W52P1J15R0090-0002.pdf
PDF 58 KB Posted
- Attached to
- ASP/TSA 2. 0
- Solicitation number
- W52P1J15R0090
About this file
Amendment 0002
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Cost No Fee
0002 2016OCT05
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
CHARLES M. WILLIAMSON
EMAIL: CHARLES.M.WILLIAMSON12.CIV@MAIL.MIL
W52P1J-15-R-0090
2016AUG26
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 19
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: CHARLES M. WILLIAMSON
Buyer Office Symbol/Telephone Number: CCRC-RA/(309)782-7690
Type of Contract 1: Cost No Fee
Kind of Contract: Service Contracts
*** End of Narrative A0000 ***
The purpose of Amendment 0002 to Solicitation W52P1J-15-R-0090 is to incorporate the following changes and recognitions:
1. Provide updated versions of the following documents:
a. Section J, Attachment 0001 Performance Work Statement (PWS). Track changes have been added.
b. Section J, Attachment 0003 Performance Based Incentive Fee (PBIF) Plan. Track changes have been added.
c. Section J, Attachment 0017 Consolidated ASP-TSA 2.0 Questions and Answers.
2. Revised the following sections of this solicitation:
a. Revise section M.11.2.1
FROM:
M.11.2.1. Recent contracts are defined as follows:
-Were awarded or commenced within five years prior to the closing date of this solicitation; or
-Were awarded or commenced prior to five years, but remained on-going as of the closing date of this solicitation.
TO:
M.11.2.1. Recent contracts are defined as follows:
-Were awarded or commenced within five years prior to the closing date of this solicitation; or
-Were awarded or commenced prior to five years, but remained on-going within five years or as of the closing date of this ____________________ solicitation.
b. Revise section L.4.2
FROM:
L.4.2. Each individual item considered privileged or confidential under FOIA should be marked by placing the text within {brackets} with the following notice placed in the right margin: Privileged or Confidential.
TO:
L.4.2. Each individual item considered privileged or confidential under FOIA should be marked by placing the text within {brackets} with the following notice placed in the right margin: Privileged or Confidential. Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
3. The solicitation close date remains unchanged from October 19, 2016 at 0800 (Central).
4. All other terms and conditions remain unchanged and applicable.
*** END OF NARRATIVE A0003 ***
2 19
W52P1J-15-R-0090 0002
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Attachment 0001 PERFORMANCE WORK STATEMENT (PWS) 03-OCT-2016 045
Attachment 0003 PERFORMANCE BASED INCENTIVE FEE (PBIF) PLAN 03-OCT-2016 029
Attachment 0017 CONSOLIDATED ASP-TSA 2.0 QUESTIONS AND ANSWERS 03-OCT-2016
3 19
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.1. GENERAL INSTRUCTIONS. These instructions are a guide for preparing proposals in response to W52P1J-15-R-0090. They describe the extent of information the Offeror should provide and emphasize the significant topic areas the Offeror should address in its proposal.
Each Offeror shall submit a maximum of one proposal. The Government will not reimburse the Offeror for costs incurred in association with the preparation of its proposal. The Offeror is expected to review the PWS contained in Section J of this RFP for further insight into the areas that the proposal must address. The Offeror shall include in its proposal sufficient information to enable the
Government to determine the Offerors understanding of the requirements in each of the evaluated areas. Offerors are cautioned that repeating language of the PWS with a statement of intent to perform does not reflect understanding of the requirement. Offerors shall not specifically prepare samples or descriptive literature for submission with its proposal. Adherence to the prescribed format is required. Data not submitted with the proposal, but submitted previously or presumed to be known, will not be considered as part of the proposal. Failure to provide a proposal in compliance with the instructions specified in this RFP shall render the Offerors proposal non-compliant. The Government reserves the right to not evaluate or further consider for award any proposal determined to be non-compliant. The Offeror must provide information in sufficient detail to allow the Government to make an assessment of the Offerors ability to successfully execute the ASP/TSA 2.0 effort. The proposal shall be prepared in a clear and legible manner. In addition, the
Offeror shall write the proposal in English and the proposal must be specific and complete as described in these instructions.
Offerors shall complete Box 12 of Standard Form 33, Solicitation, Offer and Award, indicating its offer may be accepted within 180 calendar days of the RFP closing date.
L.2. POINT OF CONTACT. The PCO is the sole point of contact for this acquisition. Any questions or concerns shall be addressed, in
English, to the PCO. Except as otherwise indicated, e-mail is the only method of communication.
