SOL_W911N2-17-R-0041.pdf
PDF 237 KB Posted
- Attached to
- METAL MILLING AND LATHE FABRICATION
- Solicitation number
- W911N2-17-R-0041
About this file
Solicitation
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W911N2-17-R-0041 31-May-2017
b. TELEPHONE NUMBER
717-267-5536
8. OFFER DUE DATE/LOCAL TIME
04:00 PM 30 Jun 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911N29. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SHAUN R. LEATHERMAN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W25G1Q7115R001
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTING OFFICE - ACC
1 OVERCASH AVENUE, ATTN: CCAM-ALK, BLDG 2S
CHAMBERSBURG PA 17201-4150
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W25G1Q 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DIRECTORATE OF INDUSTRIAL OPERATIONS
JOE SHINES
LETTERKENNY ARMY DEPOT BLDG 350 DOOR 40
CHAMBERSBURG PA 17201-4150
TEL: 717-267-5739 FAX:
717-2679834FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
332710
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF92
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W911N2-17-R-0041
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 240 Each
P/N LEAD-RCV-5905 (MILL WORK)
FFP
P/N LEAD-RCV-5905 made in accordance with drawing LEAD-RCV-
5905(MILL WORK).
FOB: Destination
PURCHASE REQUEST NUMBER: W25G1Q7115R001
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 240 Each
P/N LEAD-RCV-6189 (MILL WORK)
FFP
P/N LEAD-RCV-6189 made in accordance with drawing LEAD-RCV-
6189(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
0003 240 Each
P/N LEAD-RCV-6199 (MILL WORK)
FFP
P/N LEAD-RCV-6199 made in accordance with drawing LEAD-RCV-
6199(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
0004 240 Each
P/N LEAD-RCV-6200 (MILL WORK)
FFP
P/N LEAD-RCV-6200 made in accordance with drawing LEAD-RCV-
6200(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
0005 240 Each
P/N LEAD-RCV-6299 (MILL WORK)
FFP
P/N LEAD-RCV-6299 made in accordance with drawing LEAD-RCV-
6299(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
0006 240 Each
P/N LEAD-RCV-6197 (MILL WORK)
FFP
P/N LEAD-RCV-6197 made in accordance with drawing LEAD-RCV-
6197(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
0007 480 Each
P/N 12589871 (MILL WORK)
FFP
P/N 12589871 made in accordance with drawing 12589871 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
0008 480 Each
P/N 12589872 (MILL WORK)
FFP
P/N 12589872 made in accordance with drawing 12589872 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
0009 240 Each
P/N 12589882 (MILL WORK)
FFP
P/N 12589882 made in accordance with drawing 12589882 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
0010 240 Each
P/N 12571614 (MILL WORK)
FFP
P/N 12571614 made in accordance with drawing 12571614 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
0011 240 Each
P/N 12574917 (MILL WORK)
FFP
P/N 12574917 made in accordance with drawing 12574917 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
0012 240 Each
P/N 179223-12 (MILL WORK)
FFP
P/N 179223-12 made in accordance with drawing 179223 REV L-A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
0013 240 Each
P/N 12571594 (MILL WORK)
FFP
P/N 12571594 made in accordance with drawing 12571594 REV L-B(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
0014 240 Each
P/N 12585732 (MILL WORK)
FFP
P/N 12585732 made in accordance with drawing 12585732 REV L-A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
0015 240 Each
P/N 12585720 (MILL WORK)
FFP
P/N 12585720 made in accordance with drawing 12585720 REV L-C(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
0016 240 Each
P/N 12570991 (LATHE & MILL WORK)
FFP
P/N 12570991 made in accordance with drawing 12570991REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
0017 240 Each
P/N 12574858 (MILL WORK)
FFP
P/N 12574858 made in accordance with drawing 12574858 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
0018 240 Each
P/N 12574922 (MILL WORK)
FFP
P/N 12574922 made in accordance with drawing 12574922 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
0019 240 Each
P/N 12574313 (LATHE WORK)
FFP
P/N 12574313 made in accordance with drawing 12574313 REV A(LATHE
WORK).
