This document is an Independent Government Cost Estimate (IGCE) for solicitation number W50S8W23R0001 to repair a base perimeter fence for the Department of the Army National Guard. The IGCE provides estimated costs for labor, materials, equipment, and other direct and indirect costs required to complete the project from June 2023 through May 2024. Direct labor estimates include over 700 estimated hours for design technicians, supervisors, laborers, and skilled trades at fully burdened hourly rates. Material and service costs cover items like fencing, gates, concrete, asphalt repair, erosion control, and mobilization. The IGCE applies overhead rates of 0% to labor, other direct costs, and materials/services. A profit rate of 0% is included for the total estimated cost. The total estimated cost to repair the base perimeter fence is [dollar amount redacted].

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

ESTIMATED COST

W/OUT FULLY BURDEN

TOTAL ESTIMATED COST

(DO NOT INCLUDE FRINGE

HERE) ($)

ESTIMATED COST ($)

TOTAL ESTIMATED

COST ($)

ESTIMATED COST ($)

TOTAL ESTIMATED

COST ($)

ESTIMATED COST ($)

TOTAL ESTIMATED

COST ($)

ESTIMATED COST ($)

TOTAL ESTIMATED

COST ($)

ESTIMATED COST ($)

TOTAL ESTIMATED

COST ($)

ESTIMATED COST ($)

TOTAL ESTIMATED

COST ($)

Other Security Measures 1 $ -

5. FRINGE BENEFITS RATE (%)

TOTAL DIRECT

Sidewalk, Concrete 4 inch

Fence, Chain Link, 84", with 3 Strands Barbed Wire (non-Anti Ramming)

10' Slide Gate

Fence, Chain Link, 84", with 3 Strands Barbed Wire and cable (Anti Ramming)

Repair asphalt and concrete areas

Fence, Removal

Fence Gate, Adjustment

Erosion Control, Silt Fence

Fence, Temporary Barrier

Temporary Fence Relocation

0% $ -

1. SOLICITATION NUBMER & TITLE: W50S8W-23-R-0001 - Repair Perimeter Fence

2. PROJECT MANAGER:

Brooks Harris, P.E.

3. PERIOD OF PERFORMANCE*

FROM TO

Thu, 01-Jun-23 Fri, 31-May-24

6. LABOR OVERHEAD RATE (%)

TOTAL 4, 5

0% $ -

1 $ -

DESCRIPTION OF COST ELEMENTS

4. DIRECT LABOR (List Labor Cat) ESTIMATED HOURS / QTY RATE/UNIT COST ($)

140 $ -

SUBTOTAL

Design technician (Design Build) 160 $ -

Supervisor

Laborer 240 $ -

Skilled Trades 58

9. G&A RATE (%)

TOTAL 4, 5, 6, 7, 8

0% $ -

SUBTOTAL COSTS

*Each period of performance requires an IGE (base award and all optional periods or tasks.)

SUBTOTAL

SCHEDULE B - PRICE SHEET

8. OTHER DIRECT COSTS

Travel

11. GRAND TOTAL ESTIMATED COST

7. MATERIALS/SERVICES (Excluding Information Technology (IT)

Mobilization

SUBTOTAL

1 $ -

10. PROFIT RATE (%)

Designer (Design Build) 45 $ -

TOTAL 10

0% $ -