The PCO for this acquisition is:
Stephanie A. Brown
E-mail: mailto:USARMY.RIA.acc.mbx.asp-tsa-2@mail.mil
L.3. STANDARD PROPOSAL INSTRUCTIONS. This section specifies the format each Offeror shall use in preparing its proposal. The intent is not to restrict the manner in which proposals are prepared, but rather to ensure a certain degree of uniformity in proposal format for evaluation purposes. Five separate volumes shall be submitted. These volumes shall be self-contained and shall not be cross-referenced, with the exception of the Cost Volume. Unless specifically requested, pricing information shall not be contained in any volume except the Cost Volume. Proposals not structured IAW these instructions may be considered non-compliant and may not be evaluated. The Government will not assume the duty to search for data or information to cure problems discovered in any proposal submitted. The burden of providing complete and thorough information to address the elements below remains with the Offeror. The proposal shall include the following volumes subject to the limitations discussed below (exclusions listed, following the table):
Volume Title # of Copies Page Limit Due______________________________________________________________
I Supplemental 5 each CD/DVD No Limit RFP Closing
Docs and (except for Date
Facility 10pg Executive
Clearance Summary)
II Management 5 each CD/DVD 50 pages RFP Closing
Date
III Technical 5 each CD/DVD 75 pages RFP Closing
Date
IV Past 5 each CD/DVD 25 pages RFP Closing
Performance + 5 pages Date
For each Major
Subcontractor
V Cost 5 each CD/DVD No Limit RFP Closing
Date
Exclusions. Each page shall be counted except for the following:
- Cover pages
- Table of contents
- List of figures
- Glossaries
- Tabs / Dividers
- Other items as indicated by Volume
- Teaming Arrangements / Joint Ventures
4 19
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
- Past Performance Questionnaires
- DCMA/DCAA Audits and Reviews
- Resumes
- Property Management Plan (PMP) per L.7.3
- Past Performance Consent Letters and Commitment Letters from Major Subcontractors (Labor Brokers are not considered Major
Subcontractors)
- List of Points of Contact (POCs) who were sent a questionnaire per L.9.1(4)
- Staffing Plan per L.8
L.3.1. Offerors shall submit five copies on CD/DVD for each Volume of the proposal, which must be virus free. One CD/DVD, per volume, shall be marked as original. If the files are compressed, the necessary decompression program must be included.
Offerors are responsible for ensuring CD/DVDs function properly. Upon receipt of proposals, all CD/DVDs submitted will be scanned for viruses with an anti-virus program. If a virus is detected, the CD/DVDs shall not be considered when evaluating the Offerors proposal. At the U.S. Governments discretion, the Offeror may or may not be given the opportunity to resubmit this information. Offerors shall redact all company names/logos/pictures/personnel names from all pages of the proposal with the exception of Volume I (Supplemental Documents and Facility Clearance), Volume II (Management), Volume IV (Past
Performance), and Volume V (Cost). The electronic copies shall be submitted using Microsoft Office (MS) Word, MS Excel (for the Cost Volume only) and Adobe Acrobat software (SF33 signature page and any other RFP pages, as required). All copies of an individual volume shall be identical. The use of hyperlinks in proposals is prohibited. An official of the Offerors firm authorized to legally bind the Offeror shall sign the electronic submission of the Offerors proposal to include the SF33, and all amendment cover sheets, SF30, and all certifications requiring signature.
L.3.2. Each page is defined as one sheet, one-side. Excess pages will be removed from the back of each volume and will NOT be read or evaluated. Page limitations do not prohibit the Government from requesting additional supporting data.
L.3.3. Offerors shall use 8-1/2 x 11 inch size pages and a 12 point, or greater, Arial or Times New Roman font. Font requirements apply to bullets and other special text formatting. Ten point Arial or Times New Roman font may be utilized for tables and graphic displays. 11 x 17 inch size pages are acceptable for tables/graphic representations; however, each 11 x 17 inch size page counts as 2 pages.
L.3.4. Proposal Organization. No classified material shall appear anywhere in the proposal. All proposal volumes shall include:
L.3.4.1. Front cover, a table of contents, and the body of the proposal. All factor and subfactor narratives shall be clearly identified.
L.3.4.2. List of Tables and Figures for each Volume.
L.3.4.3. Glossary of Abbreviations and Acronyms for each Volume.
