 3 Uni t of Measur e
Uni t of measur e: Set s
1. 2. 1. 4 Payment I t ems
0002 Di gi t al Pr ogr ess I mages
1. 2. 2 I nst al l at i on of Chai n Li nk Fence
1. 2. 2. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 32 31 13 CHAI N LI NK FENCES AND GATES.
Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng and accept abl e i nst al l at i on of chai n l i nk f ence, i ncl udi ng al l pol es, concr et e, f oundat i ons, f enci ng, and appur t enances and har dwar e f or t he execut i on of t hi s wor k, as speci f i ed and as shown on t he cont r act dr awi ngs. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s work.
1. 2. 2. 2 Measurement
Measur ement f or payment shal l be by t he act ual l i neal f oot of f ence i nst al l ed, i ncl udi ng t he l engt h of t he gat es.
SECTI ON 01 22 00. 00 10 Page 5
1. 2. 2. 3 Uni t of Measur e
Uni t of measur e: Li near Foot
1. 2. 2. 4 Payment I t ems
0006 Chai n Li nk Fence
1. 2. 3 I nst al l at i on of Gat es
1. 2. 3. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 32 31 13 CHAI N LI NK FENCES AND GATES.
Payment wi l l be made f or each per sonnel gat e or vehi cul ar gat e i nst al l ed, i ncl udi ng gat e post s, assembl i ng f r amewor k, and al l ot her such oper at i ons as ar e r equi r ed t o meet t he r equi r ement s of t he pl ans and speci f i cat i ons.
1. 2. 3. 2 Measurement
Measur ement shal l be by t he number of each t ype of gat e f ur ni shed and installed.
1. 2. 3. 3 Uni t of Measur e
Uni t of measur e: Each
1. 2. 3. 4 Payment I t ems
0007 Per sonnel Swi ng Gat es 0008 Vehi cul ar Swi ng Gat es
1. 2. 4 Cl ear i ng and Gr ubbi ng
1. 2. 4. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 31 11 00. 00 08 CLEARI NG AND GRUBBI NG.
Payment wi l l be made f or cost s associ at ed wi t h c l ear i ng and gr ubbi ng, as r equi r ed t o per f or m t he wor k. Payment shal l i ncl ude, but not be l i mi t ed t o, r emoval of t opsoi l and or gani c mat t er ; r emoval of al l woody debr i s ( bushes, t r ees, st umps, et c. ) ; r emoval of obj ect i onabl e mat er i al , r ubbi sh, and t r ash wi t hi n t he pr oj ect l i mi t s; di sposal of r emoved mat er i al ; sal vage of mat er i al , i f r equi r ed, i ncl udi ng t empor ar y st or age and del i ver y; and pr epar i ng excess soi l mat er i al f or di sposal of f s i t e. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s wor k.
1. 2. 4. 2 Measurement
Measur ement f or payment shal l be by t he act ual ar ea of c l ear i ng and gr ubbi ng accept abl y per f or med based on t he sur f ace ar ea cover ed. Al l measur ement s f or payment shal l be made by or i n pr esence of t he Cont r act i ng Officer.
1. 2. 4. 3 Uni t of Measur e
Uni t of measur e: Squar e Yar d
1. 2. 4. 4 Payment I t ems
0009 Cl ear i ng and Gr ubbi ng
SECTI ON 01 22 00. 00 10 Page 6
1. 2. 5 Excavat i on and Di sposal
1. 2. 5. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 31 23 00 EARTHWORK. Payment wi l l be made f or cost s associ at ed wi t h excavat i on of t he exi st i ng soi l t o t he gr ades shown on t he const r uct i on dr awi ngs, i ncl udi ng but not l i mi t ed t o:
gr ades r equi r ed f or pr oper pl acement of st one ar mor i ng ( r i p r ap) , end pr ot ect i on and t r ench f or geot ext i l e anchor age. Payment wi l l al so be made f or cost s associ at ed wi t h t est i ng, l oadi ng, haul i ng and di sposal of excavat ed and excess soi l mat er i al s f r om excavat i ons on si t e. I t i s t he Cont r act or s sol e r esponsi bi l i t y t o ensur e t hat t he mat er i al i s di sposed of i n accor dance wi t h al l l ocal , st at e and f eder al gui del i nes, or di nances and l aws gover ni ng mat er i al s of t he char act er t o be di sposed. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s work.
