Add-Alter B235 - Type B-3 - Specifications (Div 01-06) - Rev 1.pdf
PDF 7 MB Posted
- Attached to
- 142 FW B235 ADAL Construction Federal contract opportunity
- Solicitation number
- W50S8Y24B0001
About this file
This document package includes specifications for a construction project solicitation. The solicitation is for project B235 additions and alterations at Building 235 for the 142nd Fighter Wing of the Oregon Army National Guard. Work includes adding 6,500 square feet of new corrosion control space. Specifications cover divisions including general requirements, existing conditions, concrete, masonry, metals, wood, thermal and moisture protection, openings, finishes, specialties, furnishings, special construction, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, and appendices. The specifications provide requirements for submittals, schedules, quality control, safety, environmental protection and other administrative requirements to complete the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Offers - B235.pdf | ||
| RFI Attachment P235_STRU_S-110_2023-12-07 1.pdf | ||
| B235 RFIs Page 2 of 2 - 12-11-2023.pdf | ||
| W50S8Y24B0001 Amendment 3.pdf | ||
| B235 RFIs Page 2 of 2 - 12-1-2023.pdf | ||
| W50S8Y24B001 Amendment 2.pdf | ||
| B235 RFIs Page 1 of 2 - 11-22-2023.pdf | ||
| B235 Site Visit Sign-In.pdf | ||
| Add-Alter B235 - Type B-3 - Drawings - Rev 1 - Signed.pdf | ||
| Add-Alter B235 - Type B-3 - Specifications (Appendices).pdf | ||
| Add-Alter B235 - Type B-3 - Specifications (Div 23-33).pdf | ||
| W50S8Y24B001 Amendment 1.pdf | ||
| Add-Alter B235 - Type B-3 - Specifications (Div 07-22).pdf | ||
| J and A for Monaco - Sole Source signed.pdf | ||
| J and A for Automated Logic - Sole Source signed.pdf | ||
| W50S8Y24B0001 Solicitation.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TYPE B-3 F INAL
Specifica ons (Divisions 01-06)
Add/Alter B235 Corrosion Control Project Number TQKD209002
Prepared for
142nd Civil Engineering Squadron Oregon Air NOregon Air Na onal Guard Portland ANG Base, OR
February 2023 (Rev. April 2023)
T Y P E B - 3 F I N A L
Add/Alter B235 Corrosion Control Project Number TQKD209002
Specifications (Divisions 01-06)
Prepared for
142nd Civil Engineering Squadron
Oregon Air National Guard
Portland ANG Base
February 2023
(Rev. April 2023)
CH2M HILL – HDR JV
1100 NE Circle Blvd., Suite 300
Corvallis OR, 97330
CERTIFICATIONS PAGE
PROJECT TITLE:
AGENCY:
LOCATIONS:
ANG PROJECT NUMBER:
Add-Alter B235
OR Air National Guard
Portland ANG Base, OR
TQKD209002
Project Manager
Civil Engineer
Structural Engineer
Architect
Fire Protection Engineer
Plumbing Engineer
Mechanical Engineer Electrical Engineer
Communications Designer
Add/Alter B235 OR Air National Guard Portland Air National Guard Base, OR Project No. TQKD209002
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 50 REQUEST FOR INFORMATION
01 32 01.00 10 PROJECT SCHEDULE
01 32 16.00 20 CONSTRUCTION PROGRESS DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 13 SPECIAL PROJECT PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 40.00 20 ENVIRONMENTAL MANAGEMENT
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION AND DEMOLITION WASTE
MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 81 00 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
02 84 33 REMOVAL AND DISPOSAL OF
POLYCHLORINATED BIPHENYLS (PCBs)
02 85 00 MOLD REMEDIATION
DIVISION 03 - CONCRETE
03 01 00 REHABILITATION OF CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 05 20.00 27 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 05 23.13 10 ULTRASONIC INSPECTION OF WELDMENTS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
PROJECT TABLE OF CONTENTS Page 1 SECTION PROJECT Page 1
VOLUME 01 (DIVISIONS 01-06)
05 30 00 STEEL DECKS
05 51 33 METAL LADDERS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 19 00 WATER REPELLENTS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 41 13 METAL ROOF PANELS
07 42 13 METAL WALL PANELS
07 54 19 POLYVINYL-CHLORIDE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 33 23 OVERHEAD COILING DOORS
08 51 13 ALUMINUM WINDOWS
08 60 45 TRANSLUCENT PANELS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 22 36 LATH
09 24 23 CEMENT STUCCO
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING,
3-COAT SYSTEM
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
PROJECT TABLE OF CONTENTS Page 2 SECTION PROJECT Page 2
VOLUME 02 (DIVISIONS 07-22)
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 73 SEISMIC CONTROL FOR MISCELLANEOUS
EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 11 20 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 30 00 HVAC AIR DISTRIBUTION
23 52 00 HEATING BOILERS
23 80 20.00 10 GAS-FIRED HEATING EQUIPMENT
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 CYBERSECURITY FOR LOW IMPACT
FACILITY-RELATED CONTROL SYSTEMS
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
DIVISION 26 - ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 41 00 26 51 00 26 56 00
LIGHTNING PROTECTION SYSTEM
INTERIOR LIGHTING
EXTERIOR LIGHTING
PROJECT TABLE OF CONTENTS Page 3 SECTION PROJECT Page 3
25 10 10 UTILITY MONITORING AND CONTROL STYSTEM
(UMCS) FRONT AND INTEGRATION
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
VOLUME 3 (DIVISIONS 23-33)
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 63 29 DRILLED CONCRETE PIERS AND SHAFTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 ROAD-MIX ASPHALT PAVING
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4 SECTION PROJECT Page 4
VOLUME 04
APPENDICES GEOTECHNICAL REPORT
HAZMAT REPORT
CODES AND STANDARDS REFERENCED HEREIN
THIS PROJECT IS DESIGNED IN ACCORDANCE WITH THE 2018 INTERNATIONAL BUILDING
CODE (IBC) AND THE 2018 INTERNATIONAL EXISTING BUILDING CODE (IEBC) AS
MODIFIED BY UFC 1-200-01, 01 OCTOBER 2020.
THE UNITED FACILITIES GUIDE SPECIFICATIONS (UFGS) ARE UPDATED REGULARLY.
THE VERSION OR EDITION OF CODES AND STANDARDS REFERENCED HEREIN MAY
DIFFER FROM THOSE SPECIFIED IN CHAPTER 35 OF THE 2018 IBC AND CHAPTER 16 OF
THE 2018 IEBC. IN THE EVENT OF DISCREPENCIES REGARDING VERSION OR EDITION OF
CODES AND STANDARDS, THE 2018 IBC AND 2018 IEBC WILL TAKE PRECEDENCE.
Section 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
These specifications are prepared for the Add/Alter B235 project at the Portland Air National Guard Base.
The Add/Alter B235 project adds 6,500 SF of new corrosion control space to existing Building 235.
The work to be performed under this contract includes all work identified in the contract drawings and specifications.
1.1.2 Location
The work is located at Building 235 at the Portland Air National Guard Base.
The exact location is shown on the drawings.
1.2 INITIAL APPOINTMENT TO VISIT JOB SITE
1.2.1 Job Site Walk Through
A job site walk through may be scheduled for all interested bidders prior to the bid due date that is scheduled and advertised by the KO. Otherwise all bidders shall call and coordinate with the COR at 142 CES for access to the job site.
1.2.2 Access Requests
General:
a. Provide base access requests 72 hours in advance to security forces.
Late requests may result in denial of access. Larger lists over 25 individuals may take more time. Plan accordingly.
b. Please contact Installation Access directly for short fused/last minute requests. Requests received after 1500 (3:00pm- Pacific) may not be processed until the following BUSINESS day.
c. If notification has not been received of clearance or denial after three business days, please contact the Installation Access office directly.
d. The Portland Air National Guard Base uses the Defense Biometric Identification System (DBIDS) for all visitor passes and access credentials. It is your duty, if you are bringing someone aboard this facility, to ensure they are prepared and in compliance with the standing DoD and local policy for installation access.
Security Coordinator:
Section 01 11 00 Page 2
a. It is the prime contractors responsibility to assign a "security coordinator" to the project. This person will send all names and contact information to the base security forces office for clearance. They will be the liason between project vendors and the security forces team.
b. The security coordinator will be the point of contact for base security with ongoing clearance for vendors.
Process:
a. When sending vendor information to security forces, cc your COR, Project Manager or Project POC in the email.
b. Email requests to 142.WG.SFS.VendorPass@us.af.mil c.Any requests outside of this process will be directed to the prime and directed to use the proper channels.
d. Place the information in the body of the email as plain text. Do not add photos in email. DO NOT SEND AS AN ATTACHMENT UNLESS YOU HAVE PREVIOUSLY MADE ARRANGEMENTS TO DO SO. Sending photocopies/scans of personal identification creates a risk of information loss or compromise. Government security software frequently removes attachments from emails coming from unknown sources, which causes delays in the process.
