W911SA-19-C-2009 Attachment 2 SOW
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
CA010 Repair Interior and Exterior
EL Monte USARC 1200 Potrero Ave
South El Monte, CA 91733
1. GENERAL PRE-AWARD:
1.1 The intent of this project is to provide the Government with a complete and usable product at the completion.
1.2 The Contractor shall furnish and install all plant, labor, materials; tools, equipment, and supervision necessary to provide a complete and usable project per the Scope of Work (SOW), Plans, Specifications and manufacturers recommendations. All work shall be free from defects.
1.3 The Plans and Specifications are to prescribe the details for the construction and completion of the SOW, which the Contractor undertakes to perform in accordance with the terms of the contract.
1.4 The Contractor shall visit the work site to verify the site condition. If the Contractor discovers any errors or omissions in the SOW, Plans or Specifications, the Contractor shall immediately call it to the attention of the Contracting Officer (KO) and the Contracting Officer’s Representative (COR).
1.5 Where the Specifications and Plans describe portions of the work in general terms, but not in complete detail, it is understood that all work and materials will be of the highest standard using generally accepted industry practices.
1.6 The Contractor shall not interrupt the service function or disturb the support of any utilities without prior coordination with the COR/Area Facility Operations Specialist (AFOS). If any utilities are disturbed or damaged, the Contractor shall bear costs of repair or replacement.
1.7 The Contractor shall be responsible for and repair any damage to the grounds and structures caused by the Contractor or his/her sub-contractors during the performance of this project.
1.8 Any said work in the Plans and Specifications and not in the written SOW or in the SOW and not in the Plans or Specifications shall be as though shown or mentioned in both.
1.9 The Contractor shall verify all dimensions, site conditions, and any other items required to install a complete and ready to use product, prior to submitting a bid proposal for construction.
1.10 The Contractor shall provide a project manager and alternate that is able to read, write, speak, and understand English.
1.11 The Contractor shall perform all the services of this contract during the normal operating hours of 7:30 A.M. to 4:30 P.M. (0730 to 1630) Monday-Friday. Facilities will be closed on all Federal Holidays.
1.11.1 Federal Holidays are as follows;
New Year’s Day – January 1 Martin Luther King Jr. Birthday – third Monday of January Washington’s Birthday – third Monday of February Memorial Day – final Monday of May Independence Day – July 4 Labor Day – first Monday of September Columbus Day – second Monday of October Veterans Day – November 11 Thanksgiving Day – fourth Thursday of November Christmas Day – December 25
1.11.2 Actual day observed for the following holidays is subject to change when the holiday date falls on a weekend; New Year’s Day, Independence Day, Veterans Day and Christmas Day.
1.12 The Contractor shall provide signs, barriers, and barricades to provide a safe working area.
Requirements of Occupational Safety and Health Act, latest edition and U.S. Army Corps of Engineers "Safety and Health Requirements Manual", latest edition, shall be strictly enforced and adhered to at all times at the job site.
1.13 The Contractor shall comply with Army Regulation (AR) 600-63, Army Health Promotion, for controlling smoking in Government buildings and facilities. In general NO SMOKING is allowed within building or within 50’ of any exit or door. Facility personnel can direct personnel to authorized smoking areas.
1.14 The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. This can include storm water permits, US Army Corps of Engineers permits, state water resources permits, US Fish and Wildlife permits, etc.
1.15 Antiterrorism (AT) Level I Training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days of contract award or prior to submission of final invoice and within 45 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.
1.16 iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer. This local developed training will be used to inform employees of the http://jko.jten.mil/ types of behavior to watch for and instruct employees to report suspicious activity to the COR.
This training shall be completed within 30 calendar days of contract award or prior to submission of final invoice and within 30 calendar days of new employees commencing performance with the results reported to the COR no later than 45 calendar days after contract award.
1.17 Access and general protection/security policy and procedures. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy.
In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.17.1 Contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a Department of Defense (DoD) facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
1.17.2 For contractors that are not eligible for CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.18 The contractor employees must be adequately trained in the handling and disposal of hazardous waste, in particular, lead paint and asbestos. Hazardous materials must be handled and disposed of appropriately by the contractor. Disposal is at contractor’s expense. The contractor must comply with all local, state, and federal environmental laws, regulations, and policies prior to final approval of work completed. National Environmental Policy Act (NEPA) documents must be completed prior to award of the contract or notice to proceed.