1. 2. 5. 2 Measurement
Measur ement of excavat i on quant i t i es wi l l be made f or t he act ual vol ume of common excavat i on compl et ed wi t hi n t he l i mi t s, l i nes and gr ades shown on t he cont r act dr awi ngs. No al l owance wi l l be made f or over dept h excavat i on of f or t he r emoval of any mat er i al out s i de t he r equi r ed l i nes unl ess aut hor i zed by t he Cont r act i ng Of f i cer . The vol ume of mat er i al r emoved shal l be det er mi ned by t he aver age- end- ar ea met hod based on cr oss sect i ons t aken by f i el d sur vey pr i or t o and af t er compl et i on of common excavat i on or ot her met hod appr oved by t he Cont r act i ng Of f i cer . The cr oss sect i on sur veys shal l be obt ai ned by t he Cont r act i ng Of f i cer at a maxi mum 50- f oot i nt er val over t he l engt h of channel di st ur bance pr i or t o and af t er excavat i on t o det er mi ne t he act ual amount of mat er i al r emoved. Vol ume comput at i ons shal l be per f or med by t he Cont r act or , and copi es of al l cr oss sect i on dat a and comput at i ons shal l be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n 48 hour s f ol l owi ng compl et i on of t he f i el d cr oss sect i ons.
Measur ement f or payment of di sposal shal l be made based on t he act ual vol ume, i n cubi c yar ds, of mat er i al di sposed as speci f i ed. Measur ement wi l l be det er mi ned usi ng cer t i f i ed wei ght s l i ps.
1. 2. 5. 3 Uni t of Measur e
Uni t of measur e: Cubi c Yar d
1. 2. 5. 4 Payment I t ems
0010 Excavat i on and Debr i s Removal
1. 2. 6 Backf i l l and Gr adi ng
1. 2. 6. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 31 23 00 EARTHWORK. Payment wi l l be made f or cost s associ at ed wi t h pl aci ng, gr adi ng, and compact i ng f i l l mat er i al al ong t he st r eambank sl opes as shown i n t he cont r act dr awi ngs and as speci f i ed. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s wor k.
1. 2. 6. 2 Measurement
Measur ement of quant i t i es wi l l be made f or t he act ual vol ume of backf i l l
SECTI ON 01 22 00. 00 10 Page 7 pl aced and gr aded wi t hi n t he l i mi t s, l i nes and gr ades shown on t he cont r act dr awi ngs. No al l owance wi l l be made f or any mat er i al pl aced out si de t he r equi r ed l i nes unl ess aut hor i zed by t he Cont r act i ng Of f i cer .
The vol ume of mat er i al pl aced shal l be det er mi ned by t he aver age- end- ar ea met hod, based on cr oss sect i ons t aken by f i el d sur vey pr i or t o and af t er compl et i on of backf i l l , or ot her met hod appr oved by t he Cont r act i ng Of f i cer . The cr oss sect i on sur veys shal l be obt ai ned by t he Cont r act i ng Of f i cer at a maxi mum 50- f oot i nt er val over t he l engt h of channel di st ur bance pr i or t o and af t er backf i l l pl acement t o det er mi ne t he act ual amount of mat er i al pl aced f or backf i l l . Vol ume comput at i ons shal l be per f or med by t he Cont r act or , and copi es of al l cr oss sect i on dat a and comput at i ons shal l be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n 48 hour s f ol l owi ng compl et i on of t he f i el d cr oss sect i ons.
1. 2. 6. 3 Uni t of Measur e
Uni t of measur e: Cubi c Yar d
1. 2. 6. 4 Payment I t ems
0011 Backf i l l and Gr adi ng
1. 2. 7 Geot ext i l e Separ at i on Layer
1. 2. 7. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 31 05 19 GEOTEXTI LES. Payment wi l l be made f or cost s associ at ed wi t h pl acement of woven geot ext i l e f abr i c as shown on t he const r uct i on dr awi ngs. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s wor k.
1. 2. 7. 2 Measurement
Measur ement f or payment shal l be by t he act ual ar ea, i n squar e yar ds, of geot ext i l e accept abl y i nst al l ed based on t he sur f ace ar ea cover ed.
Over l aps wi l l not be measur ed f or payment . Al l measur ement s f or payment shal l be made by or i n pr esence of t he Cont r act i ng Of f i cer .
1. 2. 7. 3 Uni t of Measur e
Uni t of measur e: Squar e Yar d
1. 2. 7. 4 Payment I t ems
0012 Geot ext i l e Separ at i on Layer
1. 2. 8 St one Pr ot ect i on
1. 2. 8. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 31 37 16. 00 08 STONE PROTECTI ON.
Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng and pl aci ng R- 6 and R- 7 st one f or t he r ock l i ned st r eam embankment , as shown i n t he const r uct i on dr awi ngs. I nci dent al t o t hi s wor k shal l be al l r el at ed mi scel l aneous wor k such as const r uct i ng a wat er t r ench, const r uct i ng pi pe ext ensi on( s) , and pl aci ng r i p r ap ar ound exi st i ng endwal l s, headwal l s, pi pe penet r at i ons, et c. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s wor k.
SECTI ON 01 22 00. 00 10 Page 8
1. 2. 8. 2 Measurement
Measur ement f or payment wi l l be made f or t he act ual vol ume of st one pl aced wi t hi n t he l i mi t s, l i nes and gr ades shown on t he cont r act dr awi ngs. The vol ume of mat er i al shal l be det er mi ned by t he aver age- end- ar ea met hod based on cr oss sect i ons t aken by f i el d sur vey pr i or t o and af t er compl et i on of st one i nst al l at i on or ot her met hod appr oved by t he Cont r act i ng Of f i cer . The cr oss sect i on sur veys shal l be obt ai ned by t he Cont r act i ng Of f i cer at a maxi mum 50- f oot i nt er val over t he l engt h of t he ar ea pr i or t o and af t er st one i nst al l at i on t o det er mi ne t he act ual amount of mat er i al pl aced. Vol ume comput at i ons shal l be per f or med by t he Cont r act or , and copi es of al l cr oss sect i on dat a and comput at i ons shal l be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n 48 hour s f ol l owi ng compl et i on of t he f i el d cr oss sect i ons.
1. 2. 8. 3 Uni t of Measur e
Uni t of measur e: Cubi c Yar d
1. 2. 8. 4 Payment I t ems
0013 St r eambank St one Pr ot ect i on, ( R- 6 Ri pr ap) 0014 St r eambank St one Pr ot ect i on, ( R- 7 Ri pr ap)
1. 2. 9 Manhol e Gr ade Adj ust ment
1. 2. 9. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 02 11 01 MI SCELLANEOUS WORK. Payment f or manhol e gr ade adj ust ment shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , pl ant , and t ool s; and f or l abor and ot her i nci dent al s necessar y t o compl et e t he wor k r equi r ed as speci f i ed, and as shown on t he Cont r act Dr awi ngs.
1. 2. 9. 2 Measurement
Manhol e gr ade adj ust ment s wi l l be measur ed f or payment by t he ver t i cal l i near f oot , of manhol e gr ade adj ust i ng r i ng or r i ser accept abl y installed.
1. 2. 9. 3 Uni t of Measur e
Uni t of measur e: Ver t i cal Li near Foot
1. 2. 9. 4 Payment I t ems
0015 Manhol e Adj ust ment
1. 2. 10 Paving
1. 2. 10. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 32 12 16. 00 08 BI TUMI NOUS PAVEMENT CONSTRUCTI ON. Payment s f or dr i veway r econst r uct i on shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l mat er i al s, equi pment , pl ant , and t ool s;
and f or l abor and ot her i nci dent al s necessar y t o compl et e t he wor k r equi r ed as speci f i ed, r emove exi st i ng sub base mat er i al t o r equi r ed dept h, pr oof r ol l i ng subgr ade, i nst al l new subbase t o dept h speci f i ed, SECTI ON 01 22 00. 00 10 Page 9 gr adi ng subbase t o al l ow posi t i ve dr ai nage, compact i on, t ack coat , i nst al l at i on of speci f i ed t hi ckness of bi t umi nous bi nder and wear i ng cour ses t o gr ades r equi r ed, and al l cost s i n connect i on t her ewi t h shal l be i ncl uded i n t he appl i cabl e pavement t o whi ch t he wor k appl i es.
1. 2. 10. 2 Measurement
Accept ance wi l l be based on a t wo- di mensi onal measur ement of t he act ual ar ea of pavement cr oss- sect i on ( subbase, bi t umi nous poi nt ) compl et ed i n pl ace. The Cont r act i ng Of f i cer shal l appr ove al l met hods and pr ocedur es f or quant i t y sur veys.
1. 2. 10. 3 Uni t of Measur e
Uni t of measur e: Squar e Yar d
1. 2. 10. 4 Payment I t ems
1002 Reconst r uct Sout h Access Dr i veway
1. 2. 11 Guiderail
1. 2. 11. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h r emoval of exi st i ng gui de r ai l ( gui de r ai l el ement s, r ai l post s, t er mi nal sect i ons, and har dwar e) and wi t h f ur ni shi ng and i nst al l i ng t he new gui de r ai l meet i ng t he speci f i ed r equi r ement s.
1. 2. 11. 2 Measurement
Thi s wor k i s speci f i ed i n Sect i on 02 11 01 MI SCELLANEOUS WORK. Gui de r ai l wi l l be measur ed f or payment by t he l i near f oot . Measur ement shal l be made al ong t he t op edge of t he compl et ed gui de r ai l i n pl ace and t o t he end of t er mi nal el ement s. Lengt h measur ed at t er mi nal el ement s shal l not i ncl ude t he por t i on of t he t er mi nal el ement t hat cur ves back on i t sel f f r om t he ext r eme end of t he t er mi nal el ement . No ext r a l engt h wi l l be gi ven or payment made f or over l aps of r ai l el ement s or bet ween r ai l el ement s and t er mi nal el ement s.
1. 2. 11. 3 Uni t of Measur e
Uni t of measur e: Li near Foot
1. 2. 11. 4 Payment I t ems
1003 New Gui der ai l and Post s
- - End of Sect i on - -
SECTI ON 01 22 00. 00 10 Page 10
| 01 22 00.00 10 - MEASUREMENT AND PAYMENT |
| 01 22 00.00 10 - MEASUREMENT AND PAYMENT |
| PART 1 GENERAL |
| 1.1 JOB PAYMENT ITEMS |
| 1.1.1 Reimbursement For Actual Performance And Payment Bond Premiums |
| 1.1.1.1 Payment |
| 1.1.1.2 Unit of Measure |
| 1.1.1.3 Payment Items |
| 1.1.2 Temporary Erosion and Sediment Controls |
| 1.1.2.1 Payment |
| 1.1.2.2 Unit of Measure |
| 1.1.2.3 Payment Items |
| 1.1.3 Bypass Pumping |
| 1.1.3.1 Payment |
| 1.1.3.2 Unit of Measure |
| 1.1.3.3 Payment Items |
| 1.1.4 Site Demolition |
| 1.1.4.1 Payment |
| 1.1.4.2 Unit of Measure |
| 1.1.4.3 Payment Items |
| 1.1.5 Site Restoration |
| 1.1.5.1 Payment |
| 1.1.5.2 Unit of Measure |
| 1.1.5.3 Payment Items |
| 1.2 UNIT PRICE ITEMS |
| 1.2.1 Progress Photographs |
| 1.2.1.1 Payment |
| 1.2.1.2 Measurement |
| 1.2.1.3 Unit of Measure |
| 1.2.1.4 Payment Items |
| 1.2.2 Installation of Chain Link Fence |
| 1.2.2.1 Payment |
| 1.2.2.2 Measurement |
| 1.2.2.3 Unit of Measure |
| 1.2.2.4 Payment Items |
| 1.2.3 Installation of Gates |
| 1.2.3.1 Payment |
| 1.2.3.2 Measurement |
| 1.2.3.3 Unit of Measure |
| 1.2.3.4 Payment Items |
| 1.2.4 Clearing and Grubbing |
| 1.2.4.1 Payment |
| 1.2.4.2 Measurement |
| 1.2.4.3 Unit of Measure |
| 1.2.4.4 Payment Items |
| 1.2.5 Excavation and Disposal |
| 1.2.5.1 Payment |
| 1.2.5.2 Measurement |
| 1.2.5.3 Unit of Measure |
| 1.2.5.4 Payment Items |
| 1.2.6 Backfill and Grading |
| 1.2.6.1 Payment |
| 1.2.6.2 Measurement |
| 1.2.6.3 Unit of Measure |
| 1.2.6.4 Payment Items |
| 1.2.7 Geotextile Separation Layer |
| 1.2.7.1 Payment |
| 1.2.7.2 Measurement |
| 1.2.7.3 Unit of Measure |
| 1.2.7.4 Payment Items |
| 1.2.8 Stone Protection |
| 1.2.8.1 Payment |
| 1.2.8.2 Measurement |
| 1.2.8.3 Unit of Measure |
| 1.2.8.4 Payment Items |
| 1.2.9 Manhole Grade Adjustment |
| 1.2.9.1 Payment |
| 1.2.9.2 Measurement |
| 1.2.9.3 Unit of Measure |
| 1.2.9.4 Payment Items |
| 1.2.10 Paving |
| 1.2.10.1 Payment |
| 1.2.10.2 Measurement |
| 1.2.10.3 Unit of Measure |
| 1.2.10.4 Payment Items |
| 1.2.11 Guiderail |
| 1.2.11.1 Payment |
| 1.2.11.2 Measurement |
| 1.2.11.3 Unit of Measure |
| 1.2.11.4 Payment Items |
File details come from the government source that posted it.