Bid_Results.pdf

PDF 8 KB Posted

Attached to
Bradys Run Bank Stabilization
Solicitation number
w911wn18b8000
Issued by

View the file

Other files

File Type Posted
W911WN18B8000-0002.pdf PDF
01_22_00.00_10_Am_2.pdf PDF
W911WN18B8000_Amendment_0001.pdf PDF
Plans_-_Bradys_Run_Final.pdf PDF
Price_Schedule.pdf PDF
Technical_Specifiations.pdf PDF
W911WN18B8000_Brady's_Run_Stream_Bank_Protection.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID RESULTS

W911WN18B8000

Brady’s Run Streambank Protection

Bid Opening: 24 JULY 2018 at 11:00AM EST.

Contractor's Name & Address Total Bid Amount

Green World Contracting Corp.

67 River Avenue Natrona, PA 15065 $ 968,719.60

Aspen Construction 3798 State 371 NW, PO Box 6 Hackensack, MN 56452 $1,685,538.00

Supplied Industrial Solutions, Inc.

550 Niedringhaus, Ave. Bldg 101 Granite City, IL 62040 $1,736,990.00

SAF, Inc.

130 E. Voris Street, STE A Akron, OH 44311 $1,797,135.69

Government Estimate w/o Profit $1,255,423.00

File details come from the government source that posted it.