UNIT UNIT PRICE MAX AMOUNT
0020 240 Each
P/N 12574314 (LATHE WORK)
FFP
P/N 12574314 made in accordance with drawing 12574314 REV A(LATHE
WORK).
UNIT UNIT PRICE MAX AMOUNT
0021 36,000 Each
P/N 12565675 (LATHE WORK)
FFP
P/N 12565675 made in accordance with drawing 12565675 (LATHE WORK).
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0022 1 Each
CONTRACTOR MANHOUR REPORTING (CMR)
FFP
Contractor Manpower Reporting in accordance with paragraph 5.8 of the Performance Work Statement.
0023 1 Each
FIRST ARTICLE TEST
FFP
P/N LEAD-RCV-5905 made in accordance with drawing LEAD-RCV-5905(MILL
WORK).
0024 1 Each
FIRST ARTICLE TEST
FFP
P/N LEAD-RCV-6189 made in accordance with drawing LEAD-RCV-6189(MILL
WORK).
0025 1 Each
FIRST ARTICLE TEST
FFP
P/N LEAD-RCV-6199 made in accordance with drawing LEAD-RCV-6199(MILL
WORK).
0026 1 Each
FIRST ARTICLE TEST
FFP
P/N LEAD-RCV-6200 made in accordance with drawing LEAD-RCV-6200(MILL
WORK).
0027 1 Each
FIRST ARTICLE TEST
FFP
P/N LEAD-RCV-6299 made in accordance with drawing LEAD-RCV-6299(MILL
WORK).
0028 1 Each
FIRST ARTICLE TEST
FFP
P/N LEAD-RCV-6197 made in accordance with drawing LEAD-RCV-6197(MILL
WORK).
0029 1 Each
FIRST ARTICLE TEST
FFP
P/N 12589871 made in accordance with drawing 12589871-REV A(MILL
WORK).
0030 1 Each
FIRST ARTICLE TEST
FFP
P/N 12589872 made in accordance with drawing 12589872 REV A(MILL
WORK).
0031 1 Each
FIRST ARTICLE TEST
FFP
P/N 12589882 made in accordance with drawing 12589882 REV A(MILL
WORK).
0032 1 Each
FIRST ARTICLE TEST
FFP
P/N 12571614 made in accordance with drawing 12571614 REV A(MILL
WORK).
0033 1 Each
FIRST ARTICLE TEST
FFP
P/N 12574917 made in accordance with drawing 12574917 REV A(MILL
WORK).
0034 1 Each
FIRST ARTICLE TEST
FFP
P/N 179223-12 made in accordance with drawing 179223 REV L-A(MILL
WORK).
0035 1 Each
FIRST ARTICLE TEST
FFP
P/N 12571594 made in accordance with drawing 12571594 REV L-B(MILL
WORK).
0036 1 Each
FIRST ARTICLE TEST
FFP
P/N 12585732 made in accordance with drawing 12585732 REV L-A(MILL
WORK).
0037 1 Each
FIRST ARTICLE TEST
FFP
P/N 12585720 made in accordance with drawing 12585720 REV L-C(MILL
WORK).
0038 1 Each
FIRST ARTICLE TEST
FFP
P/N 12570991 made in accordance with drawing 12570991REV A(MILL WORK).
0039 1 Each
FIRST ARTICLE TEST
FFP
P/N 12574858 made in accordance with drawing 12574858 REV A(MILL
WORK).
0040 1 Each
FIRST ARTICLE TEST
FFP
P/N 12574922 made in accordance with drawing 12574922 REV A(MILL
WORK).
0041 1 Each
FIRST ARTICLE TEST
FFP
P/N 12574313 made in accordance with drawing 12574313 REV A(LATHE
WORK).
0042 1 Each
FIRST ARTICLE TEST
FFP
P/N 12574314 made in accordance with drawing 12574314 REV A(LATHE
WORK).
0043 1 Each
FIRST ARTICLE TEST
FFP
P/N 12565675 made in accordance with drawing 12565675 (LATHE WORK).
