Attachment 0016 ACWS Quality Assurance Surveillance Plan 2016 05 20
View the file
Other files
Show 40 more
Latest 50 of 97 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan
Version 1.02 20 May 2016
Distribution A: Approved for public release; distribution unlimited
ARMY CONTRACT
WRITING SYSTEM
(ACWS)
Quality Assurance Surveillance Plan Version 1.02 20 May 2016
Prepared By:
Product Manager Army Contract Writing System (ACWS)
Quality Assurance Surveillance Plan i
This page intentionally left blank
Quality Assurance Surveillance Plan ii
APPROVAL PAGE
SUBMITTED BY:
LTC Robert J. Wolfe Product Manager Army Contract Writing System (ACWS)
Date
Quality Assurance Surveillance Plan iii
Revision History
Version Date Summary of Changes
Version 1.0 17 December 2015 Final RFP Version
Version 1.01 6 May 2016
Revised Final RFP version based on vendor comments;
Date and version number updated on title page and footers Sections renumbered after Section 5.2.Updated period of performance in Section 1. New Section 5.8 includes Table 2: Surveillance Matrix: Performance Outcomes and Required Services, and Table 3:
Surveillance Matrix: Processes / Products.
Version 1.02 20 May 2016 Deleted two references to EVM in Table 2: Surveillance Matrix: Performance Outcomes and Required Services;
Row 1 (Program Management)
Quality Assurance Surveillance Plan iv
Table of Contents
1.0 Purpose
2.0 Authority
3.0 Scope
3.1 Contract Scope
3.2 Contract Quality Assurance
3.3 Government Quality Assurance Surveillance
4.0 Roles and Responsibilities
4.1 Product Manager (PdM) Army Contract Writing System
4.2 Procuring Contracting Officer
4.3 Primary Contracting Officer Representative
4.4 Contracting Officer Technical Representative
4.5 PdM ACWS Budget Analyst
5.0 Methods of Quality Assurance
5.1 Surveillance Folder
5.2 Evaluation Areas of Contractor Performance Assessment Report
5.3 Contract Manpower Reporting Application
5.4 Performance Standards
5.5 Performance Rating Definitions
5.6 Timely Feedback to Contractor
5.7 Documents / Reporting
5.8 Government Surveillance Matrices
5.9 Remedies for Non-Conformance and Monitoring Forms
5.10 Contract Performance Assessment Reporting System (CPARS)
5.11 Disputes
Appendix A: Performance Assessment Report
Appendix B: Customer Complaint Form
Appendix C: Corrective Action Report
Quality Assurance Surveillance Plan v
List of Tables Table 1: Evaluation Ratings Definitions
Table 2: Surveillance Matrix: Performance Outcomes and Required Services
Table 3: Surveillance Matrix: Processes / Products
1.0 Purpose
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document that describes the systematic quality assurance methods and guidelines used by the Procuring Contracting Officer (PCO) and the Contracting Officer Representative (COR) / Contracting Office Technical Representatives (COTRs) to measure and monitor Contractor performance.
Specifically, this QASP measures the Contractor efforts toward meeting the requirements of the Statement of Objectives (SOO) and the contractual requirements for the Army Contract Writing System (ACWS).
This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the Contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results. The QASP describes the procedures to ensure that the Contractor provides quality products in response to requirements and performs in accordance with the basic SOO and performance standards.
The associated performance-based Contract has a hybrid of Cost Plus Fixed Fee (CPFF), Firm Fixed Price (FFP), and Cost Reimbursable (CR) Contract Line Item Numbers (CLINs). The Period of Performance: an initial twelve (12) month Base Ordering Period, one (1) forty-eight (48) month Option Ordering Period, and one (1) sixty (60) month Option Ordering Period.
2.0 Authority
This surveillance plan is developed in accordance with Federal Acquisition Regulation (FAR) Part 46 Quality Assurance and the relevant Clauses for Inspection of Services and/or Inspection of Supplies to establish the procedures for monitoring, reporting, and evaluating the performance of the Contractor. The Government acceptance of Supplies or Services is to be executed by the PCO or designated COR. The frequency and method of the government’s inspection, review responsibilities, and reporting requirements follow.
