This diagram depicts a proposed video wall wiring installation for the second floor of a facility. Key details include specifications for a three monitor by three monitor video wall to be installed in the distribution room, with Samsung 75-inch monitors and NEC X554UN video processors. Fiber optic cable trunk lines will connect the video wall to zone boxes and workstations throughout the floor through existing conduit and a cable tray. Control fiber will also be run through the zone boxes to the individual workstations. The related federal contract opportunity is solicitation number W50S9723Q0034 from the Department of the Army National Guard for a 218th ISRG NVX Creston controller and Cisco switches. No further product or service requirements, pricing terms, or response dates are included in the provided information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2. Video Wall First Floor Wiring Diagram.pdf | ||
| Second Floor Zone Box Layout 20140910.pdf | ||
| Second Floor 247 OPs Floor Zone Box.pdf | ||
| W50S9723Q0034 Q-A.docx | DOCX document | |
| 218th ISRG Crestron and Cisco 13.501 Brand Name JA_Redacted.pdf | ||
| 218 ISRG Video Training Collaboration System SOW 2023.docx | DOCX document | |
| W50S9723Q0034 Pricing Template.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10'-0"
Down
11'-7"
DISTRIBUTION
ROOM
OPS
ZB1
ZB2
2"
'-8
'-0
8'
-4
'-4
8"
'-6
8"
Do w n
CHIEF RESTROOM
MECHANICAL
10'-0"
7'-7"
10'-0"10'-0"
1ST SGT
ZB3
ZB4
ZB5
ZB6
ZB7
ZB8
Conduit
DO 1
CC
255254253252
4 5
Samsung 75" Samsung 75"
VIDEO WALL
MonitorMonitor X3Monitor Monitor X3 Monitor X3
NEC X554UNNEC X554UN NEC X554UN
Video Wall Fiber Trunk
Video Wall Control Fiber To Workstations (TYP.)
Video Wall Fiber Trunk
Note: The Control Fiber Will Be Ran Through Zone Boxes To Workstations Through Existing Conduit.
Actual Conduit To Access First Floor Cable Tray TBD.