L.3.5. At a minimum, all cover sheets shall contain the following information:
L.3.5.1. Offerors Proposal in response to Solicitation W52P1J-15-R-0090 IAW solicitation instructions
L.3.5.2. Volume Number and Title
L.3.5.3. Name and Address of Offeror (with the exception of Volume III)
L.3.5.4. Date of Submission
L.3.5.5. Offerors POC information to include phone number and e-mail (with the exception of Volume III)
L.4. THE FREEDOM OF INFORMATION ACT (FOIA). FOIA and its amendment have resulted in an increasing number of requests from outside the
Government for copies of contractors' proposals and other documents submitted to federal agencies. If an Offeror's submission contains information that it believes should be withheld from such requestors under FOIA on the grounds that it contains trade secrets and commercial or financial information [5 USC 552(b)(4)], the Offeror should mark its submissions in accordance with FAR 52.215-1 and in the following manner:
L.4.1. The following notice should be placed on the title page: Some parts of this document, as identified on individual pages, are considered by the submitter to be privileged or confidential trade secret or commercial or financial information not subject to mandatory disclosure under the Freedom of Information Act. Material considered privileged or confidential on such grounds is contained on page(s) ___.
L.4.2. Each individual item considered privileged or confidential under FOIA should be marked by placing the text within
{brackets} with the following notice placed in the right margin: Privileged or Confidential. Use or disclosure of data __________________________ contained on this sheet is subject to the restriction on the title page of this proposal.__________________________________________________________________________________________
5 19
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Failure to do so may result in an involuntary release via a FOIA request.
L.5. PROPOSAL SUBMITTAL. All proposals and related information shall be submitted in the format identified above, to the Army at the address shown below, no later than the date and time specified in the solicitation. The Government will not accept emailed proposals for this RFP.
Army Contracting Command Rock Island
ATTN: Stephanie A. Brown
3055 Rodman Avenue
Rock Island Arsenal, IL 61299-8000
L.5.1. Offerors are responsible for ensuring that a full and complete proposal is received by the date and time established within the solicitation for receipt of timely proposals. Receipt means actual receipt by PCO, not merely receipt on the
Government Installation. Failure to confirm receipt will result in the waiver of any argument of an offer being timely sent, but not delivered to the PCO. It is highly recommended that Offerors request a delivery confirmation or other form of acknowledgement to verify the proposal submission was received. Absent the opening of discussions, if required, the Government will not accept any changes, additions, or deletions for evaluation purposes. Should an Offeror have difficulties with the delivery of proposals, please immediately notify the PCO via email to: mailto:USARMY.RIA.acc.mbx.asp-tsa-2@mail.mil. Any proposal, or partial proposal, received after the time and date established for receipt of timely proposals will be considered late and will not be considered for award.
L.6. VOLUME I - SUPPLEMENTAL DOCUMENTS AND PROOF OF FACILITY CLEARANCE FACTOR. There is no page limit to this volume, except as noted below.
- Facility Clearance Documentation
- Completed and Signed Solicitation and any Amendments
- Executive Summary (10 page limit)
L.6.1. Facility Clearance. This SECRET level Facility Clearance requirement applies to affiliates, team members, subcontractors, etc., that will require access to classified information. For the SECRET Facility Clearance, the Offeror shall provide at the time of proposal submission the following information: name of company; company CAGE code; company facility clearance level; and company Facility Security Officer contact information (name, phone number, and email address). The
Offeror shall also include the name of its company or managing partner of a partnership, joint venture, or limited liability company that possesses the SECRET Facility Clearance if the Offeror is a newly formed partnership, joint venture, or limited liability company. Submission of the CAGE code and possession of a SECRET level Facility Clearance of the managing partner of a newly formed Joint Venture is sufficient to meet this requirement. The PCO will verify the Offeror and the teammates/ subcontractors/ managing partner identified possess a SECRET Facility Clearance via the DSS ISFD. Failure to have submitted the required SECRET Facility Clearance by the proposal closing date shall render the Offeror ineligible to receive a contract award and will result in the proposal not being evaluated further. If the CAGE code for the Offeror, managing partner, teammate or subcontractor does not possess a Secret Facility Clearance, the Offeror will be found unacceptable. The Offerors proposal will not be further evaluated and will not be further considered for award.
Note: The managing partners clearance will not serve as an extended clearance for any employee without a clearance or who is not capable of obtaining a clearance.
L.6.2. Solicitation. Utilizing Adobe Acrobat, Offerors must provide a completed and signed copy of the solicitation including
Sections A-K and any Amendments.
L.6.3. The Executive Summary should be a concise narrative of the entire proposal, including a highlight of any key or unique features, excluding price. The Executive Summary will not be evaluated for purposes of determining contract award. As such, any summary material presented here shall not be considered as meeting the requirements for any portions of other proposal volumes.
The Offeror shall, at a minimum, provide an overview of its proposal and accurately summarize all parts of the proposal, except for the Cost Volume.
L.7. VOLUME II - MANAGEMENT FACTOR. The proposal shall include a proposed approach to successfully execute the ASP/TSA 2.0 requirements, comprised of four subfactors:
Subfactor 1 - Personnel Management
Subfactor 2 - Organizational Integration & Flexibility
Subfactor 3 - Business Systems
Subfactor 4 - Transition of Operations (Phase In and Phase Out)
L.7.1. Subfactor 1 - Personnel Management.