2. GENERAL POST AWARD:
2.1 Where any conflict occurs between the requirements of federal, state, and local laws, codes, ordinances, rules and regulations, the most stringent shall govern.
2.2 The Contractor shall, at all times, keep the premises free from accumulation of waste material and rubbish caused by his work, or his subcontractors. At the completion of work, the Contractor shall thoroughly clean the work site. All debris, rubbish, and waste material shall be removed from the property at the Contractor’s expense and disposed of in an official disposal site.
2.3 The Contractor shall make no changes or deviate from the approved design of this project without written permission from the KO. In the case where a change is required, the Contractor will notify the COR of the requirement and shall not proceed with the change until such time as a modification to the contract is issued by the KO.
2.4 Prior to ordering any materials, the Contractor shall submit to the COR for approval submittals on all new items being installed on this project. Submittal may be shop drawings, diagrams, catalog cut-sheets, samples, and any other related material.
2.5 The Contractor shall submit a written construction schedule of work for this project to the KO and COR prior to the start of the project.
2.6 The Contractor shall be responsible for the conditions of the job site, including safety of all persons, and property during performance of the work. Safety shall conform to all applicable Federal, State, local laws, codes and regulations established by the El Monte, CA Division of Safety.
2.7 All work shall be in compliance with the current applicable federal, state and city codes.
2.8 All work shall be completed within 180 days upon receipt of Notice To Proceed (NTP).
3. SUBMITTALS:
3.0 Prior to ordering any materials, the Contractor shall submit to the COR for approval submittals for all new items being installed. Submittals may be cut sheets, samples, spec sheet, so long as it is clear and easily readable. Submittals must be e-mailed, faxed or sent directly to the office of the COR using Engineer Form 4025-R, dated March 2012, as the coversheet.
3.1 All materials used for this project will be subject to UFC 1-200-02 Section 2-6.1 for recycled content, biologically-based products, other green products, and ozone depleting substances, and Section 2-5.3.3 for low-emitting materials. Projects will also comply with applicable requirements for the purchase of water efficient (e.g., Water Sense), Energy Star or FEMP-designated (or an "A" or better European Union Energy Label, EU energy efficiency class), and Electronic Product Environmental Assessment Tool (EPEAT) designated products. In addition, project materials will comply with the requirements in ASHRAE 189.1-2014 Section
9.4.1.2 (Regional Materials). Submittal requirements packages will clearly outline the applicable sustainable materials being used. The owner reserves the right to reject any product that does not meet the requirements of the specification list in the SOW.
3.2 The contractor shall maintain proper construction waste management. Waste management must maximize the materials to be salvaged, recycled, or reused. All materials removed shall become the property of the contractor, and be disposed of daily. The contractor shall provide reports of all materials salvaged, recycled or reused.
4. SITE WORK:
The intent of the project is the complete repair of the interior and exterior finishes at the El Monte ARC. Men’s and Women’s latrine repair includes removal and replacement of toilets, urinals, sinks, counter tops and mirrors. The interior repair of the building finishes includes, removal and replacement of carpet tiles, VCT tile in corridors, removal and replacement of ceiling tiles as needed, and removal and replacement of lighting fixtures as needed. Asbestos removal in tool room storage and painting interior and exterior of all the buildings.
TRAINING BUILDING 8
4.1 Men’s Latrine:
4.1.1 All fixtures in Men’s restrooms shall be replaced with new toilet paper, hand towel, and soap dispensers.
4.1.2 Contractor shall remove existing nonoperational exhaust fan and install new exhaust ventilation in both bathrooms including controls.
4.1.3 Contractor shall remove existing mirror and install mirror with aluminum frame (size will be according to each bathroom space).
4.1.4 Contractor shall install Countertops shall be Cortez (3-5cm thickness), but not plastic and the color should complement the tile selection. Fixtures should be stainless steel kind or approved equivalent. The Contractor must provide a sample prior to ordering. The colors and final design will be selected by the COR prior to ordering.
