Text version
CODE
(Hour)
PAGE(S)
until 04:00 PM local time 11 Feb 2016
A
X B
C
D
EX
X
G
F
46 - 49
X H 50
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
DO-A4 1 50
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W52P1J 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and n/a conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 3
4 - 6
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
7 - 10
K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 12 - 25 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
26 - 44
PART II - CO NTRACT CLAUSES
ARMY CONTRACTING COMMAND ROCK ISLAND
ACC-RI
3055 RODMAN AVENUE
ROCK ISLAND IL 61299-8000
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
08 Jan 2016
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W52P1J-16-R-3018
Section A - Solicitation/Contract Form
EXECUTIVE SUMMARY
This is a Request for Proposal (RFP) for services and components described in the Statement of Work (SOW) at attached 0001.
The Government has a requirement for a 2 year IDIQ contract. The minimum guarantee quantity to be ordered will be for the contracted components necessary to complete 5 full M8E1 Chemical-Biological Protective Shelter
(CBPS) First Article Test (FAT) units and is separate from the time and material CLIN. The maximum order quantity for this contract will be for the contracted components necessary to complete 90 full CBPS units. This contract will consist of a one year of both start-up services as well as components and a second year of components only. The start-up services and components for the CBPS will be provided in accordance with (IAW) the specifications in the SOW, dated 5 January 2016, located at Attachment 0001 (provided in electronic format via email) and the Technical Data Package (TDP), located at Attachment 0003, (provided in electronic format via disc), both of which will be incorporated into the resulting contract:
Performance & Shipping:
Jobs sites will be at various locations at Pine Bluff Arsenal.
Postal Address:
Pine Bluff Arsenal
Bldg 10-020 Kabrich Circle
Pine Bluff, AR 71602-9500
Additional Required Information:
1) As per Section L, a detailed cost proposal, IAW FAR 15.403-5(b) and FAR Table 15-2, to include separate loaded fixed hourly rates for each labor category for ordering period 1, shall be provided. The final negotiated labor rates will be incorporated into contract as firm-fixed price labor rates. These final negotiated hourly labor rates will be used for the T&M portion of the resulting contract. Reimbursement will be on a time and materials basis for production assistance.
2) Shipping is FOB Destination.
Waiver of FAT: Table II of the SOW identifies component parts which require First Article Testing. The
Government may however waive First Article Testing for those listed components which the Contractor has acquired or will acquire under its current production contract. "Current production contract" is defined as the contract in place between the Government and the Contractor on the date of the issuance of this solicitation for production of M8E1 CBPS.
This waiver applies provided that there are no changes in any of the following:
a) Technical Data, Manufacturing Process, or Source of Supply as laid out in paragraphs 4.1.3 of the
SOW.
b) The Contractor shall provide a copy of the acceptance letter for each individual item showing they have been inspected and accepted.
c) The Contractor shall make available upon request all the approvals, quality inspection data, certs, etc.
3) Travel will be IAW the Joint Travel Regulations (JTR).
4) Delivery date/Completion date will be specified at the Task Order level and IAW the SOW.
5) Projected delivery for all contracted components necessary to complete the 5 full FAT units is 15 October
2016.
6) Any resulting basic contract and task orders will be required to comply with all clauses of this RFP.
This RFP is not a firm commitment on the part of the Government and does not constitute an award.
System for Award Management (SAM) access and registration is required and will be used for all of the following:
(i) contractor registration (formerly CCR), (ii) reps & certs (formerly ORCA), and (iii) exclusions (formerly EPLS).
Responses are required by 4 PM Central Time, Thursday, 11 February 2016.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Contract Manpower Reporting
FFP
FOB: Destination
NET AMT
Production Parts and Components
0003 1 Startup Services
T&M
TOT ESTIMATED PRICE
CEILING PRICE
0004 1 Lot Training
Travel
COST
Not Fee Bearing
ESTIMATED COST
0006 1 Unit PFS Interface
FFP
Optional CLIN
0007 1 Lot Warranty
0008 1 Lot
CDRL
FFP
Provide required documentation in accordance with the CDRL list.
