RFIs Answered (23-R-0001).xls
XLS spreadsheet 44 KB Posted
- Attached to
- Repair Base Perimeter Fence
- Solicitation number
- W50S8W23R0001
- Issued by
-
Department of the Army National Guard
About this file
This document contains answers to questions regarding solicitation number W50S8W23R0001 for repairing a base perimeter fence. The solicitation requires bids to include a bid bond submitted with the proposal by June 12, 2023. Performance and payment bonds are due within 10 days of awarding the contract. The solicitation was issued by the Department of the Army National Guard to repair a perimeter fence at a base.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions
| No. | Topic | Reference Document | Question | Type | Govt Response |
| 1 | Bid Bonds | SF-1442 Document Page 1 & Page 13 | Can you please verify when the bid bond is due? I noticed the SF-1442 states "within 10 days of award", but later in the submission instructions it states that it : |
"Please note that the Bid Bond must be received by the Contract Specialist on or before the proposal due date and time" which would be 6/12/23 Contractual On the SF-1442 page 1 block 12A states “Performance and Payment Bonds” are due within 10 days after contract award. Page 13 then states “A bid bond is required with submission of proposal”.
Block 12A of SF-1442 is correct, performance and payments bonds due within 10 days (after award of the contract). So those are not required to be submitted at time of proposal. Only the bid bond is required to be submitted on or before submission of proposal.