The Offeror shall describe its approach to and demonstrate its understanding of the processes, procedures, capabilities and
6 19
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
experience it will employ and rely upon to ensure successful execution of the requirements of the resulting contract from on-set through the final performance period. The Offeror's proposal should include but is not limited to discussion of the following aspects of managing the ASP/TSA 2.0 mission:
-The Offeror's approach to recruiting, hiring, and managing the various skills and personnel resources required for contract execution. The Offeror's approach should address U.S. Citizen, Host Nation Country, and Foreign National personnel resources. The Offeror should include and address its understanding of and implementation approach to the numerous Kuwait Labor Laws to include Sponsorship and Visa processing and other international requirements associated with staffing this mission.
-The Offeror's approach to manage retention of personnel. The approach should include the Offeror's tools and any incentivization mechanisms that will be employed to retain staff and quickly fill vacancies in an austere Outside the
Continental United States environment. In addition, the Offeror's approach should include its plan to proactively manage attrition of personnel to minimize disruption to performance of services.
-The Offeror's approach to identifying all designated key positions. The Offeror's approach should include the responsibilities of each key position and the Offeror's identified minimum qualifications the Offeror will employ over the life of the contract for all key personnel positions.
Upon inclusion in the Competitive Range, the PCO may request Offerors to submit a by name resume for each key position within five days of notice. If requested, resumes are limited to two pages and shall describe a sample representative skill set and how it relates to the requirements of the contract.
Disclosure statement: Each named resume shall contain the following statement and signature: "I consent to the disclosure of my resume, technical certifications (or other personal data) for evaluation purposes regarding the proposal submitted in response to RFP W52P1J-15-R-0090." This information shall not be disclosed to those without a need to know, and shall be used only for evaluation purposes.
-The Offeror's approach for Combating Trafficking in Persons (CTIP). The approach should not merely convey compliance with minimum requirements but should demonstrate the Offerors commitment to comply with the spirit and intent of CTIP regulations. The approach should describe the Offeror's approach and commitment to preventing trafficking in persons in all aspects of personnel management and contract execution. The Offeror's approach should discuss the Offeror's processes and procedures for self-assessments and its reporting and mitigation procedures should a CTIP violation be discovered or reported.
-The Offeror's approach should describe the processes it will employ to motivate and incentivize outstanding contract performance throughout all levels of the Offeror's workforce and the workforces of any major subcontractors or teaming partners. The approach should identify how the organization will encourage the identification, development, and implementation of improved processes or cost reduction ideas without jeopardizing the quality of services provided.
The approach should include discussion of how such process improvements will be communicated and coordinated with the
U.S. Governments management staff as well as within the Offeror's organization, to include any major subcontractors or teaming partners.
-The Offeror should identify the risks associated with its proposed approach and describe the methods and procedures the Offeror will employ to mitigate such risks throughout the contract's life.
L.7.2. Subfactor 2 - Organizational Integration & Flexibility.
The Offeror shall provide its organizational structure and describe the flexibility of its personnel and equipment, to include cross utilization of employees, material, and equipment while maintaining responsiveness to the U.S. Government. The Offeror's proposal shall include, but not be limited to the following:
-The Offeror's approach should provide a detailed description of the organizational structure internal to the Offeror and the Offeror's relationship to any higher corporate levels, or parent companies. These relationships should also be provided for any Joint Venture member, and/or teaming member firms. The Offeror's approach should include its capability for obtaining higher level corporate, parent company, or member firm financial, managerial, or technical support and oversight, as applicable. The Offeror's approach should also detail the constraints or limitations that will be placed on obtaining such support throughout the contract's life.
-The Offeror's approach to the management and integration of major teaming subcontractors and/or Joint Venture members. The approach should describe any teaming arrangements or Joint Venture agreements to include managerial authorities and controlling interests; how final decisions will be made; how conflict will be resolved; how contract change and contract change management processes will be integrated among member firms; financial roles and responsibilities among the members; how quality and performance oversight will be executed; how communication will flow; how profit and or loss will be distributed among member firms and how agreement change will be communicated to the U.S. Government. The approach should include a copy of all teaming or Joint Venture agreements.
7 19
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
-The Offeror's approach should discuss the organizational hierarchical structure at the program level and demonstrate how the lines of communication, and command and control responsibilities will promote efficient and effective contract execution. The approach should include the cross-utilization of personnel, materials, and equipment. The approach should focus on minimizing duplication of efforts and costs while maintaining responsiveness to the U.S. Government.