UNIT UNIT PRICE MAX AMOUNT
1001 240 Each
OPTION P/N LEAD-RCV-5905 (MILL WORK)
FFP
P/N LEAD-RCV-5905 made in accordance with drawing LEAD-RCV-
5905(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
1002 240 Each
OPTION P/N LEAD-RCV-6189 (MILL WORK)
FFP
P/N LEAD-RCV-6189 made in accordance with drawing LEAD-RCV-
6189(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
1003 240 Each
OPTION P/N LEAD-RCV-6199 (MILL WORK)
FFP
P/N LEAD-RCV-6199 made in accordance with drawing LEAD-RCV-
6199(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
1004 240 Each
OPTION P/N LEAD-RCV-6200 (MILL WORK)
FFP
P/N LEAD-RCV-6200 made in accordance with drawing LEAD-RCV-
6200(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
1005 240 Each
OPTION P/N LEAD-RCV-6299 (MILL WORK)
FFP
P/N LEAD-RCV-6299 made in accordance with drawing LEAD-RCV-
6299(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
1006 240 Each
OPTION P/N LEAD-RCV-6197 (MILL WORK)
FFP
P/N LEAD-RCV-6197 made in accordance with drawing LEAD-RCV-
6197(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
1007 480 Each
OPTION P/N 12589871 (MILL WORK)
FFP
P/N 12589871 made in accordance with drawing 12589871 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
1008 480 Each
OPTION P/N 12589872 (MILL WORK)
FFP
P/N 12589872 made in accordance with drawing 12589872 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
1009 240 Each
OPTION P/N 12589882 (MILL WORK)
FFP
P/N 12589882 made in accordance with drawing 12589882 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
1010 240 Each
OPTION P/N 12571614 (MILL WORK)
FFP
P/N 12571614 made in accordance with drawing 12571614 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
1011 240 Each
OPTION P/N 12574917 (MILL WORK)
FFP
P/N 12574917 made in accordance with drawing 12574917 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
1012 240 Each
OPTION P/N 179223-12 (MILL WORK)
FFP
P/N 179223-12 made in accordance with drawing 179223 REV L-A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
1013 240 Each
OPTION P/N 12571594 (MILL WORK)
FFP
P/N 12571594 made in accordance with drawing 12571594 REV L-B(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
1014 240 Each
OPTION P/N 12585732 (MILL WORK)
FFP
P/N 12585732 made in accordance with drawing 12585732 REV L-A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
1015 240 Each
OPTION P/N 12585720 (MILL WORK)
FFP
P/N 12585720 made in accordance with drawing 12585720 REV L-C(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
1016 240 Each
OPTION P/N 12570991 (LATHE & MILL WORK)
FFP
P/N 12570991 made in accordance with drawing 12570991REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
1017 240 Each
OPTION P/N 12574858 (MILL WORK)
FFP
P/N 12574858 made in accordance with drawing 12574858 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
1018 240 Each
OPTION P/N 12574922 (MILL WORK)
FFP
P/N 12574922 made in accordance with drawing 12574922 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
1019 240 Each
OPTION P/N 12574313 (LATHE WORK)
FFP
P/N 12574313 made in accordance with drawing 12574313 REV A(LATHE
WORK).
UNIT UNIT PRICE MAX AMOUNT
1020 240 Each
OPTION P/N 12574314 (LATHE WORK)
FFP
P/N 12574314 made in accordance with drawing 12574314 REV A(LATHE
WORK).
UNIT UNIT PRICE MAX AMOUNT
1021 36,000 Each
OPTION P/N 12565675 (LATHE WORK)
FFP
P/N 12565675 made in accordance with drawing 12565675 (LATHE WORK).
1022 1 Each
OPTION CONTRACTOR MANHOUR REPORTING (CMR)
FFP
Contractor Manpower Reporting in accordance with paragraph 5.8 of the Performance Work Statement.