NOTE:
Reference "Section L, Volume II - Price" The pricing matrix price sheet will be controlling regarding contract pricing.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
0006 Destination Government Destination Government
0007 Destination Government Destination Government
0008 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-4 Inspection Of Services--Fixed Price AUG 1996
52.246-6 Inspection--Time-And-Material And Labor-Hour MAY 2001
QUALITY CLAUSES
INITIAL PRODUCT INSPECTION (IPI) TACOM ARDEC/ECBC – RI-
ES6027 52.209-4515 Initial Product Inspection (IPI) (Reference SOW 4.2 and SOW Table 1)
The Contractor shall perform an Initial Production Inspection, consisting of first piece inspection of three (3 ea.)
units selected from the initial production lot by the DCMA Quality Assurance Representative (QAR). The
Contractor shall notify the Contracting Officer and the QAR at least 15 days in advance of conducting any IPI as described in this provision, in order to ensure the QAR witnesses the inspection. The Contractor shall inspect and document all dimensions with actual measurements. If the Contractor takes metric measurements, the Contractor shall provide standard measurements as well, and the QAR will verify both types. The Contractor shall also provide all certifications of materials and processes that are necessary to verify compliance of the tested units to drawing requirements. The Contractor shall review all IPI data with the QAR, and the QAR will then either approve or reject the IPI results by written notification to the Contractor, and concurrently provide a copy of the notification to both the Contracting Officer and his or her quality assurance point of contact. The written notification will include the Contractor’s name, the contract number, the inspected item’s NSN(s) and part number(s), and, the item’s serial number(s) (if applicable). If the IPI is rejected, the Contractor shall repeat the inspection, or those portions of it specified by the QAR, until IPI is successfully completed.
The Contractor shall not proceed into full production until the QAR has approved IPI, and the Contracting Officer has been so notified. The Contractor shall immediately inform the Contracting Officer, QAR, and quality assurance point of contact if any changes to production processes or suppliers are made subsequent to IPI. The
Contractor shall maintain a copy of all IPI data for 3 years following the inspection, unless the parties otherwise agree. The Contracting Officer reserves the right to order an additional IPI whenever a post-IPI change by the
Contractor, such as tooling, ECPs, or the incorporation of new vendor parts, might affect the item’s quality. For any such additional IPI ordered, the Contractor shall provide serial numbers (if applicable) for all items fabricated after the new process or new supplier was initiated. If serial numbers are not applicable, then, in order to identify the affected units, the Contractor shall document the date the new process began. The approval process for additional inspections shall be the same as approval for the initial IPI.
QA POC is Scott Ellis, scott.m.ellis6.civ@mail.mil, Telephone: (870) 540-3104
(End of Clause)
52.209-3- CONTRACTOR FIRST ARTICLE TEST APPROVAL - IF60005 (Reference SOW 4.2 and SOW
Table 1)
(a) The Contractor shall test Components as specified in this contract. At least 15 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within 30 calendar days from the date of this contract to the COR and Contracting Officer marked “First Article Test Report: Contract No. __________________, Lot/Item
No. ______”. Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the Contracting Officer may, by written authorization, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal deviations from contract requirements, the Contractor shall, at the location designated by the mailto:scott.m.ellis6.civ@mail.mil
Government, make the required changes or replace all items produced under this contract at no change in the contract price.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
(i) The Contractor shall produce both the first article and the production quantity at the same facility.
(End of clause)
52.209-4512- FIRST ARTICLE TEST: - CONTRACTOR FIRST ARTICLE TESTING – ES6026 (Reference
SOW 4.2 and SOW Table 1)
a. The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
b. The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
c. The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test
Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.
(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
d. Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch (es) from which the first article was selected.
e. A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including suppliers and vendor's inspection records and certifications, when applicable). The First Article
Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the
QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to (see
CDRL Attachment 0005).
f. Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions
(i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the Government shall be borne by the Contractor.
