Amendment 0001
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011284706
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment extends solicitation due date, provides draw ings w ith visible notes to make them easier to read, replaces Attachment 4 Wage Requirements w ith current version (CA190022 05/03/2019 CA22) and includes responses to all questions received. All bids are now due no later than 2:00 PM CST on 13 JUN 2019. Prior versions of the Wage Requirements are hereby null/void and any reference to versions other than current version are not applicable under this solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-May-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911SA19B2011
X 9B. DATED (SEE ITEM 11)
03-May-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-May-2019
CODE
MICC - FT MCCOY
BLDG 1108 SOUTH R ST
FORT MCCOY WI 54656-5153
W911SA 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911SA19B2011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 03-Jun-2019 02:00 PM to 13-Jun-2019 02:00 PM.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
QUESTIONS AND ANSWERS
The following questions and answers are hereby made part of this bidding requirement and Scope of Work and shall be taken into account in preparation of all bids and execution of all work. The responses made herein have taken into account all requirements under this scope;
therefore, any ambiguity between this section and any other parts of scope, then this section shall govern. For all other matters, the order of precedence under FAR 52.236-21—Specifications and Drawings for Construction shall apply.
Q1: Bid Item 0001 is to Repair Interior & Exterior Bldg. 6, 8 and 10. What Plans Sheets shows Bldgs. 6, 8 &10?
A1: Floor plans (Drawings) are provided with the addition of visible notes to make them easier to read. Please see following attachments in FBO:
Attachment 6: Drawings with Notes Bldg. 6 Attachment 7: Drawings with Notes Bldg. 8 Attachment 8: Drawings with Notes Bldg. 10 Attachment 9: Drawings with Notes Bldg. OMS
Q2: The Specs call for work to be done in OMS Administration Building. Is the cost for this work to be included in the cost for Bldg. 6, 8 & 10 Bid Item 0001??
A2: Yes
Q3: Where is the existing Countertops that are to be replaced?
A3: Countertops/ Vanity are to be replace in the Men’s and Woman’s Latrine in building 8
Q4: Building 8 - Lighting - Please advise existing fixture(s) model and base line number of fixtures that need to be replaced or repaired.
A4: 10 ea. 2 tube surface mounted led fixtures and LED's.
Q5: Building 8 - Ceiling Tile - Please advise on the type and amount of ceiling tiles that need to be replaced.
A5: 50 ea. 2x4 ceiling tiles
Q6: Building 8 - Please advise on the model number of the desired accordion partitions.
A6: Contractor should refer to UFC 4-610-01 section 4-4.6 for accordion doors spec's and details. The space generally dictates the type of accordion doors are to be used in accordance with Army/ DOD requirements.
Q7: Building 6 - Please advise whether the offices (119-130) with the low partitions are to have the flooring replaced along with the offices.
A7 Yes replace flooring
Q8: Building 6 - Please advise whether or not the Common Area 131 is not to have the flooring replaced.
A8: Flooring is to be replaced
TRAINING BUILDING-8
Q9: 4.1.4 Countertop material shall be Cortez: No such material. Are Quartz, Granite, or Cultured Marble OK?
A9: Countertop/vanity in men’s and woman’s Latrine. The contractor is to install laminate vanity/countertops
Q10: 4.1.6 Current partitions are Solid Phenolic in Excellent condition and will not hold paint. Is clean only an option?
A10: Deep steam clean.
Q11: 4.1.7 Furnish and Install Urinal Partitions: Are solid Phenolic to match existing OK?
A11: Yes. Match to existing
Q12: 4.1.8 Remove Tile on walls and replace with green board: Should there be at least a 6 or 8 inch tile floor boarder to prevent water damage?
A12: Yes
Q13: Building-8: There is no mention of any shower replacement or repairing. Should shower, pan, and fixtures be replaced?
If so, with Tile, Solid Surface, Fiberglass Inserts?
A13: Replace shower with Fiberglas inserts.
Q14 4.2.4 Countertop material shall be Cortez: No such material. Are Quartz, Granite, or Cultured Marble OK?
A14: Countertop/ Vanity will be laminate.
Q15 4.2.6 Current partitions are Solid Phenolic in Excellent condition and will not hold paint. Is “Clean only” permissible?
A15: Yes, Deep cleaning is permissible.
Q16: 4.2.7 Furnish and Install Urinal Partitions: Are solid Phenolic to match existing OK?
A16: Yes. Match urinal partitions to existing
Q17: 4.2.8 Remove Tile on walls and replace with green board: Should there be at least a 6 or 8 inch tile floor boarder to prevent water damage?
A17: Yes Place a 6 to 8 inch floor boarder.
Q18 Building-8: There is no mention of any shower replacement or repairing. Should shower, pan, and fixtures be replaced? If so, with Tile, Solid Surface, Fiberglass Inserts?
A18: Replace with fiberglass inserts.
Q19: 4.5 Interior Flooring: Rooms 103, 104, and 106 have old carpeting that needs replacing. Replace to match other offices or leave as-is?
A19: Yes replace carpet in room 103 and 104 and 106
Q20: 4.5 Room 145 is tiled: Replace to match other tiling or leave as-is?
A20: Replace to match
Q21: Building-8: Kitchen and serving area Porcelain Tile needs deep cleaning. Steam deep clean tile and grout or leave As-Is?
A21: Steam deep clean Kitchen tiles and grout.
Q22: Building-8, Rm-101: Accordion Door in classroom. Replace, Remove, or leave As-is?
A22: Replace with new Accordion door
ADMIN BUILDING-6
Q23: 4.10.5 Countertop material shall be Cortex: No such material. Are Quartz, Granite, or Cultured Marble OK?
A23: Vanity / countertop shall be Laminate
Q24” 4.10.6 Current partitions are Solid Phenolic in Excellent condition and will not hold paint. Is “Clean only” permissible?
A24: Steam Deep clean partitions
Q25: 4.11.5 Countertop material shall be Cortex: No such material. Are Quartz, Granite, or Cultured Marble OK?
A25: Vanity / countertop shall be Laminate
Q26: 4.11.6 Current partitions are Solid Phenolic in Excellent condition and will not hold paint. Is “Clean only” permissible?
A26: Steam Deep clean partitions
Q27: 4.13.5 Install Carpet Tiles. Some offices have carpet over tile and some have tile.
Carpet all offices?
A27: Install carpet tiles in office spaces.
Q28: 4.15 Tool Room Storage: There is no Asbestos-Vinyl tile in any of the storage areas in Bldg-6 or 10. Should this paragraph be deleted?
A28: See attached applicable floor plan.
Q29: 4.16 Asbestos Mastic Removal. Does this apply to all mastic in all buildings?
A29: No only in building 6 , space are Tool storage, Supply offices and supply storage, See attached floor plans for detail notes
Q30: 4.17 Widow Coverings: Faux Wood Blinds. Does this apply to all mastic in all buildings?
A30: Yes
Q31: 4.19 Soffits: Bldg 3 and 6 need extensive work. Bldg 8 and 10 need minor work. Is this for all buildings?
A31: Repair soffits in all building
OMS BUILDING (Note: OMS is Building 10)
Q32: 4.21.3 Remove and Replace Vinyl Flooring. Would Epoxy coating of floors be acceptable?
A32: Yes epoxy coating would be acceptable
Q33: 4.22.2 Countertop material shall be Cortez: No such material. Are Quartz, Granite, or Cultured Marble OK?
A33: Vanity/ countertop shall be eliminated
Q34: 4.22.3 Remove and Replace Vinyl Flooring. Would Epoxy coating of floors be acceptable?
A34: Yes Epoxy coating would be acceptable
STORAGE BUILDING -10 (Note: It’s actually BLDG- 3)
Q35: 4.25 Is it possible to change “LATRINE” to “Latrine and Office Space”?
A35: No
Q36: 4.25.1 Is it possible to: Remove carpet and tiling from office areas and install Vinyl tile and Cove base in Family Support Office, and apply Epoxy Coating in Latrine?
A36: Yes, it is acceptable to install in vinyl flooring and epoxy coat the latrine
Q37: 4.25.2 Toilet enclosure is old wood and not repairable. Is it possible to "Remove existing toilet stall enclosure”? and “Remove and Replace latrine entry door to include bathroom lockset”?
A37: bathroom lockset is acceptable
Q38: 4.25.3 Countertop material shall be Cortez: No such material. Are Quartz, Granite, or Cultured Marble OK?
A38: Countertop/ vanity shall be laminate.
(End of Summary of Changes)