W56HZV-19-R-0070_A0001.pdf

PDF 35 KB Posted

Attached to
CORROSION ENGINEERING SERVICES
Solicitation number
W56HZV19R0070
Issued by

About this file

Not Listed

View the file

Other files

File Type Posted
Revised_09_May_Exhibit_B_-_Past_Performance_Questionnaire_.doc DOC document
W56HZV19R0070-0002.pdf PDF
Q&A_9_May_2019.docx DOCX document
Q&A_8_May_2019.docx DOCX document
Response_to_Question_6_May_2019.docx DOCX document
Q&A_17_April_2019.docx DOCX document
Q&A_16_April_2019.docx DOCX document
Exhibit_A-CDRL_A004.pdf PDF
Exhibit_A-CDRL_A005.pdf PDF
Exhibit_A-CDRL_A002.pdf PDF
Exhibit_A-CDRL_A003.pdf PDF
Exhibit_A-CDRL_A001.pdf PDF
Exhibit_D_GFPM.xlsx XLSX spreadsheet
QASP_Exhibit_C.pdf PDF
W56HZV19R0070.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0001 2019MAY06

W56HZV

U.S. ARMY CONTRACTING COMMAND

WARREN, MICHIGAN 48397-5000

DAVID DIROMA

EMAIL: DAVID.J.DIROMA.CIV@MAIL.MIL

W56HZV-19-R-0070

2019APR10

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 9

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: DAVID DIROMA

Buyer Office Symbol/Telephone Number: CCTA-ASG-D/(586)467-6064

Type of Contract 1: Firm Fixed Price

Kind of Contract: Other

*** End of Narrative A0000 ***

2 9

W56HZV-19-R-0070

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

1.1.1 Purpose and Scope

1.1.2 Purpose

1.1.3 The purpose of this contract is for the contractor to provide corrosion engineering and logistics technical, analytical, programmatic, research and development, technical assistance, testing, training, and technical writing support for the U.S. Army Combat Capabilities Development Command (CCDC) Ground Vehicle Systems Center (GVCS) and TACOM Life Cycle

Management Center (LCMC). The effort provided shall include independent analysis and assessment of TACOMs program to help administer the Army Corrosion Prevention and Control (CPC) Program for corrosion prevention, detection, and mitigation practices during sustainment and in support of ACCDCs technical objectives.

1.1.4 Scope

1.1.5 The Contractor, as an independent contractor and not as an agent of the Government, shall provide engineering and logistics analytical support to include field assessments, inspection, technology assessment, demonstration, testing, technical assistance, technical writing, material, engineering changes, acquisition support, video production, and research and development (R&D) services to CCDCs Materials, Environmental, Coatings and Corrosion Team and other DoD departments to execute assigned programs and functions. These programs and functions support the DoD Corrosion Prevention and Control (CPC) program, Corrosion Engineering Support for ground systems managed by Program Executive Office Combat

Support & Combat Service Support (PEO CS & CSS), PEO Ground Combat Systems (GCS) and Life Cycle Sustainment support for the

TACOM Integrated Logistics Support Center (ILSC). These services support Army Force Generation Sustainable Readiness and

RESET efforts. The Contractor shall furnish all supplies, equipment, laptops, facilities, material, and services to perform under this Performance Work Statement.

1.1.6 Background

1.1.7 Army Regulation 750-59 assigns to the Commanding Generals of Life Cycle Management Commands (LCMCs) the responsibility to administer the Army Corrosion Prevention and Control (CPC) Program. The TACOM CPC Program Manager and the

U.S. Army Combat Capabilities Development Command (CCDC) Ground Vehicle System Center (GVSC) have been assigned to manage the program. The program creates cost effective product and process improvements to reduce vehicle maintenance costs and improve fleet readiness. The Army CPC program addresses use of materials and processes to prevent corrosion during weapon system and infrastructure design, production and maintenance; collects/analyzes data on the current state of the fielded fleet; performs demonstration/validation engineering studies for new processes and materials; and supports the institutionalization of improved corrosion prevention and control as a means to reduce life-cycle costs for legacy weapon systems and new acquisition programs. Under Army Regulations for Corrosion Prevention and Control for Army Materiel, emphasis is placed on corrosion assessment, training, technical support, logistics for prevention and control of corrosion (materials and methods), research, development, testing and engineering (RDT&E) programs.

