Engineering Pre-Bid Conference.pdf
PDF 4 MB Posted
- Attached to
- Construct Hydrazine Facility
- Solicitation number
- W50S95-22-B-0001
- Issued by
-
Department of the Army National Guard
About this file
This document includes a pre-bid conference presentation and related federal contract opportunity solicitation. The pre-bid conference presentation provides an overview of requirements for constructing a new Hydrazine storage facility at McEntire Joint National Guard Base in Eastover, South Carolina. The scope of work includes site work, construction of a new facility on concrete footings and slab with a standing seam metal roof, building utility systems, interior finishes, and fire protection systems.
The related federal contract opportunity solicitation seeks a single firm fixed-price contract to provide all labor, materials, equipment and supervision necessary to construct the new Hydrazine storage facility. Interested contractors must attend the pre-bid conference on June 14, 2022 and site visit. Questions are due by May 5, 2022. The bid opening is scheduled for June 28, 2022. The project is set aside 100% for small businesses and has an estimated value between $500,000 to $1,000,000. The solicitation and plans/specifications are available through the betaSAM website.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
McEntire Joint National Guard Base
McEntire Joint National Guard Base Eastover, South Carolina
14 June 2022
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 3
Hydrazine Facility
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Site Plan
Existing asphalt access to be milled and resurfaced
7-foot chained link fence
11,000 Gallon Stainless Steel H-70 Neutralization Tank
New addition/pavement
Demolition
Site of demolished Approx.
1,600‐SF Building and sidewalk
Existing asphalt access to be milled and replaced
Site Plan
Loading/Parking Area
H‐70 Decontamination Tanks
New addition/pavement
Hydrazine Facility
• Drum Storage
• Servicing area
• Bathroom
• Comm/Elec/Mech
Building Systems
• Mechanical Multi‐split DX Heat pump will serve the bathroom and prep areas Explosion Proof electric unit heaters will condition the storage and mixing areas New plumbing fixtures to be installed (low flow, water efficient fixtures), hot water recirculation and compressed air loops
2 sanitary drains: One for building and other Hydrazine drainage (HDPE piping) to holding tank
Building Systems
• Structural
• New construction
• CMU & brick veneer
• Steel roof truss – light gage
• Roofing – gabled roof, architectural prefinished metal standing seam roof panel system
Questions?
File details come from the government source that posted it. Updated .