W911SA-19-C-2009_Attachment_8_Drawings_with_Notes_Bldg_10.pdf

PDF 618 KB Posted

Attached to
Award Notice: Interior/Exterior Repair - USARC El Monte Federal contract opportunity
Solicitation number
W911SA-19-B-2011
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort McCoy

About this file

W911SA-19-C-2009 Attachment 8 Drawings with Notes Bldg 10

View the file

Other files for this federal contract opportunity

Other files attached to Award Notice: Interior/Exterior Repair - USARC El Monte, newest first.
File Type Posted
W911SA-19-C-2009_Award_Repair_Interior_&_Exterior_El_Monte_USARC.pdf PDF
W911SA-19-C-2009_Attachment_3_Drawings.pdf PDF
W911SA-19-C-2009_Attachment_5_SF24.pdf PDF
W911SA-19-C-2009_Attachment_7_Drawings_with_Notes_Bldg_8.pdf PDF
W911SA-19-C-2009_Attachment_9_Drawings_with_Notes_Bldg_OMS.pdf PDF
W911SA-19-C-2009_Attachment_4_Wage_Requirements_(CA20190022_05032019).pdf PDF
W911SA-19-C-2009_Attachment_1_ATOPSEC.pdf PDF
W911SA-19-C-2009_Attachment_2_SOW.pdf PDF
W911SA-19-C-2009_Attachment_6_Drawings_with_Notes_Bldg_6.pdf PDF
W911SA-19-B-2011_Bid_Abstract.pdf PDF
W911SA-19-B-2011_Attachment_9_Drawings_with_Notes_Bldg_OMS.pdf PDF
W911SA-19-B-2011_Attachment_4_Wage_Requirements_(CA190022_05032019__CA22).pdf PDF
W911SA-19-B-2011_Attachment_7_Drawings_with_Notes_Bldg_8.pdf PDF
W911SA-19-B-2011_Attachment_6_Drawings_with_Notes_Bldg_6.pdf PDF
W911SA-19-B-2011_Attachment_8_Drawings_with_Notes_Bldg_10.pdf PDF
W911SA-19-B-2011_Amendment_0001.pdf PDF
W911SA-19-B-2011_Attachment_1_ATOPSEC.pdf PDF
W911SA-19-B-2011_El_Monte_USARC_Repair_Interior_&_Exterior.pdf PDF
W911SA-19-B-2011_Attachment_3_Drawings.pdf PDF
W911SA-19-B-2011_Attachment_2_SOW.pdf PDF
W911SA-19-B-2011_Attachment_4_Wage_Requirements.pdf PDF
W911SA-19-B-2011_Attachment_5_SF24.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLDG 10

CA010 Floor Plans Building 10 CADD Notes

Page: 1 Number: 1 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 3:46:11 PM Family Support

1. Remove existing flooring

2. install new carpet tiles

3. Repair and paint interior wall according

Number: 2 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 3:45:53 PM Supply Storage 1.Remove existing flooring and replace with new carpet tiles flooring.

2 The contract shall paint walls, repair all holes, cracks and marks with fillers, sealant, and putties as appropriate for the finishing in accordance with industry standards before painting. Walls shall be wiped down as necessary before painting.

Number: 3 Author: james.r.bir Subject: Sticky Note Date: 2019/05/29 3:46:25 PM Latrine 1.Contractor shall remove of existing vanity, sink, and toilet.

2.Contractor shall furnish and install new vanity with counter sunk self-draining sink, faucet toilet and mirror will aluminum frame 3.The contract shall paint latrine, repair all holes, cracks and marks with fillers, sealant, and putties as appropriate for the finishing in accordance with industry standards before painting. Walls shall be wiped down as necessary before painting

File details come from the government source that posted it.