Engineering Pre-Bid Conference.pdf

PDF 4 MB Posted

Attached to
Construct Hydrazine Facility
Solicitation number
W50S95-22-B-0001
Issued by

About this file

This document includes a pre-bid conference presentation and related federal contract opportunity solicitation. The pre-bid conference presentation provides an overview of requirements for constructing a new Hydrazine storage facility at McEntire Joint National Guard Base in Eastover, South Carolina. The scope of work includes site work, construction of a new facility on concrete footings and slab with a standing seam metal roof, building utility systems, interior finishes, and fire protection systems.

The related federal contract opportunity solicitation seeks a single firm fixed-price contract to provide all labor, materials, equipment and supervision necessary to construct the new Hydrazine storage facility. Interested contractors must attend the pre-bid conference on June 14, 2022 and site visit. Questions are due by May 5, 2022. The bid opening is scheduled for June 28, 2022. The project is set aside 100% for small businesses and has an estimated value between $500,000 to $1,000,000. The solicitation and plans/specifications are available through the betaSAM website.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

McEntire Joint National Guard Base

McEntire Joint National Guard Base Eastover, South Carolina

14 June 2022

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 3

Hydrazine Facility

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Site Plan

Existing asphalt access to be milled and resurfaced

7-foot chained link fence

11,000 Gallon Stainless Steel H-70 Neutralization Tank

New addition/pavement

Demolition

Site of demolished Approx.

1,600‐SF Building and sidewalk

Existing asphalt access to be milled and replaced

Site Plan

Loading/Parking Area

H‐70 Decontamination Tanks

New addition/pavement

Hydrazine Facility

• Drum Storage

• Servicing area

• Bathroom

• Comm/Elec/Mech

Building Systems

• Mechanical Multi‐split DX Heat pump will serve the bathroom and prep areas Explosion Proof electric unit heaters will condition the storage and mixing areas New plumbing fixtures to be installed (low flow, water efficient fixtures), hot water recirculation and compressed air loops

2 sanitary drains: One for building and other Hydrazine drainage (HDPE piping) to holding tank

Building Systems

• Structural

• New construction

• CMU & brick veneer

• Steel roof truss – light gage

• Roofing – gabled roof, architectural prefinished metal standing seam roof panel system

Questions?

File details come from the government source that posted it. Updated .