UNIT UNIT PRICE MAX AMOUNT
2001 240 Each
OPTION P/N LEAD-RCV-5905 (MILL WORK)
FFP
P/N LEAD-RCV-5905 made in accordance with drawing LEAD-RCV-
5905(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
2002 240 Each
OPTION P/N LEAD-RCV-6189 (MILL WORK)
FFP
P/N LEAD-RCV-6189 made in accordance with drawing LEAD-RCV-
6189(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
2003 240 Each
OPTION P/N LEAD-RCV-6199 (MILL WORK)
FFP
P/N LEAD-RCV-6199 made in accordance with drawing LEAD-RCV-
6199(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
2004 240 Each
OPTION P/N LEAD-RCV-6200 (MILL WORK)
FFP
P/N LEAD-RCV-6200 made in accordance with drawing LEAD-RCV-
6200(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
2005 240 Each
OPTION P/N LEAD-RCV-6299 (MILL WORK)
FFP
P/N LEAD-RCV-6299 made in accordance with drawing LEAD-RCV-
6299(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
2006 240 Each
OPTION P/N LEAD-RCV-6197 (MILL WORK)
FFP
P/N LEAD-RCV-6197 made in accordance with drawing LEAD-RCV-
6197(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
2007 480 Each
OPTION P/N 12589871 (MILL WORK)
FFP
P/N 12589871 made in accordance with drawing 12589871 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
2008 480 Each
OPTION P/N 12589872 (MILL WORK)
FFP
P/N 12589872 made in accordance with drawing 12589872 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
2009 240 Each
OPTION P/N 12589882 (MILL WORK)
FFP
P/N 12589882 made in accordance with drawing 12589882 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
2010 240 Each
OPTION P/N 12571614 (MILL WORK)
FFP
P/N 12571614 made in accordance with drawing 12571614 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
2011 240 Each
OPTION P/N 12574917 (MILL WORK)
FFP
P/N 12574917 made in accordance with drawing 12574917 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
2012 240 Each
OPTION P/N 179223-12 (MILL WORK)
FFP
P/N 179223-12 made in accordance with drawing 179223 REV L-A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
2013 240 Each
OPTION P/N 12571594 (MILL WORK)
FFP
P/N 12571594 made in accordance with drawing 12571594 REV L-B(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
2014 240 Each
OPTION P/N 12585732 (MILL WORK)
FFP
P/N 12585732 made in accordance with drawing 12585732 REV L-A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
2015 240 Each
OPTION P/N 12585720 (MILL WORK)
FFP
P/N 12585720 made in accordance with drawing 12585720 REV L-C(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
2016 240 Each
OPTION P/N 12570991 (LATHE & MILL WORK)
FFP
P/N 12570991 made in accordance with drawing 12570991REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
2017 240 Each
OPTION P/N 12574858 (MILL WORK)
FFP
P/N 12574858 made in accordance with drawing 12574858 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
2018 240 Each
OPTION P/N 12574922 (MILL WORK)
FFP
P/N 12574922 made in accordance with drawing 12574922 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
2019 240 Each
OPTION P/N 12574313 (LATHE WORK)
FFP
P/N 12574313 made in accordance with drawing 12574313 REV A(LATHE
WORK).
UNIT UNIT PRICE MAX AMOUNT
2020 240 Each
OPTION P/N 12574314 (LATHE WORK)
FFP
P/N 12574314 made in accordance with drawing 12574314 REV A(LATHE
WORK).
UNIT UNIT PRICE MAX AMOUNT
2021 36,000 Each
OPTION P/N 12565675 (LATHE WORK)
FFP
P/N 12565675 made in accordance with drawing 12565675 (LATHE WORK).
2022 1 Each
OPTION CONTRACTOR MANHOUR REPORTING (CMR)
FFP
Contractor Manpower Reporting in accordance with paragraph 5.8 of the Performance Work Statement.