(ES6026) (End of clause)
Section F - Deliveries or Performance
REFERENCE:
See Statement of Work for Delivery and Performance.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
0004 N/A N/A N/A N/A
0005 N/A N/A N/A N/A
0006 N/A N/A N/A N/A
0007 N/A N/A N/A N/A
0008 N/A N/A N/A N/A
Section H - Special Contract Requirements
CLAUSES INCORPORATED FULL TEXT
PB 52.000-4315 II SHIPPING INSTRUCTION (PBA) (AUG 90) (431511)
DELIVERY IS F.O.B. DESTINATION. Shipment is to be prepaid to the destination shown in Block 14 on page 1 of DD Form1155 or Block 15 of Standard Form 1449. The cost of shipping and risk of loss are borne by the seller.
Original bill of lading must be forwarded same day material is shipped to address shown in Block 14 on page 1 of
DD Form 1155 or Block 15 of Standard Form 1449.
Forward acknowledgement of order and notice of shipment to the address shown in Block 6 of DD Form 1155 or
Block 9 of Standard Form 1449.
Receiving hours are from 6:30a.m. to 2:30p.m., Monday through Thursday, except federal holidays.
NOTE: Shipment to any address other than that designated in Block 14, Standard Form 1155 or in Block 15, Standard Form 1449 may result in a delay in payment of your invoice without the commencement of interest accrual under the Prompt Payment Act (Public Law 97 -117).
PB 52.000-4318 EMPLOYEE IDENTIFICATION
The contractor shall be responsible for providing positive identification of employees as required by the Security
Office at Pine Bluff Arsenal. Prior to beginning work or receiving a notice to proceed, the contractor shall identify with the Pine Bluff Contracting Division and Security Office points of contact who shall be responsible for identifying employees, subcontractors, vendors and delivery personnel. One identified point of contact shall personally accompany any contractor personnel, subcontractors, vendors, or delivery personnel to be badged to the
Security Office. Employees or other personnel arriving without an identified point of contact will not be badged.
Any delays caused by improper identification of employees shall be at the contractor's expense and no time extensions shall be allowed for such delays.
PB 52.000-4319 DELIVERY OF MATERIALS
It is the responsibility of the contractor or subcontractor to inform their vendors or truck drivers of the prime contractor's name, contract number and work site. Pine Bluff Arsenal is a controlled access installation therefore, subcontractors, vendors, or delivery persons who do not possess the above information and other proper identification as required by the Security Office may be denied access to Pine Bluff Arsenal. Any delay caused by such denial will be at the contractor's expense and no time extensions for such delays will be allowed. Contractors will provide escorts for suppliers' trucks from the perimeter gates to job site when required.
PB 52.000-44061 PERSONNEL (PBA) (REVISED FEB 2006) (44061)
All personnel are hereby notified that any NON-U.S. Citizen/Foreign National (FN) must meet the provisions of
PBAR 190-3 prior to being permitted on Pine Bluff Arsenal.
a. All contractor personnel will be required to produce proof of citizenship prior to being badged. If contractors employees are NON-U.S. Citizen/Foreign National (FN), the contractor will submit a request through the COR, through the Security Office to the Commander, asking for authorization for the resident alien to work on Pine Bluff Arsenal. The request shall include the information as shown in PBAR 190-3, Appendix E, Annex 1.
b. Upon authorization, NON-U.S. Citizen/FN will be issued an "Escort Required" badge, meaning a permanently badged PBA employee must escort the individual at all times while on the installation, except as authorized by PBAR 190-3 para E.l.l.
PB 52.000-4416 III SECURITY REQUIREMENTS
In addition to security requirements covered in PB 52.000-4416 II, the following is applicable to work in the exclusion area:
a. Contractor's personnel entering into an exclusion area must be clean-shaven and have hair of such length that they can get a seal on a protective mask supplied by the Government.
b. All personnel engaged in work in igloo storage areas and the Toxic Storage Yard shall be required to carry a properly fitted protective mask on their person at all times. Personnel working Public Access Exclusion Distance (all areas north of Atkisson Road) will have a protective mask immediately available.
Protective mask will be furnished, fitted and periodically inspected by the Government. Protective masks will be issued to the contractor on a receipt basis for each employee under his supervision. Masks must be returned to the
Government upon termination of the contract. The contractor shall not take the masks off the Arsenal. The contractor shall provide a waterproof box with lock for storage of the masks during non-work hours. The box shall be kept at a site approved by the Contracting Officer. Such other safety measures as the Contracting Officer may determine to be reasonable and necessary for the protection of personnel and property will be enforced.
c. Contractor personnel entering into an exclusion area may be required to take blood test.
PB 52.000-4416II SECURITY REQUIREMENTS (PBA) (AUG 90) (4416II)
a. All prime contractors and sub-contractors performing services or duties at the Pine Bluff Arsenal shall comply with security rules and regulations generally applicable to all persons entering the installation.
b. In addition specific requirements applicable to contractor personnel are as follows:
(l) Contractors will register vehicles, used in performance of with the Security Office. An affidavit will be signed by the contractor stating that he has and will continue to maintain liability insurance on all vehicles in an amount not lower than the minimum limits prescribed by the financial responsibility or the compulsory law of the State of
Arkansas.
(2) Contractor employees desiring to operate their private owned vehicles (POV) on the Arsenal will be required to sign the same affidavit as specified in para b. (1) above and to register POV in the Security Office.
(3) All contractor personnel will be required to be badged prior to the beginning of any contractor service as follows:
(i) Contractors performing services within non-sensitive areas of the installation will be issued a non-photographic type ID badge if the contract does not exceed 21 calendar days. Issuance of this badge does not require the presence of the contractor employees at the Security Office.
(ii) Contractors performing services within non-sensitive areas of the installation will be issued a photographic type ID badge if the contract exceeds 21 calendar days. Issuance of this badge requires the presence of the contractor employees at the Security Office.
(iii) Contractors performing services within sensitive areas of the installation will be issued a non-photographic type ID badge and visitor pass if the contract does not exceed 21 calendar days.
Issuance of this badge and pass will require the presence of the contractor employees at the Security
Office. Badge exchange will be required by all personnel at the entrance to areas where required.
(iv) Contractors performing services within sensitive areas of the installation will be issued a photographic type ID badge if the contract exceeds 21 calendar days. Issuance of this badge will require the presence of contractor employees at the Security Office. Badge exchange is required by all personnel at the entrance to areas where required.
(v) If non-photographic type badges are utilized it will be the responsibility of the contractor or subcontractor to furnish the Security office with the name of all contractor employees to whom such badges are issued by number. This list of names will remain current at all times. If visitor passes are issued with non-photographic type badges, the procedures in paragraph (vi) below apply.
(vi) If photographic type badges are issued to contractor employees the Security Office will maintain a list of all badges issued by name, number, etc., however, it will be the responsibility of the contractor to insure that all employees report to the Security Office for issuance of photographic type ID badges or visitor passes.
(vii) It will be the responsibility of the contractor or subcontractor to insure that all ID badges, photographic and non-photographic type, are returned to the Security Office upon termination of any individual employee. Contractors will also be responsible to insure that all vehicle registrations, contractor and POV, are cancelled and vehicle decals are removed and returned to the Security
Office.
(viii) Contractors or sub-contractors will be required to reimburse the U.S. Government in the amount of
$44.00 for replacement (a second badge) of PBA Security access badges that are lost, stolen or mutilated. In addition, fees for re-issue of badges will increase in $5.00 increments for each subsequent loss (i.e., $49.00 for third badge, $54.00 for fourth badge, etc.) of ID badges not returned to the Security Office upon completion or termination of contract.
(ix) Contractor employees arriving at any gate or area improperly badges or without Arsenal ID badge will be denied entrance until proper identification or badging has been accomplished.
(x) Contractor and sub-contractor personnel performing services within exclusion areas or highly sensitive areas will be required to be escorted by an appropriately cleared and authorized individual at all times while in such areas. NOTE: Services for this contract will be performed in various area(s) of the installation. Work will not be in an exclusion area.
c. All contractors or sub-contractor's vehicles used on Pine Bluff Arsenal must have a company sign prominently displayed on each side of the vehicle, if work is being performed in the production area. These signs may be permanently affixed to the vehicle or may be magnetic type.
PB 52.000-4417 UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT PERSONNEL (PBA) (AUG 90)
(4417)
a. The contractor will not accept any instructions by any person employed by the U.S. Government or otherwise other than the Contracting Officer, or the designated Contracting Officer's Representative (COR) acting within the limits of his authority. Contracting Officer's Representative will be so designated in writing to the contractor and the scope of his authority will be set forth therein.
b. No information, other than that which may be contained in an authorized modification to this purchase instrument duly issued by the Contracting Officer, may be considered a valid obligation. Information received from any other person employed by the U.S. Government will not be considered grounds for deviation from any stipulation of this purchase instrument or referenced drawings and/or specifications
PB 52.000-4458 SAFETY REQUIREMENTS (PBA) (AUG 90) (4458)
The contractor will comply with the following factors:
a. Applicable portions of Department of Labor, Occupational Safety and Health Administration (OSHA)
Standards 29 CFR 1910 and 1926; etc.; Army Regulation (AR), Department of Army Pamphlets (DA PAM);
Pine Bluff Arsenal Regulations (PBAR); PBA Policy Letters; EM 385-1-1; General Safety Requirements (latest issue), whichever is the most stringent. The contractor shall be required to comply with any provisions of the
Act/Manual pertaining to this operation. Any violation noted by the Contracting Officer or PBA Safety Officer must be corrected.
b. Where the work requires, the contractor will be required to furnish all personnel, equipment, marking, etc., necessary for the safe movement and flow of traffic at the job site as determined by the Contracting Officer.
c. Warning and Safety Signs – The Contractor shall install warning and safety signs at all strategic locations on the work site. Signs and barricades shall be constructed in accordance with OSHA standards.
d. Illumination – If night operations are carried on, the contractor will be required to furnish all plant, equipment, and labor necessary to insure adequate illumination. Prior to commencing night operations the contractor shall submit a plan to the Contracting Officer for approval showing the illumination layout he proposes to use.
Adequate illumination as used herein shall be construed as the minimum lighting required to provide safe working conditions for contractor and Government personnel wherever work on this contract is in progress.
There shall be sufficient light to permit the work to be performed in accordance with the plans and specifications and to permit complete inspection of all the work.
e. In certain specified areas, matches, lighters, or other flame producing devices will not be allowed. Smoking is absolutely prohibited in any of the restricted areas, buildings, or in cars and trucks except as authorized by the
Contracting Officer.
f. Safety Briefing – The contractor shall allow for a 45 minute, mandatory, Safety briefing for all employees conducted at the Pine Bluff Arsenal Pass and ID office.
g. Notice of Required Seat Belt Use – As a means to increase safety, the Commander, Pine Bluff Arsenal, has established a policy that all occupants of a vehicle on the Pine Bluff Arsenal shall wear a seat belt. This policy extends to contractors and/or sub-contractors. Failure to use seat belts may result in the issuance of a citation or loss of driving privileges on the Pine Bluff Arsenal.
h. The contractor shall provide evidence that the company has a Safety & Occupational Health Plan.
i. The Contractor and Contracting Officer's Representative (COR) will document any hazardous work to be accomplished on the Hazardous Work Permit (Form PBA 387-7) in accordance with PBAR 385-31.
j. The General Contractor is responsible for assuring their sub-contractors comply with the safety items above.
PB 52.000-5322 ORDER AND SCHEDULING OF WORK (PBA) (AUG90) (5322)
a. Unless otherwise expressly provided in the specifications, the contractor shall work only the normal working hours of Pine Bluff Arsenal, 7:00a.m. to 4:30p.m., Monday through Thursday and 7:00a.m. to 3:30p.m., every other
Friday. However, contractor shall coordinate Friday work with the Contracting Officer or Contracting Officer's
Representative, on Government Holidays or days that are observed in lieu of Government holidays or other days that are declared non-work days by the commanding Officer of Pine Bluff Arsenal or official of higher headquarters.
Deviations from this requirement must be requested in writing and be approved by the Contracting Officer prior to the proposed extra working hours or work days.
b. Government holidays are as follows:
New Year’s Day Independence Day Labor Day
Thanksgiving Day Christmas Day Memorial Day
Veteran's Day Columbus Day President’s Day
Martin Luther King's Birthday
When one of the above designated holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday by
U.S. Government agencies.
c. In the event the Contractor wishes to perform work outside the normal work hours, he shall submit his request through the technical representative to the Contracting Officer for approval. If such request is approved, the
Contractor may be required to reimburse the Government for the cost of having an inspector at the work site.
52.0000-4001 CLAUSES/SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
(FAR 52.252-1/52.252-2)
This solicitation incorporates one or more clauses and/or solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at these addresses:
http://farsite.hill.af.mil/; http://www.arnet.gov/far/; http://akss.dau.mil/jsp/default.jsp;
(End of clause/provision)
52.0000-4167 AUTHORIZED SIGNATURE (MAR 2000)
The signature on this solicitation, offer or contract should be the signature of:
(a) A Corporate Officer (President, Vice-President, Treasurer, Secretary); or,
(b) An individual authorized in writing by a Corporate Officer to bind the company to a legal document.
(End of Provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
As a result of this solicitation, the Government contemplates award of a Firm Fixed price, two-year IDIQ contract
(two one-year ordering periods) with a Time and Material piece for services in the first ordering period.
(End of provision)
52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2015)
(a) This clause does not apply to small business concerns.
(b) Definitions. As used in this clause--
“Alaska Native Corporation (ANC)” means any Regional Corporation, Village Corporation, Urban Corporation, or
Group Corporation organized under the laws of the State of Alaska in accordance with the Alaska Native Claims
Settlement Act, as amended (43 U.S.C. 1601, et seq.) and which is considered a minority and economically disadvantaged concern under the criteria at 43 U.S.C. 1626(e)(1). This definition also includes ANC direct and indirect subsidiary corporations, joint ventures, and partnerships that meet the requirements of 43 U.S.C. 1626(e)(2).
“Commercial item” means a product or service that satisfies the definition of commercial item in section 2.101 of the Federal Acquisition Regulation.
“Commercial plan” means a subcontracting plan (including goals) that covers the offeror’s fiscal year and that applies to the entire production of commercial items sold by either the entire company or a portion thereof (e.g., division, plant, or product line).
“Electronic Subcontracting Reporting System (eSRS)” means the Governmentwide, electronic, web-based system for small business subcontracting program reporting. The eSRS is located at http://www.esrs.gov.
“Indian tribe” means any Indian tribe, band, group, pueblo, or community, including native villages and native groups (including corporations organized by Kenai, Juneau, Sitka, and Kodiak) as defined in the Alaska Native
Claims Settlement Act (43 U.S.C.A. 1601 et seq.), that is recognized by the Federal Government as eligible for services from the Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes
Indian-owned economic enterprises that meet the requirements of 25 U.S.C. 1452(e).
“Individual contract plan” means a subcontracting plan that covers the entire contract period (including option periods), applies to a specific contract, and has goals that are based on the offeror’s planned subcontracting in support of the specific contract except that indirect costs incurred for common or joint purposes may be allocated on a prorated basis to the contract.
“Master plan” means a subcontracting plan that contains all the required elements of an individual contract plan, except goals, and may be incorporated into individual contract plans, provided the master plan has been approved.