-The Offeror's approach should demonstrate its ability to be responsive to change. The Offeror should demonstrate its ability to rapidly scale up operations (i.e. surge) and the process to identify the need for and ability to efficiently reduce the workforce during protracted periods of decreased level of effort.
-The Offeror's approach should identify the risks associated with its proposed approach and describe the methods and procedures the Offeror will employ to mitigate such risks throughout the contracts life.
L.7.3. Subfactor 3- Business Systems.
The Offeror shall demonstrate its ability and experience to manage, integrate, oversee and maintain fully functional Business
Systems necessary to effectively and efficiently execute contract requirements and generate supportable, reliable performance and financial data relevant for the contract performance assessments. The Offeror's proposal shall include but not be limited to the following:
-Identification of the Offeror's Business Systems that will be employed in the execution of contract performance. The
Offeror's proposal should include a discussion of which Business Systems will and will not be integrated and operated on-site in Kuwait and the rationale for such decisions.
-The DCMA or DCAA recognized status of each of the planned Business Systems at the time of Offeror's proposal submission. The Offeror should provide a copy of the most recent DCMA or DCAA system review and the status of any associated corrective action plans. If a Business System is considered unapproved or un-assessed, the Offeror shall provide the rationale for such status. The Offeror should include related audit information and review determinations such as the provisional billing audits, or purchase existence and consumption audits. Note, the Offerors Accounting
System must be adequate and acceptable, in accordance with FAR 16.401 and DFARS 252.242-7006, in order to be awarded this contract.
-In the case of teaming arrangements/Joint Ventures, the Offeror's approach should describe which member's system is being employed and how proprietary information will be shared and protected.
-The Offeror's approach for exporting and implementing the planned on-site Business Systems to include timelines, location of operations, personnel training, integration and incorporation with teaming or Joint Venture members and subcontractors; processes for collection and utilization of member firms' and subcontractors' data.
-The Offeror's approach to implementing and executing oversight and self-assessment of the identified Business Systems and its approach to executing timely self-correction measures throughout the contract's life. The approach should address teaming, Joint Venture members and major subcontractors. The discussion should also include the Offeror's approach for communicating to the U.S. Government self-assessment findings and the status of corrective actions.
-The Offeror's approach shall include a summary level PMP containing voluntary consensus standards or industry leading practices and standards to be used in the management of Government property, or existing property management plans, methods, practices, or procedures for accounting for property.
L.7.4. Subfactor 4 - Transition of Operations (Phase In and Phase Out).
The Offeror shall demonstrate that it has the understanding, ability, and experience to successfully manage the processes, procedures, and timelines necessary to transition operations both in-coming as the Offeror positions to begin full-scale performance on the established date; and out-going as the Offeror demobilizes operations to ensure planned, coordinated, and professionally executed transitions. The Offerors proposal shall include, but not be limited to the following:
-The Offeror's approach to the phase in of operations, and how it will ensure uninterrupted services to the
Government. The approach should include scheduling and sequencing of activities to include hand-off/assumption of services, communication strategies, logistics considerations, coordination procedures and planned interaction with both the out-going Contractor and appropriate Government personnel.
-The Offeror's approach to the phase out of operations at the conclusion of contract performance and how it will ensure uninterrupted services to the Government. The approach should include scheduling and sequencing of activities to include hand-off of services, communication strategies, logistics - demobilization considerations, coordination procedures, and planned interaction with both the in-coming Contractor and appropriate Government personnel.
-The Offeror's approach should identify the risks associated with its proposed approach and describe the methods and procedures the Offeror will employ to mitigate such risk throughout transition of operations.
8 19
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L.8. VOLUME III - TECHNICAL FACTOR. The Technical proposal shall describe the Offeror's understanding, processes, abilities, and experiences to successfully execute all ASP/TSA 2.0 requirements, including providing the necessary labor, equipment, and process controls. The Offeror's Technical proposal shall include, but is not limited to the following:
-The Offeror's approach should include its concept of operations, including an outline of its plans, procedures, and assumptions, so as to demonstrate the Offeror's understanding of the Governments requirements. The Offeror should provide its execution approach to successfully provide services in each of the different functional areas as contained in the PWS. The
Offeror should include a description of its plan to continue essential contractor services listed in Attachment 0015, Mission
Essential Contractor Services, during a period of crisis. The Offeror's technical approach for the management of equipment, materials and personnel should detail how the PWS requirements will be efficiently and effectively executed, including preventative and remedial maintenance for all equipment.
-The Offeror shall provide a staffing plan delineating labor hours per month, for a full year of performance, by labor category and skill level, by individual position, and identifying which positions will be occupied by U.S. Citizens, Host Country
Nationals, or Third Country Nationals.