UNIT UNIT PRICE MAX AMOUNT
3001 120 Each
OPTION P/N LEAD-RCV-5905 (MILL WORK)
FFP
P/N LEAD-RCV-5905 made in accordance with drawing LEAD-RCV-
5905(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
3002 120 Each
OPTION P/N LEAD-RCV-6189 (MILL WORK)
FFP
P/N LEAD-RCV-6189 made in accordance with drawing LEAD-RCV-
6189(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
3003 120 Each
OPTION P/N LEAD-RCV-6199 (MILL WORK)
FFP
P/N LEAD-RCV-6199 made in accordance with drawing LEAD-RCV-
6199(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
3004 120 Each
OPTION P/N LEAD-RCV-6200 (MILL WORK)
FFP
P/N LEAD-RCV-6200 made in accordance with drawing LEAD-RCV-
6200(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
3005 120 Each
OPTION P/N LEAD-RCV-6299 (MILL WORK)
FFP
P/N LEAD-RCV-6299 made in accordance with drawing LEAD-RCV-
6299(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
3006 120 Each
OPTION P/N LEAD-RCV-6197 (MILL WORK)
FFP
P/N LEAD-RCV-6197 made in accordance with drawing LEAD-RCV-
6197(MILL WORK).
UNIT UNIT PRICE MAX AMOUNT
3007 240 Each
OPTION P/N 12589871 (MILL WORK)
FFP
P/N 12589871 made in accordance with drawing 12589871 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
3008 240 Each
OPTION P/N 12589872 (MILL WORK)
FFP
P/N 12589872 made in accordance with drawing 12589872 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
3009 120 Each
OPTION P/N 12589882 (MILL WORK)
FFP
P/N 12589882 made in accordance with drawing 12589882 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
3010 120 Each
OPTION P/N 12571614 (MILL WORK)
FFP
P/N 12571614 made in accordance with drawing 12571614 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
3011 120 Each
OPTION P/N 12574917 (MILL WORK)
FFP
P/N 12574917 made in accordance with drawing 12574917 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
3012 120 Each
OPTION P/N 179223-12 (MILL WORK)
FFP
P/N 179223-12 made in accordance with drawing 179223 REV L-A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
3013 120 Each
OPTION P/N 12571594 (MILL WORK)
FFP
P/N 12571594 made in accordance with drawing 12571594 REV L-B(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
3014 120 Each
OPTION P/N 12585732 (MILL WORK)
FFP
P/N 12585732 made in accordance with drawing 12585732 REV L-A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
3015 120 Each
OPTION P/N 12585720 (MILL WORK)
FFP
P/N 12585720 made in accordance with drawing 12585720 REV L-C(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
3016 120 Each
OPTION P/N 12570991 (LATHE & MILL WORK)
FFP
P/N 12570991 made in accordance with drawing 12570991REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
3017 120 Each
OPTION P/N 12574858 (MILL WORK)
FFP
P/N 12574858 made in accordance with drawing 12574858 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
3018 120 Each
OPTION P/N 12574922 (MILL WORK)
FFP
P/N 12574922 made in accordance with drawing 12574922 REV A(MILL
WORK).
UNIT UNIT PRICE MAX AMOUNT
3019 120 Each
OPTION P/N 12574313 (LATHE WORK)
FFP
P/N 12574313 made in accordance with drawing 12574313 REV A(LATHE
WORK).
UNIT UNIT PRICE MAX AMOUNT
3020 120 Each
OPTION P/N 12574314 (LATHE WORK)
FFP
P/N 12574314 made in accordance with drawing 12574314 REV A(LATHE
WORK).
UNIT UNIT PRICE MAX AMOUNT
3021 18,000 Each
OPTION P/N 12565675 (LATHE WORK)
FFP
P/N 12565675 made in accordance with drawing 12565675 (LATHE WORK).
3022 1 Each
OPTION CONTRACTOR MANHOUR REPORTING (CMR)
FFP
Contractor Manpower Reporting in accordance with paragraph 5.8 of the Performance Work Statement.
SOLICITATION NOTES
1. System for Award Management (SAM): In accordance with FAR 4.1102, Offerors shall be registered in the SAM database in order to be eligible for contract award. No award will be made to an Offeror not registered.
Registration can be accomplished at https://www.sam.gov/portal/public/SAM/. Registration in this database shall remain active.
2. Annual Representations and Certifications: In accordance with FAR 4.1201, Offerors shall complete electronic annual representations and certifications within SAM as part of required registration. Registration in this database shall remain active and can be accessed at https://www.sam.gov/portal/public/SAM/.