Full name Date of birth Driver's license Number/State Last four digits of Social Security number Name of the project vendor is requesting access.
Name of the COR, Project Manager or POC
Requests:
a. A courtesy notification email will be sent to security coordinator.
They will(should) be included in the response from the security managers personnel who has completed and is approved on the check.
b. DO NOT reply all on the response you receive.
c. Individuals will be listed as "clear" or "not clear".
c.1 Federal and state laws prevent security forces from releasing further information.
c.2 If you have questions concerning a clearance or denial notification, please direct them to the individual who sent the notification. (NOTE: SEE Do not reply all. Only reply to individual who sent notification.)
Special requests on denials are a case by case basis, this is an exception and not a standard. These should be directed to Cliff Bergstrom clifford.bergstrom.1@us.af.mil
1.2.3 Guidelines For Entering The Base
a. The Oregon Air National Guard base is located at 6801 NE Cornfoot Road in Portland, Oregon 97218.
b. Please do not attempt to enter the Jackson Armory (red sign).
c. Upon entering the main gate please have a valid driver's license, vehicle insurance and registration ready for the security officer;
Section 01 11 00 Page 3 it saves a lot of time. You will not be allowed to drive on base without these documents.
d. Contractors are not allowed to bring weapons onto the ANG base;
this includes concealed weapon permit holders.
e. All vehicles entering the base are subject to search.
f. Cell phone use at the contractor gate is prohibited.
g. Spitting or smoking tobacco products at the contractor gate is prohibited.
h. Badge must be worn visible at all times while working on base.
Unless special work duties prevents wearing for safety issues. Must be requested and cleared by security forces.
1.3 BASE ACCESS AND SECURITY
1.3.1 Contractor Identification Badges
1.3.1.1 DBIDS Badges
To be issued by the 142nd SFS (Security Forces) to the Contractor and his personnel and subcontractors.
1.3.1.2 Coordination
The contractor shall be responsible for the coordinating with the 142 SFS/Resource Protection Office (503-335-4984) to gain base access and approval of their personnel and subcontractors. This requires an appointment for each individual needing a DBIBS Badge.
a. Contractors and subcontractors working on the installation shall be issued contractor identification badges.
b. Contractors shall have visible on their person while at PANG.
1.3.2 AT Level Training
a. All contractor employees, to include subcontractor employees, requiring access to Government Installations, Facilities and Controlled Access areas shall complete AT Level l awareness training within ten (10) calendar days after contract NTP.
b. Certificates of completion for each affected contractor employee and subcontractor employee shall be submitted to the COR.
c. AT Level l Awareness Training will be performed at the Base SFS Building (145). If the Contractors personnel is unable to attend this Base Training, the Contractor personnel shall complete the training at the following website: https://atlevel1.dtic.mil/at.
1.4 OCCUPANCY OF PREMISES
Building(s) will not be occupied during performance of work under this Contract.
http://atlevel1.dtic.mil/at
Section 01 11 00 Page 4
Before work is started, the Contractor shall arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.5 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.6 ON-SITE PERMITS
Notify the Contracting Officer at least 3 working days prior to starting excavation work. The Contractor shall obtain from the Contracting Officer a completed AF 103 Form. A separate AF Form 103 is required for each discrete area to be disturbed. The Contractor shall retain this form until completion of work.
Contractor is responsible for marking and verifying all utilities not marked. Once an area to be excavated has been marked, the contractor is solely responsible for maintaining all markings throughout the life of the contract as needed to facilitate his work. This permit may be issued daily or up to a week at the discretion of the Government.
The Contractor shall obtain an approved Welding, Cutting and Brazing Permit, AF Form 592, from the ANG Base Fire Department prior to welding or starting any open flames. This permit shall be renewed daily.
Other Federal, State and local permits may be required as referenced in Contract Clause 52.236-7 entitled "Permits and Responsibilities."
1.6.1 Asbestos
Accomplish all surveys, permits, plans, training, applications or fees associated with asbestos in accordance with state DEQ requirements.
Asbestos Survey: Except as OAR 340-248-0250 provides, before performing a demolition or renovation, the contractor must have an accredited inspector complete a survey according to OAR 340-248-0270(3). The demolition or renovation activity that requires a survey under OAR 340-248-0270(1) must send a copy of the asbestos survey report to DEQ upon request by DEQ and keep a copy of the asbestos survey report onsite at the facility during a demolition or renovation activity. Additional information and requirements can be found at:
https://secure.sos.state.or.us/oard/displayDivisionRules.action?selectedDivi sion=1557
Section 01 11 00 Page 5
Existing Base Asbestos Management Program: The base asbestos management program consists of an Asbestos Management Plan (AMP) and an Asbestos Operating Plan (AOP) available through the COR. The asbestos surveys conducted as part of the AMP are nondestructive surveys, as such if areas are involved in major renovation or demolition, an additional survey is required. The contractor shall provide adequate protection to the environment and their workers as defined by Oregon DEQ and OSHA. In the event that the survey or the contractor encounters any materials believed to contain asbestos, the contractor shall notify the contracting officer immediately.
1.7 LOCATION OF UNDERGROUND UTILITIES
The Contractor shall scan the construction site with electromagnetic or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities, and any type of underground or encased obstruction not indicated to be specified or removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.8 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged shall remain the property of the Government.
a. Non-damaged ceiling tiles
b. Cypher lock (Room 86)
The salvaged property shall be segregated, itemized, delivered, and off-loaded at the Government designated storage area.
Contractor shall maintain property control records for material or equipment designated as salvage. Contractor's system of property control may be used if approved by the Contracting Officer. Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
-- End of Section --
Section 01 14 00 Page 1
SECTION 01 14 00
WORK RESTRICTIONS
1.1 SPECIAL SCHEDULING REQUIREMENTS
b. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
c. The adjacent facilities will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations.
d. Permission to interrupt any roads, railroads, and/or utility service shall be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
1.2 CONTRACTOR ACCESS AND USE OF PREMISES
1.2.1 Working Hours
Regular working hours are between the hours of 7 a.m. and 4 p.m., Monday through Friday, excluding Government holidays.
1.2.2 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
The Contractor shall provide justification for this work outside of regular working hours. Except for utility cutover work, the Government may require compensation for all additional personnel or services it shall perform to accommodate such work. Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress
1.2.3 Occupied Buildings
The Contractor shall be working in an existing building which is occupied.
The existing buildings and their contents shall be kept secure at all times.
Provide temporary closures as required to maintain security as directed by the Contracting Officer.
Provide dust covers or protective enclosures to protect existing work that remains and Government material located in the buildings during the construction period.
The Government will remove and relocate other Government property in the areas of the buildings scheduled to receive work.
1.2.4 Utility Cutovers and Interruptions
a. Coordinate utility cutovers and interruptions with the Contracting Officer. This may require work after normal working hours or on
Section 01 14 00 Page 2
Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air, are considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours." Such interruption are further limited to regular work 7:00am-4:00pm hours. This time limit includes time for deactivation and reactivation.
d. Operation of Station Utilities: The Contractor shall not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor shall notify the Contracting Officer giving reasonable advance notice when such operation is required.
Not Used
Section 01 30 00 Page 1
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33
00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Progress and completion pictures Project Schedule; CPM and AF3064 and AF 3065; G Demolition Plan; G AF66, Material Submittal Log with completion dates;
G Requests for substitution; G List of subcontractors; G Schedule of Values; G Quality Control Plan; G Waste Management Plan; G MSDS Sheets Initial Base Access List; G
SD-04 Samples
Color boards; G
1.2 PROGRESS AND COMPLETION PICTURES
Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color in JPEG file format showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten views. Submit a view location sketch indicating points of view. Submit with the monthly invoice on a CD-R, cumulative of all photos to date.
Indicate photographs demonstrating environmental procedures. Photographs for each month shall be in a separate monthly directory and each file shall be named to indicate its location on the view location sketch. The view location sketch shall also be provided on the CD as digital file. All file names shall include a date designator. Cross reference submittals in the appropriate daily report. Photographs shall be provided for unrestricted use by the Government.
1.3 SUPERVISION
Have at least one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during all working hours. In addition, if a Quality Control (QC) representative is required on the contract, then that individual shall also have fluent English communication skills.
Section 01 30 00 Page 2
1.4 PRECONSTRUCTION CONFERENCE
After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the value engineering and safety program, preparation of the schedule of prices or earned value report, shop drawings, and other submittals, scheduling programming, prosecution of the work, and clear expectations of the "Interim DD Form 1354" Submittal. Major subcontractors who will engage in the work shall also attend.
