Attachment 0025 COST DATA SUMMARY REPORT

View the file

Other files

File Type Posted
Attch_0029_ACWS_Section_LM_2017_01_23.pdf PDF
Attch_0015_ACWS_Staff_Levels_Skill_Mix_Schedule_2017_01_23.xlsx XLSX spreadsheet
W52P1J16R0058-0011.pdf PDF
Attch_0030_ACWS_RFP_Attachment_List_STATUS_2017_01_23.pdf PDF
VendorName_Attch_0032_EN_XRef_FPR_W52P1J-16-R-0058.xlsx XLSX spreadsheet
Attch_0015_ACWS_Staff_Levels_Skill_Mix_Schedule_2017_01_11.xlsx XLSX spreadsheet
Attch_0029_ACWS_Section_LM_2017_01_11.pdf PDF
Attch_0030_ACWS_RFP_Attachment_List_STATUS_2017_01_11.pdf PDF
W52P1J16R0058-0010.pdf PDF
W52P1J16R0058-0009.pdf PDF
Attch_0019_ACWS_CDRL_List_Delivery_Dates_2016_11_18.xlsx XLSX spreadsheet
Attch_0020_ACWS_Price_Matrix_2016_11_18.xlsx XLSX spreadsheet
Exhibit_A_CDRLS_Acq_Program_Management_2016_11_18.pdf PDF
Attch_0021_ACWS_Price_Matrix_2016_11_18.xlsx XLSX spreadsheet
Attch_0015_ACWS_Staff_Levels_Skill_Mix_Schedule_2016_09_30.xlsx XLSX spreadsheet
Attch_0001_ACWS_Statement_Of_Objectives_2016_09_30.pdf PDF
Exhibit_A_CDRLS_Acq_Program_Management_2016_09_30.pdf PDF
Attch_0021_ACWS_Additional_Price_Matrix_2016_09_30.xlsx XLSX spreadsheet
Attch_0020_ACWS_Price_Matrix_2016_09_30.xlsx XLSX spreadsheet
W52P1J16R0058-0008.pdf PDF
Attch_0002_ACWS_Task_Order_0001_Statement_Of_Objs_2016_09_30.pdf PDF
Attch_0019_ACWS_CDRL_List_Delivery_Dates_2016_09_30.xlsx XLSX spreadsheet
W52P1J16R0058-0007.pdf PDF
Attch_0021_ACWS_Additional_Price__Matrix_2016_06_08.xlsx XLSX spreadsheet
Attch_0020_ACWS_Price__Matrix_2016_06_08.xlsx XLSX spreadsheet
W52P1J16R0058-0006.pdf PDF
Attch_0020_ACWS_Price__Matrix_2016_05_25.xlsx XLSX spreadsheet
Attch_0016_ACWS_Quality_Assurance_Surveillance_Plan_2016_05_31.pdf PDF
Attch_0021_ACWS_Additional_Price__Matrix_2016_05_25.xlsx XLSX spreadsheet
Attch_0029_ACWS_Section_LM_2016_05_31.pdf PDF
Attch_0016_ACWS_Quality_Assurance_Surveillance_Plan_2016_05_20.pdf PDF
W52P1J16R0058-0005.pdf PDF
Attch_0013_ACWS_DISA_SRF_Form_2016_05_20.docx DOCX document
Attch_0029_ACWS_Section_LM_2016_05_20.pdf PDF
Attch_0029_ACWS_Section_LM_2016_05_17.pdf PDF
W52P1J16R0058-0004.pdf PDF
Exhibit_B_CDRLS_Systems_Engineering_Data_2016_05_06.pdf PDF
Attch_0024_ACWS_Software_License_Disclosure_2016_05_06.xlsx XLSX spreadsheet
Attch_0028_ACWS_Offeror_Software_Solution_2016_05_06.xlsx XLSX spreadsheet
Attch_0026_ACWS_Tech_Demo_Logistics_2016_05_06.pdf PDF
Attch_0002_ACWS_Task_Order_0001_Statement_Of_Objs_2016_05_06.pdf PDF
Attch_0029_ACWS_Section_LM_2016_05_06.pdf PDF
Exhibit_A_CDRLS_Acq_Program_Management_2015_05_06.pdf PDF
Attch_0020_ACWS_Price__Matrix_2016_05_06.xlsx XLSX spreadsheet
Attch_0021_ACWS_Additional_Price__Matrix_2016_05_06.xlsx XLSX spreadsheet
Attch_0017_Small_Business_Participation_2016_05_06.xlsx XLSX spreadsheet
Exhibit_D_CDRLS_Operations_Support_2016_05_06.pdf PDF
Attch_0001_ACWS_Statement_Of_Objectives_2016_05_06.pdf PDF
Attch_0019_ACWS_CDRL_List_Delivery_Dates_2016_05_06.xlsx XLSX spreadsheet
Attch_0027_ACWS_Offeror_Self_Certification_RFP_2016_05_06.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 97 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover

Important Note

6 May 2016: The following documents have been updated and included for your use:
1)Resource Distribution Table (RDT), ACWS System - Contract Plan;
2)RDT Training Briefing from CAPE / DCARC for use with item 1) above;
3)Government Work Breakdown Structure (WBS) with mapping to the CSDR Plan

ACWS Investment Pg 1(CSDR Plan)

COST AND SOFTWARE DATA REPORTING PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1. MAJOR PROGRAMa. NAME:Army Contract Writing System
b. PHASE/MILESTONEc. PRIME MISSION PRODUCT2. WBS SYSTEM TYPE3. SUBMISSION TYPE4. CURRENT SUBMISSION DATE (YYYYMMDD)5. LAST APPROVED PLAN DATE (YYYYMMDD)
XPre-ABC-FRPArmy Contract Writing System Increment 1 InvestmentAutomated Information SystemXINITIAL
AC-LRIPO&SCHANGE20151028
6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code)6b. TELEPHONE NUMBER (Include Area Code)6c. FAX NUMBER (Include Area Code)6d. E-MAIL ADDRESS
Kim Reid(703) 545-9061kim.g.reid.civ@mail.mil
7. PLAN TYPE8. PREPARING ORGANIZATION9a. CONTRACTOR NAME/ADDRESS9b. CONTRACT NUMBER9c. APPROPRIATION10. APPROVED PLAN NUMBER
PROGRAMXCONTRACT (PRIME)i. PERFORMING ORGANIZATIONii. DIVISIONTBDXRDT&EA-15-L-C1
CONTRACT (SUB)PEO EISTBDXPROCUREMENT
O&M
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):
X
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYb. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. SRDR

FORMATS

1.01.0Army Contract Writing System (ACWS) InvestmentXXXX
1.11.1Prime Mission ProductXXXX
1.1.11.1.1Custom Application SoftwareXXXX
1.1.11.1.1.1Custom Application Software HardwareXXXX
1.1.11.1.1.1.xBuild 1..NXXXX
1.1.11.1.1.2Custom Application Software SoftwareXXXX
1.1.11.1.1.2.xBuild 1..NXXXX
1.1.11.1.1.3Custom Application Software Integration, Assembly, Test and CheckoutXXXX
1.1.11.1.1.3.xBuild 1..NXXXX
1.1.21.1.2Enterprise Service ElementXXXX
1.1.21.1.2.1Enterprise Service Element HardwareXXXX
1.1.21.1.2.1.xBuild 1..NXXXX
1.1.21.1.2.2Enterprise Service Element SoftwareXXXX
1.1.21.1.2.2.xBuild 1..NXXXX
1.1.21.1.2.3Enterprise Service Element Integration, Assembly, Test and CheckoutXXXX
1.1.21.1.2.3.xBuild 1..NXXXX
1.1.31.1.3Enterprise Information SystemXXXX
1.1.31.1.3.1Enterprise Information System HardwareXXXX
1.1.31.1.3.1.xBuild 1..NXXXX
1.1.31.1.3.2Enterprise Information System SoftwareXXXX
1.1.31.1.3.2.xBuild 1..NXXXX
1.1.31.1.3.3Enterprise Information System Integration, Assembly, Test and CheckoutXXXX
1.1.31.1.3.3.xBuild 1..NXXXX
1.1.41.1.4External System Interface DevelopmentXXXX
1.1.41.1.4.1External System Interface Development HardwareXXXX
1.1.41.1.4.1.xBuild 1..NXXXX
1.1.41.1.4.2External System Interface Development SoftwareXXXX
1.1.41.1.4.2.xBuild 1..NXXXX
1.1.41.1.4.3Enterprise Service Element Integration, Assembly, Test and CheckoutXXXX
1.1.41.1.4.3.xBuild 1..NXXXX
1.1.51.1.5AIS Platform HardwareXXX
1.1.51.1.5.xBuild 1..NXXXX
1.1.61.1.6System Level IntegrationXXXX
1.1.61.1.6.xBuild 1..NXXXX
1.21.2System EngineeringXXXX
DD FORM 2794, MAY 2011PREVIOUS EDITION IS OBSOLETE
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):
X
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYb. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. SRDR

FORMATS

1.2.11.2.1Contractor System EngineeringXX
1.2.11.2.1.1Management and PlanningXX
1.2.11.2.1.2Solution Development & DesignXX
1.3.11.3Program ManagementXXXX
1.41.4Change ManagementXXX
1.4.11.4.1Change Management PlanningXXX
1.4.21.4.2Change Management ToolsXXX
1.51.5System Test and EvaluationXXX
1.5.11.5.1Development Test and EvaluationXXX
1.5.21.5.2Operational Test and Evaluation SupportXXX
1.5.31.5.3Human System Integration SupportXXX
1.5.41.5.4Test and Evaluation SupportXXX
1.5.51.5.5Test FacilitiesXXX
1.5.61.5.6Test ToolsXXX
1.61.6TrainingXXX
1.71.7DataXXX
1.7.11.7.1Technical PublicationsXX
1.7.21.7.2Engineering DataXX
1.7.31.7.3Management DataXX
1.7.41.7.4Support DataXX
1.7.51.7.5Data DepositoryXX
1.81.8Peculiar Support EquipmentXN/A
1.91.9Common Support EquipmentXN/A
1.101.10Operational/Site ActivationXXX
1.10.11.10.1Deployment Hardware and SoftwareXXX
1.10.21.10.2User DocumentationXXX
1.10.31.10.3Site ActivationXXX
1.10.41.10.4User TrainingXXX
1.10.51.10.5Data MigrationXXX
1.10.61.10.6Management/Engineering SupportXXX
1.10.71.10.7Interim Logistics SupportXXX
1.111.11Industrial FacilitiesXXX
1.121.12Initial Spares and Repair PartsXN/A
1.131.13Not Applicable
1.141.14Not Applicable
1.151.15Other (Facilities and Mega Data Centers)XXX
Subtotal CostX
Reporting Contractor G&AX
Reporting Contractor Undistributed BudgetX
Reporting Contractor Management ReserveX
Reporting Contractor FCCMX
Total CostX
Reporting Contractor Profit/Loss or FeeX
Total PriceX
DD FORM 2794, MAY 2011PREVIOUS EDITION IS OBSOLETE

ACWS Investment Pg 2(CSDR Plan)

14. CSDR SUBMISSION DATES
a.
SUBMISSIONb.
FORM(S)c.
EVENTd. AS OF DATEe. DUE DATE
(YYYYMMDD)(YYYYMMDD)
CWBS DictionaryCWBS Dictionary - 60 days after Contract AwardTBDTBD
1921, 1921-1Initial Report - 60 days after Contract AwardTBDTBD
SRDR InitialRisk Reduction Dev SRDR - Due 60 days after TO 001 AwardTBDTBD
1921, 1921-1Interim Cost Report - Due 90 before MS BTBDTBD
SRDR FinalRisk Reduction Dev SRDR - Due 60 days after TO 001 CompletionTBDTBD
SRDR InitialBuild X Dev SRDR - Due 60 days after TO XX AwardTBDTBD
SRDR FinalBuild X Dev SRDR - Due 60 days after Software DeliveryTBDTBD
SRDR InitialBuild X Dev SRDR - Due 60 days after TO XX AwardTBDTBD
SRDR FinalBuild X Dev SRDR - Due 60 days after Software DeliveryTBDTBD
SRDR InitialBuild X Dev SRDR - Due 60 days after TO XX AwardTBDTBD
SRDR FinalBuild X Dev SRDR - Due 60 days after Software DeliveryTBDTBD
1921, 1921-1Annual Cost ReportTBDTBD
1921, 1921-1Annual Cost ReportTBDTBD
1921, 1921-1Annual Cost ReportTBDTBD
1921, 1921-1Annual Cost ReportTBDTBD
1921, 1921-1Annual Cost ReportTBDTBD
1921, 1921-1Final Cost ReportTBDTBD
DD FORM 2794 (PAGE 2), MAY 2011PREVIOUS EDITION IS OBSOLETE
15. REMARKS
Special Instructions
1.NON-RECURRING/RECURRING DEFINITIONS:
The contractor will utilize the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the forms 1921, 1921-1, and 1921-2 to segregate Recurring and Nonrecurring costs discretely and not as an aggregate. Refinements or expansions to these definitions are TBD pending the pre-contract or post contract award conference.
2.COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT:
Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.
3.DD Form 1921-3 Contractor Business Data Report:
a.The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.
b.Reports are submitted annually at the end of the contractor's fiscal year.
c.Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.
Software Special Instructions
Software Reporting and Dates
The Software Resource Data Reports (SRDRs) identified in section in Section 14b and 14c will be subject to change pending the proposed development strategy by the contractor. The contractor will be required to provide an SRDR submission for each individual build, increment, release, etc. that is identified in the approved development strategy. Upon contract award the CSDR plan will be revised to ensure the submission events reflect development strategy.
DD FORM 2794 (PAGE 2), MAY 2011PREVIOUS EDITION IS OBSOLETE

ACWS Sustainment Pg1(CSDR Plan)

COST AND SOFTWARE DATA REPORTING PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1. MAJOR PROGRAMa. NAME:Army Contract Writing System
b. PHASE/MILESTONEc. PRIME MISSION PRODUCT2. WBS SYSTEM TYPE3. SUBMISSION TYPE4. CURRENT SUBMISSION DATE (YYYYMMDD)5. LAST APPROVED PLAN DATE (YYYYMMDD)
XPre-ABC-FRPArmy Contract Writing System Increment 1 SustainmentAutomated Information SystemXINITIAL
AC-LRIPO&SCHANGE20151028
6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code)6b. TELEPHONE NUMBER (Include Area Code)6c. FAX NUMBER (Include Area Code)6d. E-MAIL ADDRESS
Kim Reid(703) 545-9061kim.g.reid.civ@mail.mil
7. PLAN TYPE8. PREPARING ORGANIZATION9a. CONTRACTOR NAME/ADDRESS9b. CONTRACT NUMBER9c. APPROPRIATION10. APPROVED PLAN NUMBER
PROGRAMXCONTRACT (PRIME)i. PERFORMING ORGANIZATIONii. DIVISIONTBDRDT&EA-15-L-C2
CONTRACT (SUB)PEO EISTBDPROCUREMENT
XO&M
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):
X
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYb. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. SRDR

FORMATS

2.02.0AIS Sustainment EffortXXX
2.12.1Unit Level ManpowerXXX
2.22.2Unit Level OperationsXXX
2.32,3Hardware MaintenanceXXX
2.42.4Sustaining SupportXXX
2.4.12.4.1System-specific TrainingXXX
2.4.22.4.2Support Equipment Replacement and RepairXXX
2.4.32.4.3Sustaining/Systems EngineeringXXX
2.4.32.4.3.1Systems EngineeringXX
2.4.32.4.3.2Sustaining EngineeringXX
2.4.42.4.4Program ManagementXXX
2.4.42.4.4.1Program ManagementXX
2.4.42.4.4.2Change ManagementXX
2.4.52.4.5Information SystemsXXX
2.4.52.4.5.1Tech RefreshXXX
2.4.52.4.5.2License Fees (Software)XXX
2.4.52.4.5.3System SupportXXX
2.4.52.4.5.3.1Help DeskXXXX
2.4.52.4.5.3.1.1Tier 1XXXX
2.4.52.4.5.3.1.2Tier 2XXXX
2.4.52.4.5.3.1.3Tier 3XXXX
2.4.52.4.5.3.2System and Database AdministrationXXX
2.4.52.4.5.3.3Follow-on User TrainingXXX
2.4.52.4.5.3.4Accreditation (Recurring)XXX
2.4.52.4.5.3.5Independent Verification and Validation (IV&V)XXX
2.4.62.4.6Data and Technical PublicationsXXX
2.4.72.4.7Simulator OperationsXXX
2.4.82.4.8Data Maintenance (Management)XX
2.4.92.4.9Other Sustaining SupportXXXX
2.52.5Continuing System ImprovementsXXX
2.5.12.5.1Hardware ModificationsXXX
2.5.22.5.2Software Modification/MaintenanceXXX
2.5.22.5.2.1Software ModificationXXXX
2.5.22.5.2.2Software MaintenanceXXXX
DD FORM 2794, MAY 2011PREVIOUS EDITION IS OBSOLETE
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):
X
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYb. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-5
(SFCHR)f. SRDR

FORMATS

Subtotal CostX
Reporting Contractor G&AX
Reporting Contractor Undistributed BudgetX
Reporting Contractor Management ReserveX
Reporting Contractor FCCMX
Total CostX
Reporting Contractor Profit/Loss or FeeX
Total PriceX
DD FORM 2794, MAY 2011PREVIOUS EDITION IS OBSOLETE

ACWS Sustainment Pg2(CSDR Plan)

14. CSDR SUBMISSION DATES
a.
SUBMISSIONb.
FORM(S)c.
EVENTd. AS OF DATEe. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1CWBS DictionaryCWBS Dictionary - Contract AwardTBDTBD
21921, 1921-5Annual CCDRTBDTBD
3SRDR FinalAnnual Maintenance SRDRTBDTBD
41921, 1921-5Annual CCDRTBDTBD
5SRDR FinalAnnual Maintenance SRDRTBDTBD
61921, 1921-5Annual CCDRTBDTBD
7SRDR FinalAnnual Maintenance SRDRTBDTBD
81921, 1921-5Annual CCDRTBDTBD
9SRDR FinalAnnual Maintenance SRDRTBDTBD
101921, 1921-5Final Maintenance CCDRTBDTBD
11SRDR FinalFinal Maintenance SRDRTBDTBD
15. REMARKS
Special Instructions
1.NON-RECURRING/RECURRING DEFINITIONS:
The contractor will utilize the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the forms 1921, 1921-1, and 1921-2 to segregate Recurring and Nonrecurring costs discretely and not as an aggregate. Refinements or expansions to these definitions are TBD pending the pre-contract or post contract award conference.
2.COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT:
Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.
3.DD Form 1921-3 Contractor Business Data Report:
a.The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.
b.Reports are submitted annually at the end of the contractor's fiscal year.
c.Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.
Software Maintenance Special Instructions
CR/DR
The contractor will report the number and age of change requests and discrepancy reports by the level of complexity as identified by the contractor. Also, the contractor must define each level of complexity in the data dictionary.
DD FORM 2794 (PAGE 2), MAY 2011PREVIOUS EDITION IS OBSOLETE

ACWS Government Work Breakdown Structure (WBS)

The ACWS Government Work Breakdown Structure (WBS) has been developed in accordance with MIL-STD-881C, Appendix K, Automated Information Systems (AIS) and the DoD AIS Economic Analysis Guide, Appendix B. The WBS construct frames the ACWS acquisition (development and procurement) and Operation & Support (O&S) (sustainment) activities and sets the basis from which program planning and cost estimates will be developed. It is to be used as a reference for the contractor in developing the Contractor WBS (CWBS) and Cost and Software Data Reporting (CSDR) Plan. It is acknowledged that the Government WBS and Government CSDR Plan elements are not the same; hence the inclusion of the mapping of the Government WBS element to the Government CSDR Plan WBS element. The contractor may recommend modifications to the CSDR Plan.

Govt WBS Element

Govt CSDR Plan WBS Element

Title

Description

1.0

1.0

Army Contract Writing System (ACWS) Investment

(MIL-STD-881C)

ACWS Automated Information System (AIS). The set of enterprise elements, equipment (hardware), software, legacy systems, users, business rules, data, and facilities required to develop and/or configure, test, and deploy ACWS.

1.1

1.1

Prime Mission Product

The hardware, software, and associated effort used to analyze, design, integrate, and test all elements.

1.1.1

1.1.1

Custom Application Software 1…n

This element includes all the hardware, software, and associated effort needed to analyze, design, build, and test a custom-only (no COTS) software application, at the system developer’s site, to fulfill a capability gap not implemented within procured software packages. (COTS, combined with custom software is captured under Enterprise Service Element Software Item (1...n), WBS 1.1.2). Excludes, for example, software development necessary for external system interfaces (see WBS 1.1.4).

1.1.1.1

1.1.1.x

Custom Application Software Hardware

This element includes all the associated hardware equipment needed to analyze, design, build, and test the "custom application software" element at the system developer’s site to fulfill a capability gap not captured by the procured software packages. Use lower levels to identify individual hardware items (servers, routers, etc.). Includes, for example, development and test hardware. Excludes, for example, deployment hardware at each operational site.

1.1.1.2

1.1.1.x

Custom Application Software Component

This element includes the custom application software to be developed. For each custom application software element to be developed, insert a description of the element here. Note that this item is currently a placeholder for custom application software and will be replaced once custom applications are identified as a result of engineering and architecture analysis and design. See note 1.

1.1.1.3

1.1.1.x

Custom Application Software Integration, Assembly, Test, and Checkout

This element includes the Subsystem Software Integration, Assembly, Test and Checkout for custom components, specifically, the effort and material associated with integrating and testing subsystem software items and hardware of an individual (or group of) subsystem software application that have undergone individual Item qualification test.

Excludes, for example, Software development efforts necessary for external system interfaces.

1.1.2

1.1.2

Enterprise Service Element 1…n

This element includes all the hardware, software, and associated effort needed for developing functionality or software services. These elements are considered unassociated, loosely coupled units of functionality that do not have calls to each other embedded in them. These services can be integrated or used by several organizations, even if their respective client systems are substantially different.

Includes, for example, reports; interfaces; configurations; extensions; forms; workflow; enterprise service management (monitoring, fault management); service discovery; metadata discovery; mediation; service security; content discovery and delivery; federated search; enterprise catalog service; data source integration; text collaboration (chat, instant messaging); white boarding and annotation; application sharing; application broadcasting; virtual spaces; identity management.

1.1.2.1

1.1.2.x

Enterprise Service Element Hardware

This element includes all the hardware needed for developing functionality or software services that are unassociated, loosely coupled units of functionality that do not have any calls to each other embedded in them. These services can be integrated or used by several organizations, even if their respective client systems are substantially different.

1.1.2.2

1.1.2.x

Enterprise Service Element Software

This element includes all the software needed for developing functionality or software services that are unassociated, loosely coupled units of functionality that do not have any calls to each other embedded in them. These services can be integrated or used by several organizations, even if their respective client systems are substantially different.

See note 2.

1.1.2.3

1.1.2.x

Enterprise Service Element Integration, Assembly, Test, and Checkout

This element includes all the associated efforts needed for developing functionality or software services that are unassociated, loosely coupled units of functionality that do not have any calls to each other embedded in them. These services can be integrated or used by several organizations, even if their respective client systems are substantially different.

1.1.3

1.1.3

Enterprise Information Systems 1…n

This element includes all the hardware equipment and effort to plan, analyze, design, build, and test functionality(s) of an enterprise information system that uses an integrated database to support typical business processes within business/functional areas and consistent information access across areas and systems. Includes, for example, enterprise resource planning, enterprise data warehouse, data mart, and operational data store. Excludes, for example: general ledger, accounts payable, revenue and accounts receivable, funds control and budgetary accounting, cost management, financial reporting, and real property inventory and management.

1.1.3.1

1.1.3.x

Business Area Hardware

This element includes all the associated hardware equipment needed at the system developer’s facility for planning, analyzing, designing, building, and testing functionalities that can be attributed, in whole or in-part, to a specific functional/business area or module within the EIS system. Use lower levels to identify individual hardware items. Includes, for example, development and test hardware. Excludes, for example: deployment hardware at each operational site.

1.1.3.2

1.1.3.x

Business Area Software

This element includes all the associated effort needed at the system developer’s facility for planning, analyzing, designing, building, and testing functionalities that can be attributed, in whole or in-part, to a specific functional/business area or module within the EIS system. See note 3.

1.1.3.3

1.1.3.x

Business Area Integration, Assembly, Test, and Checkout

The element includes the effort and material associated with integrating and testing the required software and hardware of an individual (or group of) Business Area Element(s).

1.1.4

1.1.4

External System Interface Development 1…n

The hardware equipment, software, and effort necessary for developing the set of software artifacts (threads, reports, queries, or scripts, or data export schemas) for a specific ACWS external system interface. Use lower levels to identify each specific external system interface that must be developed or modified.

Includes, for example, Design of the interface specification and the development of the interface. Excludes, for example: Data Migration/Cleansing NOTE: An external system interface is required for proper transmission of data and/or control between the AIS solution and separate systems for which a mutual dependency exists.

1.1.4.1

1.1.4.x

External Interface Hardware

The hardware equipment necessary for developing the set of software artifacts (threads, reports, queries, or scripts, or data export schemas) for a specific ACWS external system interface.

1.1.4.2

1.1.4.x

External Interface Software

The software necessary for developing the set of software artifacts (threads, reports, queries, or scripts, or data export schemas) for a specific ACWS external system interface. See note 4.

1.1.4.3

1.1.4.x

External Interface Integration, Assembly, Test, and Checkout

The other efforts necessary for developing the set of software artifacts (threads, reports, queries, or scripts, or data export schemas) for a specific ACWS external system interface.

1.1.5

1.1.5

AIS Platform Hardware

This element includes all effort and equipment to develop a hardware system to host the deliverable ACWS software.

1.1.6

1.1.6

System Level Integration

This element includes all effort and equipment to assemble, integrate, and test all elements as a whole at the system developer’s facility.

1.2

1.2

System Engineering

This element identifies the technical and management efforts of directing and controlling the integrated engineering effort of ACWS. Includes, for example, effort to define the system and the integrated planning and control of the technical program efforts of design engineering, specialty engineering, production engineering, and integrated test planning; effort associated with developing the Systems Engineering Management Plan (SEMP); effort to transform an operational need or statement of deficiency into a description of system requirements and a preferred system configuration; technical planning and control effort for planning, monitoring, measuring, evaluating, directing, and re-planning the management of the technical program; all “ility” programs, where applicable: value engineering, configuration management, Human Systems Integration (Human Factors Engineering; Personnel; Habitability; Manpower; Training; Environment, Safety and Occupational Health; Survivability), vulnerability, maintainability, reliability, standardization, system analysis, logistic support analysis, etc.; technical baseline management and event based technical reviews with independent subject matter expertise participation; cross product IPT integration; survivability/vulnerability analysis; and System of Systems (SoS) and System Level architecting, modeling and simulation, verification and validation and external interface definition and management. Excludes, for example, actual design engineering and the production engineering directly related to the WBS element with which it is associated.

1.2.1

1.2.1

Contractor System Engineering

Specific System Engineering (see 1.2) activities to be performed by a system engineering contractor. The contractor will provide its own sub-elements under this WBS element.

1.2.2

Not included in Government CSDR Plan WBS

Government System Engineering

Specific System Engineering (see 1.2) activities to be performed and/or managed directly by the Government.

1.3

1.3

Program Management

The business and administrative planning, organizing, directing, coordinating, controlling, and approval actions designated to accomplish overall program objectives, which are not associated with specific hardware elements and are not included in systems engineering. Includes, for example:

a. Cost, schedule, performance measurement management, warranty administration, contract management, data management, vendor liaison, subcontract management, etc.

b. Support element management, defined as the logistics tasks management effort and technical control, and the business management of the support elements. The logistics management function encompasses the support evaluation and supportability assurance required to produce an affordable and supportable defense materiel system.

c. Planning and management of all the functions of logistics. Examples are: maintenance support planning and support facilities planning; other support requirements determination; support equipment requirements determination; supply support; packaging, handling, storage, and transportation; provisioning requirements determination and planning; training system requirements determination; computer resource determination; organizational, intermediate, and depot maintenance determination management; and data management.

1.3.1

1.3

Government Program Management

This element includes specific Program Management (see 1.3) activities to be performed and/or managed directly by the Government.

1.3.2

1.3

Contractor Program Management

This element includes specific Program Management (see 1.2) activities to be performed by a system engineering and/or development contractor. The contractor will provide its own sub-elements under this WBS element.

1.4

1.4

Change Management

This element includes the process and activities necessary for managing organizational change. Change management encompasses planning, oversight or governance, project management, testing and implementation. Change management is a structured approach to shifting/transitioning individuals, teams, and organizations from a current state to a desired future state. It is an organizational process aimed at helping employees to accept and embrace changes in their current business environment. In project management, change management refers to a project management process where changes to a project are formally introduced and approved.

1.4.1

1.4.1

Change Management Planning

This element includes identification of the sequence of steps or activities that a change management team or project leader would follow to apply change management to a project. The objective of change management in this context is to ensure that standardized methods and procedures are used for efficient and prompt handling of all changes to control IT infrastructure, in order to minimize the number and impact of any related incidents upon service. Changes in the IT infrastructure may arise reactively in response to problems or externally imposed requirements, e.g. legislative changes, or proactively from seeking improved efficiency and effectiveness or to enable or reflect business initiatives, or from programs, projects, or service improvement initiatives.

1.4.2

1.4.2

Change Management Tools

This element includes tools used to perform change management.

1.5

1.5

System Test and Evaluation

This element included the use of pilot, prototype, production, or specifically fabricated hardware/ software to obtain or validate engineering data on ACWS during the developmental phase (normally funded from RDT&E) of the program. It also includes all effort associated with the development of any specialized tools or data in support of the system level test program. Includes, for example:

a. Detailed planning, conduct, support, data reduction and reports (excluding the contract data requirements list data) from such testing, and test articles that are functionally configured to represent and test subsystems/components of the defense materiel end item being developed or produced

b. Design and production of models, specimens, fixtures and instrumentation NOTE: Test articles that are functionally configured to represent and test the complete defense materiel end item being developed or produced, are excluded from this WBS element.

Excludes, for example, all formal and informal testing up through the subsystem level, which can be associated with the hardware/software element acceptance testing. Note that these excluded efforts are to be included with the appropriate hardware or software elements.

1.5.1

1.5.1

Development Test and Evaluation

This element includes the development test and evaluation activities conducted to evaluate design approaches, validate analytical models, quantify contract technical performance and manufacturing quality measure progress in system engineering design and development, minimize design risks, predict integrated system operational performance (effectiveness and suitability) in the intended environment, and identify system problems (or deficiencies) to allow for early and timely resolution or correction. Decision-makers use DT&E results to minimize design risk, whereas OT&E evaluated military utility, and system effectiveness and suitability. DT&E usually includes SI testing.

1.5.2

1.5.2

Operational Test and Evaluation

This element includes the operational test and evaluation activities conducted to validate the utility of the system to the user. The goal of OT&E is to evaluate operational effectiveness, suitability, and survivability of a DoD system. OT&E provides decision-makers with an independent, credible, clear, comprehensive, and valid evaluation. The OTAs have different levels of test events: Limited User Test (LUT), System Assessment (SA), and Operational Assessment (OA) in addition to the normal IOT&E and FOT&E. Each DT&E team maybe involved in supporting each event. These test events are managed by the Operational Test Agency (OTA). OTE events are conducted in as realistic an operational environment as possible to estimate the prospective system's utility. In addition, operational test and evaluation provides information on organization, personnel requirements, doctrine, and tactics.

1.5.3

1.5.3

Human Systems Integration Labs (SILs)

This element includes establishing a lab environment that can be used in testing a new development, or in teaching personnel how to operate or maintain a system. A "SIL" refers to a facilities designed to test the performance and compatibility of components, subsystems and systems when they are integrated with other systems or functions.

1.5.4

1.5.4

Test and Evaluation Support

This element includes the personnel resources required to perform the activities identified in elements 1.5.1 to 1.5.3. Key areas to be addressed include survivability, reliability, interoperability, and Human System Integration.

1.5.5

1.5.5

Test Facilities

This element includes the facilities designed to test the performance and compatibility of components, sub-systems, or systems when they are integrated with other functions or systems. Facilities include building(s), hardware, data, power, air-conditioning, connections, necessary T&E support services, and all other considerations at one or more physical sites to enable testing as planned.

1.5.6

1.5.6

Test Tools

This element includes the tools associated with performing any tests.

1.5.7

1.5.4

Test and Evaluation Travel

This element includes any travel associated with Government test support.

1.6

1.6

Training

This element includes the delivery of training services, devices, accessories, aids, equipment, and parts used to facilitate instruction through which personnel will learn to operate and maintain the system with maximum efficiency. Includes, for example, all effort associated with the design, development, and production of deliverable training equipment and its associated software as well as the execution of training services. Excludes, for example, overall planning, management, and task analysis in the WBS elements for systems engineering and program management.

1.6.1

1.6

Equipment

This element includes the delivery of distinct end items of training equipment required to meet specific training objectives. Includes, for example, operational trainers, maintenance trainers, and other items such as cutaways, mock-ups, and models (e.g., Operational Instructional Equipment, Maintainer Instructional Equipment).

1.6.2

1.6

Services

This element includes the delivery of training services, accessories, and aids necessary to accomplish the objectives of training. Includes, for example:

a. Training course materials; contractor-conducted training (in-plant and service training); and the materials and curriculum required to design, execute, and produce a contractor developed training program. (e.g., Operator Instructional Software, Maintainer Instructional Software)

b. Materiel, courses, and associated documentation (primarily the computer software, courses and training aids) Excludes, for example: Deliverable training data associated with the WBS element support data.

1.6.3

1.6

Facilities

This element is not applicable to the projected ACWS solution. This element identifies the special construction necessary to accomplish training objectives. Includes, for example, modification or rehabilitation of existing training facilities and infrastructure used to accomplish training objectives. Excludes, for example: installed equipment used to acquaint the trainee with the system or establish trainee proficiency; and the brick and mortar-type facilities identified as industrial facilities.

1.7

1.7

Data

This element includes the deliverable data required to be listed on a contract data requirements list, DD Form 1423. Includes, for example:

a. Only such effort that can be reduced or avoided if the data item is eliminated

b. Government-peculiar data; acquiring, assembling, reproducing, packaging and shipping the data

c. Transforming data into Government format, reproducing and shipping data identical to that used by the contractor but in a different format.

1.7.1

1.7.1

Technical Publications

This element includes technical data formatted into a technical document. Data may be presented in any form regardless of the form or method of recording. Includes, for example, program documents, operation and maintenance instructions, parts lists or parts breakdown, and related technical information or procedures exclusive of administrative procedures; and data item descriptions (DIDs).

1.7.2

1.7.2

Engineering Data

This element includes recorded scientific or technical information (regardless of the form or method of recording) and computer software documentation. Engineering data defines and documents an engineering design or product configuration (sufficient to allow duplication of the original items) and is used to support production, engineering, and logistics activities. Includes, for example, all final plans, procedures, reports, and documentation pertaining to systems, subsystems, computer, and computer resource programs, component engineering, operational testing, human factors, reliability, availability, and maintainability, and other engineering analysis; and technical data package (re-procurement package), which includes all engineering drawings, associated lists, process descriptions, and other documents defining physical geometry, material composition, and performance procedures.

1.7.3

1.7.3

Management Data

This element includes the data items necessary for configuration management, cost, schedule, contractual data management, program management, etc., required by the Government. Includes, for example, contractor cost reports, cost performance reports, contract funds status reports, schedules, milestones, networks, integrated support plans.

1.7.4

1.7.4

Support Data

The data items designed to document support planning in accordance with functional categories. Includes, for example, Supply; general maintenance plans and reports; training data; transportation, handling, storage, and packaging information; facilities data; data to support the provisioning process and all other support data; and software supportability planning and software support transition planning documents. Program Management team should identify the products within this element at the next lowest (level 3) WBS level. (Note that no placeholder products have so far been identified for this element.)

1.7.5

1.7.5

Data Depository

This element includes the entity, including storage requirements, designated to act as custodian to maintain a master engineering specification and establish a drawing repository service for Government approved documents that are the property of the U.S. Government. As custodian for the Government, the repository, authorized by approved change orders, maintains master documents at the latest approved revision level. This distinct entity may hold electronic or hard copy data. Includes, for example, all effort necessary to maintain documents. Excludes, for example: all similar effort in support of its engineering and production activities.

1.8

1.8

Peculiar Support Equipment

This includes the design, development, and production of deliverable items and associated software required to support and maintain the system or portions of the system while the system is not directly engaged in the performance of its mission, and which are not common support equipment. Includes, for example: vehicles, equipment, tools, etc., used to fuel, service, transport, hoist, repair, overhaul, assemble, disassemble, test, inspect, or otherwise maintain mission equipment; any production of duplicate or modified factory test or tooling equipment delivered to the Government for use in maintaining the system; and any additional equipment or software required to maintain or modify the software portions of the system. Excludes, for example: overall planning, management and task analysis functions inherent in the WBS elements for Systems Engineering and Program Management; and common support equipment, presently in the DoD inventory or commercially available, bought by the using command, not by the acquiring command.

1.8.1

1.8

Test and Measurement Equipment

This element includes the peculiar or unique testing and measurement equipment that allows an operator or maintenance function to evaluate operational conditions of a system or equipment by performing specific diagnostics, screening, or quality assurance effort at an organizational, intermediate, or depot level of equipment support. Includes, for example, test measurement and diagnostic equipment, precision measuring equipment, automatic test equipment, manual test equipment, automatic test systems, test program sets, appropriate interconnect devices, automated load modules, firmware and support hardware . Used at all levels of maintenance; and packages or similar items to be diagnosed using automatic test equipment.

1.8.2

1.8

Support and Handling Equipment

This element includes tools and handling equipment used for support of the mission system. Includes, for example, ground support equipment, vehicular support equipment, powered support equipment, non-powered support equipment, munitions material handling equipment, material handling equipment, and software support equipment (hardware and software).

1.9

1.9

Common Support Equipment

This element includes the items required to support and maintain the system or portions of the system while not directly engaged in the performance of its mission, and which are presently in the DoD inventory for support of other systems. Includes, for example, acquisition of additional quantities of this equipment needed to support the item; and all efforts required to assure the availability of this equipment to support the item.

1.9.1

1.9

Test and Measurement Equipment

This element includes the common testing and measurement equipment that allows an operator or maintenance function to evaluate operational conditions of a system or equipment by performing specific diagnostics, screening, or quality assurance effort at an organizational, intermediate, or depot level of equipment support. Includes, for example, test measurement and diagnostic equipment, precision measuring equipment, automatic test equipment, manual test equipment, automatic test systems, test program sets, appropriate interconnect devices, automated load modules, firmware and support hardware . Used at all levels of maintenance; and packages or similar items to be diagnosed using automatic test equipment.

1.9.2

1.9

Support and Handling Equipment

This element includes the tools and handling equipment used for support of the mission system. Includes, for example, ground support equipment, vehicular support equipment, powered support equipment, non-powered support equipment, munitions material handling equipment, material handling equipment, and software support equipment (hardware/software).

1.10

1.10

Operational/Site Activation

This element includes all deployment hardware and software, user documentation, site survey, site activation, user training, data migration, management/engineering support, and interim logistics support to achieve operational status.

1.10.1

1.10.1

Deployment Hardware and Software

This element includes all deployment software, user documentation, site survey, site activation, user training, data migration, management/engineering support, and interim logistics support to achieve operational status; and all deployment hardware to achieve operational status.

1.10.2

1.10.2

User Documentation

This element includes the development of user documents, tutorials, online help, etc. that describe each feature of the new system being deployed and assists the user in realizing these features.

1.10.3

1.10.3

Site Activation

This element includes the preparation of a site to perform its assigned or intended function.

1.10.4

1.10.4

User Training

This element includes providing training to end users to successfully make the transition to the newly deployed hardware and software. This includes setting training goals, creating a training plan, assessing the end user needs and training delivery methods and creating and delivering the training program to all end users. The training should cover all aspects of the newly deployed hardware and software and related processes and policies.

1.10.5

1.10.5

Data Migration

This element includes the transferring data between storage types, formats, or systems. Data from legacy systems is mapped to the new system and includes data extraction and data loading, relating old formats to the new system formats and requirements, data verification to determine whether data was accurately and completely translated. Any areas of disparity should be identified and fixed.

1.10.6

1.10.6

Management/Engineering Support

This element includes the technical and management efforts of directing and controlling the integrated engineering effort of the system for the given site.

Includes, for example, effort to define the system and the integrated planning and control of the technical program efforts of design engineering, specialty engineering, production engineering, and integrated test planning; effort to transform an operational need or statement of deficiency into a description of system requirements and a preferred system configuration; technical planning and control effort for planning, monitoring, measuring, evaluating, directing, and re-planning the management of the technical program; all 'ility programs, where applicable: value engineering, configuration management, Human Systems Integration (Human factors engineering; Personnel; Habitability; Manpower; Training; Environment, Safety and Occupational Health; Survivability), vulnerability, maintainability, reliability, standardization, system analysis, logistic support analysis, etc.; technical baseline management and event based technical reviews with independent subject matter expertise participation; cross product IPT integration; survivability/vulnerability analysis; and System of Systems (SoS) and System Level Architecting, modeling and simulation, verification and validation and external interface definition and management.

1.10.7

1.10.7

Interim Logistics Support

This element includes labor, material, and assets used in providing temporary logistics support for the deployed service delivery sites until long-term operations and maintenance capability is established.

1.11

1.11

Industrial Facilities

This element includes the construction, conversion, or expansion of industrial facilities for production, inventory, and contractor depot maintenance required when that service is for the operation of the system. Includes, for example, equipment acquisition or modernization, where applicable; maintenance of these facilities or equipment; and industrial facilities for hazardous waste management to satisfy environmental standards. Excludes, for example: capital equipment.

1.11.1

1.11

Construction/Conversion/Expansion

This element includes the real estate and preparation of system peculiar industrial facilities for production, inventory, depot maintenance, and other related activities.

1.11.2

1.11

Equipment Acquisition or Modernization

This element includes the production equipment acquisition, modernization, or transferal of equipment for the system. This pertains to Government owned and leased equipment under facilities contract.

1.11.3

1.11

Maintenance (Industrial Facilities)

This element includes the maintenance, preservation, and repair of industrial facilities and equipment.

1.12

1.12

Initial Spares and Repair Parts

This element includes the delivery of spare components, assemblies, and subassemblies used for initial replacement purposes in the materiel system equipment end item. Includes, for example, repairable spares (repairable) and repair parts required as initial stockage to support and maintain newly fielded systems or subsystems during the initial…