3. Questions: Questions regarding this solicitation shall be submitted to the Contracting Officer, in writing, at least 10 calendar days prior to the closing date. Questions submitted after this time will be answered at the discretion of the Contracting Officer. The Contracting Officer for this action is Sarah Keebaugh (sarah.keebaugh.civ@mail.mil) .
Copy Contract Specialist Shaun Leatherman (shaun.r.leatherman.civ@mail.mil)
4. Award without Discussions: The Government intends to award without discussions, offerors should submit their best prices in their initial offer. If FAR Provision 52.212-2, Evaluation-Commercial Items, is included, Offerors must submit all information requested therein in order for the Government to determine technical acceptability.
5. Amendments: The Offeror shall submit to the Contracting Officer signed copies of all amendments issued to this solicitation. Failure to comply may cause your proposal to be rejected.
6. Payment: Payment for this action will be made by Electronic Funds Transfer (EFT) through the Defense Finance and Accounting Services (DFAS) utilizing Wide Area Work Flow (WAWF). See 252.232-7006 for more information.
7. Period for Acceptance of Offers: The Offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers.
8. Type of Contract: The type of contract resulting from this solicitation is specified in FAR Provision 52.216-1, Type of Contract. For Indefinite Delivery/Indefinite Quantity (IDIQ) or Requirements contracts all quantities are estimated and individualt task orders shall be issued citing specific quantities and delivery dates. Payment will be made on actual quantities serviced.
9. Proposals: Proposals shall be signed by an authorized individual in accordance with FAR 4.102, Contractor’s Signature. Failure to comply may cause your proposal to be rejected. Offerors should mark each page of their proposal as "Proprietary Information" if they want it treated as Proprietary Information under the Procurement Integrity Act.
10. Set- Aside: The proposed contract is 100% set-aside for small business concerns.
11. First Article Approval: A successful First Article Approval shall be required for CLIN's 0023 through 0043 in accordance with FAR 52.209-4, First Article Approval - Government Testing.
12. FOB Destination: Unless otherwise stated in the solicitation, Offerors shall provide FOB Destination prices.
13. Contact Information: A Contracting Officer's Representative (COR) will be appointed at the time of award.
The successful Offeror will be furnished the COR name and contact information at the time of contract award.
14. Wage Determination: Wage Determination number 2015-4253, dated 16 March 2017 and is hereby incorporated. Wage Determination can be viewed at http://www.wdol.gov.
15. Drawings: “Technical data can only be distributed to contractors who have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). Technical data that are export-controlled must be marked with an export control warning notice. This statement identifies technical data which the DoD will withhold from public release using authority in 10 U.S.C. 130. The Government’s right to use, modify, reproduce, release, perform, display, or disclose such technical data are restricted for the Contractor/their subsidiaries/or sub-contractors’ at every level. Any reproduction of technical data or portions thereof marked with these legends must also reproduce these legends on such technical data. Contractors wanting to obtain access to the unclassified technical data drawings MUST have Joint Certification Program (JCP) certification. Instructions for obtaining JCP certification can be found at:
https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx
16. AMC-Level Protest Program: Prior to submitting an agency protest, it is preferable that you first attempt to resolve your concerns with the responsible contracting officer. However, you may also file a protest to the Headquarters (HQ), Army Materiel Command (AMC). The HQ AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accountability Office (GAO), or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 35 calendar days from filing. To be timely, protests must be filed within the periods specified in Federal Acquisition Regulation 33.103. If you want to file a protest under the HQ AMC-Level Protest Program, the protest must request resolution under that program and be sent to the address below.
Headquarters U.S. Army Materiel Command Office of Command Counsel-Deputy Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000 Fax: (256) 450-8840 or email usarmy.redstone.usamc.mbx.protests@mail.mil
The AMC-level protest procedures are found at:
www.amc.army.mil/amc/commandcounsel.html
If internet access is not available, contact the contracting officer or HQ, AMC to obtain the AMC-Level Protest Procedures.