Preconstruction conference shall comply with FAR 52.236-26
At a minimum, the Contractor shall submit for government review and comment all of the preconstruction submittals noted above at the preconstruction conference, except for progress and completion photos (if required).
Initial base access list shall include the name, company, driver's license number and last four digits of social security number for those personnel that will initially require base access. See Summary of work 01 11 00 for more details on base access.
1.5 AVAILABILITY OF CADD DRAWING FILES
After award and upon request, the electronic "Computer-Aided Drafting and Design (CADD)" drawing files will only be made available to the Contractor for use in preparation of construction data related to the referenced contract subject to the following terms and conditions.
Data contained on these electronic files shall not be used for any purpose other than as a convenience in the preparation of construction data for the referenced project. Any other use or reuse shall be at the sole risk of the Contractor and without liability or legal exposure to the Government. The Contractor shall make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The Contractor shall, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.
These electronic CADD drawing files are not construction documents.
Differences may exist between the CADD files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic CADD files, nor does it make representation to the compatibility of these files with the Contractors hardware or software. In the event that a conflict arises between the signed and sealed construction documents prepared by the Government and the furnished CADD files, the signed and sealed construction documents shall govern. The Contractor is responsible for determining if any conflict exists. Use of these CADD files does not relieve the Contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work of all contractors for the project.
Section 01 30 00 Page 3
If the Contractor uses, duplicates and/or modifies these electronic CADD files for use in producing construction drawings and data related to this contract, all previous indicia of ownership (seals, logos, signatures, initials and dates) shall be removed.
1.6 ELECTRONIC MAIL (E-MAIL) ADDRESS
The Contractor shall establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments in Microsoft, Adobe Acrobat, and other similar formats. Within 10 days after contract award, the Contractor shall provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes, terrorist threats, etc. Multiple email address will not allowed.
It is the Contractor's responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field office(s). The Contractor shall promptly notify the Contracting Officer, in writing, of any changes to this email address.
Section 01 31 50 Page 1
SECTION 01 31 50
REQUEST FOR INFORMATION
1.1 RELATED DOCUMENTS
a. Drawings and general provisions of the Contract, including General and
Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
a. Section includes administrative provisions for coordinating Requests for Information by the Government, Architect or Contractor.
1.3 DEFINITIONS
a. Request for Information (RFI): A document submitted by the Contractor requesting information or clarification of a portion of the Contract
Documents that is required to properly perform the work.
(1) Requests shall clearly and concisely set forth the issue for which clarification or interpretation is sought and why a response is needed from the Government. On the RFI form, the Contractor shall include a detailed description of all information required in
Article 1.4 of this Section. The COR will respond to all Proper
RFIs, and will return Improper RFIs and Frivolous RFIs without action unless indicated otherwise.
b. Proper RFIs:
(1) Requests shall clearly and concisely set forth the issue for which clarification or interpretation is sought and why a response is needed from the Government. On the RFI form, the Contractor shall include a detailed description of all information required in
Article 1.4 of this Section. The COR will respond to all Proper
RFIs, and will return Improper RFIs and Frivolous RFIs without action unless indicated otherwise.
c. Improper RFIs:
(1) RFIs submitted by entities other than Contractor will be returned with no response.
(2) An Improper RFI can be identified by its lack of conformance to the requirements of Article 1.4 of this Section. Improper RFIs may be returned without action.
d. Frivolous RFIs:
(1) Frivolous RFIs are those that request information that is clearly shown on the Contract Documents.
(2) Frivolous RFIs may be returned without action or may be processed by the Government with costs for the related review effort, by the
Government and Architect/Engineer, being withheld from monies due the Contractor.
Section 01 31 50 Page 2
1.4 REQUESTS FOR INFORMATION (RFIS)
a. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.
(1) RFIs shall originate with Contractor. Government will return RFIs submitted to COR by other entities controlled by Contractor with no response.
(2) Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.
(3) Wherever possible, such clarification shall be requested at the next appropriate project meeting, with the response entered into the meeting minutes. When clarification at the meeting is not possible, either because of the urgency of the need, or the complexity of the item, Contractor shall prepare and submit an RFI to the COR.
(4) If clarification of an item is required of a document known to have been prepared by a consultant to the Architect, the Contractor may
NOT direct the RFI directly to the consultant. Each RFI shall be processed through the COR.
