Attachment_0001_-_Compliance_Sheet.xls
XLS spreadsheet 47 KB Posted
- Attached to
- Water Blast Roadwheel Denuding System
- Solicitation number
- W911RQ19R0019
About this file
This document contains a solicitation for a water blast roadwheel denuding system along with a compliance sheet for offerors. The solicitation seeks to obtain a new denuding system for the Red River Army Depot Rubber Products Branch capable of removing bonded rubber from 25-inch and 24-inch roadwheels down to bare metal without removing metal from the wheel surface. The system must operate fully automated during normal operation and be capable of manual control for recovery. It must utilize a programmable logic controller, touchscreen interface, and high-intensity water blast process to remove up to one inch of bonded rubber from roadwheels within six minutes maximum per cycle. The system shall not exceed 25 feet wide by 40 feet long. Offerors must indicate compliance with requirements for standards, specifications, safety, electrical systems, environmental conditions, training, manuals, performance testing, installation time, and warranty in the provided compliance sheet.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911RQ19R0019 Amendment 0004.pdf | ||
| Amendment_0003_W911RQ19R0019.pdf | ||
| W911RQ19R0019_Amendment_P00002_-_Released.pdf | ||
| Q&A_Tracker_10-31-19.pdf | ||
| Q&A_Tracker_10-24-19.pdf | ||
| W911RQ19R0019_Amendment_0001.pdf | ||
| Q&A_Tracker.pdf | ||
| FBO_Synopsis.docx | DOCX document | |
| FBO_Confirmation_-_Synopsis.oxps | OXPS file | |
| W911RQ19R0019.pdf | ||
| Attachment_0002-GFM.xlsx | XLSX spreadsheet | |
| Market_Survey.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wire EDM
| OFFEROR'S STATEMENT OF COMPLIANCE | |||
| NON- | FOR NON-COMPLIANCE, JUSTIFICATION OR | ||
| PARAGRAPH | COMPLY | COMPLY | ALTERNATIVE/EQUIVALENT OFFER |
| 1.1 | Supplying a Water Blast Roadwheel Denuding System | ||
| to satisfy all requirements of solictation | |||
| 3.1 | Will adhere to standards listed | ||
| 3.2 | Will fulfill all requirements as listed | ||
| 3.2.1 | Conforms to all requirements listed for Cabinet | ||
| 3.2.2 | Conforms to all specifications listed for | ||
| Water Blast System | |||
| 3.2.3 | Conforms to all specifications listed for the type of | ||
| controls | |||
| 3.2.3.1 | Conforms to all specifications listed for | ||
| Programmable Logic Controllers (PLC) | |||
| 3.2.4 | Conforms to all specifications for type of filtration | ||
| listed | |||
| 3.3 | Conforms to all specifications listed for | ||
| Safety | |||
| 3.4 | Conforms to all specifications listed for | ||
| 3.4.1 | Electrical System to include Lock Out Tag Out | ||
| 3.5 | Conforms to all specifications listed for | ||
| to operate in Environmental Conditions listed | |||
| 3.7 | Conforms to all specifications listed for | ||
| installation to include off loading, complete installation | |||
| Utility Connection, and installation schedule | |||
| 3.8 | Will provide Training | ||
| 3.8.1 | and adhere to requirements in Training Location | ||
| 3.9 | Will provide all manuals as specfied | ||
| 3.10 | Conforms with all Performance requirements | ||
| 3.10.1 | Will Provide Performance Design | ||
| 3.10.2 | Conforms to all specifications listed for | ||
| Factory Acceptance Testing | |||
| 3.10.3 | Conforms to all specifications listed for | ||
| Installation Time Period | |||
| 3.12 | Will provide Warranty as specfied in Warranty | ||
| section | |||
| Conforms to all specifications listed for | |||
| 4.00 | Preparation to include Preservation, Packing, Marking | ||
| 4.2.1 | Conforms to all specifications listed for | ||
| installation's Spill Prevention Control and Countermeasures Plan (SPCC) | |||
| 4.2.2 | Conforms to all enviironmental compliances |
&CPage &P&RFY18 One NEW 6-Axes Wire EDM Comply Sheet.xls Spec # 37-18-3419 &CPage &P&R________________________
AUTHORIZED SIGNATURE
Sheet1
File details come from the government source that posted it. Updated .