-The Offeror's approach should identify all positions the Offeror will designate as requiring specialized, documented training and/or recognized certification, and the specific training and certification requirements for those positions. The Offeror's approach should include its processes for ensuring such training and certifications are properly maintained throughout the contract's life.
-The Offeror's approach to implement a robust Quality Control program providing comprehensive Quality Control of its processes and procedures. The Offeror should describe its surveillance and oversight processes to ensure the integrity and effectiveness of its Quality Control program.
-The Offeror's comprehensive approach to employee safety and security at all times. The approach should provide safe and secure working and living environments as services are provided throughout the functional areas of the PWS. The Offeror should describe its surveillance and oversight processes to ensure the integrity and effectiveness of its safety and security approach.
-The Offeror's approach should identify the risks associated with its proposed approach and describe the methods and procedures the Offeror will employ to mitigate such risks throughout the contract's life.
L.9. VOLUME IV - PAST PERFORMANCE FACTOR. The Past Performance Volume may be submitted at any time after the formal RFP release up until the proposal due time and date.
L.9.1. Offerors shall submit past performance information on up to five recent and relevant Government and/or commercial contracts for the prime Offeror and three recent and relevant Government and/or commercial contracts for each major subcontractor. For the purposes of this requirement, recent and relevant are defined in Section M. The Offeror shall also submit the written consent of its major subcontractors to allow the disclosure of its subcontractors' past performance information to the Offeror. In addition, signed letters of commitment shall be included for all major subcontractors. Failure to submit signed letters of commitment may result in non-consideration of the major subcontractors identified. In regards to new corporate entities, Offerors may submit data on prior contracts involving its parent company. This volume shall be organized into the following sections:
(1) Section 1 - Contract Descriptions. This section shall include the following information in the following format. Offeror data shall be listed first followed by each proposed major subcontractor, alphabetically.
(a) Contractor/Subcontractor place of performance, CAGE Code and Data Universal Numbering System (DUNS) Number. It is recommended that Offerors limit references to those involving its performance as a prime or first tier subcontractor only. If the work was performed as a subcontractor, also provide the name of the prime contractor and POC within the prime contractor organization.
(b) Government contracting activity, and current address, PCO's name, e-mail address and telephone numbers.
(c) Governments technical representative/Contracting Officer Representative and current email address, and telephone numbers.
(d) Government contract administration activity and the Administrative Contracting Officer's name, and current email address, and telephone number.
(e) Contract Number and Delivery Order Numbers (as applicable).
(f) Contract Type (specific type such as Fixed-Price (FP), Cost Reimbursement (CR), Time & Material (T&M), etc.). In
9 19
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
the case of Indefinite Delivery contracts, indicate specific type (i.e., Requirements, Definite Quantity, and
Indefinite Quantity) and secondary contract type (i.e., FP, CR, T&M, etc.).
(g) Awarded price/cost and final/projected price/cost.
(h) Original delivery schedule, including dates of start and completion or work.
(i) Period of Performance
(2) Section 2 - Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1, Contract Description, describing the objectives achieved and detailing how the effort is relevant to the requirement of this
RFP. For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The Offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for
Deviation and Requests for Waiver shall be addressed with respect to causes and corrective actions. The Offerors shall also provide copies of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the Offeror or proposed major subcontractor. The Offeror shall indicate if any of the contracts listed were terminated and the type and reasons for the termination. For any contracts with adverse performance, the Offeror shall identify every recent and relevant contract awarded that encountered any performance problems related to deliverables or services, and any recent and relevant contracts that were in whole or in part terminated; these are excluded from the Past
Performance Factor page count.
(3) Section 3 - Subcontracts. Offerors shall provide an outline of how the effort required by this RFP will be assigned for performance within the Offeror's corporate entity and among the proposed subcontractors. The information provided for the prime
Offeror and each proposed major subcontractor must include the entire company name, company address, CAGE Code, DUNS Number and type of work to be performed by citing the applicable U.S. Government PWS subparagraph number. Major subcontractors are defined as members of an Offeror's overall team who are expected to perform 10 percent or more of the proposed effort's target cost and do not include labor brokers.
(4) Past Performance Questionnaire. For all contracts identified in Section 1, Contract Descriptions, a Past Performance
Questionnaire (Attachment 0014) must be completed and submitted. The Offeror shall complete Part I of the Past Performance
Questionnaire and e-mail the questionnaire to mail to: mailto:USARMY.RIA.acc.mbx.asp-tsa-2@mail.mil and to the POC responsible for the past/current contract. The POCs shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Office no later than the proposal due date, to mail to:
mailto:USARMY.RIA.acc.mbx.asp-tsa-2@mail.mil. Early submission of Past Performance data is encouraged. However, Past
Performance data may be submitted up through the RFP closing date and time. The Offeror shall submit within its Past
Performance Volume a list of all the POCs who were sent a questionnaire. The POC list shall be submitted in table format to include the following fields: Solicitation Number; Company Name; Contract Number; Government Agency; POC Last Name, First Name;
POC Title; POC Telephone Number; POC email Address; and Date the questionnaire was emailed to the POC.
