QA18Q0017.pdf

PDF 167 KB Posted

Attached to
Bridge Crane
Solicitation number
W911RQ-18-Q-0017
Issued by

About this file

submitted questions and their answers

View the file

Other files

File Type Posted
Mod_Doc_W911RQ-18-Q-0017_0003.pdf PDF
W911RQ-18-Q-0017_amendment_0003.pdf PDF
QA18Q0017III.pdf PDF
Q&A18Q0017(2).pdf PDF
W911RQ-18-Q-0017_amendment_0002.pdf PDF
Mod_Doc_W911RQ-18-Q-0017_00002.pdf PDF
18Q00170001_AMENDMENT_ONE_SUMMARY.pdf PDF
18Q001700001_CONFORMEDpdf.pdf PDF
Bridge_Crane_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question:

In the solicitation it states that 2 (two) 10,000 lb bridge cranes will be on a runway with one bridge crane at each end of the runway. The issue is whether or not there is a possibility that both bridges could be in the same bay or section of the runway at the same time. Can you please get clarification on if there is a possibility that both cranes could be operated in close proximity to each other or not?

Answer:

No, they will not be able to work on the same line, a stop will be installed to keep them apart

Question:

If columns are needed, this adds other questions such as runway beam size, and how often to support, etc.

Answer:

This is a complete replacement system. The columns that are required are dictated due to the tonnage of the cranes that they will be supporting, along with beams size, how often to support, etc.