Attachment 3. Video Wall Second Floor Wiring Diagram.pdf

PDF 111 KB Posted

Attached to
218th ISRG NVX Creston Controller and Cisco Switches
Solicitation number
W50S9723Q0034
Issued by

About this file

This diagram depicts a proposed video wall wiring installation for the second floor of a facility. Key details include specifications for a three monitor by three monitor video wall to be installed in the distribution room, with Samsung 75-inch monitors and NEC X554UN video processors. Fiber optic cable trunk lines will connect the video wall to zone boxes and workstations throughout the floor through existing conduit and a cable tray. Control fiber will also be run through the zone boxes to the individual workstations. The related federal contract opportunity is solicitation number W50S9723Q0034 from the Department of the Army National Guard for a 218th ISRG NVX Creston controller and Cisco switches. No further product or service requirements, pricing terms, or response dates are included in the provided information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10'-0"

Down

11'-7"

DISTRIBUTION

ROOM

OPS

ZB1

ZB2

2"

'-8

'-0

8'

-4

'-4

8"

'-6

8"

Do w n

CHIEF RESTROOM

MECHANICAL

10'-0"

7'-7"

10'-0"10'-0"

1ST SGT

ZB3

ZB4

ZB5

ZB6

ZB7

ZB8

Conduit

DO 1

CC

255254253252

4 5

Samsung 75" Samsung 75"

VIDEO WALL

MonitorMonitor X3Monitor Monitor X3 Monitor X3

NEC X554UNNEC X554UN NEC X554UN

Video Wall Fiber Trunk

Video Wall Control Fiber To Workstations (TYP.)

Video Wall Fiber Trunk

Note: The Control Fiber Will Be Ran Through Zone Boxes To Workstations Through Existing Conduit.

Actual Conduit To Access First Floor Cable Tray TBD.