L.10. VOLUME V - COST FACTOR. Volume IV shall contain cost proposal information for all CLINs identified in Section B. Offerors shall include of copy of the schedule located in Section B, Supplies and Services and Prices/Costs, of the solicitation, completed for all years. Volume IV has no page limits. The cost proposal shall consist of pricing for the Base Performance period, five one-year evaluated options and the six-month extension period. Failure to provide prices for all CLINs is unacceptable and will render the offeror ineligible for award.
L.10.1. General Instructions. Offerors shall submit a proposal in accordance with the contract type structure specified in
Section A and B of this solicitation. The proposal shall be for a base performance period, five one-year evaluated options, and a six-month extension period, based on the CLINs listed in Section B.
-Non Fee Bearing costs include materials, equipment, value added tax, incentive pay above applicable department of state guidelines, insurance, and ODCs will be non-fee bearing. Fee will only be allowed on value-added costs. Fee bearing and non-fee bearing cost elements are outlined within the PBIF Plan, Section J Attachment 0003.
L.10.2. Specific Instructions. The cost proposal shall be fully supported in accordance with the instructions detailed below.
L.10.2.1. Offerors shall state and explain all pricing assumptions and associated rationale. In addition, the
Offerors may provide any written explanations or documentation (in addition to the required explanations and documentation above), as deemed necessary, in order to enable the Government to understand the basis for the costs that might seem unreasonable or incomplete. Offerors are cautioned against placing conditions or qualifications upon their cost proposals that are contrary, or otherwise to attempt to amend, the requirements of the solicitation; doing so may result in an offer being deemed unacceptable for award.
L.10.2.2. The Offerors Cost Volume shall contain a table of contents outlining all of the documents (by document file name) comprising the Offerors Cost Volume. The table of contents shall identify all of the Offerors cost proposal documents as well as all major subcontractor proposal documents.
10 19
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L.10.2.3. Offerors shall provide details of the proposed prices for all years, CLINs, including supporting documentation for all costs. The Cost Volume shall be submitted in Microsoft Excel compatible format. All electronic spreadsheets in support of the proposal shall be in Microsoft Excel or a compatible format and contain all working formulas and algorithms. PDF files are not acceptable as they do not contain working formulas and algorithms. All proposals shall be stated in U.S. dollars and rounded to two decimal places. The Offerors Cost Proposal shall summarize total prices for the base year, and each of the five option years. Proposals may contain macros if the calculations are visible and contained in the MS Excel spreadsheet. A macro is a series of commands and instructions that are grouped together as a single command to accomplish a task automatically. However, a narrative in MS Word format must be included that provides instructions for operating the macro.
L.10.2.4. The Offeror shall provide a narrative to explain the flow of data to a summary from the detailed calculations within the electronic proposal. Explanations should address the mechanics of the detailed calculations
(i.e. pivot tables, lookup tables, and cell name definitions). The Offeror shall provide a basis of estimate for all costs. Any assumption that alters or supplants terms or conditions contained in this solicitation or, as amended, will result in the Offerors proposal being rejected and the Offeror being removed from award consideration.
L.10.2.5. Failure to propose costs for all CLINs, with the exception of the NSP CLINs, may result in the Offeror being ineligible for award.
L.10.2.6. The basis of award will be a total evaluated price (TEP) of the base performance period and five one-year evaluated option prices for all CLINs. The TEP will also include an additional six-month extension in accordance with
FAR 52.217-8, Option to Extend Services. Offerors are not required to propose anything for the six-month extension period; the cost will be calculated by the Government by taking 50% of the 12 months of performance CLINs proposed for Option Year Five as a plug in for the possible six-month extension.
L.10.2.7. Offerors shall provide the POC name and local DCAA office address for the prime Offeror and all major subcontractors within the Cost Proposal.
L.10.2.8. With respect to cost, the proposal is presumed to represent the Offerors best effort in responding to the solicitation. Any significant inconsistency between promised performance and cost should be explained by the Offeror in its proposal.
L.10.2.9. Data Other Than Certified Cost or Pricing Data. The Government anticipates receiving competitive proposals and using competition to determine price reasonableness. However, the Government reserves the right to request data other than certified cost or pricing data and/or subcontract prices after receipt of proposals. If required, data other than certified cost or pricing data must be submitted in accordance with the instructions specified at FAR
15.403-5, Instructions for Submission of Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing
Data.
L.10.2.10. The Offeror and all its proposed Teammates/Subcontractors, with proposal values exceeding $750,000 for the total five years of potential performance, shall provide detailed cost element proposals by CLIN submitted electronically in MS Excel format, with working formulas prepared in accordance with FAR 15.408 Solicitation
Provisions and Contract Clauses Table 15-2, Instructions for Submitting Cost/Price Proposals When Certified Cost or
Pricing Data are Required. The Cost Proposal shall be supported with verifiable facts, figures, and basis of estimates in accordance with instructions at FAR 15-2. The Cost Proposal shall contain working formulas/algorithms and shall calculate proposed costs.
L.10.3. In addition to the labor breakdown, Offerors shall provide an explanation of all labor elements, materials, equipment, indirect rates and other direct costs as follows:
L.10.3.1. Available Hours: Offerors shall explain how available hours are calculated to include standard work weeks
(per Kuwait Labor Law), anticipated shifts, hours of operations (when applicable), etc.
L.10.3.2. Productive Hours: Offerors shall explain how available hours are divided between productive hours and nonproductive hours. Nonproductive hours shall be broken out by element and may include vacation time, holidays, sick leave, and other personal leave. Offerors shall explain how the nonproductive hours are calculated in accordance with the Kuwait Labor Law. Offerors must also explain how the nonproductive hours will be accumulated and charged (direct or indirect).
L.10.3.3. Overtime Hours: Offerors shall explain how overtime hours are calculated to include anticipated shifts, coverage required for specific operations, holidays, etc.
L.10.3.4. Base Labor Rate: Offerors shall specify the base labor rate for each position. Offerors shall explain the basis for the base labor rates and provide relevant documentation (payroll records, wage surveys, market research, 11 19
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
etc.) to support those rates. Any change to the base labor rates in the option periods (escalation, etc.) should be explained with supporting documentation.
L.10.3.5. Overtime Labor Rate: Offerors shall specify the overtime labor rate for each position. Offerors shall explain the basis for the overtime labor rates and how they are calculated in compliance with the Kuwait Labor Law.
L.10.3.6. Cost of Living Adjustment (COLA): Offerors shall explain how COLA is calculated, if applicable. COLA shall be calculated in accordance with, and limited to the maximum rates allowed in the U.S. Department of State
Standardized Regulations.
L.10.3.7. Post Differential: Offerors shall explain how post differential is calculated, if applicable. Post differential shall be calculated in accordance with, and limited to the maximum rates allowed in, the U.S. Department of State Standardized Regulations.
L.10.3.8. End of Service Benefit: Offerors shall explain how end of service benefit is calculated. In addition, Offerors shall explain how the calculations are in compliance with Kuwait Labor Law.
L.10.3.9. Fringe Benefits: Offerors shall provide a Forward Pricing Rate Agreement (FPRA), Forward Pricing Rate
Recommendation (FPRR), or Forward Pricing Rate Proposal (FPRP) to support the proposed fringe benefits rate(s). A statement that the proposal has been submitted to, and can be obtained from DCAA, or DCMA is not acceptable. If a
FPRA, FPRR, or FPRP is not available, Offerors shall provide a breakdown of the pool and base information for the proposed fringe benefits rate(s). If the Offeror provides a pool and base information, the details for each pool and base information shall include the accounts/line items for each pool and base in both account/line item name and dollar value. For option period rates, Offerors shall provide budgetary data or, if it is not available, an explanation of why it is not available. If the rate proposed for this effort differs from the rate supported by the submitted documentation, Offerors shall provide an explanation for the difference and calculations to support the proposed rate. See the Indirect Cost Rates section below for additional details.
L.10.3.10. Material Costs: The Prime Contractor and each major subcontractor should provide associated supporting documentation, to include assumptions with regard to Government-furnished material and rationale for Contractor acquired material. Supporting documentation shall include the following information: item descriptions, source
(vendor), basis for source selection, cost or price reasonableness determinations, quantities, unit costs, tax (if applicable), and total item costs.
L.10.3.11. Equipment Costs: The Prime Contractor and each major subcontractor should provide associated supporting documentation, to include assumptions with regard to Government-furnished equipment and rationale for Contractor acquired equipment. Supporting documentation shall include the following information: item descriptions, source
(vendor), basis for source selection, cost or price reasonableness determinations, quantities, unit costs, tax (if applicable), and total item costs.
L.10.3.12. Other Direct Costs (ODCs) and Life Support: Offerors shall include all ODC and life support which may…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .