Attachment 01a - Part 1 Plans Construct Hydrazine PSTE172020.pdf
PDF 10 MB Posted
- Attached to
- Construct Hydrazine Facility
- Solicitation number
- W50S95-22-B-0001
- Issued by
-
Department of the Army National Guard
About this file
This document provides details for a solicitation to construct a new Hydrazine Storage Facility. The South Carolina Air National Guard intends to award a single firm fixed-price contract for construction services including constructing a new facility on a concrete foundation and slab with a standing seam metal roof, along with site work, utilities, interior finishes, and fire protection systems. The project is set aside entirely for small businesses and has an estimated value between $500,000 and $1,000,000. Interested offerors must register in SAM and attend a pre-bid conference on June 14, 2022, with bids due by June 28, 2022. The scope of work is to be performed at McEntire Joint National Guard Base in Eastover, South Carolina within 180 days of notice to proceed.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C:
\rv t\2
8\1
7-
-G _d er ek
.w or ley .rv t 9/1
/20
2:
:04 P
M
RWORLEY
Stamp
ASENK
Snapshot
SMOKE PARTITION
CLEAR DOOR WIDTH [FEET - INCHES]
OCCUPANT LOAD CAPACITY [NO.OF PEOPLE]
EXIT DOOR TAG
1. FOR EXIT SIGNS AND EMERGENCY LIGHTING, SEE ELECTRICAL LIGHTING DRAWINGS (E SERIES).
LINE TYPES FOR MEANS OF EGRESS:
TRAVEL DISTANCE
SYMBOLCOMPONENT
LIFE SAFETY SYMBOLS:
TD
EXIT DISCHARGE ARROW
EXIT DISCHARGE
A
B
8 76
PROJECT MANAGER
HDR PROJECT #:
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
10136847
NICK OVERBY HYDRAZINE FACILITY
SC AIR NATIONAL GUARD
169TH FIGHTER WING
EASTOVER, SCANG PROJECT #: PSTE172020
CONTRACT #: W912QG-18-F-0040
MCENTIRE JOINT NATIONAL GUARD BASE
SO
UT
H
AN
ILO
RAC
C E R
TI
AU TH
OR
CATE OF
I
TIAZ
O N
HDR ENGINEERING,
INC.
OF THE CAROLINAS
NO. C0318FI
G-005
G-005.DWG
CODE COMPLIANCE
SITE PLAN
1" = 20'
ADAM SENK
THAD FREEMAN
ZACH SACHSENMAIER
- AUG 2020 B-3 DESIGN SUBMISSION
LEGEND:
KEY NOTES:
1. ALL PARTS OF BUILDING EXTERIOR WITHIN 350
FT AS REQUIRED UFC 3-600-01 PARA. 9-3.5.8.2.
2. ALL WEATHER GROUND ACCESS SHALL BE
PROVIDED FOR EMERGENCY VEHICLES PER UFC
3-600-01 PARA 9-1.1.
3. FIRE DEPARTMENT CONNECTION PROVIDED
WITHIN 150 FT AS REQUIRED BY UFC 3-600-01
PARA. 3-7.3.3.
4. FIRE ALARM/SPRINKLER RISER ROOM.
5. FIRE HOSE PULL 150 FT.
6. FIRE WATER SUPPLY ISOLATION GATE VALVE
BELOW GRADE IN VALVE BOX
7. SITE FENCE
8. FIRE WATER SUPPLY
CODE COMPLIANCE SITE PLAN
SCALE: 1" = 20' - 0"
HOSE PULL
HYDRANT
C :\p w w or ki ng \e as t0
1\ d0
\G
-0
.d w g, P lo t, 8/
/2
9:
:2
A
M , T
H
FR
E E
M A
AutoCAD SHX Text
FH
AutoCAD SHX Text
FH
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
6' WOVEN WIRE FENCE WITH BARB
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
FH
AutoCAD SHX Text
FH
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
6' WOVEN WIRE FENCE WITH BARB
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
ASENK
Snapshot
Rectangle
PROJECT MANAGER
HDR PROJECT #:
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
ALLAN GOFF
ALLAN GOFF
ROBERT BAYSDEN
10136847
NICK OVERBY HYDRAZINE FACILITY
SC AIR NATIONAL GUARD
169TH FIGHTER WING
EASTOVER, SCANG PROJECT #: PSTE172020
CONTRACT #: W912QG-18-F-0040
MCENTIRE JOINT NATIONAL GUARD BASE
C-000
C-000.DWG
CIVIL LEGEND
- AUG 2020 B-3 DESIGN SUBMISSION
PIPELINE
LIMITS OF DISTURBANCELOD LOD LOD
EXISTING CONTOUR W/ ELEVATION (MAJOR)25
EXISTING CONTOUR (MINOR)
CONTOUR W/ ELEVATION (MAJOR)25
X X X X X X SECURITY FENCE
SILT FENCE
DOWNGUY
SURVEY BENCHMARK
SPOT ELEVATION
SURVEY CONTROL POINT
CIVIL MAPPING SYMBOLOGY
FLOW ARROW
CLEANOUT
HORIZONTAL CONTROL POINT
VERTICAL CONTROL POINT
PUMP STATION
SANITARY MANHOLE
EXISTING UTILITY POLE
UTILITY/CIVIL LINE SYMBOLOGY
FIRE HYDRANT
CP-X
CO
S
PS
X
X
TANK BELOW GROUND
TANK HORIZONTAL ABOVE GROUND
TANK VERTICAL ABOVE GROUND
X
X
X
A. SCREENING OR SHADING OF WORK IS USED TO INDICATE EXISTING
COMPONENTS.
DIVERSION SWALE
CONCRETE SIDEWALK
SEDIMENT TUBE
W W
EXISTING ELECTRICAL
EXISTING WATER
EXISTING SANITARY SEWER
CONTOUR (MINOR)
X X X X X X EXISTING SECURITY FENCE
RIPRAP
SILT FENCE ROCK OUTLET
EXISTING OVERHEAD ELECTRICAL
EXISTING UNDERGROUND FIBER OPTIC
EXISTING UNDERGROUND TELEPHONE
OHE
ASPHALT PAVEMENT MILLING
EXISTING UNDERGROUND ELECTRICAL
WW WATER MAIN
SEWER FORCE MAIN
STORM DRAINAGE PIPING
FM FM FM
GRAVITY SEWER PIPING
SD
BLOCK & GRAVEL CURB
INLET SEDIMENT FILTER
CONSTRUCTION ENTRANCE
HEAVY DUTY CONCRETE PAVEMENT
1 STAKING POINT
FFE = 123 BUILDING FINISHED FLOOR ELEVATION
TYPE A SEDIMENT TUBE INLET
PROTECTION
08/28/202008/28/2020
AGOFF
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
ALLAN GOFF
ALLAN GOFF
ROBERT BAYSDEN
10136847
NICK OVERBY HYDRAZINE FACILITY
SC AIR NATIONAL GUARD
169TH FIGHTER WING
EASTOVER, SCANG PROJECT #: PSTE172020
CONTRACT #: W912QG-18-F-0040
MCENTIRE JOINT NATIONAL GUARD BASE
C-001
C-001.DWG
OVERALL SITE
PLAN
1" = 20'
- AUG 2020 B-3 DESIGN SUBMISSION
OVERALL SITE PLAN
1" = 20'
08/28/202008/28/2020
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
ALLAN GOFF
ALLAN GOFF
ROBERT BAYSDEN
10136847
NICK OVERBY HYDRAZINE FACILITY
SC AIR NATIONAL GUARD
169TH FIGHTER WING
EASTOVER, SCANG PROJECT #: PSTE172020
CONTRACT #: W912QG-18-F-0040
MCENTIRE JOINT NATIONAL GUARD BASE
C-002
C-002.DWG
SITE
DEMOLITION PLAN
1" = 20'
- AUG 2020 B-3 DESIGN SUBMISSION
REMOVE METAL BUILDING
AND STAIRS
ABANDON EXISTING VALVE IN PLACE
SITE DEMOLITION PLAN
1" = 20'
08/28/202008/28/2020
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
ALLAN GOFF
ALLAN GOFF
ROBERT BAYSDEN
10136847
NICK OVERBY HYDRAZINE FACILITY
SC AIR NATIONAL GUARD
169TH FIGHTER WING
EASTOVER, SCANG PROJECT #: PSTE172020
CONTRACT #: W912QG-18-F-0040
MCENTIRE JOINT NATIONAL GUARD BASE
C-003
C-003.DWG
CIVIL
EROSION CONTROL PLAN
1" = 20'
- AUG 2020 B-3 DESIGN SUBMISSION
EROSION CONTROL PLAN
1" = 20'
08/28/202008/28/2020
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
ALLAN GOFF
ALLAN GOFF
ROBERT BAYSDEN
10136847
NICK OVERBY HYDRAZINE FACILITY
SC AIR NATIONAL GUARD
169TH FIGHTER WING
EASTOVER, SCANG PROJECT #: PSTE172020
CONTRACT #: W912QG-18-F-0040
MCENTIRE JOINT NATIONAL GUARD BASE
C-004
C-004.DWG
CIVIL
GRADING AND DRAINAGE PLAN
1" = 20'
- AUG 2020 B-3 DESIGN SUBMISSION
GRADING AND DRAINAGE PLAN
1" = 20'
08/28/202008/28/2020
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
ALLAN GOFF
ALLAN GOFF
ROBERT BAYSDEN
10136847
NICK OVERBY HYDRAZINE FACILITY
SC AIR NATIONAL GUARD
169TH FIGHTER WING
EASTOVER, SCANG PROJECT #: PSTE172020
CONTRACT #: W912QG-18-F-0040
MCENTIRE JOINT NATIONAL GUARD BASE
C-005
C-005.DWG
CIVIL
UTILITY PLAN
1" = 20'
- AUG 2020 B-3 DESIGN SUBMISSION
UTILITY PLAN
1" = 20'
08/28/202008/28/2020
6. LIME AND FERTILIZER SHALL BE APPLIED UNIFORMLY AND MIXED WITH THE SOIL DURING SEEDBED
PREPARATION. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED DEPENDING ON
FIELD CONDITION.
7. MULCH TO BE TACKED OR MECHANICALLY TIED DOWN IMMEDIATELY AFTER MULCH IS SPREAD.
8. ALL SLOPES GREATER THAN 3:1 SHALL BE STABILIZED WITH NORTH AMERICAN GREEN SC150 OR
EQUIVALENT
STABILIZATION REQUIREMENTS
TEMPORARY OR PERMANENT GROUND COVER STABILIZATION SHALL OCCUR WITHIN 7 CALENDAR DAYS
FROM THE LAST LAND-DISTURBING ACTIVITY, WITH THE FOLLOWING EXCEPTIONS IN WHICH
TEMPORARY OR PERMANENT GROUND COVER SHALL BE PROVIDED IN 14 CALENDAR DAYS FROM THE
LAST LAND-DISTURBING ACTIVITY:
· SLOPES BETWEEN 2:1 AND 3:1, WITH A SLOPE LENGTH OF 10 FT. OR LESS
· SLOPES 3:1 OR FLATTER, WITH A SLOPE OF LENGTH OF 50 FT. OR LESS
· SLOPES 4:1 OR FLATTER
NATIVE GRASS SEEDING AND MULCHING: (EAST)
NATIVE GRASS SEEDING AND MULCHING SHALL BE PERFORMED ON THE DISTURBED AREAS OF
WETLANDS AND RIPARIAN AREAS, AND ADJACENT TO STREAM RELOCATION CONSTRUCTION WITHIN A 50 FOOT ZONE ON BOTH SIDES OF THE STREAM OR DEPRESSION, MEASURED FROM TOP OF STREAM
BANK OR CENTER OF DEPRESSION. THE STREAM BANK OF THE STREAM RELOCATION SHALL BE
SEEDED BY A METHOD THAT DOES NOT ALTER THE TYPICAL CROSS SECTION OF THE STREAM BANK.
NATIVE GRASS SEEDING AND MULCHING SHALL ALSO BE PERFORMED IN THE PERMANENT SOIL
REINFORCEMENT MAT SECTION OF PREFORMED SCOUR HOLES, AND IN OTHER AREAS AS DIRECTED.
THE KINDS OF SEED AND FERTILIZER, AND THE RATES OF APPLICATION OF SEED, FERTILIZER, AND LIMESTONE, SHALL BE AS STATED BELOW. DURING PERIODS OF OVERLAPPING DATES, THE KIND OF
SEED TO BE USED SHALL BE DETERMINED. ALL RATES ARE IN POUNDS PER ACRE.
FERTILIZER SHALL BE 10-20-20 ANALYSIS. A DIFFERENT ANALYSIS OF FERTILIZER MAY BE USED PROVIDED THE 1-2-2 RATIO IS MAINTAINED AND THE RATE OF APPLICATION ADJUSTED TO PROVIDE
THE SAME AMOUNT OF PLANT FOOD AS A 10-20-20 ANALYSIS AND AS DIRECTED.
NATIVE GRASS SEEDING AND MULCHING SHALL BE PERFORMED IN ACCORDANCE WITH SECTION 1660 OF THE STANDARD SPECIFICATIONS AND VEGETATIVE COVER SUFFICIENT TO RESTRAIN EROSION
SHALL BE INSTALLED IMMEDIATELY FOLLOWING GRADE ESTABLISHMENT.
TEMPORARY SEEDING
FERTILIZER SHALL BE THE SAME ANALYSIS AS SPECIFIED FOR SEEDING AND MULCHING AND APPLIED AT THE RATE OF 400 POUNDS AND SEEDED AT THE RATE OF 50 POUNDS PER ACRE. GERMAN MILLET OR BROWNTOP MILLET SHALL BE USED IN SUMMER MONTHS AND RYE GRAIN DURING THE REMAINDER OF THE YEAR. THE EXACT DATES TO BE APPROVED BY THE CORPS BASED ON EACH KIND OF SEED.
FERTILIZER TOPDRESSING
FERTILIZER USED FOR TOP DRESSING SHALL BE 16-8-8 GRADE AND SHALL BE APPLIED AT THE RATE OF 500 POUNDS PER ACRE. A DIFFERENT ANALYSIS OF FERTILIZER MAY BE USED PROVIDED THE 2-1-1 RATIO IS MAINTAINED AND THE RATE OF APPLICATION ADJUSTED TO PROVIDE THE SAME AMOUNT OF
PLANT FOOD AS 16-8-8 ANALYSIS AND AS DIRECTED.
SUPPLEMENTAL SEEDING
THE KINDS OF SEED AND PROPORTIONS SHALL BE THE SAME AS SPECIFIED FOR SEEDING AND
MULCHING, AND THE RATE OF APPLICATION MAY VARY FROM 25# TO 75# PER ACRE. THE ACTUAL RATE PER ACRE WILL BE DETERMINED PRIOR TO THE TIME OF TOPDRESSING AND THE CONTRACTOR WILL BE NOTIFIED IN WRITING OF THE RATE PER ACRE, TOTAL QUANTITY NEEDED, AND AREAS ON WHICH TO APPLY THE SUPPLEMENTAL SEED. MINIMUM TILLAGE EQUIPMENT, CONSISTING OF A SOD SEEDER
SHALL BE USED FOR INCORPORATING SEED INTO THE SOIL AS TO PREVENT DISTURBANCE OF
EXISTING VEGETATION. A CLODBUSTER (BALL AND CHAIN) MAY BE USED WHERE DEGREE OF SLOPE
PREVENTS THE USE OF A SOD SEEDER.
MOWING
THE MINIMUM MOWING HEIGHT SHALL BE 4 INCHES.
CLEARING:
CLEARING SHALL INCLUDE THE TRIMMING OF ONLY THOSE TREES OVERHANGING THE CLEARING LIMITS
AS NECESSARY TO PERFORM THE WORK. THE CONTRACTOR SHALL ALSO CLEAR THOSE AREAS OR
FEATURES SPECIFICALLY SHOWN ON THE PLANS TO BE CLEARED. CLEARING SHALL NOT INCLUDE THE UNNECESSARY REMOVAL OF TREES, GRASS, TURF, BRUSH, OR LANDSCAPING OR SIMILAR GROUND
COVERS OR OTHER VEGETATION. THE CONTRACTOR SHALL NOT CONDUCT ANY CLEARING
OPERATIONS OUTSIDE THE LIMITS SPECIFIED, UNLESS APPROVED BY THE BASE AUTHORITY. ALL
OTHER SUCH FEATURES REMOVED OR DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES BY THE
CONTRACTOR SHALL BE RESTORED TO ORIGINAL CONDITION.
TEMPORARY AND PERMANENT NON LAWN SEEDING MEASURES
A. GENERAL:
1. AFTER CONSTRUCTION IS COMPLETE IN ANY AREA OR PHASE OF THE PROJECT, THE DISTURBED
AREAS SHALL RECEIVE A PERMANENT GROUND COVER. SEEDING AND MULCHING SHALL BE
PERFORMED IMMEDIATELY BEHIND CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE
PERMANENT SEEDING IN ALL DISTURBED AREAS AS INDICATED IN THE CONTRACT DOCUMENTS.
THE CONTRACTOR SHALL ADAPT PERMANENT SEEDING OPERATIONS TO PROTECT AND TO
ACCOMMODATE ANY TEMPORARY SEEDING AND SOIL AND EROSION CONTROL MEASURES THAT
MAY ALREADY BE IN PLACE DURING THE WORK PERIOD.
2. WHEN SEEDING MUST TAKE PLACE OUT OF SEASON FOR PERMANENT GRASS THE APPROPRIATE
TEMPORARY SEEDING SHALL BE DONE AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR
PERMANENT SEEDING AS SPECIFIED IN SEASON AT NO ADDITIONAL COST TO OWNER.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR TURF MAINTENANCE THROUGH SUBSTANTIAL
COMPLETION. SLOPES MUST BE AT 90% COVERAGE AT SUBSTANTIAL COMPLETION REVIEW TO BE ACCEPTED. IF NOT AT 90% COVERAGE, SUBSTANTIAL COMPLETION WILL BE DELAYED UNTIL THE
FOLLOWING GROWING SEASON.
B. SITE PREPARATION AND INSTALLATION:
1. GROUND COVER: ALL DISTURBED AREAS SHALL BE DRESSED TO A DEPTH OF FIVE (5) INCHES. THE TOP TWO (2) INCHES SHALL BE PULVERIZED TO PROVIDE A UNIFORM SEEDBED. RAKE OR HARROW THE SITE TO ESTABLISH A SMOOTH AND LEVEL FINAL GRADE. SOIL PARTICLES SHOULD BE NO LARGER THAN MARBLE SIZE, AND PEA GRAVEL SIZE IS EVEN BETTER. AGRICULTURAL LIME SHALL BE APPLIED AT THE RATE OF 95 LBS./1000 SQ. FT. IMMEDIATELY BEFORE PLOWING. GRASS SEED
SHALL BE APPLIED AT THE RATES OUTLINED IN TABLES 2A AND 2B.
2. 5-10-10 FERTILIZER SHALL BE APPLIED TO ALL DISTURBED AREAS AT A RATE OF 21 LBS./1000 SQ. FT.
MULCHING SHALL CONSIST OF SMALL GRAIN STRAW APPLIED AT A RATE OF 2 TONS/ACRE.
MULCHED AREAS SHALL BE TACKED WITH ASPHALT OR OTHER APPROVED METHOD SUFFICIENT TO
HOLD THE STRAW IN PLACE, AT A RATE OF 150 TO 200 GALLONS PER TON OF STRAW.
3. IF ACTIVE CONSTRUCTION CEASES IN ANY AREA FOR MORE THAN FOURTEEN (14) DAYS, ALL DISTURBED AREAS MUST BE SEEDED, MULCHED, FERTILIZED AND TACKED AT NO ADDITIONAL COST
TO THE OWNER.
4. SOME AREAS MAY REQUIRE TEMPORARY SEEDING DUE TO AN INTERRUPTION OF WORK
EXCEEDING FOURTEEN (14) DAYS OR SEASONAL RESTRICTIONS AS SPECIFIED IN THE PERMANENT
SEEDING SCHEDULE, OR A COMBINATION THEREOF. THESE AREAS SHALL BE RESEEDED IN
ACCORDANCE WITH THE PERMANENT SEEDING SCHEDULE. IF TEMPORARY SEEDING IS REQUIRED
DUE TO CONTRACTOR DELAYS, THERE WILL BE NO COMPENSATION FOR THE TEMPORARY
SEEDING. TEMPORARY SEEDING SHALL BE PERFORMED ONLY AT THE DIRECTION OF THE ARMY
CORPS OF ENGINEERS (ACOE).
C. CLEANUP AND INSPECTION:
1. UPON COMPLETION OF WORK, THE CONTRACTOR SHALL REMOVE FROM THE SITE ALL EQUIPMENT
AND OTHER ARTICLES USED. ALL EXCESS SOIL, STONE, AND DEBRIS SHALL BE REMOVED AND
LEGALLY DISPOSED OF AT NO ADDITIONAL COST TO THE OWNER. ALL WORK AREAS SHALL BE LEFT
IN A CLEAN AND NEAT CONDITION. ALL DAMAGE TO EXISTING CONSTRUCTION CAUSED BY
LANDSCAPING OPERATIONS SHALL BE REPAIRED TO THE SATISFACTION OF THE TOWN AT THE
CONTRACTOR'S EXPENSE.
2. SEEDED AREAS SHALL BE PROTECTED AND REPLANTED AS NECESSARY TO ESTABLISH A UNIFORM STAND OF SPECIFIED GRASS. SCATTERED BARE SPOTS, NONE OF WHICH SHALL BE LARGER THAT ONE (1) SQUARE FOOT, WILL BE ALLOWED UP TO A MAXIMUM OF 3% OF THE SEEDED AREA FOR
EACH PROPERTY. WHEN SEEDED AREAS ARE READY FOR INSPECTION, THE MAINTAINED TURF
AREAS SHALL BE NEATLY MOWED TO THE UNIFORM HEIGHT OF APPROXIMATELY TWO AND
ONE-HALF (2.5) INCHES. THE LAWNS SHALL BE CONSIDERED ESTABLISHED ONLY WHEN THE
SPECIFIED GRASS IS VIGOROUS AND GROWING WELL IN ADDITION TO MEETING THE OTHER
REQUIREMENTS SPECIFIED.
3. AN INSPECTION OF THE COMPLETED SEEDING SHALL BE MADE AT THE CONCLUSION OF THE
LANDSCAPE WORK UPON WRITTEN NOTICE REQUESTING SUCH INSPECTION SUBMITTED BY THE
CONTRACTOR TO THE ACOE, AT LEAST TEN (10) DAYS PRIOR TO THE ANTICIPATED DATE OF
INSPECTION.
4. A FINAL INSPECTION SHALL BE PERFORMED WHEN A SATISFACTORY STAND OF SEEDED TURF GRASS HAS BEEN PRODUCED, UPON WRITTEN NOTICE REQUESTING SUCH INSPECTION SUBMITTED BY THE CONTRACTOR TO THE ACOE, AT LEAST TEN (10) DAYS PRIOR TO THE ANTICIPATED DATE OF
INSPECTION. IF A SATISFACTORY STAND OF TURF HAS NOT BEEN PRODUCED AT THE TIME OF
FINAL INSPECTION, NECESSARY REPAIRS SHALL BE PERFORMED IN CONFORMANCE WITH THE
REQUIREMENTS OF THIS SECTION. UPON COMPLETION OF THESE REPAIRS, THE SEEDED GRASS
SHALL BE REINSPECTED UPON WRITTEN NOTICE AS ABOVE.
SEEDBED PREPARATION NOTES
1. SURFACE WATER CONTROL MEASURES TO BE INSTALLED ACCORDING TO PLAN.
2. AREAS TO BE SEEDED SHALL BE RIPPED AND SPREAD WITH AVAILABLE TOPSOIL 3 INCH DEEP.
TOTAL SEEDBED PREPARED DEPTH SHALL BE 4 INCH TO 6 INCH DEEP.
3. LOOSE ROCKS, ROOTS AND OTHER OBSTRUCTIONS SHALL BE REMOVED FROM THE SURFACE SO
THAT THEY WILL NOT INTERFERE WITH ESTABLISHMENT AND MAINTENANCE OF VEGETATION.
SURFACE FOR FINAL SEEDBED PREPARATION AT FINISHED GRADES SHOWN SHALL BE
REASONABLY SMOOTH AND UNIFORM.
4. IF NO SOIL TEST IS TAKEN, FERTILIZER AND LIME TO BE ACCORDING TO SEEDING SPECIFICATIONS
BELOW. IN ADDITION, PROVIDE 15 LBS/1000 SF OF SUPERPHOSPHATE.
5. IF SOIL TEST IS TAKEN, PROVIDE LIME AND FERTILIZER ACCORDING TO SOIL TEST REPORT.
PERMANENT LAWN SEEDING MEASURES
A. GENERAL
1. THE FOLLOWING INFORMATION SHALL BE APPLICABLE FOR ALL PERMANENT LAWN SEEDING.
PERMANENT LAWN SEEDING SHALL TAKE PLACE WITHIN ALL DEVELOPED AREAS OF DISTURBANCE INCLUDING RESIDENTIAL AND COMMERCIAL AREAS AND SHALL BE REPLACED IN KIND OF EXISTING MATERIAL BY THE CONTRACTOR. AN APPROVED TURF TYPE TALL FESCUE BLEND SHALL BE USED
PER THE CONTRACT DOCUMENTS. KENTUCKY 31 IS NOT AN ACCEPTABLE BLEND.
2. WHEN SEEDING MUST TAKE PLACE OUT OF SEASON FOR PERMANENT GRASS THE APPROPRIATE
TEMPORARY SEEDING SHALL BE DONE AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR
PERMANENT SEEDING AS SPECIFIED IN SEASON AT NO ADDITIONAL COST TO OWNER.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR LAWN MAINTENANCE THROUGH SUBSTANTIAL
COMPLETION. LAWNS MUST BE AT 90% COVERAGE AT SUBSTANTIAL COMPLETION REVIEW TO BE
ACCEPTED. IF NOT AT 90% COVERAGE, SUBSTANTIAL COMPLETION WILL BE DELAYED UNTIL THE
FOLLOWING GROWING SEASON.
B. SITE PREPARATION:
1. REMOVE OR KILL ANY UNDESIRABLE EXISTING TURF OR VEGETATION. HERBICIDE SPRAYING OR OTHER CHEMICAL TREATMENT SHALL BE APPROVED BY THE ACOE PRIOR TO BEING USED BY THE
CONTRACTOR. IF PREEXISTING TURF OR OTHER VEGETATION IS MIXED WITH THE SOIL TO BE
REUSED, THE CONTRACTOR SHALL USE BEST JUDGEMENT IN REMOVING IT OR INCORPORATING IT
INTO THE SOIL DURING PREPARATION.
2. IF TOPSOIL WAS NOT USED TO REESTABLISH THE UPPER SOIL LAYER AND THE UPPER SOIL IS HEAVY WITH HIGH CLAY CONTENT, SPREAD 1.5-2 INCHES OF AGED GROUND PINE BARK OR BAGGED
ORGANIC HUMUS OVER THE AREA TO BE REPAIRED.
3. FOR ALL GRASSES EXCEPT CENTIPEDE GRASS, APPLY PER 1,000 SQUARE FEET: 75 POUNDS OF
GROUND LIMESTONE AND ONE OF THE FOLLOWING FERTILIZERS: 40 POUNDS OF 5-10-10; 20
POUNDS OF 10-20-20; OR 20 POUNDS OF 8-8-8 OR 10-10-10 IN COMBINATION WITH 4 POUNDS OF 0-46-0. CENTIPEDE GRASS PREFERS ACIDIC SOILS AND LOW LEVELS OF PHOSPHORUS AND MAY
NOT REQUIRE THE ADDITION OF LIME AND PHOSPHORUS.
4. INCORPORATE LIME AND FERTILIZER (AND PINE BARK IF ADDED) INTO THE TOP 6 INCHES OF THE SOIL USING A ROTOTILLER OR BY HAND. ROTOTILL OR HAND CULTIVATE TO WELL INCORPORATE
THE AMENDMENTS AND GET A UNIFORM LOOSELY TEXTURED SOIL OF MINIMUM 6-INCH DEPTH.
5. RAKE OR HARROW THE SITE TO ESTABLISH A SMOOTH AND LEVEL FINAL GRADE. SOIL PARTICLES SHOULD BE NO LARGER THAN MARBLE SIZE, AND PEA GRAVEL SIZE IS EVEN BETTER. HAND RAKING TO LEVEL THE SOIL AND WORK OUT HILLS AND HOLLOWS. FOR AREAS LARGER THAN 100 SQ FT ALLOW RAIN OR IRRIGATE TO SETTLE THE SOIL. IN SOME SITUATIONS, THE ACOE MAY REQUIRE ROLLING OR CULTIPACKING TO FIRM THE SOIL BEFORE SEEDING. HAND RAKE AGAIN TO BREAK UP
THE CRUSTY SURFACE BEFORE SEEDING OR PLANTING.
C. INSTALLATION:
1. GENERAL:
a. SEED OR PLANT THE REQUIRED GRASS ACCORDING TO THE TABLE.
b. THE CHOICE OF TURF GRASS TYPE, VARIETY AND PROPAGATION FORM SHALL BE SPECIFIED IN THE CONTRACT DOCUMENTS, AS SPECIFIED IN THE ITEMIZED PROPOSAL, OR AS DESIGNATED BY THE
ACOE.
c. SEED SHALL BE TAGGED CERTIFIED SEED. GERMINATION SHALL BE A MINIMUM OF 95%. SEED SHALL BE 98% PURE WITH LESS THAN 2% OTHER-CROP SEED OR DEBRIS. SEED SHALL BE FREE OF
NOXIOUS WEED SEED.
d. SOD, SPRIGS, PLUGS OR OTHER VEGETATIVE PLANT PROPAGATION MATERIALS SHALL BE CERTIFIED FREE OF NOXIOUS WEEDS. MATERIALS SHALL BE IN GOOD HEALTH AND VIGOR, FREE
OF DISEASE OR PESTS, OR DAMAGE FROM DRYNESS, ADVERSE TEMPERATURE, HERBICIDES,
FERTILIZER OR OTHER CHEMICALS. SPRIGS THAT ARE OLDER THAN 48 HOURS ARE NOT
ACCEPTABLE REGARDLESS OF CONDITION.
e. THE CONTRACTOR SHALL MAINTAIN A LOG OF DATES THAT SOD, SPRIGS, PLUGS, OR OTHER
SEEDING INSTALLATION WAS COMPLETED FOR EACH INDIVIDUAL PROPERTY AND SHALL NOTIFY
THE ACOE OR INSPECTOR OF EACH DAY'S PROGRESS.
2. SEEDING:
a. SOW THE SEED ON FRESHLY PREPARED SOIL. ENSURE UNIFORM COVERAGE BY USING A CENTRIFUGAL (ROTARY) OR DROP-TYPE SPREADER. AREAS LARGER THAN 100 SQ. FT. SHALL BE SEEDED WITH A MINIMUM OF TWO PASSES AT THE APPROPRIATE PARTIAL RATE FOR EACH PASS.
FOR AREAS AVERAGING GREATER 15 FT. WIDTH, APPLY HALF THE SEED IN ONE DIRECTION AND
THE OTHER HALF AT RIGHT ANGLES TO THE FIRST DIRECTION.
b. APPLY A STARTER-TYPE FERTILIZER TO THE SOIL SURFACE ACCORDING TO FERTILIZER TOP
DRESSING NOTES.
c. LIGHTLY COVER THE SEED BY HAND RAKING OR DRAGGING WITH A MAT OR CHAIN-LINK FENCE.
ROLL OR TAMP THE SOIL LIGHTLY TO FIRM THE SURFACE AND PROVIDE GOOD SEED-TO-SOIL
CONTACT.
d. MULCH GRASS SEED WITH WEED-FREE SMALL GRAIN STRAW OR HAY APPLIED AT A RATE OF 2
TONS/ACRE. STABILIZE SMALL AREAS OF MULCH BY ROLLING, WATERING OR TACKING WITH
ASPHALT TACKING SPRAY. TWINE NETTING CAN BE USED IF WIND DISPLACEMENT IS A PROBLEM.
IF APPLIED EVENLY AND LIGHTLY, THESE MATERIALS NEED NOT BE REMOVED. LARGER AREAS
SHALL BE STABILIZED BY ASPHALT TACKING SPRAY OR TWINE NETTING.
D. CLEANUP AND INSPECTION:
1. UPON COMPLETION OF WORK, THE CONTRACTOR SHALL REMOVE FROM THE SITE ALL EQUIPMENT AND OTHER ARTICLES USED. ALL EXCESS SOIL, STONE, AND DEBRIS SHALL BE REMOVED AND LEGALLY DISPOSED OF AT NO ADDITIONAL COST TO THE OWNER. ALL WORK AREAS SHALL BE LEFT IN A CLEAN AND NEAT CONDITION.
ALL DAMAGE TO EXISTING CONSTRUCTION CAUSED BY LANDSCAPING OPERATIONS SHALL BE REPAIRED TO
THE SATISFACTION OF THE OWNER AT THE CONTRACTOR'S EXPENSE.
2. SEEDED AREAS SHALL BE PROTECTED AND REPLANTED AS NECESSARY TO ESTABLISH A UNIFORM STAND OF SPECIFIED GRASS. SCATTERED BARE SPOTS, NONE OF WHICH SHALL BE LARGER THAT ONE (1) SQUARE FOOT, WILL BE ALLOWED UP TO A MAXIMUM OF 3% OF THE SEEDED AREA FOR EACH PROPERTY. WHEN SEEDED AREAS ARE READY FOR INSPECTION, THE MAINTAINED TURF AREAS SHALL BE NEATLY MOWED TO THE UNIFORM HEIGHT OF APPROXIMATELY TWO AND ONE-HALF (2.5) INCHES. THE LAWNS SHALL BE CONSIDERED ESTABLISHED ONLY WHEN THE SPECIFIED GRASS IS VIGOROUS AND GROWING WELL IN ADDITION TO MEETING THE OTHER REQUIREMENTS SPECIFIED. iii. AN INSPECTION OF THE COMPLETED SEEDING SHALL BE MADE AT THE CONCLUSION OF THE LANDSCAPE WORK UPON WRITTEN NOTICE REQUESTING SUCH INSPECTION SUBMITTED BY THE CONTRACTOR TO THE ACOE, AT LEAST TEN (10) DAYS PRIOR TO THE ANTICIPATED DATE OF
INSPECTION.
3. A FINAL INSPECTION SHALL BE PERFORMED WHEN A SATISFACTORY STAND OF SEEDED TURF GRASS HAS BEEN PRODUCED, UPON WRITTEN NOTICE REQUESTING SUCH INSPECTION SUBMITTED BY THE CONTRACTOR TO THE ACOE, AT LEAST TEN (10) DAYS PRIOR TO THE ANTICIPATED DATE OF INSPECTION. IF A SATISFACTORY STAND OF TURF HAS NOT BEEN PRODUCED AT THE TIME OF FINAL INSPECTION, NECESSARY REPAIRS SHALL BE PERFORMED IN CONFORMANCE WITH THE REQUIREMENTS OF THIS SECTION. UPON COMPLETION OF THESE REPAIRS, THE SEEDED GRASS SHALL BE REINSPECTED UPON WRITTEN NOTICE AS ABOVE.
SOUTH CAROLINA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL (SCDHEC) STANDARD EROSION
CONTROL STANDARD NOTES:
1. IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT
TO GRADE.
2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN
FOURTEEN DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW.
2.1. WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND
CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE.
2.2. WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY STABILIZATION
MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE.
3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION
REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION.
4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE SEDIMENT BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE.
5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE
REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED.
6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY
REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED.
7. RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL PROPERTY OWNERS SHALL FOLLOW THESE PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN IN ACCORDANCE WITH S.C REG. 72-300 ET SEQ.
AND SCR100000.
8. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO
PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO
APPROPRIATE TRAPS OR STABLE OUTLETS.
9. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN’T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE
MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS.
10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM
WATER DISCHARGES.
11. A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS
REACHED.
12. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A
PERIOD OF 7 CALENDAR DAYS.
13. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL.
14. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE
CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE;
15. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMPS (SEDIMENT BASIN, FILTER BAG, ETC.).
16. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED:
16.1. WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL;
16.2. WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING
16.3. COMPOUNDS AND OTHER CONSTRUCTION MATERIALS;
16.4. FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE;
AND
16.5. SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING.
17. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL
AREAS OF THE CONSTRUCTION SITE.
18. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR SC’S WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND
ALTERNATIVE BMPS MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE.
19. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES. FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE THIS CONFERENCE MUST BE HELD ON-SITE UNLESS THE DEPARTMENT HAS
APPROVED OTHERWISE.
PROJECT MANAGER
HDR PROJECT #:
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
ALLAN GOFF
ALLAN GOFF
ROBERT BAYSDEN
10136847
NICK OVERBY HYDRAZINE FACILITY
SC AIR NATIONAL GUARD
169TH FIGHTER WING
EASTOVER, SCANG PROJECT #: PSTE172020
CONTRACT #: W912QG-18-F-0040
MCENTIRE JOINT NATIONAL GUARD BASE
C-006
C-006.DWG
CIVIL
EROSION CONTROL NOTES
AS NOTED
- AUG 2020 B-3 DESIGN SUBMISSION
08/28/202008/28/2020
TEMPORARY SILT FENCE
NOT TO SCALE
C-007
SILT FENCE ROCK OUTLET
ELEVATION - UP-SLOPE FACE
SECTION A-A
SILT FENCE ROCK OUTLET
NOT TO SCALE
C-007
PLAN
SECTION A-A
STAKE
(2 PER BALE)
STRAW BALE
(TYP)
10 MIL PLASTIC
LINER
10 MIL PLASTIC
LINER
STRAW
BALE
BINDING
WIRE
STAPLES
(2 PER BALE)
WOOD OR
METAL STAKES
(2 PER BALE)
NATIVE MATERIAL
(OPTIONAL)
1/8" DIA
STEEL WIRE
A A
EXISTING
GRADE
1. ACTUAL LAYOUT DETERMINED IN FIELD.
2. INSTALL CONCRETE WASHOUT SIGN (24"X24", MINIMUM) WITHIN 30' OF THE TEMPORARY
CONCRETE WASHOUT FACILITY.
3. TEMPORARY WASHOUT AREA MUST BE AT LEAST 50' FROM A STORM DRAIN, CREEK BANK OR
PERIMETER CONTROL.
4. REMOVE STRUCTURE AND SIGN UPON PROJECT COMPLETION. GRADE THE EARTH MATERIAL TO
MATCH THE EXISTING CONTOURS AND PERMANENTLY SEED AND MULCH AREA.
5. REFER TO EROSION CONTROL GENERAL NOTES FOR INSPECTION AND MAINTENANCE
SPECIFICATIONS.
NOTES:
CONCRETE WASHOUT AREA
NOT TO SCALE
C-007
1. SILT FENCE POSTS MUST BE 48-INCH LONG STEEL POSTS THAT MEET, AT A MINIMUM, THE FOLLOWING
PHYSICAL CHARACTERISTICS.
COMPOSED OF A HIGH STRENGTH STEEL WITH A MINIMUM YIELD STRENGTH OF 50,000 PSI.
INCLUDE A STANDARD "T" SECTION WITH A NOMINAL FACE WIDTH OF 1.38-INCHES AND A NOMINAL "T"
LENGTH OF 1.48-INCHES.
WEIGH 1.25 POUNDS PER FOOT (± 8%)
2. POSTS SHALL BE EQUIPPED WITH PROJECTIONS TO AID IN FASTENING OF FILTER FABRIC.
3. STEEL POSTS MAY NEED TO HAVE A METAL SOIL STABILIZATION PLATE WELDED NEAR THE BOTTOM WHEN INSTALLED ALONG STEEP SLOPES OR INSTALLED IN LOOSE SOILS. THE PLATE SHOULD HAVE A MINIMUM CROSS SECTION OF 17-SQUARE INCHES AND BE COMPOSED OF 15 GAUGE STEEL, AT A MINIMUM. THE METAL
SOIL STABILIZATION PLATE SHOULD BE COMPLETELY BURIED.
4. INSTALL POSTS TO A MINIMUM OF 24-INCHES. A MINIMUM HEIGHT OF 1- TO 2- INCHES ABOVE THE FABRIC SHALL BE MAINTAINED, AND A MAXIMUM HEIGHT OF 3 FEET SHALL BE MAINTAINED ABOVE THE GROUND.
5. POST SPACING SHALL BE AT A MAXIMUM OF 6-FEET ON CENTER.
1. SILT FENCE MUST BE COMPOSED OF WOVEN GEOTEXTILE FILTER FABRIC THAT CONSISTS OF THE
FOLLOWING REQUIREMENTS:
COMPOSED OF FIBERS CONSISTING OF LONG CHAIN SYNTHETIC POLYMERS OF AT LEAST 85% BY
WEIGHT OF POLYOLEFINS, POLYESTERS, OR POLYAMIDES THAT ARE FORMED INTO A NETWORK
SUCH THAT THE FILAMENTS OR YARNS RETAIN DIMENSIONAL STABILITY RELATIVE TO EACH OTHER;
FREE OF ANY TREATMENT OR COATING WHICH MIGHT ADVERSELY ALTER ITS PHYSICAL
PROPERTIES AFTER INSTALLATION;
FREE OF ANY DEFECTS OR FLAWS THAT SIGNIFICANTLY AFFECT ITS PHYSICAL AND/OR FILTERING
PROPERTIES; AND,
HAVE A MINIMUM WIDTH OF 36-INCHES.
2. USE ONLY FABRIC APPEARING ON SC DOT'S QUALIFIED PRODUCTS LISTING (QPL), APPROVAL SHEET #34, MEETING THE REQUIREMENTS OF THE MOST CURRENT EDITION OF THE SC DOT STANDARD
SPECIFICATIONS FOR HIGHWAY CONSTRUCTION.
3. 12-INCHES OF THE FABRIC SHOULD BE PLACED WITHIN EXCAVATED TRENCH AND TOED IN WHEN THE
TRENCH IS BACKFILLED.
4. FILTER FABRIC SHALL BE PURCHASED IN CONTINUOUS ROLLS AND CUT TO THE LENGTH OF THE BARRIER
TO AVOID JOINTS.
5. FILTER FABRIC SHALL BE INSTALLED AT A MINIMUM OF 24-INCHES ABOVE THE GROUND.
1. DO NOT PLACE SILT FENCE ACROSS CHANNELS OR IN OTHER AREAS SUBJECT TO CONCENTRATED FLOWS. SILT FENCE SHOULD NOT BE USED AS A VELOCITY CONTROL BMP. CONCENTRATED FLOWS ARE ANY FLOWS
GREATER THAN 0.5 CFS.
2. MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO THE SILT FENCE SHALL BE 100-FEET.
3. MAXIMUM SLOPE STEEPNESS (NORMAL [PERPENDICULAR] TO THE FENCE LINE) SHALL BE 2:1.
4. SILT FENCE JOINTS, WHEN NECESSARY, SHALL BE COMPLETED BY ONE OF THE FOLLOWING OPTIONS:
WRAP EACH FABRIC TOGETHER AT A SUPPORT POST WITH BOTH ENDS FASTENED TO THE POST, WITH A
1-FOOT MINIMUM OVERLAP;
OVERLAP SILT FENCE BY INSTALLING 3-FEET PASSED THE SUPPORT POST TO WHICH THE NEW SILT FENCE
ROLL IS ATTACHED. ATTACH OLD ROLL TO NEW ROLL WITH HEAVY-DUTY PLASTIC TIES; OR,
OVERLAP ENTIRE WIDTH OF EACH SILT FENCE ROLL FROM ONE SUPPORT POST TO THE NEXT SUPPORT
POST.
5. ATTACH FILTER FABRIC TO THE STEEL POSTS USING HEAVY-DUTY PLASTIC TIES THAT ARE EVENLY SPACED
WITHIN THE TOP 8-INCHES OF THE FABRIC.
6. INSTALL THE SILT FENCE PERPENDICULAR TO THE DIRECTION OF THE STORMWATER FLOW AND PLACE THE SILT FENCE THE PROPER DISTANCE FROM THE TOE OF STEEP SLOPES TO PROVIDE SEDIMENT STORAGE AND
ACCESS FOR MAINTENANCE AND CLEANOUT.
7. INSTALL SILT FENCE CHECKS (TIE-BACKS) EVERY 50-100 FEET, DEPENDENT ON SLOPE, ALONG SILT FENCE THAT IS INSTALLED WITH SLOPE AND WHERE CONCENTRATED FLOWS ARE EXPECTED OR ARE DOCUMENTED ALONG
THE PROPOSED/INSTALLED SILT FENCE.
FLAT-BOTTOM TRENCH DETAIL
V-SHAPED TRENCH DETAIL
SILT FENCE INSTALLATION
1. SILT FENCE TO EXTEND AROUND ENTIRE PERIMETER OF STOCKPILE, OR IF STOCKPILE AREA IS LOCATED ON/NEAR A SLOPE THE
SILT FENCE IS TO EXTEND ALONG CONTOURS OF THE DOWN-GRADIENT AREA.
2. IF STOCKPILE IS TO REMAIN FOR MORE THAN 14 DAYS, TEMPORARY STABILIZATION MEASURES MUST BE IMPLEMENTED.
3. SILT FENCE SHALL BE MAINTAINED UNTIL STOCKPILE AREA HAS EITHER BEEN REMOVED OR PERMANENTLY STABILIZED.
4. THE KEY TO FUNCTIONAL TEMPORARY STOCKPILE AREAS IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR
SEDIMENT REMOVAL.
SILT FENCE
(SEE DETAIL
FOR MORE
INFORMATION)
SOIL/SEDIMENT
STOCKPILE AREA
ORIGINAL GROUND SURFACE
10"
(TYP.)
TEMPORARY STOCKPILE
NOT TO SCALE
C-007
PROJECT MANAGER
HDR PROJECT #:
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
ALLAN GOFF
ALLAN GOFF
ROBERT BAYSDEN
10136847
NICK OVERBY HYDRAZINE FACILITY
SC AIR NATIONAL GUARD
169TH FIGHTER WING
EASTOVER, SCANG PROJECT #: PSTE172020
CONTRACT #: W912QG-18-F-0040
MCENTIRE JOINT NATIONAL GUARD BASE
C-007
C-007.DWG
CIVIL
EROSION CONTROL DETAILS
AS NOTED
- AUG 2020 B-3 DESIGN SUBMISSION
08/28/202008/28/2020
TYPE A - SEDIMENT TUBE INLET PROTECTION
C-008
C-008
1. STABILIZED CONSTRUCTION ENTRANCES SHOULD BE
USED AT ALL POINTS WHERE TRAFFIC WILL
EGRESS/INGRESS A CONSTRUCTION SITE ONTO A PUBLIC
ROAD OR ANY IMPERVIOUS SURFACES, SUCH AS PARKING
LOTS.
2. INSTALL A NON-WOVEN GEOTEXTILE FABRIC PRIOR TO
PLACING ANY STONE.
3. INSTALL A CULVERT PIPE ACROSS THE ENTRANCE WHEN
NEEDED TO PROVIDE POSITIVE DRAINAGE.
4. THE ENTRANCE SHALL CONSIST OF 2-INCH TO 3-INCH D50
STONE PLACED AT A MINIMUM DEPTH OF 6-INCHES.
5. MINIMUM DIMENSIONS OF THE ENTRANCE SHALL BE
24-FEET WIDE BY 100-FEET LONG, AND MAY BE MODIFIED
AS NECESSARY TO ACCOMMODATE SITE CONSTRAINTS.
6. THE EDGES OF THE ENTRANCE SHALL BE TAPERED OUT
TOWARDS THE ROAD TO PREVENT TRACKING AT THE
EDGE OF THE ENTRANCE.
7. DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM THE
STONE PAD TO A SEDIMENT TRAP OR BASIN OR OTHER
SEDIMENT TRAPPING STRUCTURE.
8. LIMESTONE MAY NOT BE USED FOR THE STONE PAD.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE
NOT TO SCALE
POST INSTALLATION DETAIL
SEDIMENT TUBE INSTALLATION
DETAIL
SEDIMENT TUBE BURIAL DETAIL
"D"=TUBE DIAMETER
2" x 2" WOOD STAKES or
1.25 #/FT
STEEL POSTS
1. SEDIMENT TUBES ARE ELONGATED TUBES OF COMPACTED GEOTEXTILES,
CURLED EXCELSIOR WOOD, NATURAL COCONUT FIBER, OR HARDWOOD
MULCH. STRAW, PINE NEEDLE, AND LEAF MULCH-FILLED SEDIMENT
TUBES ARE NOT PERMITTED.
2. THE OUTER NETTING OF THE SEDIMENT TUBE SHOULD CONSIST OF
SEAMLESS, HIGH-DENSITY POLYETHYLENE PHOTODEGRADABLE MATERIALS
TREATED WITH ULTRAVIOLET STABILIZERS OR A SEAMLESS, HIGH-DENSITY
POLYETHYLENE NON-DEGRADABLE MATERIAL.
3. SEDIMENT TUBE DIAMETERS SHALL RANGE FROM 18-INCHES TO
24-INCHES. SEDIMENT TUNES WITH SMALLER DIAMETERS ARE
PROHIBITED WHEN USED AS INLET PROTECTION.
4. CURLED EXCELSIOR WOOD, OR NATURAL COCONUT PRODUCTS THAT ARE
ROLLED UP TO CREATE A SEDIMENT TUBE ARE NOT ALLOWED.
5. SEDIMENT TUBES SHOULD BE STAKED USING WOODEN OAK STAKES
(2-INCH X 2-INCH) OR STEEL POSTS (STANDARD "U" OR "T"
SECTIONS WITH A MINIMUM WEIGHT OF 1.25 POUNDS PER FOOT) AT
A MINIMUM OF 48-INCHES IN LENGTH PLACED ON 2-FOOT CENTERS.
6. INSTALL ALL SEDIMENT TUBES TO ENSURE THAT NO GAPS EXIST
BETWEEN THE SOIL AND THE BOTTOM OF THE TUBE. MANUFACTUER'S
RECOMMENDATIONS SHOULD ALWAYS BE CONSULTED BEFORE
INSTALLATION.
7. THE ENDS OF ADJACENT SEDIMENT TUBES SHOULD BE OVERLAPPED
6-INCHES TO PREVENT FLOW AND SEDIMENT FROM PASSING THROUGH
THE FIELD JOINT.
8. SEDIMENT TUBES SHOULD NOT BE STACKED ON TOP OF ONE ANOTHER.
9. EACH SEDIMENT TUBE SHOULD BE INSTALLED IN A TRENCH WITH A
DEPTH EQUAL TO 1/5 THE DIAMETER OF THE SEDIMENT TUBE.
10. INSTALL STAKES AT A DIAGONAL FACING INCOMING RUNOFF.
C-008
DESCRIPTION
WHEN AND WHERE TO USE IT:
MATERIALS
NOT
INSTALLATION:
INSPECTION AND MAINTENANCE:
PROJECT MANAGER
HDR PROJECT #:
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
ALLAN GOFF
ALLAN GOFF
ROBERT BAYSDEN
10136847
NICK OVERBY HYDRAZINE FACILITY
SC AIR NATIONAL GUARD
169TH FIGHTER WING
EASTOVER, SCANG PROJECT #: PSTE172020
CONTRACT #: W912QG-18-F-0040
MCENTIRE JOINT NATIONAL GUARD BASE
C-008
C-008.DWG
CIVIL
EROSION CONTROL DETAILS
AS NOTED
- AUG 2020 B-3 DESIGN SUBMISSION
08/28/202008/28/2020
CONCRETE BOLLARDS
CONCRETE SIDEWALK
NOT TO SCALE
4,000 PSI AIR-ENTRAINED
CONCRETE SLAB.
GRADED AGGREGATE
BASE COURSE
COMPACTED SUBGRADE
#4 REBAR @ CENTER OF POUR,
15" O.C., E.W., MIN. 2" CLR. (TYP)
HEAVY DUTY CONCRETE PAVEMENT SECTION
NOT TO SCALE
HOLD DOWN CONCRETE PAD
SEE STRUCTURAL DRAWINGS
FOR ADDITIONAL DETAILS
11,000 GALLON STAINLESS STEEL
DUAL WALL HYDRAZINE (H-70)
NEUTRALIZATION TANK
ANCHOR STRAPS
32" ACCESS MANWAY WITH
ACCESS LADDER
INLET FROM 4" HDPE DRAIN
1" DRAIN PUMP WITH MANUAL CONTROL SWITCH
SEE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION
(TANK MANUFACTURER TO VERIFY FINAL PUMP SIZING
BASED ON ACTUAL PIPE AND COMPONENT
CONFIGURATIONS USED. ENSURE ALL OPERATIONAL
PERFORMANCE REQUIREMENTS ARE MET)
STAINLESS STEEL 4" DROP TUBE
DROP TUBE OUTLET SET 6" ABOVE
TANK FLOOR
CONNECT TO 2" HDPE FORCEMAIN
2" TANK LEAK DETECTION
11,000 GALLON STAINLESS STEEL H-70 NEUTRALIZATION TANK
NOT TO SCALE
PROJECT MANAGER
HDR PROJECT #:
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
ALLAN GOFF
ALLAN GOFF
ROBERT BAYSDEN
10136847
NICK OVERBY HYDRAZINE FACILITY
SC AIR NATIONAL GUARD
169TH FIGHTER WING
EASTOVER, SCANG PROJECT #: PSTE172020
CONTRACT #: W912QG-18-F-0040
MCENTIRE JOINT NATIONAL GUARD BASE
C-009
C-009.DWG
CIVIL
SITE CONSTRUCTION DETAILS
AS NOTED
- AUG 2020 B-3 DESIGN SUBMISSION
08/28/202008/28/2020
TYPE 1 UTILITY TRENCH PATCH
VALVE BOX & PROTECTOR RING
DETAIL
NOTES:
GATE VALVES SHALL OPEN LEFT.
VALVE BOX MUST BE STANDARD CAST IRON SCREW-ON TYPE.
GATE VALVE BOX DETAIL VALVE BOX & PROTECTOR RING DETAIL
NOT TO SCALE
10' MIN.
PROFILE
PLAN
2" FM
4" FM
45° BEND
FORCE MAIN 45° BEND 8" GS
MAINTENANCE ACCESS STRUCTURE
INCREASER
45° BEND
WALL PENETRATING
SEAL
NOTES:
1. CONNECTION TO EXISTING MANHOLE TO BE COORDINATION WITH BASE UTILITIES.
FORCE MAIN CONNECTION TO GRAVITY SEWER MANHOLES DETAIL
NOT TO SCALE
SDR35 PVC PIPE
FINISHED GRADE
NDS STD. SERIES 111BCS
10" VALVE BOX LABELLED
"SEWER" OR APPROVED
EQUAL
2" m in
. FEMALE THREADED
ADAPTOR w/ PLUG
(SOLVENT)
CLEANOUT BOX (Unimproved)
NOTE:
APPLY PLUMBERS SILICONE OR OTHER APPROVED
LUBRICANT TO THREADS OF PLUG.
SANITARY SEWER CLEANOUT BOX DETAIL
NOT TO SCALE
PROJECT MANAGER
HDR PROJECT #:
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
ALLAN GOFF
ALLAN GOFF
ROBERT BAYSDEN
10136847
NICK OVERBY HYDRAZINE FACILITY
SC AIR NATIONAL GUARD
169TH FIGHTER WING
EASTOVER, SCANG PROJECT #: PSTE172020
CONTRACT #: W912QG-18-F-0040
MCENTIRE JOINT NATIONAL GUARD BASE
C-010
C-010.DWG
CIVIL
SITE CONSTRUCTION DETAILS
AS NOTED
- AUG 2020 B-3 DESIGN SUBMISSION
08/28/202008/28/2020
CHAIN LINK FABRIC
#9 GAUGE 2" MESH
12" 6"
PROVIDE BARBED WIRE
AS SPECIFIED
NOTES:
1. PULL POST SHALL BE USED AT SHARP BREAKS
IN VERTICAL GRADES OR AT APPROXIMATELY
330' CENTERS ON STRAIGHT RUNS, OR AS
DIRECTED BY THE ENGINEER.
2. SPLICES SHALL BE IN WOVEN WIRE FABRIC
ONLY AT CORNER, GATE END, OR PULL POSTS.
END, CORNER OR PULL
POST (STEEL) 4" OD STEEL
PIPE - CORNER
AND PULL POSTS TO HAVE
EQUAL BRACING
ON BOTH SIDES
LINE POST
2 1/2" OD
STEEL PIPE
TENSION
BAR
12" 3'
-0
7' -0
" F
AB
R
IC
3' -0
10'-0" MAXIMUM
TENSION
BAR BANDS
3/8" TRUSS ROD
AT END SECTIONS
1 5/8" OD
BRACE TUBE
1 5/8" OD TOP RAIL
TENSION WIRE
CAP
CHAINLINK SECURITY FENCE DETAIL
NOT TO SCALE
DETAIL D
1 1/2
GATE
HEIGHT
7', 8', 9'
VARIESGATE OPENING
6' THROUGH 24'
A
B
37/64
27/64 15/64POST
GATE RECEIVER
FENCE LINE
FENCE POST
GATE MOUNTING POST
FENCE LINE
FENCE POST
FENCE
MOUNTING
POST
GATE
MOUNTING
POST
C
D
ISO VIEW
DETAIL A
3/8" THICK
PLATE
3/8"
BOLT
2" x 2"
TUBE
DETAIL B
SIDE VIEW
DETAIL C
FRONT VIEW TOP VIEW SIDE VIEW TOP VIEWFRONT VIEW
16' SLIDE GATE DETAIL
NOT TO SCALE
PROJECT MANAGER
HDR PROJECT #:
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
ALLAN GOFF
ALLAN GOFF
ROBERT BAYSDEN
10136847
NICK OVERBY HYDRAZINE FACILITY
SC AIR NATIONAL GUARD
169TH FIGHTER WING
EASTOVER, SCANG PROJECT #: PSTE172020
CONTRACT #: W912QG-18-F-0040
MCENTIRE JOINT NATIONAL GUARD BASE
C-011
C-011.DWG
CIVIL
SITE CONSTRUCTION DETAILS
AS NOTED
- AUG 2020 B-3 DESIGN SUBMISSION
08/28/202008/28/2020
JCOOKSEY
AIR BARRIER
FIRST FLOOR
231.90
T.O. MASONARY
243.90
AIR BARRIER
AIR BARRIER TO
EXTEND TO ROOF DECK
AS NOTED
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET CONTRACT #: W912QG-18-F-0040
ANG PROJECT #: PSTE172020
HDR PROJECT #: 10136847
HYDRAZINE FACILITY
SC AIR NATIONAL GUARD
169TH FIGHTER WING
EASTOVER, SC
MCENTIRE JOINT NATIONAL GUARD BASE
C :\r vt \2
8\
-0 0-
A _d an ie l.p ur pu ra
JH
K
T X
.r vt
8/
/2
3:
:0
P
M
A-100
NICK OVERBY
10136847-00-A.rvt
AIR BARRIER PLAN
J. TABOR
N. REESE
P. DAUGHTON
- 1/4" = 1'-0"
1 FLOOR PLAN
- 3/4" = 1'-0"
2 WALL SECTION AIR BARRIER
AIR BARRIER TO MEET REQUIREMENTS OF UFC 3-101-01 AND SPECIFICATION SECTION 07 27 10.00 10.
AUG 2020 B-3 DESIGN SUBMISSION
DPURPURA
FAAIM
AOM
IM
WF
P
NAC
FACU
AIM
F
SS
VS
K
FA
FA
FA
NOT ALL SYMBOLS/ABBREVIATIONS MAY BE USED
EXP
EXP
EXP
EXP
EXP
PIPE SADDLE
PROVIDE
CLAMP
WITH
SUPPORT
LENGTH & THREADS
TO ALLOW MINIMUM
AND MAXIMUM
DIMENSIONS SHOWN
IN TABLE. USE
STRAIGHT THREADS.
SCHEDULE 40 PIPE
THREADED 150 LB
REDUCING FLANGE
(4) EPOXY ADHESIVE
ANCHORS.
1. WATERTIGHT FLOOR SLEEVE
2. FIRE DEPEARTMENT CONNECTION
3. CHECK VALVE
4. 24 VDC HORN AND STROBE
5. WATER FLOW INDICATOR
6. N.C. CONTROL VALVE
7. PRESSURE GAUGE
8. MAIN DRAIN VALVE
9. MAIN DRAIN
10. DOUBLE CHECK BACKFLOW PREVENTER WITH INDICATING
VALVES
11. MAIN WATER SUPPLY
12. NOT USED
13. FLOOR PIPE SUPPORT
14. SPLASH BLOCK
15. WATERTIGHT WALL SLEEVE
ITEM DESCRIPTION
THRUST BLOCK / RESTRAINED JOINT
SYSTEMS PER NFPA 24.
NOTES:
- ALL SPRINKLER SWITCHES AND VALVES
SHALL BE MONITORED BY THE FIRE ALARM
SYSTEM.
- PROVIDE RODDING, THRUST BLOCK,
SLEEVES, AND SEALANT PER NFPA 24 &
NFPA 13 AT ENTRANCE.
- THIS DETAIL IS FOR DIAGRAMMATIC
PURPOSES ONLY. CONTRACTOR SHALL
DETERMINE FINAL LAYOUT.
FINISHED FLOOR
8/28/2020 edward chinnis SC PE Seal edward chinnis z
SC PE Seal edward chinnis
SC PE Seal edward chinnis
SC PE Seal edward chinnis
SC PE Seal edward chinnis
SC PE Seal edward chinnis
SC PE Seal edward chinnis
This page intentionally left blank.