4.1.5 Countertops must be self-draining to a countersunk sink and have a 4-inch high back splash made from the same material as the countertop. All edges and corners shall be rounded for safety. Self-draining component shall be ¼”per foot. The height of counters must be mounted at 34-inches above finished floor.
4.1.6 Contractor shall strip and repaint toilet partitions will be stripped and repainted. The contractor shall consult with COR for color scheme.
4.1.7 Contractor shall remove existing urinals, reconfigure and install high efficiency urinals with manual, piston-type flushometer with maximum flush rate of 0.13 gallons per flush.
Waterless urinals are not acceptable. Furnish and install partitions. Partition will same color as the toilets petitions
4.1.8 Contractor shall remove existing wall tiles and replaced with dry wall/ green board textured to match existing walls texture. Flooring tiles shall be removed and replaced. Contractor shall consult with COR for tile color scheme to be utilized in the restrooms. The contractor shall provide samples/submittals for approval prior to installation.
4.1.9 Contractor shall repair interior walls as needed and apply two coats of paint. The contractor shall consult with the COR for the color scheme to be utilized in both men’s and women’s restrooms.
4.1.10 Contractor shall remove existing toilet and replace with new. The toilet will be meet the following specifications. See attached specifications
4.2 Women’s Latrine
4.2.1 All fixtures in women’s restrooms shall be replaced with new toilet, toilet paper, hand towel, and soap dispensers.
4.2.2 Contractor shall remove existing nonoperational exhaust fan and install new exhaust ventilation in both bathrooms including controls.
4.2.3 Contractor shall remove existing mirror and install mirror with aluminum frame (size will be according to each bathroom space).
4.2.4 Contract shall install countertops shall be Cortez (3-5cm thickness), but not plastic and the color should complement the tile selection. Fixtures should be stainless steel kind or approved equivalent. The Contractor shall provide a samples prior to ordering. The colors and final design will be selected by the COR prior to ordering.
4.2.5 Countertops must be self-draining to a countersunk sink and have a 4-inch high back splash made from the same material as the countertop. All edges and corners shall be rounded for safety. Self-draining component shall be ¼”per foot. The height of counters must be mounted at 34-inches above finished floor.
4.2.6 Contractor shall strip and repaint toilet partitions. Contractor shall consult with COR for color scheme.
4.2.7 Contractor shall remove existing wall tiles and replaced with dry wall/ green board textured to match existing walls texture. Flooring tiles shall be removed and replaced. Contractor shall consult with COR for tile color scheme to be utilized in the restrooms.
4.2.8 Contractor shall repair interior walls as needed and apply primer and two coats of paint.
The contractor shall consult with the COR for the color scheme to be utilized in women’s restrooms.
4.3 Ceilings
4.3.1 Contractor shall only remove and replace damaged and stained ceiling tiles with like kind.
4.4 Lighting
4.4.1 Contractor shall repair and or place existing ceiling lighting fixtures in all areas as necessary with like for like product to match existing.
4.5 Interior flooring.
4.5.1 The contractor shall remove and replace all exiting vinyl flooring of the interior of the building hallway corridor and drill hall. The carpet tiles in the offices and common work space is to remain in place.
4.6 Window and Doors
4.6.1 The contractor shall remove old caulking around windows and doors. The contractor shall reseal and caulk windows before painting window frames.
Contactor shall paint the interior doors and frames. The contractor shall consult with COR for color scheme
4.7 Drill Hall
4.7.1 The contractor shall remove existing accordion partitions and tracks, and install new accordion tracks and partitions.
4.7.2 The contractor shall remove existing floor in the Drill Hall and replace with new vinyl flooring tiles.
The contractor shall consult COR for the color scheme. Walls will be patched, fill in cracks and painted with two coats of paint. Doors and door frame window frames will be painted.
4.8 Exterior
4.8.1 Contractor shall pressure clean and remove oil, grease and loose foreign matter, including, mold mildew, and dirt in a manner which causes neither undue damage to the substrate nor damage to, or contamination of, the surroundings or the paint system to be applied.
4.8.2 Contractor shall fill in cracks and holes with fillers, sealers or grouting cements as appropriate for the finishing system and substrate, and sand smooth, to ensure all coats finish smooth;
4.8.3 Contractor shall apply an undercoat plus two coats of selected finish coats specified in accordance with the manufacturer's recommendations. Allow each coat to harden for the drying time (or time between coats) recommended by the manufacturer. The contractor shall consult COR for the color scheme prior to painting
4.8.4 The contractor shall ensure each coat of paint is uniform in color, gloss, thickness and texture and free of runs, sags, blisters, or other discontinuities.
4.9 Interior Paint
4.9.1 Contract shall ensure all holes, cracks and marks is repaired with fillers, sealant, and putties as appropriate for the finishing system and substrate, and treat to achieve the required finish in accordance with industry standards before painting. Tint the filler to match substrate if the finish is transparent. Walls should be wiped down as necessary before painting.
4.9.2 Contactor shall remove all hardware, hardware accessories and similar items in place and not to be painted or provide surface applied protection prior to surface preparation and painting operations After completions re-install all removed items Exceptional care must be taken to assure tidiness of work.
4.9.3 Contractor shall use drop sheets and masking tape before painting in any section of the building and to protect finished work or other surfaces liable to damage during painting
4.9.4 Contractor shall apply paint and related material with an undercoat plus two coats of selected finish color.
4.9.5 Contractor shall ensure each coat of paint is uniform in color, gloss, thickness and texture and free of runs, sags, blisters, or other discontinuities. Contractor shall consult COR on the color scheme prior to painting.
4.9.6 Contractor shall post Wet Paint Warning - Place notices and do not remove until paint is dry.
4.9.7 Contractor shall upon completion of the work all paint cans, other materials, containers, debris and protective coverings shall be cleaned up and removed off site and disposed of accordance with local and state environmental regulations.
ADMIN BUILDING 6
4.10 Men’s Latrine
4.10.1 Contractor shall steam deep clean tile and grout in men’s latrine. This includes floor, wall and shower tiles.
4.10.2 Contractor shall remove all existing fixtures in Men’s restrooms and replaced with new faucets, toilet paper dispensers, hand towel, and soap dispensers.
4.10.3 Contractor shall remove existing nonoperational exhaust fan and install new exhaust ventilation in both bathrooms including controls.
4.10.4 Contractor shall remove existing mirror and install mirror with aluminum frame (size will be according each bathroom space).
4.10.5 Contract shall install Cortex countertop (3-5cm thickness), but not plastic and the color should complement the tile selection. Fixtures shall be stainless steel kind or equivalent. The Contractor shall provide a sample prior to ordering. The colors and final design will be selected by the COR prior to ordering
4.10.6 Contract shall strip and repaint toilet partitions. The contractor shall consult with COR for color scheme.
4.10.7 Contractor shall repair and or replace existing ceiling light fixtures in men’s restroom as necessary with like kind.
4.11 Women’s Latrine
4.11.1 Contractor shall steam deep clean tile and grout in women’s latrine. This includes floor, wall and shower tiles.
4.11.2 Contractor shall replace all fixtures in women’s restroom with new faucets, toilet paper dispensers, hand towel dispensers, and soap dispensers.
4.11.3 Contractor shall remove existing nonoperational exhaust fan and install new exhaust ventilation in both bathrooms including controls.
4.11.4 Contractor shall remove existing mirror and install mirror with aluminum frame (size will be according each bathroom space).
4.11.5 Contractor shall install Cortez Countertop. The countertop shall be (3-5cm thickness), but not plastic and the color should complement the tile selection. Fixtures shall be stainless steel kind or equivalent. The Contractor shall provide a sample prior to ordering. The colors and final design will be selected by the COR prior to ordering
4.11.6 Contractor shall strip and repaint toilet partitions. The contractor will consult with COR for color scheme.
4.11.7 Contractor shall repair and or replace existing ceiling light fixtures in women’s restroom as necessary with like kind.
4.12 Corridor Flooring
4.12.1 Contractor shall remove and dispose of existing vinyl composition tile (VCT) and cove base.
4.12.2 Contractor shall prepare substrate for application of new VCT and cove base.
4.12.3 Contractor shall install 12”x12” x1/8” VCT and rubber base cove in of the all corridors.
Base Cove will 1/8” rubber, pre-molded, rounded-top and cove base; 4” high, butt type with both end stops and pre-formed corners. Contract will consult COR for VCT and base cove colors.