2 REQUIREMENTS

2.1 General - The contractor shall provide qualified personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, other items and non-personal services necessary to perform objectives as defined in this

Performance Work Statement (PWS). As required, the Contractor may also be provided items specified as Government furnished property and services in accordance with (IAW) task orders (TO) issued by the Procuring Contracting Officer (PCO) under this contract.

2.2 Life Cycle Sustainment - The Contractor shall support the TACOM LCMC CPC Program Manager and the CCDC GVSC

Materials, Environmental Coatings and Corrosion Team in the performance of their respective CPC duties as described in AR 750-59.

This support shall include platform specific corrosion problem resolution for fielded Army Ground Equipment including

Engineering Change Proposals (ECP) and Modification Work Orders (MWO), insertion of CPC into maintenance programs, field level vehicle assessments and surveys, data collection and analysis, evaluation of field activity CPC plans, corrosion training, updates to technical manuals and documentation to support corrosion maintenance and procurement and application of paints and coatings as it relates to corrosion prevention and control.

2.2.1 Survey Teams - The Contractor shall assemble a traveling assessment team as an independent team to participate with representatives from Army Materiel Command (AMC) LCMCs and CCDC in Command corrosion prevention and control surveys. The Contractor shall develop a strategy to collect representative corrosion data from fielded vehicles. The strategy shall employ statistically significant sampling or other means to identify corrosion trends on US Army vehicles and equipment by variant, location and across the entire vehicle population. The team will include corrosion engineers capable of gathering and analyzing data indicative of class problems for potential ECP development. The results will be used to identify and report corrosion-prone areas of Army weapon systems (for example, vehicles, aircraft, and trailers) in order to determine the cause of the corrosion problem Contract Deliverables Requirements List (CDRL) A005.

2.2.2 Data Collection & Analysis The Contractor shall collect and analyze data on fielded ground weapon systems and equipment using existing assessment tools for the purposes of tracking corrosion progression. The data shall allow for trend analysis and isolation of problem areas for possible redesign. The data shall also support analysis of data on fielded ground weapon systems and equipment. The Contractor shall develop or upgrade assessment tools to meet the specific needs for engineering studies, research programs and recommendations for new acquisition programs, maintenance and technology insertion. The Contractor shall provide analysis and assessment of the command corrosion survey data in a written report, published at least annually, to include recommendations for ECP and MWO development CDRL A002.

2.2.3 Review and Development of Technical Documents The Contractor shall review and validate modifications to corrosion related military specification and standards, Commercial Item Descriptions (CIDs), Technical Manuals (TM) and

Technical Bulletins (TB), Engineering Drawings and contract language to support the use of procedures and other materials or maintenance procedures for the corrosion protection of ground vehicles and watercraft, and to correct those documents and make them current. This review shall include an assessment of the technical characteristics of these specifications as they

3 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

relate to coatings, fasteners, pre and post treatments, procedures and corrosion control, comparing the performance requirements to the current state-of-the-art in corrosion resistant materials and testing. This review and analysis shall include a review of the corrosion performance of these materials/procedures and the development of specific test requirements for validation of performance to the applicable military or commercial standards, which can be used for qualification of said standard by the Government. The contractor shall develop recommended changes to the documents to ensure they meet the guidance in Department of Defense (DoD) and Army regulations and directives (CDRL A002). Contractor shall assist in logistics documentation e.g. National Stock Number (NSN) assignment and interface with Army data DoD

Material Management and data systems.