3.0 Scope
3.1 Contract Scope
The Statement of Objectives (SOO) for ACWS establishes the requirements for a System Integrator to provide a single enterprise-wide contract writing and management system that will replace the Standard Procurement System (SPS), the Procurement
Automated Document Data System (PADDS), and the Virtual Contracting Enterprise (VCE) suite of tools in order to meet the Army's current and future critical functional requirements.
3.2 Contract Quality Assurance
Per the Defense Federal Acquisition Regulation (DFAR) 246.4 Government Contract Quality Assurance and the contract PWS paragraph 6.1 Program Management, the Government will monitor and record the Contractor performance as stated in this QASP.
PWS paragraph 6.1 Program Management, requires that:
a. The Contractor shall develop a Quality Assurance Program Plan (QAPP) [Contract Data Requirements List (CDRLs) A007].
As corrective actions are identified, the PCO may notify the Contractor of required modifications to the plan during the period of performance.
3.3 Government Quality Assurance Surveillance
The Government will monitor Contractor performance under this contract in accordance with this QASP and the associated reports as Attachments A, B, and C.
Requirements for performance include CDRLs, work products, meetings, monthly Project Management Reviews (PMRs), and Technical Reviews to provide progress of the contracted effort. The Government COR and/or COTRs will monitor performance and review performance reports furnished by the Contractor to determine how the Contractor is performing against communicated and documented performance objectives. The Government will make decisions based on performance measurement metric data and will notify the Contractor of those decisions. The Contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
4.0 Roles and Responsibilities
The following Government personnel positions will oversee and implementation surveillance activities:
4.1 Product Manager (PdM) Army Contract Writing System
The ACWS Product Manager (PdM) provides primary program oversight. While the PdM may serve as a direct conduit to provide Government guidance and feedback to the Contractor on project matters, the PdM is not empowered to make any contractual commitments or any contract changes on behalf of the Government. The PdM will recommend a COR and COTRs to the PCO, ensure the COR / COTRs are trained before performing any delegated duties, and will support COR/ COTR performance assessment activities.
4.2 Procuring Contracting Officer
The Army Contracting Command-Rock Island will assign a PCO, duly appointed with the authority to enter into, administer, or terminate contract actions such as basic awards or modifications, and make related determinations and findings on behalf of the Government. See FAR Part 1.602 for authority and responsibilities.
The PCO will ensure performance of all necessary actions for effective contracting and ensure compliance with the contract terms and conditions. The PCO serves as the official Government agent with authority to modify and interpret the contract with the Contractor. The PCO is also the only Government official who can authorize contract actions that may result from review of Contractor performance. The PCO will also ensure that the Contractor receives impartial, fair, and equitable treatment.
The PCO relies on the COR and other functional COTRs to provide information and recommendations regarding Contractor performance. While the PCO may delegate many of the day-to-day contractual administration duties to the COR, certain contractual actions are retained as the sole purview of the PCO, including: negotiation and issuance of contract modifications, issuance of Contract Deficiency Reports, issuance of “show cause” letters, contract termination, contract closeout, and Contractor claims and disputes resolution. The PCO will designate in writing a COR. The PCO will ensure the COR / COTRs are trained before performing any duties and supports COR performance assessment activities.
The PCO is ultimately responsible for the final determination of adequacy of Contractor performance.
4.3 Primary Contracting Officer Representative
The primary COR will be an individual designated in writing by the PCO to act as the authorized representative to assist in the administration of the contract. The COR is responsible for providing continuous technical oversight of Contractor performance.
The COR is not empowered to make any contractual commitments or to authorize any contractual changes on behalf of the Government. For any changes that may affect contract price, terms, or conditions, the COR will alert the PCO for potential resolution or action. The source of authority for the COR is the PCO delegation memorandum.
See FAR Part 1.604 and DFAR 201.602-2 for definition of responsibilities.
4.4 Contracting Officer Technical Representative
The COTR will be an individual designated in writing by the PCO who is authorized to assist the PCO and COR in providing continuous monitoring and review Contractor technical compliance with the contract requirements. The COTR is not empowered to make any contractual commitments. For any changes that may affect contract price, terms, or conditions, the COTR will refer to the COR for coordination with the PCO for action.
