B.08 Attachment 6 - Schedule B (23-R-0001).pdf
PDF 77 KB Posted
- Attached to
- Repair Base Perimeter Fence
- Solicitation number
- W50S8W23R0001
- Issued by
-
Department of the Army National Guard
About this file
This document is an Independent Government Cost Estimate (IGCE) for solicitation number W50S8W23R0001 to repair a base perimeter fence for the Department of the Army National Guard. The IGCE provides estimated costs for labor, materials, equipment, and other direct and indirect costs required to complete the project from June 2023 through May 2024. Direct labor estimates include over 700 estimated hours for design technicians, supervisors, laborers, and skilled trades at fully burdened hourly rates. Material and service costs cover items like fencing, gates, concrete, asphalt repair, erosion control, and mobilization. The IGCE applies overhead rates of 0% to labor, other direct costs, and materials/services. A profit rate of 0% is included for the total estimated cost. The total estimated cost to repair the base perimeter fence is [dollar amount redacted].
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
ESTIMATED COST
W/OUT FULLY BURDEN
TOTAL ESTIMATED COST
(DO NOT INCLUDE FRINGE
HERE) ($)
ESTIMATED COST ($)
TOTAL ESTIMATED
COST ($)
ESTIMATED COST ($)
TOTAL ESTIMATED
COST ($)
ESTIMATED COST ($)
TOTAL ESTIMATED
COST ($)
ESTIMATED COST ($)
TOTAL ESTIMATED
COST ($)
ESTIMATED COST ($)
TOTAL ESTIMATED
COST ($)
ESTIMATED COST ($)
TOTAL ESTIMATED
COST ($)
Other Security Measures 1 $ -
5. FRINGE BENEFITS RATE (%)
TOTAL DIRECT
Sidewalk, Concrete 4 inch
Fence, Chain Link, 84", with 3 Strands Barbed Wire (non-Anti Ramming)
10' Slide Gate
Fence, Chain Link, 84", with 3 Strands Barbed Wire and cable (Anti Ramming)
Repair asphalt and concrete areas
Fence, Removal
Fence Gate, Adjustment
Erosion Control, Silt Fence
Fence, Temporary Barrier
Temporary Fence Relocation
0% $ -
1. SOLICITATION NUBMER & TITLE: W50S8W-23-R-0001 - Repair Perimeter Fence
2. PROJECT MANAGER:
Brooks Harris, P.E.
3. PERIOD OF PERFORMANCE*
FROM TO
Thu, 01-Jun-23 Fri, 31-May-24
6. LABOR OVERHEAD RATE (%)
TOTAL 4, 5
0% $ -
1 $ -
DESCRIPTION OF COST ELEMENTS
4. DIRECT LABOR (List Labor Cat) ESTIMATED HOURS / QTY RATE/UNIT COST ($)
140 $ -
SUBTOTAL
Design technician (Design Build) 160 $ -
Supervisor
Laborer 240 $ -
Skilled Trades 58
9. G&A RATE (%)
TOTAL 4, 5, 6, 7, 8
0% $ -
SUBTOTAL COSTS
*Each period of performance requires an IGE (base award and all optional periods or tasks.)
SUBTOTAL
SCHEDULE B - PRICE SHEET
8. OTHER DIRECT COSTS
Travel
11. GRAND TOTAL ESTIMATED COST
7. MATERIALS/SERVICES (Excluding Information Technology (IT)
Mobilization
SUBTOTAL
1 $ -
10. PROFIT RATE (%)
Designer (Design Build) 45 $ -
TOTAL 10
0% $ -
CUI
File details come from the government source that posted it. Updated .