2.2.4 Corrosion Maintenance Support Field Activity Plans and Processes.

2.2.4.1 Identify and Develop Organizational Corrosion Control Methods The contractor shall review existing field activity plans and develop specific organizational corrosion control maintenance procedures including corrosion control inspection (CCI) checklists for use by personnel performing Preventive Maintenance Checks and Services (PMCS).

These procedures will identify recommended maintenance actions to be performed at the operator/user level to reduce the onset of corrosion. These procedures will be used by vehicle/watercraft operators and all levels of maintenance to mitigate corrosion on Tactical and Combat Ground systems and watercraft. The procedures shall include written and pictorial representations of the materials and locations for the application of corrosion preservative compounds, practices and design and report on their efficacy as well as correcting the post-application condition of the vehicle (CDRL A002).

2.2.4.2 The Contractor shall perform corrosion audits of USMC Corrosion Repair Facilities (CRFs) and Army depots. Contractor shall document data for inclusion in Army and DoD Material Management systems.

2.2.5 Corrosion Sustainment Engineering Depot level.

2.2.5.1 The contractor shall identify corrosion, mold and mildew mitigation solutions relevant to depot rebuilders, field maintainers and PM life cycle managers. The contractor shall provide corrosion engineering support to solve platform specific corrosion problems on fielded vehicles. Requirements shall be generated as maintainability, reliability or remanufacture problems arise. The contractor shall perform field audits of Army depots and Logistics

Readiness Centers (LRCs) (CDRL A002).

2.2.5.2 Technology Insertion The contractor shall identify and develop cost effective solutions for corrosion control improvements for insertion into depot level overhaul and On Condition Cyclic Maintenance operations (CDRL

A002). Depot level overhaul of vehicles and watercraft requires significant disassembly, repair and offers opportunities for technology insertion. Corrosion control technologies (e.g., alternative coatings, corrosion preventative compounds, corrosion resistant parts or other materials) are incorporated into vehicles during these overhaul activities.

2.2.6 Corrosion Information and Awareness Knowledge Sharing and Training.

2.2.6.1 The contractor shall provide commodity specific corrosion information addressing the causes of corrosion, detection, consequences, and corrective and preventive measures (CDRL A004). CPC information will include state-of-the-art corrosion control technology (based on recent research and development and coordinated with the CARC Commodity

Manager) instruction for original equipment design, manufacturing, levels of maintenance, supply, and storage processes.

Corrosion lifecycle information shall include manufacturing practices that address material selection, coatings and surface treatments, production processes, process specifications, system geometry, environmental extremes, storage and ready conditions, preservation and packaging requirements, repairs, overhaul, and spare parts requirements. The contractor shall collect information on corrosion control practices used by other agencies and in related industries which may be applicable to TACOM and USMC assets.

2.2.6.2 CPC Program Technical Assistance The Contractor shall develop training materials (CDRL A004) for the Department of Defense PEO/TACOM and United States Marine Corps (USMC) acquisition and logistics communities that describe the requirements for a successful CPC program. The technical assistance shall provide program and project managers with guidance for developing and implementing a corrosion prevention and control program for DoD weapon systems and infrastructure. This technical assistance will be fully coordinated with recent Office of the Secretary of Defense (OSD) guidance on corrosion prevention and control for new and existing ground weapon systems and equipment (DoDI 5000.02 and DoDI

5000.67).

2.2.6.3 Field Technical assistance The Contractor shall develop training materials and on-site CPC procedure demonstrations for the users/operators of ground vehicles and equipment on the general maintenance practices for corrosion prevention and control (CDRL A004). This technical assistance will provide the users with an understanding of how to identify and document corrosion, how to correct corrosion damage (within their Military Occupational Specialty (MOS)) and how to perform PMCS maintenance activities to prevent the onset of corrosion.