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$3,600.00 $3,295,138.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government
0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government 0017 Destination Government Destination Government 0018 Destination Government Destination Government 0019 Destination Government Destination Government 0020 Destination Government Destination Government 0021 Destination Government Destination Government 0022 Destination Government Destination Government 0023 Destination Government Destination Government 0024 Destination Government Destination Government 0025 Destination Government Destination Government 0026 Destination Government Destination Government 0027 Destination Government Destination Government 0028 Destination Government Destination Government 0029 Destination Government Destination Government 0030 Destination Government Destination Government 0031 Destination Government Destination Government 0032 Destination Government Destination Government 0033 Destination Government Destination Government 0034 Destination Government Destination Government 0035 Destination Government Destination Government 0036 Destination Government Destination Government 0037 Destination Government Destination Government 0038 Destination Government Destination Government 0039 Destination Government Destination Government 0040 Destination Government Destination Government 0041 Destination Government Destination Government 0042 Destination Government Destination Government 0043 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 1010 Destination Government Destination Government 1011 Destination Government Destination Government 1012 Destination Government Destination Government 1013 Destination Government Destination Government 1014 Destination Government Destination Government 1015 Destination Government Destination Government 1016 Destination Government Destination Government 1017 Destination Government Destination Government 1018 Destination Government Destination Government 1019 Destination Government Destination Government 1020 Destination Government Destination Government 1021 Destination Government Destination Government
1022 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government 2007 Destination Government Destination Government 2008 Destination Government Destination Government 2009 Destination Government Destination Government 2010 Destination Government Destination Government 2011 Destination Government Destination Government 2012 Destination Government Destination Government 2013 Destination Government Destination Government 2014 Destination Government Destination Government 2015 Destination Government Destination Government 2016 Destination Government Destination Government 2017 Destination Government Destination Government 2018 Destination Government Destination Government 2019 Destination Government Destination Government 2020 Destination Government Destination Government 2021 Destination Government Destination Government 2022 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 3005 Destination Government Destination Government 3006 Destination Government Destination Government 3007 Destination Government Destination Government 3008 Destination Government Destination Government 3009 Destination Government Destination Government 3010 Destination Government Destination Government 3011 Destination Government Destination Government 3012 Destination Government Destination Government 3013 Destination Government Destination Government 3014 Destination Government Destination Government 3015 Destination Government Destination Government 3016 Destination Government Destination Government 3017 Destination Government Destination Government 3018 Destination Government Destination Government 3019 Destination Government Destination Government 3020 Destination Government Destination Government 3021 Destination Government Destination Government 3022 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 POP 18-AUG-2017 TO
17-AUG-2018
N/A DIRECTORATE OF INDUSTRIAL
OPERATIONS
JOE SHINES
LETTERKENNY ARMY DEPOT BLDG 350
DOOR 40
CHAMBERSBURG PA 17201-4150
717-267-5739
W25G1Q
0002 POP 18-AUG-2017 TO
17-AUG-2018
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0007 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0008 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0009 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0010 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0011 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0012 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0013 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0014 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0015 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0016 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0017 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0018 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0019 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0020 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0021 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0022 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0023 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0024 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0025 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0026 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0027 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0028 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0029 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0030 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0031 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0032 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0033 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0034 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0035 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0036 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0037 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0038 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0039 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0040 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0041 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0042 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0043 POP 18-AUG-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 18-AUG-2018 TO
17-AUG-2019
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1005 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1006 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1007 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1008 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1009 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1010 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1011 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1012 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1013 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1014 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1015 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1016 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1017 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1018 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1019 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1020 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1021 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
1022 POP 18-AUG-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 18-AUG-2019 TO