4.13 Offices flooring
4.13.1 Contractor shall move the office furniture to place carpet tiles.
4.13.2 Staff and military personnel will move the computers, phones, copiers, and disconnect electrical and data lines.
4.13.3 Contractor shall removing existing carpet flooring, padding and base cove, dispose of it off site accordance with local and state regulations.
4.13.4 Contractor shall clean subsurface to create a level surface to lay carpet tiles properly.
4.13.5 Contractor shall install new 24’X 24” carpet tile and 1/8” cove base 4” high.
4.13.6 Contractor shall place all office furniture in its original place once the new flooring is placed and adhesive cured.
4.14 Server Equipment
4.14.1 Contractor shall remove chain links and steal posts around server equipment. Build a 6x6 server room, relocate electrical, data line and server equipment. Install spilt A/C for the server room.
4.15 Tool Room storage: Removal of Resilient Flooring Materials:
4.15.1 Prior to removal, critical barriers shall be placed over openings to the regulated area.
During removal, air in the regulated area shall be filtered through the use of air filtration device(s).
4.15.2 Removal of floor tile with an infrared heat machine eliminates the critical barrier and negative pressure requirements.
4.15.3 Prior to removal, clean floors of dirt and debris with vacuums equipped with HEPA filter, disposable dust bag, and metal floor tool (brush tools are not permitted). Control odors and fumes with engineering controls.
4.15.4 Sanding the floor or related backing is not permitted.
4.15.5 Mechanical chipping of vinyl floor tile is prohibited, except when performed in a negative pressure enclosure.
4.15.6 Thoroughly wet vinyl floor tile with amended water. Use a slip scraper or equivalent to loosen the floor tile from the floor. Remove the floor tile in an intact state. Keep the floor tile wet throughout the removal and cleanup. Removal of floor tile using an infrared heat machine eliminates the wetting requirement.
4.15.7 Remove vinyl sheet flooring by cutting while wetting the snip-point. Wet sheet flooring during delamination. Rip-up of resilient flooring material is not permitted.
4.15.8 Clean resilient flooring of all debris using a HEPA vacuum, wet sweeping, mopping or equivalent and allow time to dry. Dry sweeping is prohibited.
4.15.9 Place the resilient flooring material and debris in an asbestos disposal bag. Seal the bag and place it in a properly labeled drum or polyspun bag.
4.16 Asbestos Mastic Removal:
4.16.1 Clean the floor of all debris using a HEPA vacuum, wet sweeping, mopping or equivalent.
4.16.2 Remove as much mastic as possible using an EHS approved solvent. Control odors and fumes with engineering controls.
4.16.3 Perform scraping of residual adhesive and backing using wet methods.
4.16.4 After all debris is removed, thoroughly mop the floor and allow time to dry.
4.16.5 Shot blasting is prohibited, except when performed in a negative pressure enclosure.
4.16.6 Properly dispose of all asbestos and solvent waste according to all applicable regulations, and comply with the disposal and labeling requirements of this Section.
4.17 Window Covering
4.17.1 Contractor shall remove existing window blind, shades and curtains. Prepare windows as needed, install new 2 inch white faux wood blinds.
4.18 Interior Paint
4.18.1 Contractor shall repair all holes, cracks and marks with fillers, sealant, and putties as appropriate for the finishing system and substrate, and treat to achieve the required finish in accordance with industry standards before painting. Tint the filler to match substrate if the finish is transparent. Walls should be wiped down as necessary before painting.
4.18.2 Contractor shall remove all hardware, hardware accessories and similar items in place and not to be painted or provide surface applied protection prior to surface preparation and painting operations After completions re-install all removed items Exceptional care must be taken to assure tidiness of work.
4.18.3 Contractor shall use drop sheets and masking tape before painting in any section of the building and wherever necessary to protect finished work or other surfaces liable to damage during painting
4.18.4 Contractor shall apply paint and related material with an undercoat plus two coats of selected finish color.
4.18.5 Contractor shall ensure each coat of paint is uniform in color, gloss, thickness and texture and free of runs, sags, blisters, or other discontinuities. Contractor shall consult COR on the color scheme prior to painting.
4.19 Soffit
4.19.1 Contractor shall remove and replace all damaged soffit boards and damaged support framing as required to support new soffit. Install soffit material to match existing in width and thickness. New boards will be painted using primer and two coats of paint.
4.20 Exterior Paint
4.20.1 Contractor shall pressure clean and remove oil, grease and loose foreign matter, including, mold mildew, and dirt in a manner which causes neither undue damage to the substrate nor damage to, or contamination of, the surroundings or the paint system to be applied.
4.20.2 Contractor shall repair all cracks and holes with fillers, sealers or grouting cements as appropriate for the finishing system and substrate, and sand smooth, to ensure all coats finish smooth;
4.20.3 Contractor shall apply an undercoat plus two coats of selected finish coats specified in accordance with the manufacturer's recommendations. Allow each coat to harden for the drying time (or time between coats) recommended by the manufacturer. The contractor shall consult COR for the color scheme prior to painting
4.20.4 Contractor shall ensure each coat of paint is uniform in color, gloss, thickness and texture and free of runs, sags, blisters, or other discontinuities
OMS BUILDING.
4.21 Office and Corridor Flooring.
4.21.1 Contractor shall remove and dispose of existing vinyl composition tile (VCT) and cove base.
4.21.2 Contractor shall prepare substrate for application of new VCT and cove base.
4.21.3 Contractor shall install 12”x12” x1/8” VCT and rubber base cove in of the all corridors.
Base Cove will 1/8” rubber, pre-molded, rounded-top and cove base; 4” high, butt type with both end stops and pre-formed corners. Contract shall consult COR for VCT and base cove colors.
4.22 Latrine
4.22.1 Contractor shall remove of existing vanity, sink, and toilet. The contractor shall reconfigure the restroom to install one new toilet with partition, new urinal with partition.
4.22.2 Contractor shall furnish and install new Cortez vanity with counter sunk self-draining sink, faucet and mirror with aluminum frame.
4.22.3 The contractor shall remove and replace existing floor tiles. The Contractor shall consult with COR for tile color scheme to be utilized in the restrooms.
4.22.4 The contractor shall remove existing lighting and replace with new lighting with motion sensor and timer.
4.22.5 Contractor shall remove existing exhaust fan and replace with new industrial type exhaust fan.
4.22.6 Contractor shall paint latrine, repair all holes, cracks and marks with fillers, sealant, and putties as appropriate for the finishing system and substrate, and treat to achieve the required finish in accordance with industry standards before painting. Tint the filler to match substrate if the finish is transparent. Walls should be wiped down as necessary before painting.
4.23 Interior Paint will includes office spaces, and Work bay
4.23.1 The contractor shall repair all holes, cracks and marks with fillers, sealant, and putties as appropriate for the finishing system and substrate, and treat to achieve the required finish in accordance with industry standards before painting. Tint the filler to match substrate if the finish is transparent. Walls should be wiped down as necessary before painting.
4.23.2 Contractor shall remove all hardware, hardware accessories and similar items in place and not to be painted or provide surface applied protection prior to surface preparation and painting operations After completions re-install all removed items Exceptional care must be taken to assure tidiness of work.
4.23.3 Contractor shall use drop sheets and masking tape before painting in any section of the building, wherever necessary to protect finished work or other surfaces liable to damage during painting
4.23.4 Contractor shall apply paint and related material with an undercoat plus two coats of selected finish color.
4.23.5 Contractor shall ensure each coat of paint is uniform in color, gloss, thickness and texture and free of runs, sags, blisters, or other discontinuities. Contractor shall consult COR on the color scheme prior to painting Storage spaces will be excluded.
4.24 Exterior Paint
4.24.1 Contractor shall pressure clean and remove oil, grease and loose foreign matter, including, mold mildew, and dirt in a manner which causes neither undue damage to the substrate nor damage to, or contamination of, the surroundings or the paint system to be applied.
4.24.2 The Contractor shall repair all cracks and holes with fillers, sealers or grouting cements as appropriate for the finishing system and substrate, and sand smooth, to ensure all coats finish smooth.
4.24.3 The contractor shall apply an undercoat plus two coats of selected finish coats specified in accordance with the manufacturer's recommendations. Allow each coat to harden for the drying time (or time between coats) recommended by the manufacturer. The contractor shall consult COR for the color scheme prior to painting.
STORAGE BUILDING 10
4.25 Latrine
4.25.1 Contractor shall remove existing Floor tiles and replace with new floor tiles. Contractor shall consult with COR for tile color scheme to be utilized in the restrooms.
4.25.2 Contractor shall remove of existing vanity, sink, and toilet.
4.25.3 Contractor shall furnish and install new Cortez vanity with counter sunk self-draining sink, faucet toilet and mirror will aluminum frame.
4.25.4 The contractor shall remove existing exhaust fan and replace with new industrial type exhaust fan.
4.25.5 The contract shall paint latrine, repair all holes, cracks and marks with fillers, sealant, and putties as appropriate for the finishing system and substrate, and treat to achieve the required finish in accordance with industry standards before painting. Tint the filler to match substrate if the finish is transparent. Walls shall be wiped down as necessary before painting.
4.26 Interior Paint includes Office Spaces.
4.26.1 The contractor shall repair all holes, cracks and marks with fillers, sealant, and putties as appropriate for the finishing system and substrate, and treat to achieve the required finish in accordance with industry standards before painting. Tint the filler to match substrate if the finish is transparent. Walls shall be wiped down as necessary before painting.
4.26.2 Contractor shall remove all hardware, hardware accessories and similar items in place and not to be painted or provide surface applied protection prior to surface preparation and painting operations After completions re-install all removed items Exceptional care must be taken to assure tidiness of work.
4.26.3 Contractor shall use drop sheets and masking tape before painting in any section of the building, wherever necessary to protect finished work or other surfaces liable to damage during painting
4.26.3 Contractor shall apply paint and related material with an undercoat plus two coats of selected finish color.
4.26.4 The contractor shall ensure each coat of paint is uniform in color, gloss, thickness and texture and free of runs, sags, blisters, or other discontinuities. Contractor will consult COR on the color scheme prior to painting. Storage spaces will be excluded.
4.27 Exterior Paint
4.27.1 Contractor shall pressure clean and remove oil, grease and loose foreign matter, including, mold mildew, and dirt in a manner which causes neither undue damage to the substrate nor damage to, or contamination of, the surroundings or the paint system to be applied.
4.27.2 The contractor shall repair cracks and holes with fillers, sealers or grouting cements as appropriate for the finishing system and substrate, and sand smooth, to ensure all coats finish smooth;
4.27.3 Contractor shall apply an undercoat plus two coats of selected finish coats specified in accordance with the manufacturer's recommendations. Allow each coat to harden for the drying time (or time between coats) recommended by the manufacturer. The contractor shall consult COR for the color scheme prior to painting
5. WARRANTY:
All work specified in this contract shall have a warranty of a minimum period of one full calendar year for parts and labor from the customer’s acceptance date. At the final acceptance walk-through, the Contractor shall provide to the COR a signed warranty letter.
6. QUALITY CONTROL AND INSPECTIONS:
6.1 All work shall be inspected by the contractor’s quality control person and final inspection shall be performed by the COR prior to final payment.
6.2 Contractor shall maintain a clean, clear, and safe working environment at all times.
6.3 Only qualified personnel familiar with the proper construction techniques shall be used.
6.4 All site coordination shall be accomplished through the 63rd RSC AFOS Stephen Berger
6.5 At the final acceptance walk-through, the Contractor shall provide to the COR a complete set of as-build drawings, on disc, and in either .DWG or .DGN format.
7. POINTS OF CONTACT:
AFOS: Stephen Berger
562) 795-1293 stephen.j.berger.ctr@mail.mil
COR: Matthew Buretz.
(714) 482-7250 mathew.m.buretz.civ@mail.mil
Thomas E Wiley SRM Program Manager
| 2018-12-27T14:25:04-0800 | |
| WILEY.THOMAS.EDWARD.1162678120 |
File details come from the government source that posted it.