2.2.6.4 Coating and Chemical Agent Resistant Coating (CARC) Quality Assurance (QA) Technical Assistance The

Contractor shall develop training materials specific to the CARC system (CDRL A004). This technical assistance will focus on CARC application and use of quality assurance (QA) methods to inspect the CARC system application. The content of the technical assistance will be designed to reinforce the processes and procedures outlined in MIL-DTL-53072 (Chemical Agent

Resistant Coating (CARC) System Application Procedures and Quality Control Inspection). The Contractor will coordinate its training materials with the US Army Research Laboratory (ARL), which is the preparing activity and custodian of this and other CARC specifications.

2.3 Programmatic Support.

2.3.1 Acquisition Support The Contractor shall provide corrosion control programmatic support to Program Managers

(PMs) for Department of Defense weapon systems. This support will include: analysis of alternatives for active acquisition programs; integration of Corrosion Prevention and Control into designs, specifications, Purchase Descriptions; testing of prototype systems; evaluation of the Original Equipment Manufacturer (OEM) processes; and participation in Systems Engineering

(SE), logistics support and test planning (CDRL A002). This will also include support to fielded weapon systems including

4 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

corrosion prevention and control procedures for operator maintenance, rebuild/RESET programs, recapitalization programs and other system upgrades or maintenance.

2.3.2 Support OEM Corrosion Issues The Contractor shall support Army PM system quality concerns and make recommendations related to OEM corrosion control to include painting process compliance, materials selection, proposed repair procedures, and material substitutes. As part of this support, the contractor will document corrosion issues, inspect vehicles at depots and manufacturing facilities, perform root-cause analysis and develop recommended corrective actions (CDRL A002).

2.3.3 System Technical Manuals -The Contractor shall support Army PM system logistics and publications concerns and make recommendations related to CPC maintenance and corrosion control to include Preventive Maintenance Checks and Services

(PMCS), Maintenance Allocation Charts (MAC) and Lubrication Orders (LO). As part of this support, the contractor will draft corrosion maintenance procedures for inclusion in technical manuals (CDRL A002).

2.4 Research, Development, Testing and Engineering (RDT&E) Support.

2.4.1 The contractor shall conduct and support research, development, testing and engineering projects and programs including research funded by the Office of the Under Secretary of Defense (OSD) Corrosion Policy and Oversight and other federal agencies. These efforts include program management activities, test and evaluation of corrosion prevention and control technologies for fielded weapon systems and new acquisition systems.

2.4.2 Maintain Corrosion Test Site at Cape Canaveral Air Force Station (CCAFS) The Contractor shall maintain an inventory in contractor format of all corrosion test articles exposed at the Corrosion Test Site at CCAFS. This work will include periodic exposure, inspection, analysis, reporting, and addition and removal of test articles at the site. The contractor shall coordinate maintenance of the Test Site and shall assist in the provision of access to the Test Site by assigned

U.S. Air Force personnel as required for the presence at the Test Site of required personnel or for the delivery of test articles.

2.4.3 Product Testing - The Contractor shall support testing of corrosion prevention products on ground vehicles and equipment. The Contractor shall support identification of appropriate test protocols, execution of testing, collection and evaluation of data and identification of test platforms (CDRL A002).

2.4.4 Demonstration/Validation Efforts The contractor shall review demonstration/ validation plans and monitor testing of corrosion prevention products under actual service conditions and analyze results to evaluate corrosion control technologies. This work may be accomplished through activities performed on-the-lot, in the motor-pool, at depots or done in conjunction with OEMs. These efforts will include capturing all costs associated with implementing the technology, monitoring the performance of these upgrades and determining the impact on maintenance due to corrosion. The results of this work will be used to demonstrate the benefits of these materials including a Return on Investment (ROI).

2.4.5 Identify and Evaluate Storage/Packaging Alternatives For vehicles designated for intermediate or long-term storage, technologies such as dehumidification, vapor phase corrosion inhibitors, and engineered covers may be suitable. The contractor shall evaluate Army ground vehicle program goals for individual ground vehicle systems and Army Prepositioned Stock

(APS) assets and make appropriate recommendations for storage (CDRL A002). The goal of this storage will be to maintain the vehicles in the same condition as when inducted.