See FAR Part 2.101 for Definition that a COR means an individual, including a contracting COTR, designated and authorized in writing by the PCO to perform specific technical or administrative functions.
4.5 PdM ACWS Budget Analyst
The PdM ACWS Budget Analyst will be an individual designated by PdM ACWS to act as the authorized representative to assist in the administration of the financial management of the contract.
5.0 Methods of Quality Assurance
5.1 Surveillance Folder
A surveillance folder will be used by the primary COR assigned to perform surveillance of Contractor performance for Contractor assigned contract requirements. The folder has the following divisions:
a. COR appointment letter, PCO letter of designation, and Training Record
b. PWS and other pertinent parts of the contract
c. Surveillance Plan
d. Surveillance Reports
e. Correspondence: Customer and user comments
f. Data and technical reports.
5.2 Evaluation Areas of Contractor Performance Assessment Report
The COR will perform an assessment quarterly and will file an annual assessment of the following evaluation factors:
a. Quality of Product or Service (Technical Performance) – Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives.
Following the metrics in tables 1 and 2 below, the Contractor will be evaluated monthly as to the quality of the CDRLs and work products. Results will be documented in the COR file. Included in the technical performance is the Contractor’s contribution in meetings and reviews; the quality of the Contractor's technical reports; the Contractor's productivity level, and the overall quality of the technical support provided.
b. Schedule and Timeliness of Deliveries – Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. This will take into consideration the significance of scheduled events, and will also assess the effectiveness of corrective actions taken by the Contractor. The Contractor should be responsive to Government taskings and submit their CDRLs, work products and reports as required by the contract. The Contractor shall conduct scheduled reviews on time and shall submit material for the review per the agreed upon process and associated timelines as required by the contract.
c. Cost / Resource Control – Assess the Contractor’s effectiveness in forecasting, managing, and controlling cost. Assess the causes and Contractor-proposed solutions for the existence of cost overruns. Address underruns in the same manner where performance is adversely impacted. Assess the extent to which the Contractor demonstrates cost responsibility through the efficient use of resources. The Contractor shall use the funding authorized to provide support throughout the period of performance. The Contractor should not exceed the material, travel, or other cost-reimbursable CLINs without prior PCO approval.
The Contractor will be evaluated on the successful control of resources dedicated to PWS tasks. Monthly, the COR will compare the Contractor burn rate of labor and funds usage with those allocated for the effort on the CLIN. Any discrepancies, and when funds reach 25% remaining, will be brought to the attention of the PCO.
d. Business Relations or Management – Assess the turnaround, completeness, and quality of problem identification, corrective action plans, the cooperativeness of the Contractor, and customer satisfaction. Assess the Contractor success with management of subcontracts. Assess Contractor ability to identify and apply resources required to meet schedule requirements, assign responsibility for tasks/actions required by the PWS, and communicate appropriate information to affected program elements in a timely manner. Assess Contractor risk mitigation plans. Identify any other management areas that are applicable to the PWS.
Contractor management should put adequate systems in place to most efficiently perform the contract and protect Government interests. For example, the Contractor should have approved Government property management, quality control, subcontracting, and accounting systems in place.
e. Small Business Participation – Assess the Contractor-submitted Electronic Subcontracting Report System (www.eSRS.gov) Report. Assess compliance with all terms and conditions in the contract/order relating to Small Business participation (including FAR 52.219-8, Utilization of Small Businesses and FAR 52.219-9, Small Business Subcontracting Plan (when required). Assess any small business participation goals which are stated separately in the contract/order. Assess achievement on each individual goal stated within the contract/order or subcontracting plan including good faith effort if the goal was not achieved.
f. Other Areas – Assess additional evaluation areas within the terms and conditions of the contract or unique to the PWS including Paragraph 4. Special Requirements.
5.3 Contract Manpower Reporting Application
The COR is responsible for validating Contractor input into the Contract Manpower Reporting Application (CMRA) website at https://cmra.army.mil. The COR is to obtain a user name and password, and validate that the Contractor has completely filled in required Contractor information at the CMRA web site by October 31 of the first year of the contract and annually by October 31 thereafter for the duration of the contract, or sooner if the contract is closed out. The COR will perform this validation during the month of November each year. The COR will report the CMRA results in the November Monthly COR Report (due in December of each year) to the PCO each year.
5.4 Performance Standards
Performance standards define the desired service levels. The Government performs surveillance to determine if the Contractor exceeds, meets, or does not meet these standards.
The Performance Requirements Matrix below includes the performance standards. The Government will use these standards to determine Contractor performance and will compare Contractor performance to the Acceptable Quality Level (AQL).
5.5 Performance Rating Definitions
The Government ratings and narrative must reflect FAR Part 42.1503, Table 42-1 “Evaluation Ratings Definitions” as depicted in Table 1 below:
Table 1: Evaluation Ratings Definitions
Rating Definition Note Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should not have been any significant weaknesses identified.
Very Good – Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should not be any significant weaknesses identified.
Rating Definition Note Satisfactory – Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
To justify a Satisfactory rating, there should have been only minor problems, or major problems the Contractor recovered from without impact to the contract/order.
There should not have been significant weaknesses identified. A fundamental principle of assigning ratings is that Contractors will not be evaluated with a rating lower than Satisfactory solely for not performing
Marginal – Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions.
The Contractor proposed actions appear only marginally effective or were not fully implemented.
To justify Marginal performance, identify a significant event in each category that the Contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the Contractor of the contractual deficiency (e.g., management, quality, safety, or environmental
Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which Contractor corrective actions appear or were ineffective.
To justify an Unsatisfactory rating, identify multiple significant events in each category that the Contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the Contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).
5.6 Timely Feedback to Contractor
Timely feedback to the Contractor on unacceptable performance will be provided by the COR and documented in writing. Prompt feedback is essential so that the Contractor can develop and implement a corrective action plan. The Contractor's corrective action must be reported to the PCO for tracking purposes.
5.7 Documents / Reporting
A copy of the Quarterly Contractor Performance Review shall be provided to the PCO.
The COR will report to the PCO any issues and concerns that cannot be resolved at the working level or which impact contractual requirements for resolution and contractual action as they occur.
5.8 Government Surveillance Matrices
Performance objectives are used to define the desired outcomes. Performance standards are used define the level of service required under the contract to successfully meet the performance objective. These objectives and standards are contained in the Surveillance Matrix in Table 2 along with the required services, acceptance quality, and monitoring methodology. These define how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of Contractor performance as it relates to the performance element standards. The Services Summary should be used to form the foundation of the COR inspection checklist.
The Surveillance Matrix: Performance Outcomes & Services (Table 2 below) lists the six
(6) performance objectives and standards that must be performed by the Contractor.
This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Surveillance Matrix: Processes / Products (Table 3 below) lists the four (4) process / product groups of CDRLs and standards that must be delivered by the Contractor. This matrix details the method of surveillance the COR will use to validate and inspect the CDRLs. Inspection of each element will be documented in the COR file.
Table 2: Surveillance Matrix: Performance Outcomes and Required Services
# Desired Performance Outcome Required Services Performance Standard Acceptance
Quality Level (AQL) Monitoring Method
Program Management (SOO 6.1) 1 Program Management activities will span all contract tasks. This includes the management and oversight of all activities performed by Contractor personnel, including subcontractors, to satisfy the requirements identified in the
PWS.
• Integrated Master Schedule
(IMS)
• Project Management Planning and Reporting
• Periodic and Adhoc Meetings and Reporting
• Implementation of the schedule
• Milestones met on time
• Metric reports delivered on time in correct format/content
• Meetings and Reporting provides the information needed
• Meets schedule baseline
• Meets contract cost baseline
• Personnel required to perform tasks are qualified and present
COR and Government Team will review and assess:
• IMS
• Staffing Levels and
Quality of performance
• Outcomes performance of regularly scheduled and ad hoc meetings
Systems Engineering Management and Planning (SOO 6.2) 2 Develop, implement, and maintain a Systems Engineering Management Plan to guide the architecture that is sufficiently flexible to integrate functionality to store, enroll, search, and match biometric modalities and multi-modal fusion; and be scalable to support increased throughput with improved performance and capacity based on user requirements.
• System Engineering Management / Integration
• Configuration Management
• Requirements Management
• Risk Management
• Test Management
• IT Security Management
• Knowledge Management
• Engineering Documentation
• Software Images / Builds
• Processing time
• Accuracy
• Throughput
• Design compliance with requirements, vendor specifications, and engineering practices
• Installation compliance with requirements, vendor specifications, and engineering practices
• Solution can be replicated to other Areas of Responsibility (AORs)
• Meets processing time goals
• Meets accuracy goals
• Meets throughput goals
• Supports short decision cycles
• Meets data sharing objectives
• COR and Government Team will review and assess:
• System Performance reports (with metrics)
• Design documents
• Users acceptance per release / implementation/ upgrade
Outcome Required Services Performance Standard Acceptance
Quality Level (AQL) Monitoring Method
Solution Design and Development (SOO 6.3) 3 As directed, Develop, and Deploy the ACWS Software Solution Builds 1 – N.
• Provide System Administration and Maintenance
• Provide Help Desk Operations
• Provide Data Center Operations and Management
• Provide Enterprise Server Automation Administration
• Disaster Recovery
• Network Management and
Administration
• Sustainment Testing
• ACWS Training
• Security Management and
Information Assurance (IA)/Cybersecurity
• Sustainment of ACWS service quality standards in SOO
• Meet the ACWS availability requirements
Zero degradation of ACWS critical services, with respect to up-time, response time, and matching accuracy
COR and Government Team will review and assess:
• Monthly reporting on metrics
• User feedback
• Performance metrics
Test and Evaluation (SOO 6.4) 4 Specific objectives for the DoD
ABIS 1.3 baseline are to:
• Address End of Life hardware and software upgrades to the DoD ABIS 1.2 baseline
• Maintain security accreditation and system performance
• Ensure continued standards compliant interoperability
• Ensure effective system operation through the period of performance (FY20)
• ABIS 1.3 Baseline documented, tested and planned
• Critical Infrastructure Modernization
• DoD ABIS 1.3 Data Sharing and Interoperability Upgrades
• Additional ABIS 1.3 Upgrades and Enhancements
• DoD ABIS 1.3 Testing
Meets performance standards in PWS
Zero degradation of current DoD ABIS critical services, with respect to up-time, response time, and matching accuracy
COR and Government Team will review and assess:
• Monthly reporting on metrics
• User feedback
• Performance metrics
Outcome Required Services Performance Standard Acceptance
Quality Level (AQL) Monitoring Method
Training (SOO 6.5) 5 As directed, Sustain the ACWS
Software Solution Builds 1 – N.
• Provide System
Administration and Maintenance
• Provide Help Desk Operations
• Provide Data Center Operations and Management
• Provide Enterprise Server Automation Administration
• Disaster Recovery
• Network Management and
Administration
• Sustainment Testing
• ACWS Training
• Security Management and
Information Assurance (IA)/Cybersecurity
• Sustainment of ACWS service quality standards in SOO
• Meet the ACWS availability requirements
Zero degradation of ACWS critical services, with respect to up-time, response time, and matching accuracy
COR and Government Team will review and assess:
• Monthly reporting on metrics
• User feedback
• Performance metrics
Selected Special Requirements (SOO 6.3.3 and SOO 8.0) 5 Cyber Security and Network
Compliance Compliance with all Cyber Security requirements
100 % compliance with Cyber Security regulations and policies
This is a Go / No Go criteria.
COR and Government Team will review and assess:
• Independent
Verification and Validation
6 Data Rights Granted Meet Government Data Rights 100 % compliance with Government Data Rights
This is a Go / No Go criteria.
COR and Government Team will review and assess:
• Proposed software licenses of the ACWS Solution and 3rd Party Add-Ons during trades
Table 3: Surveillance Matrix: Processes / Products
Surveyed Processes / Products
Review Method Entry Criteria Surveillance Methods
1. Exhibit A – Administrative / Management Reporting (SOO 6.1) CDRLs A001 thru A016
2. Exhibit B – Systems Engineering Management Reporting (SOO 6.2 – 6.3) CDRLs B001 thru B026
3. Exhibit C – Test and Evaluation (Soo 6.4) CDRLs C001 thru C006
4. Exhibit C – Operations and Support (SOO 6.5) CDRLs D001 thru D005
100% inspection of initial submission of CDRLs (e.g.
Schedule, Plans, Reports) submitted per DD 1423 100% of major revisions Judgmental inspection of minor revisions to deliverables
Delivered on time in the format required per DD 1423
COR and Government Team will provide:
• Comment Matrix
• Documented conversations and/or correspondence regarding issues
COR and Government Team will review:
• Meeting Minutes
• Action Items
Corrective Action / Customer Feedback Reports and Records:
• ACWS Corrective Action Report
• ACWS Customer Complaint
Record
• ACWS Performance Assessment
Report
100% of submitted Reports and Records
Report(s)/Records(s) form submitted by COR or a Customer
COR and Government Team will Report / Record form with corrective actions; plans / tasks will be tracked until completely resolved.
The Government will use generally accepted surveillance methods. These methods include, but are not limited to:
a. 100% Inspection – The Government will evaluate 100% of designated tasks.
This surveillance method is appropriate for tasks where 100% inspection is required and is practical.
b. Partial Inspection – The Government will evaluate less than 100% of designated tasks and on a selective basis. This surveillance method is appropriate for tasks that occur infrequently and where 100% inspection is neither required nor practical.
c. Random Sampling – The Government will evaluate less than 100% of designated tasks on a random basis. This surveillance method is appropriate for tasks that occur infrequently and where 100% inspection is neither required nor practical.
d. Operational Monitoring – The Government will examine reports generated by automated tools and logs and websites.
e. Performance Review Meetings – The Contractor shall attend Contract Performance Reviews as required. These meetings will focus on overall contract performance. Specific dates, locations, agenda, and attendance requirements will be specified by the PCO at least 30 days prior to each meeting.
5.9 Remedies for Non-Conformance and Monitoring Forms
In accordance with FAR 46.407 Nonconforming supplies or services, the PCO should reject supplies or services not conforming in all respects to contract requirements. If inspections indicate an unacceptable product or performance, the COR will notify the Contractor POC of the deficiencies for correction. The PCO ordinarily must give the Contractor an opportunity to correct or replace nonconforming supplies or services when this can be accomplished within the required delivery schedule.
If deficiencies are not corrected within the required time frame, the COR should notify the PCO for action. If the Contractor disagrees with the noted discrepancy and an agreement cannot be reached, the COR will notify the CO for a final decision.
Three forms are provided as attachments to record non-conformance:
Attachment A – Performance Assessment Report (PAR). The PAR will be used to report all minor discrepancies and will be generated by the COR and sent to the Contractor for corrective action. Contractors will be given ten (10) days to correct PARs unless they have requested an extension. If three (3) minor discrepancies are found, combine them and process a Corrective Action Report (CAR).
Attachment B – Customer Complaint Form. The COR must furnish instructions for this form to the customer receiving the Contractor service including the contract requirements for the service or product received. The customer must retain supporting evidence of complaint or feedback. After the COR validates feedback or complaint demonstrating Contractor noncompliance, the COR processes a PAR or CAR to the PCO. All Customer Complaint forms will be validated by the COR prior to notifying the Contractor.
Attachment C – Corrective Action Report (CAR). The CAR will be used to report a situation when there are three (3) or more minor discrepancies or one (1) or more major discrepancies documented. The CAR will be generated by the COR and forwarded to the PCO for action. A copy will be provided to the Contractor representative by the PCO. Most CARs will be corrected within 30 calendar days. Depending on the complexity of the finding, the Contractor may be allowed up to six months (maximum) to correct a CAR. The COR will request that the Contractor provide the status of CARs on a monthly basis. The COR will keep an electronic log of all CARs and will keep a hard copy of CARs in the contract surveillance file.
5.10 Contract Performance Assessment Reporting System (CPARS)
CPARS (www.cpars.gov) will be prepared at least annually, documenting Contractor performance for this specific contract. See FAR Part 42.1502. More frequent updates may be made as required to document a significant improvement or degradation of the level of contract performance.
5.11 Disputes
Every attempt will be made to resolve all disputes arising under this contact/plan using the Alternate Dispute Resolution (ADR) as outlined in FAR 33.214. If resolution cannot be made under ADR, the PCO will render a final decision.
Attachments (Fillable Forms):
A. Performance Assessment Report B. Customer Complaint Record C. Corrective Action Report
Appendix A: Performance Assessment Report
Performance Assessment Report (PAR) Template, Feb 05 (SAF/AQCP)
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACT/TASK ORDER
NUMBER
2. CONTRACTOR 3. TYPE OF SERVICES
4. QUALITY ASSURANCE PERSONNEL (QAP) SIGNATURE AND DATE
5. QAP PHONE 6. SUSPENSE DATE
I. PERFORMANCE
7. DEFICIENCY (CHECK ALL BOXES THAT
APPLY)
NEW
REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or SOW PARAGRAPH ITEM
REVIEWED
9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY
BOX WAS CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE CONCUR
NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION
DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR
NON-CONCURRENCE OF QAP CITED DEFICIENCY
III. ACTION CORRECTED
14. CONCUR NON-CONCUR QAP SIGNATURE AND DATE
15. QAP REMARKS (REQUIRED)
16. CONTRACTOR REPRESENTATIVE REMARKS
PERFORMANCE ASSESSMENT REPORT
Continuation Sheet (Number to correspond with applicable Item Number on reverse)
Performance Assessment Report (PAR) Template, Feb 05 (SAF/AQC)
Performance Assessment Report (PAR) Instructions
Block 1. Quality Assurance Personnel (QAP) enters contract or task order number.
Block 2. QAP enters contractor name.
Block 3. QAP enters type of services.
Block 4. QAP signs and dates.
Block 5. QAP enters telephone number.
Block 6. QAP assigns suspense date for Contractor Representative validation if a deficiency box was checked in Block 7.
Part I. Contractor Performance
Block 7. QAP checks all boxes that apply.
Block 8. QAP enters Services Summary or Statement of Work (SOW) paragraph item reviewed.
Block 9. QAP enters brief description of deficiency and tracking number if the deficiency box was checked in Block 7. Detailed description will be on Corrective Action Report (CAR).
Block 10. QAP enters a detailed performance assessment if the deficiency box in Block 7 was not checked.
Parts II and III will be used only if a deficiency was documented in Part I. Part II. Contractor Validation Block 11. Contractor Representative checks one box in response to QAP cited deficiency. If Concurrence is indicated, Contractor Representative continues to Block 12. If Non-Concurrence is indicated, continue to Block 13 and state reason(s) for Non-Concurrence with QAP cited deficiency and return PAR to QAP.
Block 12. Contractor Representative enters Estimated Completion Date of Corrective Action and continues to Block 13.
Block 13. Contractor Representative details Corrective Action and the Action Taken to Prevent Recurrence or Reason for Non-Concurrence of QAP cited deficiency.
Part III. Deficiency Corrected
Block 14. QAP checks appropriate block, signs, and dates.
Block 15. (Required Entry) QAP remarks regarding the Corrective Action and the Action Taken to Prevent Recurrence. If Non-Concur was checked, this block should be very detailed to explain why.
Block 16. Contractor Representative enters remarks if further discussion is needed about QAP concurrence with Contractor’s Corrective Action and Action Taken to Prevent Recurrence.
Continuation Sheet. The Continuation Sheet is to be used to expand on any information that will not fit in the applicable numbered block.
Appendix B: Customer Complaint Form
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Customer Complaint Record Template, Feb 05 (SAF/AQCP) COMPLAINANT - 1
Customer Complaint Record Template, Feb 05 (SAF/AQCP) QAE - 2
Customer Complaint Record Template, Feb 05 (SAF/AQCP) CONTRACTOR - 3
Customer Complaint Record Template, Feb 05 (SAF/AQCP) CONTRACT ADMINISTRATOR - 4
Appendix C: Corrective Action Report
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY MAJOR MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (QAP)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. QAP RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. QAP DETERMINATION
ACCEPTED REJECTED
12. CLOSE DATE
Corrective Action Report (CAR) Template, Feb 05 (SAF/AQCP)
CORRECTIVE ACTION REPORT (CAR)
Continuation Sheet
(Number to correspond with applicable Item Number on reverse)
Corrective Action Report (CAR) Template, Feb 05 (SAF/AQCP)
Corrective Action Report (CAR) Instructions Block 1. Enter Contractor Name.
Block 2. Enter Contract Number.
Block 3. Enter Contract Name or Type of Services.
Block 4. Enter Functional Area of the Contract.
Block 5. Enter the assigned suspense date given the contractor to provide a response to the CAR. A date must be entered for a Major CAR. A date is optional at the discretion of the Quality Assurance Personnel (QAP) initiating the CAR if the finding is Minor.
Block 6. All CARs will be tracked with a Control Number. The functional commander/functional director is the Issuing Authority for his/her contract Quality Assurance Evaluators (QAPs) generating CARs. By providing the control number to the QAP originating the CAR, the Issuing Authority demonstrates concurrence with the finding. The control number will be made up of the first two letters of the name of the site or contract, the last two digits of the calendar year, and a three-digit number starting with 001 and progressing upward throughout the calendar year (e.g., WP04-001).
Block 7.
1. Check the block that indicates whether the identified deficiency is assigned as a Major or Minor finding.
See Performance Plan (PP), paragraph 6.1.4, for the definitions of Major and Minor findings and associated explanations.
2. Finding: Clearly state the details of the finding followed by a reference to the stated contractual requirement. The reference must state the portion of the contract, part, section, paragraph, and subparagraph and must make a complete brief quotation of the contract reference.
3. State the impact that the finding has or could have on the accomplishment of the mission that the contract provides.
4. When determining how long to give the contractor to respond to the identified finding, the normal is 10 working days. The suspense date should reflect this unless the finding requires a greater amount of time to come to solution. Major findings require a contractor response. Minor findings may require a contractor response at the discretion of the QAP initiating the CAR and/or the Issuing Authority.
Blocks 8 and 9. Contract QAPs initiating a CAR must sign in Block 8 and the Issuing Authority signs in Block 9. Each annotates the date at the time of signature.
Block 10. Upon review of the contractor’s reply, the originator of the CAR will enter comments regarding acceptance or rejection of the contractor’s response. This block may also contain comments regarding follow-on inspections conducted or needed at a later date to validate that the finding has not reoccurred.
Block 11. The QAP selects Accept or Reject after reviewing the contractor’s response.
Block 12. The QAP enters a close date after advising the Issuing Authority that the contractor’s response is acceptable and the Issuing Authority concurs. The Issuing Authority will then forward the closed CAR to the contractor and report accordingly in the monthly Certificate Of Service (COS) or other applicable contracting officer services report. This routing remains the same if the contractor response is unacceptable and the CAR remains open until an acceptable response is received except that the Issuing Authority forwards the open CAR back to the contractor for additional information.
Continuation Sheet. The Continuation Sheet is to be used to expand on any information that will not fit in the applicable numbered block.
| 1.0 Purpose |
| 2.0 Authority |
| 3.0 Scope |
| 3.1 Contract Scope |
| 3.2 Contract Quality Assurance |
| 3.3 Government Quality Assurance Surveillance |
| 4.0 Roles and Responsibilities |
| 4.1 Product Manager (PdM) Army Contract Writing System |
| 4.2 Procuring Contracting Officer |
| 4.3 Primary Contracting Officer Representative |
| 4.4 Contracting Officer Technical Representative |
| 4.5 PdM ACWS Budget Analyst |
| 5.0 Methods of Quality Assurance |
| 5.1 Surveillance Folder |
| 5.2 Evaluation Areas of Contractor Performance Assessment Report |
| 5.3 Contract Manpower Reporting Application |
| 5.4 Performance Standards |
| 5.5 Performance Rating Definitions |
| 5.6 Timely Feedback to Contractor |
| 5.7 Documents / Reporting |
| 5.8 Government Surveillance Matrices |
| 5.9 Remedies for Non-Conformance and Monitoring Forms |
| 5.10 Contract Performance Assessment Reporting System (CPARS) |
| 5.11 Disputes |
| Appendix A: Performance Assessment Report |
| Appendix B: Customer Complaint Form |
| Appendix C: Corrective Action Report |