(5) In cases where RFIs are issued to request clarification of coordination issues, for example, pipe and duct routing, clearances, specific locations of work shown diagrammatically and similar items the Contractor shall fully lay out a suggested solution using drawings or sketches drawn to scale and submit same with the RFI. RFIs which fail to include a suggested solution will be returned Unanswered with a requirement that the Contractor submit a complete request.
(6) The Government may opt to retain RFIs for discussion during regularly scheduled project meetings for inclusion of responses in meeting minutes in lieu of responding in written form.
(7) Contractor shall endeavor to keep the number of RFI's to a minimum.
b. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
(1) Project name.
(2) Project number.
(3) Date.
(4) Name of Contractor.
(5) Name of Architect/Engineer.
(6) RFI number, numbered sequentially (Example: RFI #001).
(7) RFI subject.
(8) Specification Section number and title and related paragraphs, as appropriate.
(9) Drawing Sheet number and detail references, as appropriate.
(10) Field dimensions and conditions, as appropriate.
(11) Contractor's suggested resolution. If Contractor's suggested resolution impacts the Contract Time or the Contract Sum, Contractor shall state impact in the RFI.
(12) Contractor's signature.
(13) Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
A. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.
Section 01 31 50 Page 3
(14) Contractor’s requested date/time for response, however, this requested date/time for response is not a guarantee that the RFI will be answered by that date/time if the request is too expeditious.
c. RFI Forms: Contractor’s own Software-generated form with substantially the same content as indicated above, acceptable to Government.
(1) Attachments shall be electronic files in Adobe Acrobat PDF format.
(2) Identify each page of attachments with the RFI number and sequential page number.
(3) RFI's may be submitted by E-Mail.
d. Contracting Officer’s Representative (COR)'s and Architect/Engineer’s
Action:
(1) Contracting Officer’s Representative (COR) and Architect/Engineer will review each RFI, determine action required, and provide a response to the Contractor. Allow seven working days for COR's response for each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day.
(2) The Government will endeavor to respond in less time. If additional time is required beyond the maximum number of days specified, the
Architect/Engineer will notify the COR who will then notify the
Contractor in writing.
(3) Improper RFIs: The following Contractor-generated RFIs will be returned without action:
A. Requests for approval of submittals.
B. Requests for approval of substitutions.
C. Requests for approval of Contractor's means and methods.
D. Requests for coordination information already indicated in the
Contract
Documents.
E. Requests for changes that entail additional cost or credit.
F. Requests for adjustments in the Contract Time or the Contract Sum.
G. Requests for interpretation of COR's actions on submittals.
H. Incomplete RFIs or inaccurately prepared RFIs.
(4) COR’s or Architect's action may include a request for additional information, in which case the time for response will date from time of receipt of additional information.
(5) COR’s or Architect's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for
Contractor to submit Change Proposal according to Division 01
Section "Contract Modification Procedures."
a. If Contractor believes the RFI response warrants change in the
Contract Time or the Contract Sum, notify Contracting Officer’s
Representative and in writing within 10 days of receipt of the RFI response.
b. Answered RFIs shall not be construed as approval to perform extra work that may involve a change in the Contract Time or the Contract
Sum.
e. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number. Submit log at the time of the construction progress meetings. Software log with not less than the following:
(1) Project name.
(2) Name and address of Contractor.
(3) Name and address of Contracting Officer’s Representative (COR).
Section 01 31 50 Page 4
(4) RFI number including RFIs that were returned without action or withdrawn.
(5) RFI description.
(6) Date the RFI was submitted.
(7) Date Contracting Officer’s Representative (COR)’s response was received.
(8) Identification of related Minor Change in the Work, Construction
Change Directive, and Proposal Request, as appropriate.
(9) Identification of related Field Order, Work Change Directive, and
Proposal Request, as appropriate.
f. On receipt of COR’s action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify COR within seven days if Contractor disagrees with response.
NOT USED
NOT USED
Section 01 32 01.00 10 Page 1
SECTION 01 32 01.00 10
PROJECT SCHEDULE
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Project Schedule; G
1.2 PROJECT SCHEDULER QUALIFICATIONS
Designate an authorized representative to be responsible for the preparation of the schedule and all required updating (activity status) and preparation of reports. The authorized representative shall be experienced in scheduling and have previously developed, created, and maintained at least two electronic schedules for projects similar in nature and complexity to this project. This authorized representative shall be experienced in the use of scheduling software that meets the requirements of this specification.
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, pursuant to the Contract Clause, SCHEDULE FOR CONSTRUCTION CONTRACTS. Show in the schedule the sequence in which the Contractor proposes to perform the work and dates on which the Contractor contemplates starting and completing all schedule activities. The scheduling of the entire project is required.
Contractor management personnel shall actively participate in its development. Subcontractors and suppliers working on the project shall also contribute in developing and maintaining an accurate Project Schedule.
Provide a schedule that is a forward planning as well as a project monitoring tool.
3.1.1 Approved Project Schedule
Use the approved Project Schedule to measure the progress of the work and to aid in evaluating time extensions. Make the schedule cost loaded and activity coded. The schedule will provide the basis for all progress payments. If the Contractor fails to submit any schedule within the time
Section 01 32 01.00 10 Page 2 prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
3.1.2 Schedule Status Reports
Provide a Schedule Status Report on at least a monthly basis. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, take steps necessary to improve its progress including those that may be required by the Contracting Officer, without additional cost to the
Government. In this circumstance, the Contracting Officer may require the
Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
3.1.3 Default Terms
Failure of the Contractor to comply with the requirements of the Contracting
Officer shall be grounds for a determination, by the Contracting Officer, that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of the contract.
3.2 BASIS FOR PAYMENT AND COST LOADING
Use the schedule as the basis for determining contract earnings during each update period and therefore the amount of each progress payment. Site supervision and submittals cannot be considered as line items individually, but shall be included in the appropriate line items. Lack of an approved schedule update, or qualified scheduling personnel, will result in the inability of the Contracting Officer to evaluate contract earned value for the purposes of payment. Failure of the Contractor to provide all required information will result in the disapproval of the preliminary, initial and subsequent schedule updates. In the event schedule revisions are directed by the Contracting Officer and those revisions have not been included in subsequent revisions or updates, the Contracting Officer may hold retainage up to the maximum allowed by contract, each payment period, until such revisions to the Project Schedule have been made. Activity cost loading shall be reasonable, as determined by the Contracting Officer. The aggregate value of all activities coded to a contract CLIN shall equal the value of the CLIN on the Schedule.
3.2.1 Activity Cost Loading
Activity cost loading shall be reasonable and without front-end loading.
Provide additional documentation to demonstrate reasonableness if requested by the Contracting Officer.
3.2.2 Withholdings/Payment Rejection
Failure to meet the requirements of this specification may result in the disapproval of the preliminary, initial or periodic schedule updates and subsequent rejection of payment requests until compliance is met.
Section 01 32 01.00 10 Page 3
In the event that the Contracting Officer directs schedule revisions and those revisions have not been included in subsequent project schedule revisions or updates, the Contracting Officer may withhold 10 percent of pay request amount from each payment period until such revisions to the project schedule have been made.
3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS
The computer software system utilized to produce and update the Project
Schedule shall be capable of meeting all requirements of this specification.
Project Schedule shall be a Gantt chart and clearly indicate the critical path. Each activity shall be cost-loaded consistent with the Schedule of
Values. The original baseline schedule shall indicate the total percent complete projected for each payment period of the project. The updated schedules submitted with payment requests shall continue to show the original baseline schedule, as well actual project progress and actual project percent complete for work through the current payment period.
3.3.1 Critical Path Method
Use the Critical Path Method (CPM) of network calculation to generate the
Project Schedule.
3.3.2 Level of Detail Required
Develop the Project Schedule to an appropriate level of detail. Failure to develop the Project Schedule to an appropriate level of detail, as determined by the Contracting Officer, will result in its disapproval. The
Contracting Officer will consider, but is not limited to, the following characteristics and requirements to determine appropriate level of detail:
3.3.2.1 Activity Durations
Reasonable activity durations are those that allow the progress of ongoing activities to be accurately determined between update periods. Less than 2 percent of all non-procurement activities shall have Original Durations (OD) greater than 20 work days or 30 calendar days. Procurement activities are defined herein.
3.3.2.2 Procurement Activities
The schedule shall include activities associated with the submittal, approval, procurement, fabrication and delivery of long lead materials, equipment, fabricated assemblies and supplies. Long lead procurement activities are those with an anticipated procurement sequence of over 90 calendar days. A typical procurement sequence includes the string of activities: submit, approve, procure, fabricate, and deliver.
3.4 REQUESTS FOR TIME EXTENSIONS
In the event the Contractor believes it is entitled to an extension of the contract performance period, completion date, or any interim milestone date, furnish the following for a determination by the Contracting Officer:
justification, project schedule data, and supporting evidence as the
Contracting Officer may deem necessary. Submission of proof of excusable delay, based on revised activity logic, duration, and costs (updated to the
Section 01 32 01.00 10 Page 4 specific date that the delay occurred) is a condition precedent to any approvals by the Government. In response to each Request For Proposal issued by the Government, submit a schedule impact analysis demonstrating whether or not the change contemplated by the Government impacts the critical path.
3.4.1 Justification of Delay
The project schedule shall clearly display that the Contractor has used, in full, all the float time available for the work involved with this request.
The Contracting Officer's determination as to the number of allowable days of contract extension shall be based upon the project schedule updates in effect for the time period in question, and other factual information.
Actual delays that are found to be caused by the Contractor's own actions, which result in a calculated schedule delay, will not be a cause for an extension to the performance period, completion date, or any interim milestone date.
3.5 PROGRESS MEETINGS
a. Meet bi-weekly with the Government (or as otherwise mutually agreed to) for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress and to review planned activities for the upcoming two weeks. The then current and approved schedule update shall be used for the purposes of this meeting and for the production and review of reports. The Contractor's Project Manager and the Authorized Representative of the Contracting Officer shall attend.
The progress meeting will address the status of RFI's, RFP's and
Submittals.
c. The Government and the Contractor shall jointly review the reports. If it appears that activities on the longest path(s) which are currently driving the calculated completion date (driving activities), are not progressing satisfactorily and therefore could jeopardize timely project completion, corrective action shall be taken immediately.
Corrective action includes but is not limited to: increasing the number of work crews; increasing the number of work shifts; increasing the number of hours worked per shift; and determining if Government responsibility coded activities require Government corrective action.
Section 01 32 16.00 20 Page 1
SECTION 01 32 16.00 20
CONSTRUCTION PROGRESS DOCUMENTATION
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33
00 SUBMITTAL PROCEDURES:
1.2
SD-01 Preconstruction Submittals
Construction schedule; G
ACCEPTANCE
Prior to the start of work, prepare and submit to the Contracting Officer for acceptance a construction schedule in accordance with the terms in Contract Clause "FAR 52.236-15, Schedules for Construction Contracts," except as modified in this contract. Acceptance of an error free Baseline Schedule and updates is a condition precedent to processing the Contractor's pay request.
1.3 UPDATED SCHEDULES
Update the Construction schedule at monthly intervals or when the progress changes the schedule. Present the baseline schedule in a Gantt chart ON ONE PAGE. Monthly payments require project progress of each element on the Gantt chart for comparison with the baseline schedule. The updated schedule shall be kept current, reflection actual activity progress and plan for completing the remaining work. Submit copies of purchase orders and confirmation of delivery dates as directed.
Update the Construction schedule at monthly payment request intervals or when the progress changes the schedule and include the updated schedule with each payment application, showing work completed through the payment interval. The updated schedule shall be kept current, reflecting actual activity progress and the plan for completing the remaining work. Submit copies of purchase orders and confirmation of delivery dates as directed.
1.4 3-WEEK LOOK AHEAD SCHEDULE
The Contractor shall prepare and issue a 3-Week Look Ahead schedule to provide a more detailed day-to-day plan of upcoming work identified on the Construction Schedule. The work plans shall be keyed to activity numbers when a NAS is required and updated each week to show the planned work for the current and following two-week period. Additionally, include upcoming outages, closures, preparatory meetings, and initial meetings. Identify critical path activities on the Three-Week Look Ahead Schedule. The detail work plans are to be bar chart type schedules, maintained separately from the Construction Schedule on an electronic spreadsheet program and printed on 8 ½ by 11 sheets as directed by the Contracting Officer. Activities
Section 01 32 16.00 20 Page 2 shall not exceed 5 working days in duration and have sufficient level of detail to assign crews, tools and equipment required to complete the work.
Three hard copies and one electronic file of the 3-Week Look Ahead Schedule shall be delivered to the Contracting Officer no later than 8 a.m. each Monday and reviewed during the weekly CQC Coordination Meeting.
1.5 CORRESPONDENCE AND TEST REPORTS:
All correspondence (e.g., letters, Requests for Information (RFIs), e-mails, meeting minute items, Production and QC Daily Reports, material delivery tickets, photographs, etc.) shall reference Schedule activities that are being addressed. All test reports (e.g., concrete, soil compaction, weld, pressure, etc.) shall reference schedule activities that are being addressed.
Section 01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
1.1 SUMMARY
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
All submittals, with the exception of samples, will be submitted electronically. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Contractor to check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified.