W911SA-19-C-2009_Attachment_6_Drawings_with_Notes_Bldg_6.pdf
PDF 930 KB Posted
- Attached to
- Award Notice: Interior/Exterior Repair - USARC El Monte Federal contract opportunity
- Solicitation number
- W911SA-19-B-2011
About this file
W911SA-19-C-2009 Attachment 6 Drawings with Notes Bldg 6
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLDG 6
2 3 4 5 6 7 8
3 4
7 8 9 10
CA010 Floor Plan Building 6
Page: 1 Number: 1 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:19:18 AM
CLASSROM
1. Paint
2. Remove and replace flooring
3. Remove and replace lighting with kind
4. replace damage and stain ceiling tiles
Number: 2 Author: james.r.bir Subject: Rectangle Date: 2019/05/29 11:18:46 AM
Number: 3 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:20:08 AM
OFFICE 616
1. Paint
2. Remove and replace flooring
3. Remove and replace lighting with kind
4. replace damage and stain ceiling
Number: 4 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:19:50 AM
OFFICE 615
1. Paint
2. Remove and replace flooring
3. Remove and replace lighting with kind
4. replace damage and stain ceiling
5. Replace window blinds
Number: 5 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:20:24 AM
OFFICE 614
1. Paint
2. Remove and replace flooring
3. Remove and replace lighting with kind
4. replace damage and stain ceiling
Number: 6 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:20:37 AM
OFFICE 613
1. Paint
2. Remove and replace flooring
3. Remove and replace lighting with kind
4. replace damage and stain ceiling
Number: 7 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:21:05 AM
OFFICE 612
1. Paint
2. Remove and replace flooring
3. Remove and replace lighting with kind
4. replace damage and stain ceiling
Number: 8 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:20:50 AM
OFFICE 611
1. Paint
2. Remove and replace flooring
3. Remove and replace lighting with kind
4. replace damage and stain ceiling
Number: 9 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:21:28 AM
OFFICE 610
1. Paint
2. Remove and replace flooring
3. Remove and replace lighting with kind
4. replace damage and stain ceiling
Number: 10 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:21:43 AM
OFFICE 609
1. Paint
2. Remove and replace flooring
3. Remove and replace lighting with kind
4. replace damage and stain ceiling
Number: 11 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:22:11 AM
CORRIDOR/HALLWAY
Remove existing flooring tile and base cove Install new VCT flooring tiles and base cove
Number: 12 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:22:30 AM
Comments from page 1 continued on next page
2 3 4 5 6 7 8
13 141516 1718 1920
WOMENS LATRINE
Steam clean tiles and grout Apple sealer in on tile and grout remove and replace sinks, vanity and faucets.
Install mirror with aluminum frame Strip and repaint toilet partitions
Number: 13 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:56:01 AM
OFFICE 1
1. Paint
2. Remove and replace flooring
3. Remove and replace lighting with kind
4. replace damage and stain ceiling
Number: 14 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:58:59 AM
OFFICE 7
1. perform Asbestos Abatement
2. Demo existing walls
3. Pair and perp interior walls for paint.
4. Paint interior walls. Apply base coat/ Primer and apply two coats of finish paint.
5. Removing existing flooring and perp flooring for carpet tiles
6. install carpet t Paint
7. Remove and replace flooring
8. Remove and replace lighting with kind
9. Remove existing ceiling tiles and replace with new ceiling tiles.
10. remove existing lighting and install new lighting with like in kind.
Number: 15 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:58:10 AM
OFFICE 6
1. perform Asbestos Abatement
2. Demo existing walls
3. Pair and perp interior walls for paint.
4. Paint interior walls. Apply base coat/ Primer and apply two coats of finish paint.
5. Removing existing flooring and perp flooring for carpet tiles
6. install carpet t Paint
7. Remove and replace flooring
8. Remove and replace lighting with kind
9. Remove existing ceiling tiles and replace with new ceiling tiles.
10. remove existing lighting and install new lighting with like in kind.
Number: 16 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:56:24 AM
OFFICE 3
1. Paint
2. Remove and replace flooring
3. Remove and replace lighting with kind
4. replace damage and stain ceiling
Number: 17 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:58:40 AM
OFFICE 8
1. perform Asbestos Abatement
2. Demo existing walls
3. Pair and perp interior walls for paint.
4. Paint interior walls. Apply base coat/ Primer and apply two coats of finish paint.
5. Removing existing flooring and perp flooring for carpet tiles
6. install carpet t Paint
7. Remove and replace flooring
8. Remove and replace lighting with kind
Number: 18 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:56:14 AM
OFFICE 2
1. Paint
2. Remove and replace flooring
3. Remove and replace lighting with kind
4. replace damage and stain ceiling
Number: 19 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:57:55 AM
OFFICE 4
1. Paint
2. Remove and replace flooring
3. Remove and replace lighting with kind
4. replace damage and stain ceiling
Number: 20 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:22:45 AM
MENS LATRINE
Steam clean tiles and grout Apple sealer in on tile and grout remove and replace sinks, vanity and faucets.
Install mirror with aluminum frame Strip and repaint toilet partitions
2 3 4 5 6 7 8
101121 2223 2425
26 27
Number: 21 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 12:00:08 PM
OFFICE 11 TOOL STR
1. perform Asbestos Abatement
2. Demo existing walls
3. Pair and perp interior walls for paint.
4. Paint interior walls. Apply base coat/ Primer and apply two coats of finish paint.
5. Removing existing flooring and perp flooring for carpet tiles
6. install carpet t Paint
7. Remove and replace flooring
8. Remove and replace lighting with kind
Number: 22 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:59:24 AM
OFFICE 9 SUPPLY STR.
1. perform Asbestos Abatement
2. Demo existing walls
3. Pair and perp interior walls for paint.
4. Paint interior walls. Apply base coat/ Primer and apply two coats of finish paint.
5. Removing existing flooring and perp flooring for carpet tiles
6. install carpet t Paint
7. Remove and replace flooring
8. Remove and replace lighting with kind
Number: 23 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:48:23 AM
CORRIDOR/ HALLWAY
Remove existing flooring tile and base cove Install new VCT flooring tiles and base cove
Number: 24 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:59:44 AM
SPACE 10
1. perform Asbestos Abatement
2. Demo existing walls
3. Pair and perp interior walls for paint.
4. Paint interior walls. Apply base coat/ Primer and apply two coats of finish paint.
5. Removing existing flooring and perp flooring for carpet tiles
6. install carpet t Paint
7. Remove and replace flooring
8. Remove and replace lighting with kind
Number: 25 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:35:43 AM
CORRIDOR/ HALLWAY
Remove existing flooring tile and base cove Install new VCT flooring tiles and base cove
Number: 26 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:40:29 AM
ROOM 603 ADIM SPACE
Contractor shall remove chain links and steal posts around server equipment. Build a 6x6 server room, relocate electrical, data line and server equipment. Install spilt A/C for the server room.
Number: 27 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:36:26 AM
OFFICE 603
1. Paint
2. Remove and replace flooring
3. Remove and replace lighting with kind
4. replace damage and stain ceiling
Number: 28 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:36:38 AM
OFFICE 604
1. Paint
2. Remove and replace flooring
Number: 29 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:41:33 AM
OFFICE 605
1. Paint
2. Remove and replace flooring
2 3 4 5 6 7 8
Number: 30 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:40:58 AM
ROOM 602 ADMIN SPACE
Remove existing flooring tile and base cove Install new VCT flooring tiles and base cove
Number: 31 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:41:45 AM
OFFICE 606
1. Paint
2. Remove and replace flooring
Number: 32 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 11:42:07 AM
OFFICE 607
1. Paint
2. Remove and replace flooring