“Subcontract” means any agreement (other than one involving an employer-employee relationship) entered into by a
Federal Government prime Contractor or subcontractor calling for supplies or services required for performance of the contract or subcontract.
(c) The offeror, upon request by the Contracting Officer, shall submit and negotiate a subcontracting plan, where applicable, that separately addresses subcontracting with small business concerns, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business concerns, small disadvantaged business, and with women-owned small business concerns. If the offeror is submitting an individual contract plan, the plan must separately address subcontracting with small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns with a separate part for the basic contract and separate parts for each option (if any). The plan shall be included in and made a part of the resultant contract. The subcontracting plan shall be negotiated within the time specified by the Contracting Officer. Failure to submit and negotiate the subcontracting plan shall make the offeror ineligible for award of a contract.
(d) The offeror’s subcontracting plan shall include the following:
(1) Goals, expressed in terms of percentages of total planned subcontracting dollars, for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. The offeror shall include all subcontracts that contribute to contract performance, and may include a proportionate share of products and services that are normally allocated as indirect costs. In accordance with 43 U.S.C. 1626:
(i) Subcontracts awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size or Small Business Administration certification status of the ANC or Indian tribe.
(ii) Where one or more subcontractors are in the subcontract tier between the prime contractor and the ANC or
Indian tribe, the ANC or Indian tribe shall designate the appropriate contractor(s) to count the subcontract towards its small business and small disadvantaged business subcontracting goals.
(A) In most cases, the appropriate Contractor is the Contractor that awarded the subcontract to the ANC or Indian tribe.
(B) If the ANC or Indian tribe designates more than one Contractor to count the subcontract toward its goals, the
ANC or Indian tribe shall designate only a portion of the total subcontract award to each Contractor. The sum of the amounts designated to various Contractors cannot exceed the total value of the subcontract.
(C) The ANC or Indian tribe shall give a copy of the written designation to the Contracting Officer, the prime
Contractor, and the subcontractors in between the prime Contractor and the ANC or Indian tribe within 30 days of the date of the subcontract award.
(D) If the Contracting Officer does not receive a copy of the ANC's or the Indian tribe's written designation within
30 days of the subcontract award, the Contractor that awarded the subcontract to the ANC or Indian tribe will be considered the designated Contractor.
(2) A statement of --
(i) Total dollars planned to be subcontracted for an individual contract plan; or the offeror’s total projected sales, expressed in dollars, and the total value of projected subcontracts to support the sales for a commercial plan;
(ii) Total dollars planned to be subcontracted to small business concerns (including ANC and Indian tribes);
(iii) Total dollars planned to be subcontracted to veteran-owned small business concerns;
(iv) Total dollars planned to be subcontracted to service-disabled veteran-owned small business;
(v) Total dollars planned to be subcontracted to HUBZone small business concerns;
(vi) Total dollars planned to be subcontracted to small disadvantaged business concerns (including ANCs and Indian tribes); and
(vii) Total dollars planned to be subcontracted to women-owned small business concerns.
(3) A description of the principal types of supplies and services to be subcontracted, and an identification of the types planned for subcontracting to --
(i) Small business concerns,
(ii) Veteran-owned small business concerns;
(iii) Service-disabled veteran-owned small business concerns;
(iv) HUBZone small business concerns;
(v) Small disadvantaged business concerns, and
(vi) Women-owned small business concerns.
(4) A description of the method used to develop the subcontracting goals in paragraph (d)(1) of this clause.
(5) A description of the method used to identify potential sources for solicitation purposes (e.g., existing company source lists, the System for Award Management (SAM), veterans service organizations, the National Minority
Purchasing Council Vendor Information Service, the Research and Information Division of the Minority Business
Development Agency in the Department of Commerce, or small, HUBZone, small disadvantaged, and women-owned small business trade associations). A firm may rely on the information contained in SAM as an accurate representation of a concern's size and ownership characteristics for the purposes of maintaining a small, veteran-owned small, service-disabled veteran-owned small, HUBZone small, small disadvantaged, and women-owned small business source list. Use of SAM as its source list does not relieve a firm of its responsibilities (e.g., outreach, assistance, counseling, or publicizing subcontracting opportunities) in this clause.
