Attachment_0001_-_Compliance_Sheet.xls

XLS spreadsheet 47 KB Posted

Attached to
Water Blast Roadwheel Denuding System
Solicitation number
W911RQ19R0019
Issued by

About this file

This document contains a solicitation for a water blast roadwheel denuding system along with a compliance sheet for offerors. The solicitation seeks to obtain a new denuding system for the Red River Army Depot Rubber Products Branch capable of removing bonded rubber from 25-inch and 24-inch roadwheels down to bare metal without removing metal from the wheel surface. The system must operate fully automated during normal operation and be capable of manual control for recovery. It must utilize a programmable logic controller, touchscreen interface, and high-intensity water blast process to remove up to one inch of bonded rubber from roadwheels within six minutes maximum per cycle. The system shall not exceed 25 feet wide by 40 feet long. Offerors must indicate compliance with requirements for standards, specifications, safety, electrical systems, environmental conditions, training, manuals, performance testing, installation time, and warranty in the provided compliance sheet.

View the file

Other files

File Type Posted
W911RQ19R0019 Amendment 0004.pdf PDF
Amendment_0003_W911RQ19R0019.pdf PDF
W911RQ19R0019_Amendment_P00002_-_Released.pdf PDF
Q&A_Tracker_10-31-19.pdf PDF
Q&A_Tracker_10-24-19.pdf PDF
W911RQ19R0019_Amendment_0001.pdf PDF
Q&A_Tracker.pdf PDF
FBO_Synopsis.docx DOCX document
FBO_Confirmation_-_Synopsis.oxps OXPS file
W911RQ19R0019.pdf PDF
Attachment_0002-GFM.xlsx XLSX spreadsheet
Market_Survey.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wire EDM

OFFEROR'S STATEMENT OF COMPLIANCE
NON-FOR NON-COMPLIANCE, JUSTIFICATION OR
PARAGRAPHCOMPLYCOMPLYALTERNATIVE/EQUIVALENT OFFER
1.1Supplying a Water Blast Roadwheel Denuding System
to satisfy all requirements of solictation
3.1Will adhere to standards listed
3.2Will fulfill all requirements as listed
3.2.1Conforms to all requirements listed for Cabinet
3.2.2Conforms to all specifications listed for
Water Blast System
3.2.3Conforms to all specifications listed for the type of
controls
3.2.3.1Conforms to all specifications listed for
Programmable Logic Controllers (PLC)
3.2.4Conforms to all specifications for type of filtration
listed
3.3Conforms to all specifications listed for
Safety
3.4Conforms to all specifications listed for
3.4.1Electrical System to include Lock Out Tag Out
3.5Conforms to all specifications listed for
to operate in Environmental Conditions listed
3.7Conforms to all specifications listed for
installation to include off loading, complete installation
Utility Connection, and installation schedule
3.8Will provide Training
3.8.1and adhere to requirements in Training Location
3.9Will provide all manuals as specfied
3.10Conforms with all Performance requirements
3.10.1Will Provide Performance Design
3.10.2Conforms to all specifications listed for
Factory Acceptance Testing
3.10.3Conforms to all specifications listed for
Installation Time Period
3.12Will provide Warranty as specfied in Warranty
section
Conforms to all specifications listed for
4.00Preparation to include Preservation, Packing, Marking
4.2.1Conforms to all specifications listed for
installation's Spill Prevention Control and Countermeasures Plan (SPCC)
4.2.2Conforms to all enviironmental compliances

&CPage &P&RFY18 One NEW 6-Axes Wire EDM Comply Sheet.xls Spec # 37-18-3419 &CPage &P&R________________________

AUTHORIZED SIGNATURE

Sheet1

File details come from the government source that posted it. Updated .