Attachment 2. Video Wall First Floor Wiring Diagram.pdf
PDF 109 KB Posted
- Solicitation number
- W50S9723Q0034
- Issued by
-
Department of the Army National Guard
About this file
This diagram depicts the proposed video wall and wiring setup for the first floor of the 218th ISRG facility. The solicitation seeks proposals for a Creston controller and Cisco switches to support the video wall and network infrastructure as depicted. Key details include the installation of a 75" Samsung monitor video wall with two rows and five screens per row, as well as related networking equipment in two 118U and one 105U rack. The solicitation also specifies conduit locations and dimensions for the facility. The solicitation number is W50S9723Q0034 and was issued by the Department of the Army National Guard for the 218th ISRG NVX Creston Controller and Cisco Switches requirement. The response deadline and award date are not specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Second Floor Zone Box Layout 20140910.pdf | ||
| Second Floor 247 OPs Floor Zone Box.pdf | ||
| W50S9723Q0034 Q-A.docx | DOCX document | |
| Attachment 3. Video Wall Second Floor Wiring Diagram.pdf | ||
| 218th ISRG Crestron and Cisco 13.501 Brand Name JA_Redacted.pdf | ||
| 218 ISRG Video Training Collaboration System SOW 2023.docx | DOCX document | |
| W50S9723Q0034 Pricing Template.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Up
LIEBERT
LIEBERT
218 ISS Rack
118 CFT Rack
ROW 1
ROW 2
Samsung 75" Monitor
M on ito r X
PA
N
AS
O N
IC
'-6
CC
10'-0"
4'-9/16"
23'-10 1/8"
'-1
1/
4"
Sa m su ng
5"
M on ito r
ROW 1
Ve nd in g
Book Shelf Actual Above Conduit TBD.
File details come from the government source that posted it. Updated .