(6) A statement as to whether or not the offeror included indirect costs in establishing subcontracting goals, and a description of the method used to determine the proportionate share of indirect costs to be incurred with --
(i) Small business concerns (including ANC and Indian tribes);
(ii) Veteran-owned small business concerns;
(iii) Service-disabled veteran-owned small business concerns;
(iv) HUBZone small business concerns;
(v) Small disadvantaged business concerns (including ANC and Indian tribes); and
(vi) Women-owned small business concerns.
(7) The name of the individual employed by the offeror who will administer the offeror’s subcontracting program, and a description of the duties of the individual.
(8) A description of the efforts the offeror will make to assure that small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns have an equitable opportunity to compete for subcontracts.
(9) Assurances that the offeror will include the clause of this contract entitled “Utilization of Small Business
Concerns” in all subcontracts that offer further subcontracting opportunities, and that the offeror will require all subcontractors (except small business concerns) that receive subcontracts in excess of $700,000 ($1.5 million for construction of any public facility with further subcontracting possibilities) to adopt a plan similar to the plan that complies with the requirements of this clause.
(10) Assurances that the offeror will --
(i) Cooperate in any studies or surveys as may be required;
(ii) Submit periodic reports so that the Government can determine the extent of compliance by the offeror with the subcontracting plan;
(iii) Submit the Individual Subcontract Report (ISR) and/or the Summary Subcontract Report (SSR), in accordance with paragraph (l) of this clause using the Electronic Subcontracting Reporting System (eSRS) at http://www.esrs.gov. The reports shall provide information on subcontract awards to small business concerns
(including ANCs and Indian tribes that are not small businesses), veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns (including ANCs and Indian tribes that have not been certified by the Small Business Administration as small disadvantaged businesses), women-owned small business concerns, and for NASA only, Historically Black
Colleges and Universities and Minority Institutions. Reporting shall be in accordance with this clause, or as provided in agency regulations;
(iv) Ensure that its subcontractors with subcontracting plans agree to submit the ISR and/or the SSR using eSRS;
(v) Provide its prime contract number, its DUNS number, and the e-mail address of the offeror's official responsible for acknowledging receipt of or rejecting the ISRs, to all first-tier subcontractors with subcontracting plans so they can enter this information into the eSRS when submitting their ISRs; and
(vi) Require that each subcontractor with a subcontracting plan provide the prime contract number, its own DUNS number, and the e-mail address of the subcontractor's official responsible for acknowledging receipt of or rejecting the ISRs, to its subcontractors with subcontracting plans.
(11) A description of the types of records that will be maintained concerning procedures that have been adopted to comply with the requirements and goals in the plan, including establishing source lists; and a description of the offeror’s efforts to locate small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns and award subcontracts to them. The records shall include at least the following (on a plant-wide or company-wide basis, unless otherwise indicated):
(i) Source lists (e.g., SAM), guides, and other data that identify small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns.
(ii) Organizations contacted in an attempt to locate sources that are small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, or women-owned small business concerns.
(iii) Records on each subcontract solicitation resulting in an award of more than $150,000, indicating --
(A) Whether small business concerns were solicited and if not, why not;
(B) Whether veteran-owned small business concerns were solicited and, if not, why not;
(C) Whether service-disabled veteran-owned small business concerns were solicited and, if not, why not;
(D) Whether HUBZone small business concerns were solicited and, if not, why not;
(E) Whether small disadvantaged business concerns were solicited and if not, why not;
(F) Whether women-owned small business concerns were solicited and if not, why not; and
(G) If applicable, the reason award was not made to a small business concern.
(iv) Records of any outreach efforts to contact --
(A) Trade associations;
(B) Business development organizations;
(C) Conferences and trade fairs to locate small, HUBZone small, small…