Price_Schedule.pdf

PDF 16 KB Posted

Attached to
Bradys Run Bank Stabilization
Solicitation number
w911wn18b8000
Issued by

About this file

Price Schedule to Include with Bid

View the file

Other files

File Type Posted
Bid_Results.pdf PDF
01_22_00.00_10_Am_2.pdf PDF
W911WN18B8000-0002.pdf PDF
W911WN18B8000_Amendment_0001.pdf PDF
Plans_-_Bradys_Run_Final.pdf PDF
Technical_Specifiations.pdf PDF
W911WN18B8000_Brady's_Run_Stream_Bank_Protection.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 14, Bradys Run

EMERGENCY STREAMBANK PROTECTION

SECTION 00010

SUPPLIES OR SERVICES AND PRICES/COSTS

ITEM DESCRIPTION QUANTITY U/M U/P AMOUNT

REIMBURSEMENT FOR ACTUAL

PERFORMANCE AND PAYMENT BOND

PREMIUMS, BASE CONTRAC

1 JOB $_______.___ $_______.___

0002 DIGITAL PROGRESS IMAGES 3 SETS $_______.___ $_______.___

0003 TEMPORARY EROSION AND SEDIMENT

CONTROLS 1 JOB $_______.___ $_______.___

0004 BYPASS PUMPING 1 JOB $_______.___ $_______.___

0005 SITE DEMOLITION 1 JOB

0006 CHAIN LINK FENCE 1,100 LF $_______.___ $_______.___

0007 PERSONNEL SWING GATES 3 EA $_______.___ $_______.___

0008 VEHICULAR SWING GATES 4 EA $_______.___ $_______.___

0009 CLEARING AND GRUBBING 750 SY $_______.___ $_______.___

0010 EXCAVATION AND DEBRIS REMOVAL 1,000 CY $_______.___ $_______.___

0011 BACKFILL AND GRADING 775 CY $_______.___ $_______.___

0012 GEOTEXTILE SEPARATION LAYER 4,000 SY $_______.___ $_______.___

0013 STREAMBANK STONE PROTECTION, (R-

6 RIPRAP) 2,510 CY $_______.___ $_______.___

0014 STREAMBANK STONE PROTECTION, (R-

7 RIPRAP) 260 CY $_______.___ $_______.___

0015 MANHOLE ADJUSTMENT 6 VLF $_______.___ $_______.___

0016 SITE RESTORATION 1 JOB $_______.___ $_______.___

TOTAL BASE CONTRACT, ITEMS 0001

THROUGH 0016

1001 REIMBURSEMENT FOR ACTUAL

PERFORMANCE AND PAYMENT BOND 1 JOB $_______.___ $_______.___

1002 RECONSTRUCT SOUTH ACCESS

DRIVEWAY AREA 1,800 SY $_______.___ $_______.___

1003 NEW GUIDERAIL AND POSTS 220 LF $_______.___ $_______.___

TOTAL, AWARDABLE OPTION, ITEMS

1001 THROUGH 1003 $_______.___

TOTAL BASE CONTRACT AND

AWARDABLE OPTION $_______.___