17-AUG-2020
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2004 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2005 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2006 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2007 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2008 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2009 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2010 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2011 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2012 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2013 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2014 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2015 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2016 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2017 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2018 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2019 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2020 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2021 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
2022 POP 18-AUG-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 18-AUG-2020 TO
17-AUG-2021
N/A (SAME AS PREVIOUS LOCATION)
3002 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3003 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3004 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3005 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3006 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3007 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3008 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3009 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3010 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3011 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3012 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3013 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3014 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3015 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3016 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3017 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3018 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3019 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3020 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3021 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
3022 POP 18-AUG-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-6 Alt I Restrictions On Subcontractor Sales To The Government
(Sep 2006) -- Alternate I
OCT 1995
52.203-12 Limitation On Payments To Influence Certain Federal Transactions
OCT 2010
52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights
APR 2014
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-7 System for Award Management OCT 2016 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2016
52.204-13 System for Award Management Maintenance OCT 2016 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-21 Basic Safeguarding of Covered Contractor Information Systems
JUN 2016
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-7 Information Regarding Responsibility Matters JUL 2013 52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
JUL 2013
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under and Federal Law
FEB 2016
52.212-1 Instructions to Offerors--Commercial Items JAN 2017 52.212-3 Alt I Offeror Representations and Certifications--Commercial
Items (JAN 2017) Alternate I
OCT 2014
52.212-4 Contract Terms and Conditions--Commercial Items JAN 2017 52.217-5 Evaluation Of Options JUL 1990
52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns NOV 2016 52.219-14 Limitations On Subcontracting JAN 2017 52.222-3 Convict Labor JUN 2003 52.222-19 Child Labor -- Cooperation with Authorities and Remedies OCT 2016 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-24 Preaward On-Site Equal Opportunity Compliance Evaluation FEB 1999 52.222-26 Equal Opportunity SEP 2016 52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-41 Service Contract Labor Standards MAY 2014 52.222-43 Fair Labor Standards Act And Service Contract Labor
Standards - Price Adjustment (Multiple Year And Option Contracts)
MAY 2014
52.222-50 Combating Trafficking in Persons MAR 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.232-33 Payment by Electronic Funds Transfer--System for Award Management
JUL 2013
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.242-13 Bankruptcy JUL 1995 52.242-15 Stop-Work Order AUG 1989 52.245-1 Alt I Government Property (JAN 2017) Alternate I APR 2012 52.245-9 Use And Charges APR 2012 52.247-34 F.O.B. Destination NOV 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
OCT 2016
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.211-7007 Reporting of Government-Furnished Property AUG 2012 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.245-7001 Tagging, Labeling, and Marking of Government-Furnished
Property
APR 2012
252.245-7002 Reporting Loss of Government Property APR 2012 252.245-7003 Contractor Property Management System Administration APR 2012 252.245-7004 Reporting, Reutilization, and Disposal SEP 2016 252.247-7023 Transportation of Supplies by Sea APR 2014 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
CLAUSES INCORPORATED BY FULL TEXT
52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)
(Contracting Officer shall insert details)
(a) The Contractor shall deliver 1 unit(s) of Lot/Item CLIN 0023 through 0043 within 60 calendar days from the date of this contract to the Government at Directorate of Industrial Operations, Bldg. 350 Door 40, Letterkenny Army Depot, Chambersburg, PA 17201-4150; Attention: Joe Shines for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
(b) Within 5 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, the Contractor--
(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and
(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.
(f) If the Government does not act within the time specified in paragraphs (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
(End of clause)
52.211-8 TIME OF DELIVERY (JUN 1997)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
(Contracting Officer insert specific details)
The contractor shall make deliveries of up to 20 each for CLINs 0001 through 0006, and CLINs 0010 through 0020 (too include option year CLINs) within 30 calendar days of receipt of a task order and up to 20 each every 30 calender days thereafter. If a CLIN is stated as a high priority on the task order then the delivery time will decrease from 30 calendar days to 15 calender days. (see paragraph 5.3.2 of the PWS)
The contractor shall make deliveries of up to 40 each for CLINs 0007 and 0008 (too include option year CLINs) within 30 calendar days of receipt of a task order and up to 40 each every 30 calender days thereafter. If a CLIN is stated as a high priority on the task order then the delivery time will decrease from 30 calendar days to 15 calender days. (see paragraph 5.3.2 of the PWS)
The contractor shall make deliveries of up to 3000 each for CLIN 0021 (too include option year CLINs) within 30 calendar days of receipt of a task order and up to 3000 each every 30 calender days thereafter. If a CLIN is stated as a high priority on the task order then the delivery time will decrease from 30 calendar days to 15 calender days. (see paragraph 5.3.2 of the PWS)
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
Within Days
After Date
Item No. Quantity of Contract
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .