What is the approximate thickness of the existing concrete floor?
Answer: 8 Inches
Will the Government be removing any existing fixtures, shelving tools etcetera from the crane installation area?
Answer: Yes
Will we be able to laterally brace the new columns to the existing building/concrete columns or must the new columns be free standing?
Answer: New structure MUST be free standing. NO tying back to the building columns.
Is the maximum width of 23’-0” shown in your description the out to out of the system?
Answer: The overall width of the crane system including the bridge overhang CANNOT be wider than 23’-0”.
Upon completion of the installation & start-up will RRAD be preforming a load test and if so will the contractor be required to witness the load test?
Answer: The contractor shall perform the appropriate load testing.