W911SA-19-C-2009_Attachment_9_Drawings_with_Notes_Bldg_OMS.pdf

PDF 618 KB Posted

Attached to
Award Notice: Interior/Exterior Repair - USARC El Monte Federal contract opportunity
Solicitation number
W911SA-19-B-2011
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort McCoy

About this file

W911SA-19-C-2009 Attachment 9 Drawings with Notes Bldg OMS

View the file

Other files for this federal contract opportunity

Other files attached to Award Notice: Interior/Exterior Repair - USARC El Monte, newest first.
File Type Posted
W911SA-19-C-2009_Award_Repair_Interior_&_Exterior_El_Monte_USARC.pdf PDF
W911SA-19-C-2009_Attachment_3_Drawings.pdf PDF
W911SA-19-C-2009_Attachment_1_ATOPSEC.pdf PDF
W911SA-19-C-2009_Attachment_2_SOW.pdf PDF
W911SA-19-C-2009_Attachment_6_Drawings_with_Notes_Bldg_6.pdf PDF
W911SA-19-C-2009_Attachment_8_Drawings_with_Notes_Bldg_10.pdf PDF
W911SA-19-C-2009_Attachment_7_Drawings_with_Notes_Bldg_8.pdf PDF
W911SA-19-C-2009_Attachment_4_Wage_Requirements_(CA20190022_05032019).pdf PDF
W911SA-19-C-2009_Attachment_5_SF24.pdf PDF
W911SA-19-B-2011_Bid_Abstract.pdf PDF
W911SA-19-B-2011_Attachment_9_Drawings_with_Notes_Bldg_OMS.pdf PDF
W911SA-19-B-2011_Attachment_8_Drawings_with_Notes_Bldg_10.pdf PDF
W911SA-19-B-2011_Amendment_0001.pdf PDF
W911SA-19-B-2011_Attachment_7_Drawings_with_Notes_Bldg_8.pdf PDF
W911SA-19-B-2011_Attachment_6_Drawings_with_Notes_Bldg_6.pdf PDF
W911SA-19-B-2011_Attachment_4_Wage_Requirements_(CA190022_05032019__CA22).pdf PDF
W911SA-19-B-2011_Attachment_1_ATOPSEC.pdf PDF
W911SA-19-B-2011_Attachment_4_Wage_Requirements.pdf PDF
W911SA-19-B-2011_Attachment_5_SF24.pdf PDF
W911SA-19-B-2011_Attachment_2_SOW.pdf PDF
W911SA-19-B-2011_El_Monte_USARC_Repair_Interior_&_Exterior.pdf PDF
W911SA-19-B-2011_Attachment_3_Drawings.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMS Building

CA010 Floor Plans Shop Building CADD Notes

Page: 1 Number: 1 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 3:26:22 PM Latrine OMS 1 Contractor shall remove of existing vanity, sink, and toilet. The contractor shall reconfigure the restroom to install one new toilet with partition, new urinal with partition.

2 Contractor shall furnish and install new vanity with counter sunk self-draining sink, faucet and mirror with aluminum frame.

3 The contractor shall remove and replace existing floor tiles. The Contractor shall consult with COR for tile color scheme to be utilized in the restrooms.

4 The contractor shall remove existing lighting and replace with new lighting with motion sensor and timer.

5 Contractor shall remove existing exhaust fan and replace with new industrial type exhaust fan.

6 Contractor shall paint latrine, repair all holes, cracks and marks with fillers, sealant, and putties as appropriate for the finishes with industry standards before painting. Walls should be wiped down as necessary before painting.

Number: 2 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 3:25:48 PM

Work Bay 208 The contractor shall repair all holes, cracks and marks with fillers, sealant, and putties as appropriate for the finishes in accordance with industry standards before painting. Walls should be wiped down as necessary before painting.

Number: 3 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 3:26:43 PM Corridor/ Hallway 1 Contractor shall remove and dispose of existing vinyl composition tile (VCT) and cove base.

2 Contractor shall prepare substrate for application of new VCT and cove base.

3 Contractor shall install 12”x12” x1/8” VCT and rubber base cove in of the all corridors. Base Cove will 1/8” rubber, pre-molded, rounded-top and cove base; 4” high, butt type with both end stops and pre-formed corners. Contract shall consult COR for VCT and base cove colors 5 Repair interior walls and Paint.

Number: 4 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 3:26:02 PM Office 205 1 Contractor shall remove and dispose of existing vinyl composition tile (VCT) and cove base.

2 Contractor shall prepare substrate for application of new VCT and cove base.

3 Contractor shall install 12”x12” x1/8” VCT and rubber base cove in of the all corridors. Base Cove will 1/8” rubber, pre-molded, rounded-top and cove base; 4” high, butt type with both end stops and pre-formed corners. Contract shall consult COR for VCT and base cove colors 5 Repair interior walls and Paint.