3 Travel:

3.1 The contractor is authorized to travel as necessary to perform the various task orders, but only upon written approval by the Contracting Officer or his designee. Costs for transportation and per diem (lodging, meals, and incidental expenses) incurred by contractor personnel in the performance of this contract are allowable subject to the limitations contained in Federal Acquisition Regulation (FAR Part 31 cited in paragraph 31.20546 Travel Costs.

3.2 Potential Performance Locations Continental US (CONUS) and Outside Continental US (OCONUS). Other CONUS and OCONUS locations may be added to this list:

406th Army Field Support Brigade, Eglin AFB, FL

Aberdeen Proving Ground, MD

Air Force Installations

Anniston Army Depot (ANAD), AL

ARNG Smyrna, TN

Blount Island Command in Florida

Camp Grayling, MI and Lansing, MI

Camp Kinser in Okinawa, Japan.

Camp Lejeune, NC

Camp Pendleton, CA

Camp Shelby, MS

Cape Canaveral Air Force Station (CCAFS) Cocoa Beach, FL

Contractors facilities

Corpus Christie Army Depot (CCAD), TX

Fort Benning, GA

Fort Bliss, TX

Fort Bragg, NC

Fort Buchanan, Puerto Rico

Fort Campbell, NY

Fort Carson, CO

Fort Drum, NY

5 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Fort Greely, AK

Fort Hood, TX

Fort Hunter-Liggett, CA

Fort Knox, KY

Fort Lauderdale, FL or Cocoa Beach, FL

Fort Leonard Wood, MO

Fort McCoy, WI

Fort Polk, LA

Fort Riley, KS

Fort Shafter, HI

Fort Shafter, HI

Fort Sill, OK

Fort Stewart, GA

Fort Story, VA

Fort Wainwright

Goose Creek, SC

Guam

GVSC in Warren, MI

Joint Base Lewis McChord, WA

Letterkenny Army Depot, PA

Marine Corps Base Hawaii

Marine Corps Systems Command (MCSC) in Virginia

MDMC PPB in California

MDMC Production Plant Albany (PPA) in Georgia

Norfolk, VA

Quantico, VA.

Red River Army Depot (RRAD), TX

Schofield Barracks, HI

Second Marine Expeditionary Force (II MEF) Camp Lejeune, NC

Sierra Army Depot, CA and Fort Irwin, CA (2 weeks)

South Korea

TASM-G in Groton, CT

TASM-G in Springfield, MO

Tysons Corner, VA

US Navy Depots and Installations

USMC bases.

USMC Depots

USMC Installations

Warren, MI

Wheeler Army Airfield, HI

Yakima Training Center, WA (and surrounding area)

4 Reports and Deliverables

4.1 Monthly Contract Progress Status and Management Reports, IAW DI-MGMT-80227 (CDRL A001) from the individual task orders may be consolidated into a single report.

4.2 The Contractor shall provide a report(s) IAW the applicable task order and Exhibit A, (CDRL A002), DID DI-

MISC-80508A (T) (Technical Report - Study/Services).

4.3 Quarterly Technical Reports shall be submitted in accordance with the applicable task order and DID DI-MISC-

80508B (T) (CDRL A003). The materials may consist of written documents, presentation materials (e.g. PowerPoint slides), and/or narrated videos, as necessary for the specific task.

4.4 The Contractor shall provide training materials IAW the applicable task order and Exhibit A, (CDRL A004), DID

DI-MISC-80508A (T) (Technical Report - Study/Services).

4.5 The Contractor shall provide Command corrosion prevention and control survey reports IAW the applicable task order and Exhibit A, (CDRL A005), DID DI-MISC-80508A (T) (Technical Report - Study/Services).

4.6 The contractor shall prepare all deliverables in contractor format, compatible with Microsoft Windows and

Microsoft Office (2013), using best in-house practices that will produce documents that are clearly written, describe accomplishments accurately, detail technical issues, and define risks and problems. In order to facilitate transition to a paperless reporting system, the contractor shall submit reports in electronic format unless authorized by the COR. Electronic format shall be compatible to Government computer systems. Monthly Contract Progress Status and Management Report, (CDRL A001)

5 General

5.1 The contractor shall not act or represent itself as an agent of the Government nor shall it have authority to make decisions or bind the Government to any agreements or commitments through performance of any work under this contract.

5.2 The contractor shall notify the Contracting Officers Representative (COR) immediately by telephone or email if the established completion dates for required work or delivery dates for required data will not be met. The contractor shall follow up with written notification to the COR within 7 days.

6 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

6 Government Furnished Support/ Materials/Information: The Government will provide the contractor with the required materials and information on each individual task order. Each task order (TO) will include additional materials and information as applicable:

6.1 To enable the Contractor to accomplish the requirements under this effort, the Contracting Officer or his designee will provide the following information. This information will be provided to the Contractor at the time of TO issuance

(or at an appropriate time). The contractor shall request disposition from the Government for all Government Furnished Equipment

(GFE), Government Furnished Material (GFM), Government Furnished Information (GFI), as defined below, furnished to the contractor for performance of the work required under this contract at the end of the period of performance.

-Access to Corrosion Assessment database.

-Access to all historical and current Corrosion Assessment raw data (as available).

-Copies of Corrosion Service Team (CST) Metrics/activity data

-CST Standard Operating Procedures (SOPs)

-Cost of corrosion data supporting the TACOM Corrosion Prevention and Control Program.

-Monthly activity reports

-Scheduled/planned activities

-Types of equipment serviced and quantities per month

-Location and availability of vehicles used for demonstration as part of previous CCDC GVSC corrosion projects.

-Access to CCDC GVSC reports related to CPC activities

-Past assessment of corrosion data

-ISO Code (LEIDOS Report)

-Evaluation of CPC materials

-Historical corrosion and maintenance data collected on materials representative of Army Tactical vehicles

-Training and reporting information used by the CSTs, AMCOM and CCDC GVSC.

-Access to corrosion contractual requirements for new acquisition systems.

-Access to Depot Maintenance Work Requirements (DMWR), Standard -Operating Procedures (SOP) and other documents that provide guidance to depots and other maintenance activities on corrosion repair.

-Access to CPC project information relevant to tracking ongoing activities and for developing the annual Report to Congress.

6.2 Existing Government owned databases, documentation, directives, and associated information necessary to accomplish the task requirements. Access to Government computers, servers, and other equipment deemed necessary and as directed by each task order. The COR will use CVS (Contractor Verification System) working with the CCDC GVSC Trusted Agent as needed to obtain required common access cards (CAC) cards for the contractor.

7 Period of Performance

7.1 The period of performance for this contract is five years from the date of contract award, during which task orders may be issued under the contract within five consecutive ordering periods of one (1) year each.

7.2 The Procuring Contracting Officer (PCO) will issue Task Orders (TO) against the basic contract. Each task order will specify the applicable SOW work requirements and their associated SOW paragraph numbers, the number of hours authorized, the performance period, and any deliverables.

7.3 The following is the list of approved holidays:

Independence Day

Labor Day

Columbus Day

Veterans Day

Thanksgiving Day

The Day after Thanksgiving

Christmas Day

New Years Day

Martin Luther King, Jr Day

Presidents Day

Memorial Day

8 Security

8.1 Security Classification Requirement for contractor personnel accomplishing this statement of work is SECRET.

All Contractor personnel must maintain a favorable background investigation before accessing the TACOM databases and local Area

Network in accordance with AR 25-2 and AR 380-67. All information or data developed under this effort belongs to and is the property of the U.S. Government and shall be marked and handled as For Official Use Only (FOUO). The Contractor shall not release any information or data to third parties without express written approval of the Procuring Contract Officer (PCO). The security requirements are in accordance with the STA255.

8.2 The Contractor will have access to Government data for the accomplishment of work under this agreement. The

Contractor and each and every contractor employee used in the performance of this contract must sign a non-disclosure agreement.

8.3 The Contractor shall provide security paperwork as requested by the Government to obtain the appropriate security clearance to access various Government sites at which contract performance will take place, and Government computers. An interim security clearance is permitted until a full security clearance investigation has been completed and approved by the

Government.

9 Contractor Manpower Reporting (CMR)

9.1 The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a

7 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: https://ecmra.mil/ . The required information includes:

9.1.1 Contracting Office, Contracting Officer, Contracting Officer's Technical Representative;

9.1.2 Contract number, including task and delivery order number;

9.1.3 Beginning and ending dates covered by reporting period;

9.1.4 Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;

9.1.5 Estimated direct labor hours (including sub-contractors);

9.1.6 Estimated direct labor dollars paid this reporting period (including sub- contractors);

9.1.7 Total payments (including sub-contractors);

9.1.8 Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant

FSC for each sub-contractor if different);

9.1.9 Estimated data collection cost;

9.1.10 Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the

Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);

9.1.11 Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);

9.1.12 Presence of deployment or contingency contract language; and

9.1.13 Number of contractor, and sub-contractor employees deployed in theater this reporting period (by country).

9.2 As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending

September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor's systems to the secure web site without the need for separate data entries for each required data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site.

10. Job Classifications with Minimum Qualifications for Personnel

Program Manager / Senior Consultant Corrosion engineering and management services to maintain the overall program. A subject matter__________________________________ expert based on publication of technical articles, updated Army technical bulletins, and reports in corrosion engineering. Has ultimate responsibility for program execution. Selects / establishes program team and maintains the overall technical direction of the work. Serves as the final reviewer of the work product. Makes sure the work satisfies customer needs and complies with the overall QA process.

Requirements: More than 10 years experience in the subject matter of corrosion engineering / corrosion control. Has a B.S. Degree in

Engineering (e.g., Mechanical, Chemical, Electrical, Civil, Materials) and Advanced Degree in Management / Business Administration.

Individual is also a registered Professional Engineer with training in Lean / Six Sigma Quality Management.

Senior Logistician / Senior Analyst - Project analysis by degreed or Industry-Certificated individual. Individual serves as senior___________________________________ member of project teams to plan and gather supporting data or information related to project-objectives. This information and execution will be related to technical, non-engineering items such as regulatory analysis of EPA / OSHA statues for project impacts, discussions with product vendors / manufacturers on material specifications, or interface with logistics and planning personnel. Performs process and procedural reviews affecting corrosion control / corrosion inspection efforts.

Requirements: More than 10 years experience in corrosion control. Advanced education (M.S. Degree in Business, Science, or other area) may substitute for up to 5 years of experience. Has a B.S. Degree in Chemistry or Science (not Engineering). Industry Certifications as alternatives to B.S. Degree include NACE or SSPC Certification in Coating Inspection or SSPC Certification as a Coating Specialist.

Inspection Lead / Senior Engineer - Engineering-related services provided by a degreed engineer. Plans, co-ordinates, and executes_________________________________ engineering work on inspection efforts. Supports the acquisition of inspection data across multiple inspectors and collection platforms. Provides a quality check to ensure consistency in data collection methods and interpretation of visual inspection standards.

Consolidates multiple datasets for comprehensive analysis.

Requirements: More than 10 years experience in corrosion engineering. Has a B.S. Degree in Engineering (e.g., Mechanical, Chemical, Electrical, Civil, Materials). Has an Industry Certification as a NACE Certified Corrosion Specialist, NACE Coating Inspector (Level 2 or above), or SSPC Certified Coating Specialist.

Inspector / Staff Analyst - Technical corrosion control support services from in support of specific engineering and inspection tasks._________________________

Performs analytical / inspection work in their area of expertise requiring judgment in the evaluation, selection, and adaptation and/or modification of methodologies and tools. Is capable and experienced in the application of standard inspection protocols of corrosion phenomena and recording data on electronic tools. Will also support obtaining literature, technical reports, and regulatory statues.

Requirements: Minimum of six (6) months experience in corrosion control with B.S. Degree (not Engineering); three (3) to 10 years experience in corrosion control without B.S. Degree. Has Industry Training in the field of coating inspection.

Trainer Assistant / Staff Analyst - Technical corrosion control support services from non-engineer in support of specific engineering__________________________________ and training tasks. Has specific experience in the development of training support products in corrosion control including items such as brief videos and news-briefs on the use of particular tools and processes.

8 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Requirements: Minimum of six (6) months experience in corrosion control with B.S. Degree (not Engineering); three (3) to 10 years experience in corrosion control without B.S. Degree. Experience with software tools for computer training on corrosion control topics using MS PowerPoint.

Analysis Engineer / Staff Engineer - Corrosion engineering-related services provided by degreed engineer. Performs engineering-related__________________________________ work requiring judgment in the evaluation, selection, and adaptation and/or modification of methodologies and tools. Primary responsibilities include data acquisition, literature reviews, field data collection, data reduction, and graphics generation.

Experience in the application of databases including Access and File maker along with statistical analysis to identify trends in corrosion phenomena and root causes is required.

Requirements: Minimum of six (6) months experience. Has a B.S. Degree in Engineering (e.g., Mechanical, Chemical, Electrical, Civil, Materials) and Industry Training in the field of coating inspection. Experience with ASTM, GM corrosion testing apparatus, and CARC coating testing. Has performed exposure testing of materials and coatings at environmental exposure sites, e.g., Army, Cape Canaveral

Air Force Station exposure site.

Training Engineer / Staff Engineer - Corrosion engineering-related services provided by degreed engineer. Participates in and__________________________________ conducts technical training programs. Writes training programs, including outline, text, handouts, and tests. Designs practical training exercises to demonstrate poor and quality painting, CIC-application, and corrosion control. Administers written and practical exams and writes performance reports to evaluate trainees' performance.

Requirements: Six (6) months to 10 years experience. Has a B.S. Degree in Engineering (e.g., Mechanical, Chemical, Electrical, Civil, Materials) and Industry Training in the field of coating inspection. Has experience with software tools used for computer training such as Adobe Captivate.

Research Engineer / Staff Engineer Corrosion engineering-related services provided by degreed engineer. Performs engineering-related__________________________________ work used for the testing and evaluation of materials and coatings using ASTM, automotive, and military standards. Has established and performed real-world exposure testing of materials and coatings in multiple locations (e.g., Army Cape Canaveral exposure site and others). Primary responsibilities include data acquisition, literature reviews, field data collection, data reduction, and reporting.

Requirements: Six (6) months to 10 years experience. Has a B.S. Degree in Engineering (e.g., Mechanical, Chemical, Electrical, Civil, Materials) and Industry Training in the field of coating inspection. Experience with ASTM, GM corrosion testing apparatus, and CARC coating testing. Has performed exposure testing of materials and coatings at the Army, Cape Canaveral Air Force Station exposure site.

Research Technician / Technician - Assists consultants, engineers, and analysts by collecting, entering, retrieving, organizing, or________________________________ maintaining analytical data. Experience in the preparation and application of CARC and other protective coating systems.

Requirements: More than 10 years experience in the corrosion control industry. Previous training in coating application under the

STAR4D military coating application / coating technician.

11. Quality Assurance Surveillance Plan- The Contracting Officer Representative (COR) will evaluate the contractors performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP) (Exhibit C). This plan is primarily focused on what the

Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

12. Contracting Officer Representative (COR) - The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the

Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance:

maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notify both the

Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates.

The COR is not authorized to change any of the terms and conditions of the resulting order.

*** END OF NARRATIVE C0001 ***

9 9

SECTION A
SECTION C

File details come from the government source that posted it.